Download as PDF 60980 Federal Register / Vol. 77, No. 194 / Friday, October 5, 2012 / Notices can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: September 27, 2012. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2012–24602 Filed 10–4–12; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission hereby gives notice that members of the Commission’s staff may attend the following meeting held by the Organization of PJM States, Inc. (OPSI): pmangrum on DSK3VPTVN1PROD with NOTICES OPSI’s Eighth Annual Meeting October 1–3, 2012, 8:45 a.m.–5 p.m., Local Time. The W Chicago City Center Hotel, 172 W. Adams Street, Chicago, IL 60603. Further information may be found at https://www.opsi.us/ annual_meetings.html The discussions at the meeting described above may address matters at issue in the following proceedings: Docket No. EL05–121, PJM Interconnection, L.L.C. Docket No. EL07–56, Allegheny Electric Cooperative, Inc., et al,. v. PJM Interconnection, L.L.C. Docket No. EL07–58, Organization of PJM States, Inc., et al., v. PJM Interconnection, L.L.C. Docket No. EL08–14, Black Oak Energy LLC, et al., v. FERC Docket No. EL10–52, Central Transmission, LLC v. PJM Interconnection, L.L.C. Docket No. EL12–45, PJM Interconnection, L.L.C. Docket No. EL12–50, First Energy Solutions Corporation et al., v. PJM Interconnection, L.L.C. Docket No. EL12–54, Viridity Energy, Inc. v. PJM Interconnection, L.L.C. Docket No. EL12–69, Primary Power LLC v. PJM Interconnection, L.L.C. Docket No. EL12–8, DC Energy, L.L.C. and DC Energy Mid-Atlantic, L.L.C. vs. PJM Interconnection, L.L.C. Docket No. AD12–1 and ER11–4081, Midwest Independent Transmission System Operator, Inc. Docket No. ER09–1063, PJM Interconnection, L.L.C. Docket No. ER09–1148, PPL Electric Utilities Corporation VerDate Mar<15>2010 15:25 Oct 04, 2012 Jkt 229001 Docket No. ER09–1256, PotomacAppalachian Transmission Highline, L.L.C. Docket No. ER09–1589, FirstEnergy Service Company Docket Nos. ER10–253 and EL10–14, Primary Power, L.L.C. Docket No. ER10–549, PJM Interconnection, L.L.C. Docket No. ER11–1844, Midwest Independent Transmission System Operator, Inc. Docket Nos. ER11–2814 and ER11–2815, PJM Interconnection, L.L.C. and American Transmission Systems, Inc. Docket Nos. ER11–2875 and EL11–20, PJM Interconnection, L.L.C. Docket No. ER11–4106, PJM Interconnection, L.L.C. Docket No. ER11–4628, PJM Interconnection, L.L.C. Docket No. ER12–1173, PJM Interconnection, L.L.C., et. al. Docket No. ER12–1177, PJM Interconnection, L.L.C. Docket No. ER12–1178, PJM Interconnection, L.L.C. Docket No. ER12–1204, PJM Interconnection, L.L.C. Docket No. ER12–1761, PJM Interconnection, L.L.C. Docket No. ER12–2080, GenOn Power Midwest, LP Docket No. ER12–2085, PJM Interconnection, L.L.C. Docket No. ER12–2260, New York Independent System Operator, Inc Docket No. ER12–2262, PJM Interconnection, L.L.C. Docket No. ER12–2274, Public Service Electric and Gas Company Docket No. ER12–2391, PJM Interconnection, L.L.C. Docket No. ER12–2399, PJM Interconnection, L.L.C. Docket No. ER12–2417, PJM Interconnection, L.L.C. Docket No. ER12–2440, PJM Interconnection, L.L.C. Docket No. ER12–2442, PJM Interconnection, L.L.C. Docket No. ER12–2469, PJM Interconnection, L.L.C. Docket No. ER12–2486, PJM Interconnection, L.L.C. Docket No. ER12–2518, PJM Interconnection, L.L.C. Docket No. ER12–2527, PJM Interconnection, L.L.C. Docket No. ER12–2550, PJM Interconnection, L.L.C. Docket No. ER12–2574, PJM Interconnection, L.L.C. Docket No. ER12–2594, PJM Interconnection, L.L.C. Docket No. ER12–2599, PJM Interconnection, L.L.C. Docket No. ER12–2604, PJM Interconnection, L.L.C. PO 00000 Frm 00016 Fmt 4703 Sfmt 4703 Docket No. ER12–2606, PJM Interconnection, L.L.C. Docket No. ER12–2610, PJM Interconnection, L.L.C. Docket No. ER12–2616, PJM Interconnection, L.L.C. Docket No. ER12–2624, PJM Interconnection, L.L.C. Docket No. ER12–2661, PJM Interconnection, L.L.C. Docket No. ER12–2663, PJM Interconnection, L.L.C. Docket No. ER12–2664, PJM Interconnection, L.L.C. Docket No. ER12–2671, PJM Interconnection, L.L.C. Docket No. ER12–2688, PJM Interconnection, L.L.C. Docket No. ER12–469, PJM Interconnection, L.L.C. Docket No. ER12–513, PJM Interconnection, L.L.C. Docket No. ER12–718, New York Independent System Operator, Inc. Docket No. ER12–91, PJM Interconnection, L.L.C. Docket No. ER12–92, PJM Interconnection, L.L.C. Docket Nos. ER11–2183 and EL11–32, American Electric Power Service Corporation For more information, contact Valerie Martin, Office of Energy Market Regulation, Federal Energy Regulatory Commission at (202) 502–6139 or Valerie.Martin@ferc.gov. Dated: September 28, 2012. Kimberly D. Bose, Secretary. [FR Doc. 2012–24566 Filed 10–4–12; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission hereby gives notice that members of the Commission’s staff may attend the following meetings related to the transmission planning activities of the Mid-Continent Area Power Pool (MAPP) and Southwest Power Pool (SPP): MAPP–SPP Order 1000 Stakeholder Meeting—October 4, 2012 The above-referenced meeting will be held at: Crowne Plaza Hotel & Suites Minneapolis Airport, Three Appletree Square, Bloomington, MN 55425. The above-referenced meeting is open to the public. E:\FR\FM\05OCN1.SGM 05OCN1 Federal Register / Vol. 77, No. 194 / Friday, October 5, 2012 / Notices Further information may be found at www.mapp.org. The discussions at the meeting described above may address matters at issue in the following proceedings: Docket No. ER09–35–001, Tallgrass Transmission, LLC Docket No. ER09–36–001, Prairie Wind Transmission, LLC Docket No. ER09–548–001, ITC Great Plains, LLC Docket No. ER09–659–002, Southwest Power Pool, Inc. Docket No. ER11–4105–000, Southwest Power Pool, Inc. Docket No. EL11–34–001, Midwest Independent Transmission System Operator, Inc. Docket No. ER12–1179–000, Southwest Power Pool, Inc. Docket No. ER12–1401–000, Southwest Power Pool, Inc. Docket No. ER12–1401–000, Southwest Power Pool, Inc. Docket No. ER12–1415–000, Southwest Power Pool, Inc. Docket No. ER12–1460–000, Southwest Power Pool, Inc. Docket No. ER12–1610–000, Southwest Power Pool, Inc. Docket No. ER12–1772–000, Southwest Power Pool, Inc. Docket No. ER12–1779–000, Southwest Power Pool, Inc. Docket No. ER12–2366–000, Southwest Power Pool, Inc. Docket No. EL12–2–000, Southwest Power Pool, Inc. Docket No. EL12–60–000, Southwest Power Pool, Inc., et al. Docket No. ER12–2387, Southwest Power Pool Inc. For more information, contact Luciano Lima, Office of Energy Markets Regulation, Federal Energy Regulatory Commission at (202) 288–6738 or Luciano.Lima@ferc.gov. Dated: September 28, 2012. Kimberly D. Bose, Secretary. pmangrum on DSK3VPTVN1PROD with NOTICES [FR Doc. 2012–24571 Filed 10–4–12; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket Nos. EL12–42–000, EL12–42–001; EL12–43–000, EL12–43–001 TGP Granada, LLC and Roosevelt Wind Ranch, LLC v. Public Service Company of New Mexico, Tortoise Capital Resources Corp.; TGP Granada, LLC and Roosevelt Wind Ranch, LLC; Notice Establishing Deadline for Comments On September 5, 2012, Public Service Company of New Mexico (PNM) filed a response to the Commission’s July 5 Order,1 regarding the provision of longterm transmission service over capacity on the Eastern Interconnection Project. Any person desiring to intervene or protest in the above proceeding must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on October 9, 2012. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: September 27, 2012. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2012–24600 Filed 10–4–12; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP12–495–000] Kinder Morgan Interstate Gas Transmission L.L.C.; Notice of Intent To Prepare an Environmental Assessment for the Proposed Pony Express Pipeline Conversion Project and Request for Comments on Environmental Issues The staff of the Federal Energy Regulatory Commission (FERC or Commission) will prepare an environmental assessment (EA) that will discuss the environmental impacts of the Pony Express Pipeline Conversion Project involving conversion of facilities 1 TGP Granada, LLC v. Pub. Serv. Co. of New Mexico, 140 FERC ¶ 61,005 (2012) (July 5 Order). VerDate Mar<15>2010 15:25 Oct 04, 2012 Jkt 229001 PO 00000 Frm 00017 Fmt 4703 Sfmt 4703 60981 from natural gas to oil and construction and operation of new facilities by Kinder Morgan Interstate Gas Transmission L.L.C. (KMIGT) in various counties in Wyoming, Kansas, Colorado and Nebraska. The Commission will use this EA in its decision-making process to determine whether the project is in the public convenience and necessity. This notice announces the opening of the scoping process the Commission will use to gather input from the public and interested agencies on the project. Your input will help the Commission staff determine what issues they need to evaluate in the EA. Please note that the scoping period will close on October 29, 2012. This notice is being sent to the Commission’s current environmental mailing list for this project. State and local government representatives should notify their constituents of this proposed project and encourage them to comment on their areas of concern. If you are a landowner receiving this notice, a pipeline company representative may contact you about the acquisition of an easement to construct, operate, and maintain the facilities for the new segments of natural gas pipeline proposed in this project. The company would seek to negotiate a mutually acceptable agreement. However, if the Commission approves the project, that approval conveys with it the right of eminent domain. Therefore, if easement negotiations fail to produce an agreement, the pipeline company could initiate condemnation proceedings where compensation would be determined in accordance with state law. KMIGT provided landowners with a fact sheet prepared by the FERC entitled ‘‘An Interstate Natural Gas Facility On My Land? What Do I Need To Know?’’. This fact sheet addresses a number of typically-asked questions, including the use of eminent domain and how to participate in the Commission’s proceedings. It is also available for viewing on the FERC Web site (www. ferc.gov). Summary of the Proposed Project KMIGT proposes to: (1) Abandon certain natural gas pipeline facilities and the natural gas service therefrom by transfer to an affiliate, Kinder Morgan Pony Express Pipeline LLC (KMPXP), for the purpose of converting the facilities to oil transportation facilities; and (2) construct and operate certain replacement type facilities necessary to continue service to existing natural gas firm transportation customers following the proposed conversion. KMIGT also is seeking authorization to construct E:\FR\FM\05OCN1.SGM 05OCN1

Agencies

[Federal Register Volume 77, Number 194 (Friday, October 5, 2012)]
[Notices]
[Pages 60980-60981]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-24571]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Notice of Commission Staff Attendance

    The Federal Energy Regulatory Commission hereby gives notice that 
members of the Commission's staff may attend the following meetings 
related to the transmission planning activities of the Mid-Continent 
Area Power Pool (MAPP) and Southwest Power Pool (SPP):

MAPP-SPP Order 1000 Stakeholder Meeting--October 4, 2012

    The above-referenced meeting will be held at:

Crowne Plaza Hotel & Suites Minneapolis Airport, Three Appletree 
Square, Bloomington, MN 55425.

    The above-referenced meeting is open to the public.

[[Page 60981]]

    Further information may be found at www.mapp.org.
    The discussions at the meeting described above may address matters 
at issue in the following proceedings:

Docket No. ER09-35-001, Tallgrass Transmission, LLC
Docket No. ER09-36-001, Prairie Wind Transmission, LLC
Docket No. ER09-548-001, ITC Great Plains, LLC
Docket No. ER09-659-002, Southwest Power Pool, Inc.
Docket No. ER11-4105-000, Southwest Power Pool, Inc.
Docket No. EL11-34-001, Midwest Independent Transmission System 
Operator, Inc.
Docket No. ER12-1179-000, Southwest Power Pool, Inc.
Docket No. ER12-1401-000, Southwest Power Pool, Inc.
Docket No. ER12-1401-000, Southwest Power Pool, Inc.
Docket No. ER12-1415-000, Southwest Power Pool, Inc.
Docket No. ER12-1460-000, Southwest Power Pool, Inc.
Docket No. ER12-1610-000, Southwest Power Pool, Inc.
Docket No. ER12-1772-000, Southwest Power Pool, Inc.
Docket No. ER12-1779-000, Southwest Power Pool, Inc.
Docket No. ER12-2366-000, Southwest Power Pool, Inc.
Docket No. EL12-2-000, Southwest Power Pool, Inc.
Docket No. EL12-60-000, Southwest Power Pool, Inc., et al.
Docket No. ER12-2387, Southwest Power Pool Inc.

    For more information, contact Luciano Lima, Office of Energy 
Markets Regulation, Federal Energy Regulatory Commission at (202) 288-
6738 or Luciano.Lima@ferc.gov.

    Dated: September 28, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012-24571 Filed 10-4-12; 8:45 am]
BILLING CODE 6717-01-P