Notice of Availability of the Draft Supplemental Environmental Impact Statement and the Draft Resource Management Plan Amendment for the Proposed Silver State Solar South Project in Clark County Near Primm, NV, 62525-62526 [2012-25288]
Download as PDF
Federal Register / Vol. 77, No. 199 / Monday, October 15, 2012 / Notices
Jean Sonneman,
Bureau of Land Management, Information
Collection Clearance Officer.
[FR Doc. 2012–25287 Filed 10–12–12; 8:45 am]
BILLING CODE 4310–84–P
DEPARTMENT OF THE INTERIOR
Bureau of Land Management
[LLNVS03000. L51010000.ER0000.
LVRWF1204100; N–85801, N–89530, N–
90050, and N–90823; MO#4500039783; TAS:
14X5017]
Notice of Availability of the Draft
Supplemental Environmental Impact
Statement and the Draft Resource
Management Plan Amendment for the
Proposed Silver State Solar South
Project in Clark County Near Primm,
NV
Bureau of Land Management,
Interior.
ACTION: Notice of Availability.
AGENCY:
In accordance with the
National Environmental Policy Act of
1969, as amended (NEPA), and the
Federal Land Policy and Management
Act of 1976, as amended, the Bureau of
Land Management (BLM) has prepared
a Draft Supplemental Environmental
Impact Statement (EIS) and a Draft
Resource Management Plan (RMP)
Amendment for the proposed Silver
State Solar South Project located on
public lands east of Primm, Nevada, and
by this notice is announcing the
opening of the comment period.
DATES: To ensure that comments will be
considered, the BLM must receive
written comments on the Draft
Supplementary EIS and the Draft RMP
Amendment within 90 days following
the date the Environmental Protection
Agency publishes its Notice of
Availability in the Federal Register. The
BLM will announce future meetings or
hearings and any other public
involvement activities at least 15 days
in advance through public notices,
media releases, and/or mailings.
ADDRESSES: You may submit comments
related to the Silver State Solar South
Project by any of the following methods:
• Web site: https://www.blm.gov/nv/st/
en/fo/lvfo/blm_programs/energy/
Silver_State_Solar_South.html.
• Email:
SilverStateSouthEIS@blm.gov.
• Fax: 702–515–5155, attention
Gregory Helseth.
• Mail: Bureau of Land Management,
Las Vegas Field Office, Attn: Gregory
Helseth, 4701 North Torrey Pines Drive,
Las Vegas, NV 89130–2301.
erowe on DSK2VPTVN1PROD with
SUMMARY:
VerDate Mar<15>2010
15:21 Oct 12, 2012
Jkt 229001
Copies of the Silver State Solar South
Project Draft Supplemental EIS and the
Draft RMP Amendment are available in
the BLM Southern Nevada District
Office at the above address and on the
project Web site.
FOR FURTHER INFORMATION CONTACT:
Gregory Helseth, Renewable Energy
Project Manager, at 702–515–5173; or
address 4701 North Torrey Pines Drive,
Las Vegas, Nevada 89130–2301; or email
ghelseth@blm.gov. Persons who use a
telecommunications device for the deaf
(TDD) may call the Federal Information
Relay Service (FIRS) at 1–800–877–8339
to contact the above individual during
normal business hours. The FIRS is
available 24 hours a day, 7 days a week,
to leave a message or question with the
above individual. You will receive a
reply during normal business hours.
SUPPLEMENTARY INFORMATION: Silver
State Solar, LLC, has submitted a rightof-way (ROW) application for the
construction, operation, maintenance,
and termination of a solar energy
generation facility on 13,183 acres of
public land east of Primm, Nevada. The
ROW application is assigned BLM case
number N–89530. This application
expands on the previously considered
ROW application N–85801. The
proposed solar energy project would
consist of photovoltaic (PV) panels and
related infrastructure ROW
appurtenances, including a substation
and switchyard facilities, and would
produce about 350 megawatts (MW) of
electricity. The solar field and
infrastructure would consist of singleaxis tracker systems or fixed panels, an
underground and overhead electrical
power collection system, two step-up
transformers, 230 kilovolt (kV) and 220
kV transmission lines, an operation and
maintenance area, a switchyard, paved
access and maintenance roads, flood
and drainage controls, and a fire break.
The Silver State Solar South Project
Draft Supplemental EIS will address the
new application N–89530 and update as
necessary the consideration of N–85801,
which was initially analyzed in the
Final EIS for the Silver State Solar North
Project. The approved Silver State Solar
North Project did not authorize ROW
application N–85801. The BLM
approved a Record of Decision on
October 12, 2010, for the Silver State
Solar North Project and authorized
ROW N–85077 for the construction and
operation of a 50 MW PV solar energy
facility on 618 acres of BLM
administered lands adjacent to the
Silver State South project area. The
application for N–85801 is now
included as part of the Silver State Solar
South Project, along with ROW
PO 00000
Frm 00036
Fmt 4703
Sfmt 4703
62525
application N–89530. If the BLM
approves ROW application N–89530,
the BLM will also need to amend the
October 1998 Las Vegas RMP to address
proposed changes in land and resource
use within the Jean Lake/Roach Lake
Special Recreation Management Area
(SRMA).
The Draft Supplemental EIS analyzes
the site-specific impacts on air quality,
biological resources, cultural resources,
special designations (SRMA), water
resources, and geological resources and
hazards. The document will also
analyze land and airspace use, noise,
paleontological resources, public health,
socioeconomics, soils, traffic and
transportation, visual resources,
wilderness characteristics, waste
management, worker safety, fire
protection, and hazardous materials
handling; as well as facility-design
engineering, efficiency, reliability,
transmission-system engineering,
transmission line safety, and nuisance
issues.
By this notice, the BLM is complying
with requirements in 43 CFR 1610.2(c)
to notify the public of potential
amendments to land use plans. The
BLM will integrate the land use
planning process with the NEPA
process for this project. Besides the
SRMA, the BLM will consider
additional plan amendments to the Las
Vegas RMP, including a proposed
nomination for an Area of Critical
Environmental Concern (ACEC) within
the Ivanpah Valley and a Visual
Resource Management (VRM) change
within the project boundary from Class
III to Class IV.
As required by 43 C.F.R. 1610.7–2(b),
the BLM is also taking public comments
on the proposed ACEC. In order to
adequately protect the relevant and
important values in the proposed
40,180-acre ACEC, the BLM is
evaluating whether to impose the
following new restrictions:
Æ Retaining the lands in Federal
ownership;
Æ Allowing facilities that provide
resource protection;
Æ Enhancing the relevant and
important (R&I) values and/or
addressing human health and safety on
a case-by-case basis;
Æ Imposing a linear ROW avoidance
restriction;
Æ Excluding large site-type ROWs
(greater than 5 acres);
Æ Restoring temporary disturbances
to meet the standard BLM restoration
standards; and
Æ Allowing land use authorizations
and small site-type ROWs (5 acres or
less) on a case-by-case basis.
E:\FR\FM\15OCN1.SGM
15OCN1
erowe on DSK2VPTVN1PROD with
62526
Federal Register / Vol. 77, No. 199 / Monday, October 15, 2012 / Notices
The proposed ACEC would be open to
locatable mineral development and
closed to solid leasable mineral
development. Fluid leasable mineral
development would be allowed with
controlled surface use restrictions; the
BLM may require that a proposed
facility or activity be relocated by more
than 200 meters from a proposed
location as necessary to achieve the
desired level of resource protection.
Saleable mineral disposals that provide
resource protection, enhancement of the
R&I values and/or address human health
and safety would be allowed on a caseby-case basis.
The proposed ACEC would be closed
to livestock grazing.
The BLM would limit development of
recreation facilities to those necessary
for resource protection only. Offhighway vehicle (OHV) use would be
limited to designated routes, and
permitted non-speed recreation
activities in the ACEC would require a
desert tortoise spotter during the
tortoise active season. In addition, the
BLM would monitor the activities to
ensure tortoises are not affected.
For sensitive species, the BLM would
allow prescribed fire use to meet
resource objectives and habitat
enhancement purposes in appropriate
areas to support habitat recovery
objectives and allow use of approved
herbicides following ground-disturbing
activities in order to implement invasive
species control methods and support
habitat recovery objectives. Military
maneuvers would not be authorized.
Activities that result in loss or
degradation of tortoise habitat would
require reclamation so that predisturbance conditions may be reached
within a reasonable time frame;
reclamation may include, but is not
limited to, salvaging and transplanting
cactus and yucca, recontouring of the
area, scarifying compacted soil, adding
soil amendments, seeding, and
transplanting of seedling shrubs.
Subsequent seeding or transplanting
efforts may be required if monitoring
indicates that the original effort was not
successful. Alternative B and C would
not designate an ACEC; however, the
BLM would manage the area as part of
an SRMA.
The visual resource class change from
Class III to Class IV would only apply
to the project site and applies to
alternatives B, C and D.
The BLM will use and coordinate the
NEPA comment process to satisfy the
public involvement process for Section
106 of the National Historic
Preservation Act (16 U.S.C. 470(f)) as
provided for in 36 CFR 800.2(d)(3).
Native American tribal consultations
VerDate Mar<15>2010
15:21 Oct 12, 2012
Jkt 229001
have been conducted in accordance
with policy. Tribal concerns have been
given due consideration, including
impacts on Indian trust assets.
The Draft Supplemental EIS analyzes
four alternatives, including the no
action alternative (Alternative A) and
three action alternatives. Alternative B
is Silver State’s original proposal (as
described in its Plan of Development
dated July 2011). This alternative was
introduced in initial scoping meetings
and does not include perimeter roads.
Alternative B would disturb up to 3,855
acres of Federal land. Alternative C
would disturb up to 2,515 acres of
Federal lands, and includes the project
layout for Phases II and III that was
previously evaluated in the 2010 Final
EIS. Alternative D would disturb up to
3,091 acres of Federal land and is a
modified layout of Silver State’s original
proposal (Alternative B above) to allow
access through a historically used
recreation route.
The BLM is required to select a
preferred alternative for the RMP
amendment; this decision is separate
from whether a preferred alternative is
identified for the proposed project. The
BLM preferred alternative for the RMP
amendment identified in the Draft
Supplemental EIS is to (1) Reduce the
acreage of the SRMA by the project
footprint (if approved) and (2) To
change the VRM class from VRM Class
III to IV for the project footprint (if
approved). There is no BLM preferred
project alternative identified in the Draft
Supplemental EIS so that the BLM can
make best use of public input to reach
an informed decision. Formal scoping
for the project occurred from September
1 to October 31, 2011 (74 FR 31306).
The BLM received a total of 55 comment
submissions during the scoping period,
identifying 201 issues. The comments
identified concerns in a broad range of
categories, including OHV access;
recreation; socioeconomic resources;
federally listed species and their habitat,
including desert tortoise habitat and
rare plants; surface water/storm runoff;
alternatives for analysis; and cumulative
impacts.
Maps of the proposed project area and
the alternatives being analyzed in the
Draft Supplemental EIS are available at
the BLM Southern Nevada District
Office and the Southern Nevada BLM
energy Web site cited above. Please note
that public comments and information
submitted including names, street
addresses, and email addresses of
persons who submit comments will be
available for public review and
disclosure at the above address during
regular business hours (8 a.m. to 4 p.m.),
PO 00000
Frm 00037
Fmt 4703
Sfmt 4703
Monday through Friday, except
holidays.
Before including your address, phone
number, email address, or other
personal identifying information in your
comment, you should be aware that
your entire comment—including your
personal identifying information—may
be made publicly available at any time.
While you can ask us in your comment
to withhold your personal identifying
information from public review, we
cannot guarantee that we will be able to
do so.
Authority: 40 CFR 1506.6, 40 CFR
1506.10, 43 CFR 16.
Vanessa Hice,
Assistant Field Manager, Division of Lands.
[FR Doc. 2012–25288 Filed 10–12–12; 8:45 am]
BILLING CODE 4310–HC–P
DEPARTMENT OF THE INTERIOR
Bureau of Land Management
[LLMT926000–L14200000–BJ0000]
Notice of Filing of Plats of Survey;
South Dakota
Bureau of Land Management,
Interior.
ACTION: Notice of filing of plats of
survey.
AGENCY:
The Bureau of Land
Management (BLM) will file the plat of
survey of the lands described below in
the BLM Montana State Office, Billings,
Montana, on November 14, 2012.
DATES: Protests of the survey must be
filed before November 14, 2012 to be
considered.
SUMMARY:
Protests of the survey
should be sent to the Branch of
Cadastral Survey, Bureau of Land
Management, 5001 Southgate Drive,
Billings, Montana 59101–4669.
ADDRESSES:
FOR FURTHER INFORMATION CONTACT:
Marvin Montoya, Cadastral Surveyor,
Branch of Cadastral Survey, Bureau of
Land Management, 5001 Southgate
Drive, Billings, Montana 59101–4669,
telephone (406) 896–5124 or (406) 896–
5009, Marvin_Montoya@blm.gov.
Persons who use a telecommunications
device for the deaf (TDD) may call the
Federal Information Relay Service
(FIRS) at 1–800–877–8339 to contact the
above individual during normal
business hours. The FIRS is available 24
hours a day, 7 days a week, to leave a
message or question with the above
individual. You will receive a reply
during normal business hours.
SUPPLEMENTARY INFORMATION: This
survey was executed at the request of
E:\FR\FM\15OCN1.SGM
15OCN1
Agencies
[Federal Register Volume 77, Number 199 (Monday, October 15, 2012)]
[Notices]
[Pages 62525-62526]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-25288]
-----------------------------------------------------------------------
DEPARTMENT OF THE INTERIOR
Bureau of Land Management
[LLNVS03000. L51010000.ER0000. LVRWF1204100; N-85801, N-89530, N-90050,
and N-90823; MO4500039783; TAS: 14X5017]
Notice of Availability of the Draft Supplemental Environmental
Impact Statement and the Draft Resource Management Plan Amendment for
the Proposed Silver State Solar South Project in Clark County Near
Primm, NV
AGENCY: Bureau of Land Management, Interior.
ACTION: Notice of Availability.
-----------------------------------------------------------------------
SUMMARY: In accordance with the National Environmental Policy Act of
1969, as amended (NEPA), and the Federal Land Policy and Management Act
of 1976, as amended, the Bureau of Land Management (BLM) has prepared a
Draft Supplemental Environmental Impact Statement (EIS) and a Draft
Resource Management Plan (RMP) Amendment for the proposed Silver State
Solar South Project located on public lands east of Primm, Nevada, and
by this notice is announcing the opening of the comment period.
DATES: To ensure that comments will be considered, the BLM must receive
written comments on the Draft Supplementary EIS and the Draft RMP
Amendment within 90 days following the date the Environmental
Protection Agency publishes its Notice of Availability in the Federal
Register. The BLM will announce future meetings or hearings and any
other public involvement activities at least 15 days in advance through
public notices, media releases, and/or mailings.
ADDRESSES: You may submit comments related to the Silver State Solar
South Project by any of the following methods:
Web site: https://www.blm.gov/nv/st/en/fo/lvfo/blm_programs/energy/Silver_State_Solar_South.html.
Email: SilverStateSouthEIS@blm.gov.
Fax: 702-515-5155, attention Gregory Helseth.
Mail: Bureau of Land Management, Las Vegas Field Office,
Attn: Gregory Helseth, 4701 North Torrey Pines Drive, Las Vegas, NV
89130-2301.
Copies of the Silver State Solar South Project Draft Supplemental EIS
and the Draft RMP Amendment are available in the BLM Southern Nevada
District Office at the above address and on the project Web site.
FOR FURTHER INFORMATION CONTACT: Gregory Helseth, Renewable Energy
Project Manager, at 702-515-5173; or address 4701 North Torrey Pines
Drive, Las Vegas, Nevada 89130-2301; or email ghelseth@blm.gov. Persons
who use a telecommunications device for the deaf (TDD) may call the
Federal Information Relay Service (FIRS) at 1-800-877-8339 to contact
the above individual during normal business hours. The FIRS is
available 24 hours a day, 7 days a week, to leave a message or question
with the above individual. You will receive a reply during normal
business hours.
SUPPLEMENTARY INFORMATION: Silver State Solar, LLC, has submitted a
right-of-way (ROW) application for the construction, operation,
maintenance, and termination of a solar energy generation facility on
13,183 acres of public land east of Primm, Nevada. The ROW application
is assigned BLM case number N-89530. This application expands on the
previously considered ROW application N-85801. The proposed solar
energy project would consist of photovoltaic (PV) panels and related
infrastructure ROW appurtenances, including a substation and switchyard
facilities, and would produce about 350 megawatts (MW) of electricity.
The solar field and infrastructure would consist of single-axis tracker
systems or fixed panels, an underground and overhead electrical power
collection system, two step-up transformers, 230 kilovolt (kV) and 220
kV transmission lines, an operation and maintenance area, a switchyard,
paved access and maintenance roads, flood and drainage controls, and a
fire break.
The Silver State Solar South Project Draft Supplemental EIS will
address the new application N-89530 and update as necessary the
consideration of N-85801, which was initially analyzed in the Final EIS
for the Silver State Solar North Project. The approved Silver State
Solar North Project did not authorize ROW application N-85801. The BLM
approved a Record of Decision on October 12, 2010, for the Silver State
Solar North Project and authorized ROW N-85077 for the construction and
operation of a 50 MW PV solar energy facility on 618 acres of BLM
administered lands adjacent to the Silver State South project area. The
application for N-85801 is now included as part of the Silver State
Solar South Project, along with ROW application N-89530. If the BLM
approves ROW application N-89530, the BLM will also need to amend the
October 1998 Las Vegas RMP to address proposed changes in land and
resource use within the Jean Lake/Roach Lake Special Recreation
Management Area (SRMA).
The Draft Supplemental EIS analyzes the site-specific impacts on
air quality, biological resources, cultural resources, special
designations (SRMA), water resources, and geological resources and
hazards. The document will also analyze land and airspace use, noise,
paleontological resources, public health, socioeconomics, soils,
traffic and transportation, visual resources, wilderness
characteristics, waste management, worker safety, fire protection, and
hazardous materials handling; as well as facility-design engineering,
efficiency, reliability, transmission-system engineering, transmission
line safety, and nuisance issues.
By this notice, the BLM is complying with requirements in 43 CFR
1610.2(c) to notify the public of potential amendments to land use
plans. The BLM will integrate the land use planning process with the
NEPA process for this project. Besides the SRMA, the BLM will consider
additional plan amendments to the Las Vegas RMP, including a proposed
nomination for an Area of Critical Environmental Concern (ACEC) within
the Ivanpah Valley and a Visual Resource Management (VRM) change within
the project boundary from Class III to Class IV.
As required by 43 C.F.R. 1610.7-2(b), the BLM is also taking public
comments on the proposed ACEC. In order to adequately protect the
relevant and important values in the proposed 40,180-acre ACEC, the BLM
is evaluating whether to impose the following new restrictions:
[cir] Retaining the lands in Federal ownership;
[cir] Allowing facilities that provide resource protection;
[cir] Enhancing the relevant and important (R&I) values and/or
addressing human health and safety on a case-by-case basis;
[cir] Imposing a linear ROW avoidance restriction;
[cir] Excluding large site-type ROWs (greater than 5 acres);
[cir] Restoring temporary disturbances to meet the standard BLM
restoration standards; and
[cir] Allowing land use authorizations and small site-type ROWs (5
acres or less) on a case-by-case basis.
[[Page 62526]]
The proposed ACEC would be open to locatable mineral development and
closed to solid leasable mineral development. Fluid leasable mineral
development would be allowed with controlled surface use restrictions;
the BLM may require that a proposed facility or activity be relocated
by more than 200 meters from a proposed location as necessary to
achieve the desired level of resource protection. Saleable mineral
disposals that provide resource protection, enhancement of the R&I
values and/or address human health and safety would be allowed on a
case-by-case basis.
The proposed ACEC would be closed to livestock grazing.
The BLM would limit development of recreation facilities to those
necessary for resource protection only. Off-highway vehicle (OHV) use
would be limited to designated routes, and permitted non-speed
recreation activities in the ACEC would require a desert tortoise
spotter during the tortoise active season. In addition, the BLM would
monitor the activities to ensure tortoises are not affected.
For sensitive species, the BLM would allow prescribed fire use to
meet resource objectives and habitat enhancement purposes in
appropriate areas to support habitat recovery objectives and allow use
of approved herbicides following ground-disturbing activities in order
to implement invasive species control methods and support habitat
recovery objectives. Military maneuvers would not be authorized.
Activities that result in loss or degradation of tortoise habitat would
require reclamation so that pre-disturbance conditions may be reached
within a reasonable time frame; reclamation may include, but is not
limited to, salvaging and transplanting cactus and yucca, recontouring
of the area, scarifying compacted soil, adding soil amendments,
seeding, and transplanting of seedling shrubs. Subsequent seeding or
transplanting efforts may be required if monitoring indicates that the
original effort was not successful. Alternative B and C would not
designate an ACEC; however, the BLM would manage the area as part of an
SRMA.
The visual resource class change from Class III to Class IV would
only apply to the project site and applies to alternatives B, C and D.
The BLM will use and coordinate the NEPA comment process to satisfy
the public involvement process for Section 106 of the National Historic
Preservation Act (16 U.S.C. 470(f)) as provided for in 36 CFR
800.2(d)(3). Native American tribal consultations have been conducted
in accordance with policy. Tribal concerns have been given due
consideration, including impacts on Indian trust assets.
The Draft Supplemental EIS analyzes four alternatives, including
the no action alternative (Alternative A) and three action
alternatives. Alternative B is Silver State's original proposal (as
described in its Plan of Development dated July 2011). This alternative
was introduced in initial scoping meetings and does not include
perimeter roads. Alternative B would disturb up to 3,855 acres of
Federal land. Alternative C would disturb up to 2,515 acres of Federal
lands, and includes the project layout for Phases II and III that was
previously evaluated in the 2010 Final EIS. Alternative D would disturb
up to 3,091 acres of Federal land and is a modified layout of Silver
State's original proposal (Alternative B above) to allow access through
a historically used recreation route.
The BLM is required to select a preferred alternative for the RMP
amendment; this decision is separate from whether a preferred
alternative is identified for the proposed project. The BLM preferred
alternative for the RMP amendment identified in the Draft Supplemental
EIS is to (1) Reduce the acreage of the SRMA by the project footprint
(if approved) and (2) To change the VRM class from VRM Class III to IV
for the project footprint (if approved). There is no BLM preferred
project alternative identified in the Draft Supplemental EIS so that
the BLM can make best use of public input to reach an informed
decision. Formal scoping for the project occurred from September 1 to
October 31, 2011 (74 FR 31306). The BLM received a total of 55 comment
submissions during the scoping period, identifying 201 issues. The
comments identified concerns in a broad range of categories, including
OHV access; recreation; socioeconomic resources; federally listed
species and their habitat, including desert tortoise habitat and rare
plants; surface water/storm runoff; alternatives for analysis; and
cumulative impacts.
Maps of the proposed project area and the alternatives being
analyzed in the Draft Supplemental EIS are available at the BLM
Southern Nevada District Office and the Southern Nevada BLM energy Web
site cited above. Please note that public comments and information
submitted including names, street addresses, and email addresses of
persons who submit comments will be available for public review and
disclosure at the above address during regular business hours (8 a.m.
to 4 p.m.), Monday through Friday, except holidays.
Before including your address, phone number, email address, or
other personal identifying information in your comment, you should be
aware that your entire comment--including your personal identifying
information--may be made publicly available at any time. While you can
ask us in your comment to withhold your personal identifying
information from public review, we cannot guarantee that we will be
able to do so.
Authority: 40 CFR 1506.6, 40 CFR 1506.10, 43 CFR 16.
Vanessa Hice,
Assistant Field Manager, Division of Lands.
[FR Doc. 2012-25288 Filed 10-12-12; 8:45 am]
BILLING CODE 4310-HC-P