Natural Currents Energy Services, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications, 61598 [2012-24905]
Download as PDF
61598
Federal Register / Vol. 77, No. 196 / Wednesday, October 10, 2012 / Notices
competing applications may be filed
electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov or toll
free at 1–866–208–3676, or for TTY,
(202) 502–8659. Although the
Commission strongly encourages
electronic filing, documents may also be
paper-filed. To paper-file, mail an
original and seven copies to: Kimberly
D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE., Washington, DC 20426.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–14425) in the docket number field to
access the document. For assistance,
contact FERC Online Support.
Dated: October 1, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012–24817 Filed 10–9–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14415–000]
rmajette on DSK2TPTVN1PROD with NOTICES
Natural Currents Energy Services,
LLC; Notice of Preliminary Permit
Application Accepted for Filing and
Soliciting Comments, Motions To
Intervene, and Competing Applications
On May 22, 2012, Natural Currents
Energy Services, LLC filed an
application, pursuant to section 4(f) of
the Federal Power Act, proposing to
study the feasibility of the Alexandria
Bay Hydroelectric Project, which would
be located on the St. Lawrence River in
Jefferson County, New York. The
proposed project would not use a dam
or impoundment. The sole purpose of a
preliminary permit, if issued, is to grant
the permit holder priority to file a
license application during the permit
term. A preliminary permit does not
authorize the permit holder to perform
any land-disturbing activities or
VerDate Mar<15>2010
15:15 Oct 09, 2012
Jkt 229001
otherwise enter upon lands or waters
owned by others without the owners’
express permission.
The proposed project would consist
of: (1) Installation of 50 NC Sea Dragon
tidal turbines at a rated capacity of 100
kilowatts, (2) an estimated 2.5
kilometers in length of additional
transmission infrastructure, and (3)
appurtenant facilities. Initial estimated
production would be a minimum of
17,520 megawatt hours per year with
the installation of 50 units.
Applicant Contact: Mr. Roger Bason,
Natural Currents Energy Services, LLC,
24 Roxanne Boulevard, Highland, New
York 12561, (845) 691–4009.
FERC Contact: Woohee Choi (202)
502–6336.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.1
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36. Comments, motions to
intervene, notices of intent, and
competing applications may be filed
electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov or toll
free at 1–866–208–3676, or for TTY,
(202) 502–8659. Although the
Commission strongly encourages
electronic filing, documents may also be
paper-filed. To paper-file, mail an
original and seven copies to: Kimberly
D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE., Washington, DC 20426.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of the Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–14415) in the docket number field to
access the document. For assistance,
contact FERC Online Support.
1 The Commission is issuing a second notice for
this project because some municipalities may not
have been notified by the first notice issued on
August 13, 2012.
PO 00000
Frm 00030
Fmt 4703
Sfmt 4703
Dated: October 3, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012–24905 Filed 10–9–12; 8:45 am]
BILLING CODE 6717–01–P
ENVIRONMENTAL PROTECTION
AGENCY
[FRL–9522–9]
Agency Information Collection
Activities OMB Responses
Environmental Protection
Agency (EPA).
ACTION: Notice.
AGENCY:
This document announces the
Office of Management and Budget
(OMB) responses to Agency Clearance
requests, in compliance with the
Paperwork Reduction Act (44 U.S.C.
3501 et. seq.). An agency may not
conduct or sponsor, and a person is not
required to respond to, a collection of
information unless it displays a
currently valid OMB control number.
The OMB control numbers for EPA
regulations are listed in 40 CFR part 9
and 48 CFR chapter 15.
FOR FURTHER INFORMATION CONTACT: Rick
Westlund (202) 566–1682, or email at
westlund.rick@epa.gov and please refer
to the appropriate EPA Information
Collection Request (ICR) Number.
SUPPLEMENTARY INFORMATION:
SUMMARY:
OMB Responses To Agency Clearance
Requests
OMB Approvals
EPA ICR Number 2071.05; NESHAP
for Printing, Coating and Dyeing of
Fabrics and Other Textiles; 40 CFR part
63 subparts A and OOOO; was approved
on 09/12/2012; OMB Number 2060–
0522; expires on 09/30/2015; Approved
without change.
EPA ICR Number 0997.10; NSPS for
Petroleum Dry Cleaners; 40 CFR part 60
subparts A and JJJ; was approved on 09/
14/2012; OMB Number 2060–0079;
expires on 09/30/2015; Approved
without change.
EPA ICR Number 2040.05; NESHAP
for Refractory Products Manufacturing;
40 CFR part 63 subparts A and SSSSS;
was approved on 09/14/2012; OMB
Number 2060–0515; expires on 09/30/
2015; Approved without change.
EPA ICR Number 1541.10; NESHAP
for Benzene Waste Operations; 40 CFR
part 61 subparts A and FF; was
approved on 09/14/2012; OMB Number
2060–0183; expires on 09/30/2015;
Approved without change.
EPA ICR Number 1100.14; NESHAP
for Radionuclides; 40 CFR part 61
E:\FR\FM\10OCN1.SGM
10OCN1
Agencies
[Federal Register Volume 77, Number 196 (Wednesday, October 10, 2012)]
[Notices]
[Page 61598]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-24905]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 14415-000]
Natural Currents Energy Services, LLC; Notice of Preliminary
Permit Application Accepted for Filing and Soliciting Comments, Motions
To Intervene, and Competing Applications
On May 22, 2012, Natural Currents Energy Services, LLC filed an
application, pursuant to section 4(f) of the Federal Power Act,
proposing to study the feasibility of the Alexandria Bay Hydroelectric
Project, which would be located on the St. Lawrence River in Jefferson
County, New York. The proposed project would not use a dam or
impoundment. The sole purpose of a preliminary permit, if issued, is to
grant the permit holder priority to file a license application during
the permit term. A preliminary permit does not authorize the permit
holder to perform any land-disturbing activities or otherwise enter
upon lands or waters owned by others without the owners' express
permission.
The proposed project would consist of: (1) Installation of 50 NC
Sea Dragon tidal turbines at a rated capacity of 100 kilowatts, (2) an
estimated 2.5 kilometers in length of additional transmission
infrastructure, and (3) appurtenant facilities. Initial estimated
production would be a minimum of 17,520 megawatt hours per year with
the installation of 50 units.
Applicant Contact: Mr. Roger Bason, Natural Currents Energy
Services, LLC, 24 Roxanne Boulevard, Highland, New York 12561, (845)
691-4009.
FERC Contact: Woohee Choi (202) 502-6336.
Deadline for filing comments, motions to intervene, competing
applications (without notices of intent), or notices of intent to file
competing applications: 60 days from the issuance of this notice.\1\
Competing applications and notices of intent must meet the requirements
of 18 CFR 4.36. Comments, motions to intervene, notices of intent, and
competing applications may be filed electronically via the Internet.
See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's
Web site https://www.ferc.gov/docs-filing/efiling.asp. Commenters can
submit brief comments up to 6,000 characters, without prior
registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information
at the end of your comments. For assistance, please contact FERC Online
Support at FERCOnlineSupport@ferc.gov or toll free at 1-866-208-3676,
or for TTY, (202) 502-8659. Although the Commission strongly encourages
electronic filing, documents may also be paper-filed. To paper-file,
mail an original and seven copies to: Kimberly D. Bose, Secretary,
Federal Energy Regulatory Commission, 888 First Street NE., Washington,
DC 20426.
---------------------------------------------------------------------------
\1\ The Commission is issuing a second notice for this project
because some municipalities may not have been notified by the first
notice issued on August 13, 2012.
---------------------------------------------------------------------------
More information about this project, including a copy of the
application, can be viewed or printed on the ``eLibrary'' link of the
Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P-14415) in the docket number field to access
the document. For assistance, contact FERC Online Support.
Dated: October 3, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012-24905 Filed 10-9-12; 8:45 am]
BILLING CODE 6717-01-P