Notice of Attendance at NYISO Meetings, 61586-61587 [2012-24819]
Download as PDF
61586
Federal Register / Vol. 77, No. 196 / Wednesday, October 10, 2012 / Notices
SD1, which outlines the subject areas
to be addressed in the environmental
document, was mailed to the
individuals and entities on the
Commission’s mailing list. Copies of
SD1 will be available at the scoping
meetings, or may be viewed on the Web
at https://www.ferc.gov, using the
‘‘eLibrary’’ link. Follow the directions
for accessing information in paragraph
n. Based on all oral and written
comments, a Scoping Document 2 (SD2)
may be issued. SD2 may include a
revised process plan and schedule, as
well as a list of issues, identified
through the scoping process.
Environmental Site Review
The potential applicant and
Commission staff will conduct an
Environmental Site Review of the
project on Thursday, November 1, 2012,
starting at 2:00 p.m. All participants
should meet at NextEra Energy’s Saco
River Maintenance Facility, located at 3
Company Road, Hollis, ME 04042. All
participants are responsible for their
own transportation. Anyone with
questions about the site visit should
contact Mr. Frank Dunlap of NextEra
Energy at (207) 629–1817 on or before
October 24, 2012.
rmajette on DSK2TPTVN1PROD with NOTICES
Meeting Objectives
At the scoping meetings, staff will: (1)
Initiate scoping of the issues; (2) review
and discuss existing conditions and
resource management objectives; (3)
review and discuss existing information
and identify preliminary information
and study needs; (4) review and discuss
the process plan and schedule for prefiling activity that incorporates the time
frames provided for in Part 5 of the
Commission’s regulations and, to the
extent possible, maximizes coordination
of federal, state, and tribal permitting
and certification processes; and (5)
discuss the appropriateness of any
federal or state agency or Indian tribe
acting as a cooperating agency for
development of an environmental
document.
Meeting participants should come
prepared to discuss their issues and/or
concerns. Please review the PAD in
preparation for the scoping meetings.
Directions on how to obtain a copy of
the PAD and SD1 are included in item
n. of this document.
Meeting Procedures
The meetings will be recorded by a
stenographer. The transcripts will be
placed in the public record for the
project.
VerDate Mar<15>2010
15:15 Oct 09, 2012
Jkt 229001
Dated: October 1, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012–24820 Filed 10–9–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Attendance at NYISO
Meetings
The Federal Energy Regulatory
Commission hereby gives notice that
members of the Commission and
Commission staff may attend upcoming
New York Independent System
Operator, Inc. (NYISO) meetings, as well
as other subcommittee or working group
meetings that are not currently
scheduled, but that are typically
scheduled on short notice or meetings
that are scheduled on short notice based
on items arising from the agenda as
posted on the NYISO Web site.1 The
Commission and Commission staff may
attend the following meetings:
NYISO Business Issues Committee
• October 17, 2012 (Rensselaer, NY).
• November 14, 2012 (Rensselaer,
NY).
• December 5, 2012 (Rensselaer, NY).
• January 16, 2013 (Rensselaer, NY).
• February 13, 2013 (Rensselaer, NY).
• March 13, 2013 (Rensselaer, NY).
• April 10, 2013 (Rensselaer, NY).
• May 8, 2013 (Rensselaer, NY).
• June 19, 2013 (Rensselaer, NY).
• July 17, 2013 (Rensselaer, NY).
• August 14, 2013 (Rensselaer, NY).
• September 18, 2013 (Rensselaer,
NY).
NYISO Management Committee
• October 31, 2012 (Rensselaer, NY).
• November 28, 2012 (Rensselaer,
NY).
• December 19, 2012 (Rensselaer,
NY).
• January 30, 2013 (Rensselaer, NY).
• February 27, 2013 (Rensselaer, NY).
• March 27, 2013 (Rensselaer, NY).
• April 24, 2013 (Rensselaer, NY).
• May 29, 2013 (Rensselaer, NY).
• June 11, 2013 (Rensselaer, NY).
• July 31, 2013 (Rensselaer, NY).
• August 28, 2013 (Rensselaer, NY).
• September 25, 2013 (Rensselaer,
NY).
1 NYISO Subcommittees, Task Forces, and
Working Groups of the three primary committees
(Management, Business Issues, and Operating) meet
on a variety of topics; they convene and dissolve
on an as-needed basis. Therefore, staff may monitor
different working groups as issues arise and
according to postings on the NYISO Web site.
PO 00000
Frm 00018
Fmt 4703
Sfmt 4703
NYISO ICAP Working Group
• October 23, 2012 (Rensselaer, NY).
• November 20, 2012 (Rensselaer,
NY).
• December 11, 2012 (Rensselaer,
NY).
• Various additional dates.
NYISO Operating Committee
• October 18, 2012 (Rensselaer, NY).
• November 15, 2012 (Rensselaer,
NY).
• December 6, 2012 (Rensselaer, NY).
• January 17, 2013 (Rensselaer, NY).
• February 28, 2013 (Rensselaer, NY).
• March 14, 2013 (Rensselaer, NY).
• April 11, 2013 (Rensselaer, NY).
• May 9, 2013 (Rensselaer, NY).
• June 20, 2013 (Rensselaer, NY).
• July 18, 2013 (Rensselaer, NY).
• August 15, 2013 (Rensselaer, NY).
• September 19, 2013 (Rensselaer,
NY).
Market Issues Working Group
• Various dates.
NYISO Transmission Planning
Advisory Subcommittee
• Various dates.
NYISO Budget and Priorities Working
Group
• Various dates.
NYISO Credit Policy Task Force
• Various dates.
NYISO Price Responsive Load Working
Group
• Various dates.
NYISO Interconnection Issues Task
Force
• Various dates.
For additional meeting information,
see: https://www.nyiso.com/public/
committees/calendar/index.jsp.
The discussions at each of the
meetings described above may address
matters at issue in pending proceedings
before the Commission including the
following:
Docket Nos. EL07–39 and ER08–695,
New York Independent System
Operator, Inc.
Docket No. EL08–70–000, Canandaigua
Power Partners, LLC v. New York
Independent System Operator, Inc.
Docket No. EL11–42, Astoria Generating
Company LLC v. New York
Independent System Operator, Inc.
Docket No. EL11–50, Astoria Generating
Company LLC v. New York
Independent System Operator, Inc.
Docket No. EL12–6, Seneca Power
Partners, L.P. v. New York
Independent System Operator, Inc.
Docket No. EL12–9, Astoria Gas Turbine
Power LLC v. New York Independent
System Operator, Inc.
E:\FR\FM\10OCN1.SGM
10OCN1
rmajette on DSK2TPTVN1PROD with NOTICES
Federal Register / Vol. 77, No. 196 / Wednesday, October 10, 2012 / Notices
Docket No. EL12–56, Energy Spectrum,
Inc. and Riverbay Corporation v. New
York Independent System Operator,
Inc.
Docket No. EL12–64, Linden VFT, LLC
v. New York Independent System
Operator, Inc.
Docket No. EL12–89, Village of Port
Jefferson v. New York Independent
System Operator, Inc.
Docket No. EL12–98, Hudson
Transmission Partners, LLC v. New
York Independent System Operator,
Inc.
Docket No. ER01–3155, New York
Independent System Operator, Inc.
Docket Nos. ER01–3001–021/ER03–
647–012 and ER01–3001–022/ER03–
647–013, New York Independent
System Operator, Inc.
Docket No. ER04–449, New York
Independent System Operator, Inc.
Docket No. ER04–230, New York
Independent System Operator, Inc.
Docket No. ER06–291–001, New York
Independent System Operator, Inc.
Docket No. ER04–230, New York
Independent System Operator, Inc.
Docket No. ER04–230, New York
Independent System Operator, Inc.
Docket No. ER04–230, New York
Independent System Operator, Inc.
Docket No. ER06–1014, New York
Independent System Operator, Inc.
Docket No. ER07–612, New York
Independent System Operator, Inc.
Docket No. ER08–850, New York
Independent System Operator, Inc.
Docket No. ER08–867, New York
Independent System Operator, Inc.
Docket No. ER08–1281, New York
Independent System Operator, Inc.
Docket No. ER09–1142, New York
Independent System Operator, Inc.
Docket No. ER10–1359, TC
Ravenswood, LLC
Docket No. ER10–2220, New York
Independent System Operator, Inc.
Docket No. ER10–2371, New York
Independent System Operator, Inc.
Docket No. ER10–3043, New York
Independent System Operator, Inc.
Docket No. ER11–2547, New York
Independent System Operator, Inc.
Docket No. ER11–1844, New York
Independent System Operator, Inc.
Docket No. ER11–4338, New York
Independent System Operator, Inc.
Docket No. ER12–360–001, New York
Independent System Operator, Inc.
Docket No. ER12–718–001, New York
Independent System Operator, Inc.
Docket Nos. ER12–1653–000, –001, New
York Independent System Operator,
Inc.
Docket No. ER12–2568, New York
Independent System Operator, Inc.
Docket No. ER12–2622, New York
Independent System Operator, Inc.
VerDate Mar<15>2010
15:15 Oct 09, 2012
Jkt 229001
Docket No. RM04–7, Market-Based
Rates for Wholesale Sales of Electric
Energy, Capacity, and Ancillary
Services by Public Utilities
Docket No. RM10–11, Integration of
Variable Energy Resources
Docket No. RM10–15, Mandatory
Reliability Standards for
Interconnection Reliability Operating
Limits
Docket No. RM10–16, System
Restoration Reliability Standards
Docket No. RM10–23, Order No. 1000,
Transmission Planning and Cost
Allocation by Transmission Owning
and Operating Public Utilities
The meetings are open to
stakeholders. For more information,
contact Travis Allen, Office of Energy
Market Regulation, Federal Energy
Regulatory Commission at (202) 502–
8796 or Travis.Allen@ferc.gov.
Dated: October 2, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012–24819 Filed 10–9–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Filings Instituting Proceedings
Docket Numbers: RP13–1–000.
Applicants: KO Transmission
Company.
Description: Order No. 587–V
Compliance Filing to be effective 12/1/
2012.
Filed Date: 10/1/12.
Accession Number: 20121001–5010.
Comments Due: 5 p.m. ET 10/15/12.
Docket Numbers: RP13–2–000.
Applicants: Panhandle Eastern Pipe
Line Company, LP.
Description: Fuel Filing on 10–1–12 to
be effective 11/1/2012.
Filed Date: 10/1/12.
Accession Number: 20121001–5033.
Comments Due: 5 p.m. ET 10/15/12.
Docket Numbers: RP13–3–000.
Applicants: Texas Gas Transmission,
LLC.
Description: 2012 Fuel Tracker Filing
to be effective 11/1/2012.
Filed Date: 10/1/12.
Accession Number: 20121001–5034.
Comments Due: 5 p.m. ET 10/15/12.
Docket Numbers: RP13–4–000.
Applicants: Trunkline Gas Company,
LLC.
PO 00000
Frm 00019
Fmt 4703
Sfmt 4703
61587
Description: Fuel Filing on 10–1–12 to
be effective 11/1/2012.
Filed Date: 10/1/12.
Accession Number: 20121001–5035.
Comments Due: 5 p.m. ET 10/15/12.
Docket Numbers: RP13–5–000.
Applicants: Texas Gas Transmission,
LLC.
Description: NAESB 587–V
Compliance Filing (RM96–1–037) to be
effective 12/1/2012.
Filed Date: 10/1/12.
Accession Number: 20121001–5036.
Comments Due: 5 p.m. ET 10/15/12.
Docket Numbers: RP13–6–000.
Applicants: Southwest Gas Storage
Company.
Description: Fuel Filing on 10–1–2012
to be effective 11/1/2012.
Filed Date: 10/1/12.
Accession Number: 20121001–5037.
Comments Due: 5 p.m. ET 10/15/12.
Docket Numbers: RP13–7–000.
Applicants: Panhandle Eastern Pipe
Line Company, LP.
Description: NAESB Version 2.0
Compliance to be effective 12/1/2012.
Filed Date: 10/1/12.
Accession Number: 20121001–5038.
Comments Due: 5 p.m. ET 10/15/12.
Docket Numbers: RP13–8–000.
Applicants: Panther Interstate
Pipeline Energy, LLC.
Description: Panther Order No. 587–V
Compliance Filing to be effective 12/1/
2012.
Filed Date: 10/1/12.
Accession Number: 20121001–5039.
Comments Due: 5 p.m. ET 10/15/12.
Docket Numbers: RP13–9–000.
Applicants: Trunkline Gas Company,
LLC.
Description: NAESB Version 2.0
Compliance to be effective 12/1/2012.
Filed Date: 10/1/12.
Accession Number: 20121001–5041.
Comments Due: 5 p.m. ET 10/15/12.
Docket Numbers: RP13–10–000.
Applicants: Gulf Crossing Pipeline
Company LLC.
Description: NAESB 2.0 587–V
compliance filing to be effective 11/1/
2012.
Filed Date: 10/1/12.
Accession Number: 20121001–5042.
Comments Due: 5 p.m. ET 10/15/12.
Docket Numbers: RP13–11–000.
Applicants: Southwest Gas Storage
Company.
Description: NAESB Version 2.0
Compliance to be effective 12/1/2012.
Filed Date: 10/1/12.
Accession Number: 20121001–5043.
Comments Due: 5 p.m. ET 10/15/12.
Docket Numbers: RP13–12–000.
Applicants: Gulf South Pipeline
Company, LP.
E:\FR\FM\10OCN1.SGM
10OCN1
Agencies
[Federal Register Volume 77, Number 196 (Wednesday, October 10, 2012)]
[Notices]
[Pages 61586-61587]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-24819]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Notice of Attendance at NYISO Meetings
The Federal Energy Regulatory Commission hereby gives notice that
members of the Commission and Commission staff may attend upcoming New
York Independent System Operator, Inc. (NYISO) meetings, as well as
other subcommittee or working group meetings that are not currently
scheduled, but that are typically scheduled on short notice or meetings
that are scheduled on short notice based on items arising from the
agenda as posted on the NYISO Web site.\1\ The Commission and
Commission staff may attend the following meetings:
---------------------------------------------------------------------------
\1\ NYISO Subcommittees, Task Forces, and Working Groups of the
three primary committees (Management, Business Issues, and
Operating) meet on a variety of topics; they convene and dissolve on
an as-needed basis. Therefore, staff may monitor different working
groups as issues arise and according to postings on the NYISO Web
site.
---------------------------------------------------------------------------
NYISO Business Issues Committee
October 17, 2012 (Rensselaer, NY).
November 14, 2012 (Rensselaer, NY).
December 5, 2012 (Rensselaer, NY).
January 16, 2013 (Rensselaer, NY).
February 13, 2013 (Rensselaer, NY).
March 13, 2013 (Rensselaer, NY).
April 10, 2013 (Rensselaer, NY).
May 8, 2013 (Rensselaer, NY).
June 19, 2013 (Rensselaer, NY).
July 17, 2013 (Rensselaer, NY).
August 14, 2013 (Rensselaer, NY).
September 18, 2013 (Rensselaer, NY).
NYISO Management Committee
October 31, 2012 (Rensselaer, NY).
November 28, 2012 (Rensselaer, NY).
December 19, 2012 (Rensselaer, NY).
January 30, 2013 (Rensselaer, NY).
February 27, 2013 (Rensselaer, NY).
March 27, 2013 (Rensselaer, NY).
April 24, 2013 (Rensselaer, NY).
May 29, 2013 (Rensselaer, NY).
June 11, 2013 (Rensselaer, NY).
July 31, 2013 (Rensselaer, NY).
August 28, 2013 (Rensselaer, NY).
September 25, 2013 (Rensselaer, NY).
NYISO ICAP Working Group
October 23, 2012 (Rensselaer, NY).
November 20, 2012 (Rensselaer, NY).
December 11, 2012 (Rensselaer, NY).
Various additional dates.
NYISO Operating Committee
October 18, 2012 (Rensselaer, NY).
November 15, 2012 (Rensselaer, NY).
December 6, 2012 (Rensselaer, NY).
January 17, 2013 (Rensselaer, NY).
February 28, 2013 (Rensselaer, NY).
March 14, 2013 (Rensselaer, NY).
April 11, 2013 (Rensselaer, NY).
May 9, 2013 (Rensselaer, NY).
June 20, 2013 (Rensselaer, NY).
July 18, 2013 (Rensselaer, NY).
August 15, 2013 (Rensselaer, NY).
September 19, 2013 (Rensselaer, NY).
Market Issues Working Group
Various dates.
NYISO Transmission Planning Advisory Subcommittee
Various dates.
NYISO Budget and Priorities Working Group
Various dates.
NYISO Credit Policy Task Force
Various dates.
NYISO Price Responsive Load Working Group
Various dates.
NYISO Interconnection Issues Task Force
Various dates.
For additional meeting information, see: https://www.nyiso.com/public/committees/calendar/index.jsp.
The discussions at each of the meetings described above may address
matters at issue in pending proceedings before the Commission including
the following:
Docket Nos. EL07-39 and ER08-695, New York Independent System Operator,
Inc.
Docket No. EL08-70-000, Canandaigua Power Partners, LLC v. New York
Independent System Operator, Inc.
Docket No. EL11-42, Astoria Generating Company LLC v. New York
Independent System Operator, Inc.
Docket No. EL11-50, Astoria Generating Company LLC v. New York
Independent System Operator, Inc.
Docket No. EL12-6, Seneca Power Partners, L.P. v. New York Independent
System Operator, Inc.
Docket No. EL12-9, Astoria Gas Turbine Power LLC v. New York
Independent System Operator, Inc.
[[Page 61587]]
Docket No. EL12-56, Energy Spectrum, Inc. and Riverbay Corporation v.
New York Independent System Operator, Inc.
Docket No. EL12-64, Linden VFT, LLC v. New York Independent System
Operator, Inc.
Docket No. EL12-89, Village of Port Jefferson v. New York Independent
System Operator, Inc.
Docket No. EL12-98, Hudson Transmission Partners, LLC v. New York
Independent System Operator, Inc.
Docket No. ER01-3155, New York Independent System Operator, Inc.
Docket Nos. ER01-3001-021/ER03-647-012 and ER01-3001-022/ER03-647-013,
New York Independent System Operator, Inc.
Docket No. ER04-449, New York Independent System Operator, Inc.
Docket No. ER04-230, New York Independent System Operator, Inc.
Docket No. ER06-291-001, New York Independent System Operator, Inc.
Docket No. ER04-230, New York Independent System Operator, Inc.
Docket No. ER04-230, New York Independent System Operator, Inc.
Docket No. ER04-230, New York Independent System Operator, Inc.
Docket No. ER06-1014, New York Independent System Operator, Inc.
Docket No. ER07-612, New York Independent System Operator, Inc.
Docket No. ER08-850, New York Independent System Operator, Inc.
Docket No. ER08-867, New York Independent System Operator, Inc.
Docket No. ER08-1281, New York Independent System Operator, Inc.
Docket No. ER09-1142, New York Independent System Operator, Inc.
Docket No. ER10-1359, TC Ravenswood, LLC
Docket No. ER10-2220, New York Independent System Operator, Inc.
Docket No. ER10-2371, New York Independent System Operator, Inc.
Docket No. ER10-3043, New York Independent System Operator, Inc.
Docket No. ER11-2547, New York Independent System Operator, Inc.
Docket No. ER11-1844, New York Independent System Operator, Inc.
Docket No. ER11-4338, New York Independent System Operator, Inc.
Docket No. ER12-360-001, New York Independent System Operator, Inc.
Docket No. ER12-718-001, New York Independent System Operator, Inc.
Docket Nos. ER12-1653-000, -001, New York Independent System Operator,
Inc.
Docket No. ER12-2568, New York Independent System Operator, Inc.
Docket No. ER12-2622, New York Independent System Operator, Inc.
Docket No. RM04-7, Market-Based Rates for Wholesale Sales of Electric
Energy, Capacity, and Ancillary Services by Public Utilities
Docket No. RM10-11, Integration of Variable Energy Resources
Docket No. RM10-15, Mandatory Reliability Standards for Interconnection
Reliability Operating Limits
Docket No. RM10-16, System Restoration Reliability Standards
Docket No. RM10-23, Order No. 1000, Transmission Planning and Cost
Allocation by Transmission Owning and Operating Public Utilities
The meetings are open to stakeholders. For more information,
contact Travis Allen, Office of Energy Market Regulation, Federal
Energy Regulatory Commission at (202) 502-8796 or
Travis.Allen@ferc.gov.
Dated: October 2, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012-24819 Filed 10-9-12; 8:45 am]
BILLING CODE 6717-01-P