Notice of Commission Staff Attendance, 60980-60981 [2012-24571]
Download as PDF
60980
Federal Register / Vol. 77, No. 194 / Friday, October 5, 2012 / Notices
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: September 27, 2012.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2012–24602 Filed 10–4–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Commission Staff
Attendance
The Federal Energy Regulatory
Commission hereby gives notice that
members of the Commission’s staff may
attend the following meeting held by the
Organization of PJM States, Inc. (OPSI):
pmangrum on DSK3VPTVN1PROD with NOTICES
OPSI’s Eighth Annual Meeting
October 1–3, 2012, 8:45 a.m.–5 p.m.,
Local Time.
The W Chicago City Center Hotel, 172
W. Adams Street, Chicago, IL 60603.
Further information may be found at
https://www.opsi.us/
annual_meetings.html
The discussions at the meeting
described above may address matters at
issue in the following proceedings:
Docket No. EL05–121, PJM
Interconnection, L.L.C.
Docket No. EL07–56, Allegheny Electric
Cooperative, Inc., et al,. v. PJM
Interconnection, L.L.C.
Docket No. EL07–58, Organization of
PJM States, Inc., et al., v. PJM
Interconnection, L.L.C.
Docket No. EL08–14, Black Oak Energy
LLC, et al., v. FERC
Docket No. EL10–52, Central
Transmission, LLC v. PJM
Interconnection, L.L.C.
Docket No. EL12–45, PJM
Interconnection, L.L.C.
Docket No. EL12–50, First Energy
Solutions Corporation et al., v. PJM
Interconnection, L.L.C.
Docket No. EL12–54, Viridity Energy,
Inc. v. PJM Interconnection, L.L.C.
Docket No. EL12–69, Primary Power
LLC v. PJM Interconnection, L.L.C.
Docket No. EL12–8, DC Energy, L.L.C.
and DC Energy Mid-Atlantic, L.L.C.
vs. PJM Interconnection, L.L.C.
Docket No. AD12–1 and ER11–4081,
Midwest Independent Transmission
System Operator, Inc.
Docket No. ER09–1063, PJM
Interconnection, L.L.C.
Docket No. ER09–1148, PPL Electric
Utilities Corporation
VerDate Mar<15>2010
15:25 Oct 04, 2012
Jkt 229001
Docket No. ER09–1256, PotomacAppalachian Transmission Highline,
L.L.C.
Docket No. ER09–1589, FirstEnergy
Service Company
Docket Nos. ER10–253 and EL10–14,
Primary Power, L.L.C.
Docket No. ER10–549, PJM
Interconnection, L.L.C.
Docket No. ER11–1844, Midwest
Independent Transmission System
Operator, Inc.
Docket Nos. ER11–2814 and ER11–2815,
PJM Interconnection, L.L.C. and
American Transmission Systems, Inc.
Docket Nos. ER11–2875 and EL11–20,
PJM Interconnection, L.L.C.
Docket No. ER11–4106, PJM
Interconnection, L.L.C.
Docket No. ER11–4628, PJM
Interconnection, L.L.C.
Docket No. ER12–1173, PJM
Interconnection, L.L.C., et. al.
Docket No. ER12–1177, PJM
Interconnection, L.L.C.
Docket No. ER12–1178, PJM
Interconnection, L.L.C.
Docket No. ER12–1204, PJM
Interconnection, L.L.C.
Docket No. ER12–1761, PJM
Interconnection, L.L.C.
Docket No. ER12–2080, GenOn Power
Midwest, LP
Docket No. ER12–2085, PJM
Interconnection, L.L.C.
Docket No. ER12–2260, New York
Independent System Operator, Inc
Docket No. ER12–2262, PJM
Interconnection, L.L.C.
Docket No. ER12–2274, Public Service
Electric and Gas Company
Docket No. ER12–2391, PJM
Interconnection, L.L.C.
Docket No. ER12–2399, PJM
Interconnection, L.L.C.
Docket No. ER12–2417, PJM
Interconnection, L.L.C.
Docket No. ER12–2440, PJM
Interconnection, L.L.C.
Docket No. ER12–2442, PJM
Interconnection, L.L.C.
Docket No. ER12–2469, PJM
Interconnection, L.L.C.
Docket No. ER12–2486, PJM
Interconnection, L.L.C.
Docket No. ER12–2518, PJM
Interconnection, L.L.C.
Docket No. ER12–2527, PJM
Interconnection, L.L.C.
Docket No. ER12–2550, PJM
Interconnection, L.L.C.
Docket No. ER12–2574, PJM
Interconnection, L.L.C.
Docket No. ER12–2594, PJM
Interconnection, L.L.C.
Docket No. ER12–2599, PJM
Interconnection, L.L.C.
Docket No. ER12–2604, PJM
Interconnection, L.L.C.
PO 00000
Frm 00016
Fmt 4703
Sfmt 4703
Docket No. ER12–2606, PJM
Interconnection, L.L.C.
Docket No. ER12–2610, PJM
Interconnection, L.L.C.
Docket No. ER12–2616, PJM
Interconnection, L.L.C.
Docket No. ER12–2624, PJM
Interconnection, L.L.C.
Docket No. ER12–2661, PJM
Interconnection, L.L.C.
Docket No. ER12–2663, PJM
Interconnection, L.L.C.
Docket No. ER12–2664, PJM
Interconnection, L.L.C.
Docket No. ER12–2671, PJM
Interconnection, L.L.C.
Docket No. ER12–2688, PJM
Interconnection, L.L.C.
Docket No. ER12–469, PJM
Interconnection, L.L.C.
Docket No. ER12–513, PJM
Interconnection, L.L.C.
Docket No. ER12–718, New York
Independent System Operator, Inc.
Docket No. ER12–91, PJM
Interconnection, L.L.C.
Docket No. ER12–92, PJM
Interconnection, L.L.C.
Docket Nos. ER11–2183 and EL11–32,
American Electric Power Service
Corporation
For more information, contact Valerie
Martin, Office of Energy Market
Regulation, Federal Energy Regulatory
Commission at (202) 502–6139 or
Valerie.Martin@ferc.gov.
Dated: September 28, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012–24566 Filed 10–4–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Commission Staff
Attendance
The Federal Energy Regulatory
Commission hereby gives notice that
members of the Commission’s staff may
attend the following meetings related to
the transmission planning activities of
the Mid-Continent Area Power Pool
(MAPP) and Southwest Power Pool
(SPP):
MAPP–SPP Order 1000 Stakeholder
Meeting—October 4, 2012
The above-referenced meeting will be
held at:
Crowne Plaza Hotel & Suites
Minneapolis Airport, Three Appletree
Square, Bloomington, MN 55425.
The above-referenced meeting is open
to the public.
E:\FR\FM\05OCN1.SGM
05OCN1
Federal Register / Vol. 77, No. 194 / Friday, October 5, 2012 / Notices
Further information may be found at
www.mapp.org.
The discussions at the meeting
described above may address matters at
issue in the following proceedings:
Docket No. ER09–35–001, Tallgrass
Transmission, LLC
Docket No. ER09–36–001, Prairie Wind
Transmission, LLC
Docket No. ER09–548–001, ITC Great
Plains, LLC
Docket No. ER09–659–002, Southwest
Power Pool, Inc.
Docket No. ER11–4105–000, Southwest
Power Pool, Inc.
Docket No. EL11–34–001, Midwest
Independent Transmission System
Operator, Inc.
Docket No. ER12–1179–000, Southwest
Power Pool, Inc.
Docket No. ER12–1401–000, Southwest
Power Pool, Inc.
Docket No. ER12–1401–000, Southwest
Power Pool, Inc.
Docket No. ER12–1415–000, Southwest
Power Pool, Inc.
Docket No. ER12–1460–000, Southwest
Power Pool, Inc.
Docket No. ER12–1610–000, Southwest
Power Pool, Inc.
Docket No. ER12–1772–000, Southwest
Power Pool, Inc.
Docket No. ER12–1779–000, Southwest
Power Pool, Inc.
Docket No. ER12–2366–000, Southwest
Power Pool, Inc.
Docket No. EL12–2–000, Southwest
Power Pool, Inc.
Docket No. EL12–60–000, Southwest
Power Pool, Inc., et al.
Docket No. ER12–2387, Southwest
Power Pool Inc.
For more information, contact
Luciano Lima, Office of Energy Markets
Regulation, Federal Energy Regulatory
Commission at (202) 288–6738 or
Luciano.Lima@ferc.gov.
Dated: September 28, 2012.
Kimberly D. Bose,
Secretary.
pmangrum on DSK3VPTVN1PROD with NOTICES
[FR Doc. 2012–24571 Filed 10–4–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket Nos. EL12–42–000, EL12–42–001;
EL12–43–000, EL12–43–001
TGP Granada, LLC and Roosevelt
Wind Ranch, LLC v. Public Service
Company of New Mexico, Tortoise
Capital Resources Corp.; TGP
Granada, LLC and Roosevelt Wind
Ranch, LLC; Notice Establishing
Deadline for Comments
On September 5, 2012, Public Service
Company of New Mexico (PNM) filed a
response to the Commission’s July 5
Order,1 regarding the provision of longterm transmission service over capacity
on the Eastern Interconnection Project.
Any person desiring to intervene or
protest in the above proceeding must
file in accordance with Rules 211 and
214 of the Commission’s Regulations (18
CFR 385.211 and 385.214) on or before
5:00 p.m. Eastern time on October 9,
2012. Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: September 27, 2012.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2012–24600 Filed 10–4–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP12–495–000]
Kinder Morgan Interstate Gas
Transmission L.L.C.; Notice of Intent
To Prepare an Environmental
Assessment for the Proposed Pony
Express Pipeline Conversion Project
and Request for Comments on
Environmental Issues
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) will prepare an
environmental assessment (EA) that will
discuss the environmental impacts of
the Pony Express Pipeline Conversion
Project involving conversion of facilities
1 TGP Granada, LLC v. Pub. Serv. Co. of New
Mexico, 140 FERC ¶ 61,005 (2012) (July 5 Order).
VerDate Mar<15>2010
15:25 Oct 04, 2012
Jkt 229001
PO 00000
Frm 00017
Fmt 4703
Sfmt 4703
60981
from natural gas to oil and construction
and operation of new facilities by
Kinder Morgan Interstate Gas
Transmission L.L.C. (KMIGT) in various
counties in Wyoming, Kansas, Colorado
and Nebraska. The Commission will use
this EA in its decision-making process
to determine whether the project is in
the public convenience and necessity.
This notice announces the opening of
the scoping process the Commission
will use to gather input from the public
and interested agencies on the project.
Your input will help the Commission
staff determine what issues they need to
evaluate in the EA. Please note that the
scoping period will close on October 29,
2012.
This notice is being sent to the
Commission’s current environmental
mailing list for this project. State and
local government representatives should
notify their constituents of this
proposed project and encourage them to
comment on their areas of concern.
If you are a landowner receiving this
notice, a pipeline company
representative may contact you about
the acquisition of an easement to
construct, operate, and maintain the
facilities for the new segments of natural
gas pipeline proposed in this project.
The company would seek to negotiate a
mutually acceptable agreement.
However, if the Commission approves
the project, that approval conveys with
it the right of eminent domain.
Therefore, if easement negotiations fail
to produce an agreement, the pipeline
company could initiate condemnation
proceedings where compensation would
be determined in accordance with state
law.
KMIGT provided landowners with a
fact sheet prepared by the FERC entitled
‘‘An Interstate Natural Gas Facility On
My Land? What Do I Need To Know?’’.
This fact sheet addresses a number of
typically-asked questions, including the
use of eminent domain and how to
participate in the Commission’s
proceedings. It is also available for
viewing on the FERC Web site (www.
ferc.gov).
Summary of the Proposed Project
KMIGT proposes to: (1) Abandon
certain natural gas pipeline facilities
and the natural gas service therefrom by
transfer to an affiliate, Kinder Morgan
Pony Express Pipeline LLC (KMPXP),
for the purpose of converting the
facilities to oil transportation facilities;
and (2) construct and operate certain
replacement type facilities necessary to
continue service to existing natural gas
firm transportation customers following
the proposed conversion. KMIGT also is
seeking authorization to construct
E:\FR\FM\05OCN1.SGM
05OCN1
Agencies
[Federal Register Volume 77, Number 194 (Friday, October 5, 2012)]
[Notices]
[Pages 60980-60981]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-24571]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Notice of Commission Staff Attendance
The Federal Energy Regulatory Commission hereby gives notice that
members of the Commission's staff may attend the following meetings
related to the transmission planning activities of the Mid-Continent
Area Power Pool (MAPP) and Southwest Power Pool (SPP):
MAPP-SPP Order 1000 Stakeholder Meeting--October 4, 2012
The above-referenced meeting will be held at:
Crowne Plaza Hotel & Suites Minneapolis Airport, Three Appletree
Square, Bloomington, MN 55425.
The above-referenced meeting is open to the public.
[[Page 60981]]
Further information may be found at www.mapp.org.
The discussions at the meeting described above may address matters
at issue in the following proceedings:
Docket No. ER09-35-001, Tallgrass Transmission, LLC
Docket No. ER09-36-001, Prairie Wind Transmission, LLC
Docket No. ER09-548-001, ITC Great Plains, LLC
Docket No. ER09-659-002, Southwest Power Pool, Inc.
Docket No. ER11-4105-000, Southwest Power Pool, Inc.
Docket No. EL11-34-001, Midwest Independent Transmission System
Operator, Inc.
Docket No. ER12-1179-000, Southwest Power Pool, Inc.
Docket No. ER12-1401-000, Southwest Power Pool, Inc.
Docket No. ER12-1401-000, Southwest Power Pool, Inc.
Docket No. ER12-1415-000, Southwest Power Pool, Inc.
Docket No. ER12-1460-000, Southwest Power Pool, Inc.
Docket No. ER12-1610-000, Southwest Power Pool, Inc.
Docket No. ER12-1772-000, Southwest Power Pool, Inc.
Docket No. ER12-1779-000, Southwest Power Pool, Inc.
Docket No. ER12-2366-000, Southwest Power Pool, Inc.
Docket No. EL12-2-000, Southwest Power Pool, Inc.
Docket No. EL12-60-000, Southwest Power Pool, Inc., et al.
Docket No. ER12-2387, Southwest Power Pool Inc.
For more information, contact Luciano Lima, Office of Energy
Markets Regulation, Federal Energy Regulatory Commission at (202) 288-
6738 or Luciano.Lima@ferc.gov.
Dated: September 28, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012-24571 Filed 10-4-12; 8:45 am]
BILLING CODE 6717-01-P