Avalon Wind, LLC; Avalon Wind 2, LLC; Catalina Solar, LLC; Catalina Solar 2, LLC; Pacific Wind Lessee, LLC; Pacific Wind 2, LLC; Valentine Solar, LLC; EDF Renewable Development, Inc.; Notice of Petition for Declaratory Order, 61597 [2012-24829]

Download as PDF Federal Register / Vol. 77, No. 196 / Wednesday, October 10, 2012 / Notices Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. On or before the comment date, it is not necessary to serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5 p.m. Eastern Time on October 19, 2012. Dated: October 1, 2012. Kimberly D. Bose, Secretary. [FR Doc. 2012–24818 Filed 10–9–12; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL12–109–000] rmajette on DSK2TPTVN1PROD with NOTICES Avalon Wind, LLC; Avalon Wind 2, LLC; Catalina Solar, LLC; Catalina Solar 2, LLC; Pacific Wind Lessee, LLC; Pacific Wind 2, LLC; Valentine Solar, LLC; EDF Renewable Development, Inc.; Notice of Petition for Declaratory Order Take notice that on September 27, 2012, Avalon Wind, LLC, Avalon Wind 2, LLC, Catalina Solar, LLC, Catalina Solar 2, LLC, Pacific Wind Lessee, LLC, Pacific Wind 2, LLC, Valentine Solar, LLC, and EDF Renewable Development, Inc., (collectively, Petitioners) pursuant to section 207 of the Federal Energy Regulatory Commission’s (Commission) VerDate Mar<15>2010 15:15 Oct 09, 2012 Jkt 229001 Rules of Practice and Procedure 18 CFR 385.207, filed a petition for declaratory order requesting the Commission to confirm their priority to firm transmission rights to the capacity of the Antelope Valley line, which encompasses two generation-tie lines to be constructed and jointly owned by the Petitioners to connect the full planned capacity of the Petitioners’ wind and solar generation projects to the integrated transmission grid. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. On or before the comment date, it is not necessary to serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5 p.m. Eastern Time on October 29, 2012. Dated: October 1, 2012. Kimberly D. Bose, Secretary. [FR Doc. 2012–24829 Filed 10–9–12; 8:45 am] BILLING CODE 6717–01–P PO 00000 Frm 00029 Fmt 4703 61597 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14425–000] Liberty University, Inc.; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On June 15, 2012, Liberty University, Inc., filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act (FPA), proposing to study the feasibility of the Scott’s Mill Hydropower Project (project) to be located on the James River, in the City of Lynchburg, Virginia. The proposed project would be located in Amherst and Bedford Counties, Virginia. The project would not occupy any federal land. The sole purpose of a preliminary permit, if issued, is to grant the permit holder priority to file a license application during the permit term. A preliminary permit does not authorize the permit holder to perform any land-disturbing activities or otherwise enter upon lands or waters owned by others without the owners’ express permission. The proposed project would consist of the following: (1) The existing 15-foothigh, 925-foot-long Scott’s Mill dam, impounding a 316-acre reservoir with a normal maximum water surface elevation of 511 feet mean sea level; (2) a new powerhouse containing four generating units with a total installed capacity of 4.8 megawatts; (3) a new 500-foot-long underground transmission line; and (4) appurtenant facilities. The project would have an estimated annual generation of 10,500 megawatt-hours, and would be sold to a local utility. Applicant Contact: Mr. Lee Beaumont, Assistant to the Chancellor, Liberty University, 1971 University Blvd., Lynchburg, Virginia 24502; phone: (434) 592–3315; email: lbeaumont@liberty.edu. FERC Contact: Tim Looney; phone: (202) 502–6096. Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice.1 Competing applications and notices of intent must meet the requirements of 18 CFR 4.36. Comments, motions to intervene, notices of intent, and 1 The Commission is issuing a second notice for this project because some municipalities may not have been notified by the first notice issued on July 9, 2012. Sfmt 4703 E:\FR\FM\10OCN1.SGM 10OCN1

Agencies

[Federal Register Volume 77, Number 196 (Wednesday, October 10, 2012)]
[Notices]
[Page 61597]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-24829]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. EL12-109-000]


Avalon Wind, LLC; Avalon Wind 2, LLC; Catalina Solar, LLC; 
Catalina Solar 2, LLC; Pacific Wind Lessee, LLC; Pacific Wind 2, LLC; 
Valentine Solar, LLC; EDF Renewable Development, Inc.; Notice of 
Petition for Declaratory Order

    Take notice that on September 27, 2012, Avalon Wind, LLC, Avalon 
Wind 2, LLC, Catalina Solar, LLC, Catalina Solar 2, LLC, Pacific Wind 
Lessee, LLC, Pacific Wind 2, LLC, Valentine Solar, LLC, and EDF 
Renewable Development, Inc., (collectively, Petitioners) pursuant to 
section 207 of the Federal Energy Regulatory Commission's (Commission) 
Rules of Practice and Procedure 18 CFR 385.207, filed a petition for 
declaratory order requesting the Commission to confirm their priority 
to firm transmission rights to the capacity of the Antelope Valley 
line, which encompasses two generation-tie lines to be constructed and 
jointly owned by the Petitioners to connect the full planned capacity 
of the Petitioners' wind and solar generation projects to the 
integrated transmission grid.
    Any person desiring to intervene or to protest this filing must 
file in accordance with Rules 211 and 214 of the Commission's Rules of 
Practice and Procedure (18 CFR 385.211, 385.214). Protests will be 
considered by the Commission in determining the appropriate action to 
be taken, but will not serve to make protestants parties to the 
proceeding. Any person wishing to become a party must file a notice of 
intervention or motion to intervene, as appropriate. Such notices, 
motions, or protests must be filed on or before the comment date. On or 
before the comment date, it is not necessary to serve motions to 
intervene or protests on persons other than the Applicant.
    The Commission encourages electronic submission of protests and 
interventions in lieu of paper using the ``eFiling'' link at https://www.ferc.gov. Persons unable to file electronically should submit an 
original and 14 copies of the protest or intervention to the Federal 
Energy Regulatory Commission, 888 First Street NE., Washington, DC 
20426.
    This filing is accessible on-line at https://www.ferc.gov, using the 
``eLibrary'' link and is available for review in the Commission's 
Public Reference Room in Washington, DC. There is an ``eSubscription'' 
link on the Web site that enables subscribers to receive email 
notification when a document is added to a subscribed docket(s). For 
assistance with any FERC Online service, please email 
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For 
TTY, call (202) 502-8659.
    Comment Date: 5 p.m. Eastern Time on October 29, 2012.

    Dated: October 1, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012-24829 Filed 10-9-12; 8:45 am]
BILLING CODE 6717-01-P