Town of Stuyvesant, New York and Albany Engineering Corporation; Notice of Availability of Draft Environmental Assessment, 60418-60419 [2012-24363]
Download as PDF
60418
Federal Register / Vol. 77, No. 192 / Wednesday, October 3, 2012 / Notices
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: September 25, 2012.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2012–24226 Filed 10–2–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
erowe on DSK2VPTVN1PROD with
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Filings Instituting Proceedings
Docket Numbers: RP12–1059–000.
Applicants: Dominion Transmission,
Inc.
Description: DTI—September 25, 2012
Negotiated Rate Agreements to be
effective 10/1/2012.
Filed Date: 9/25/12.
Accession Number: 20120925–5026.
Comments Due: 5 p.m. ET 10/9/12.
Docket Numbers: RP12–1060–000.
Applicants: Kinder Morgan Interstate
Gas Transmission.
Description: Neg Rate 2012–09–21.
MGE to be effective 10/1/2012.
Filed Date: 9/25/12.
Accession Number: 20120925–5034.
Comments Due: 5 p.m. ET 10/9/12.
Docket Numbers: RP12–1061–000.
Applicants: Tres Palacios Gas Storage
LLC.
Description: Tres Palacios Gas Storage
LLC—Modify Enhanced Interruptible
Wheeling Service to be effective 11/1/
2012.
Filed Date: 9/25/12.
Accession Number: 20120925–5104.
Comments Due: 5 p.m. ET 10/9/12.
Docket Numbers: RP12–1062–000.
Applicants: Texas Eastern
Transmission, LP.
Description: Order 587–V Compliance
Filing (NAESB Version 2.0 Standards)
TETLP to be effective 12/1/2012.
VerDate Mar<15>2010
15:03 Oct 02, 2012
Jkt 229001
Filed Date: 9/25/12.
Accession Number: 20120925–5131.
Comments Due: 5 p.m. ET 10/9/12.
Docket Numbers: RP12–1063–000.
Applicants: Algonquin Gas
Transmission, LLC.
Description: Order 587–V Compliance
Filing (NAESB Version 2.0 Standards)
AGT to be effective 12/1/2012.
Filed Date: 9/25/12.
Accession Number: 20120925–5132.
Comments Due: 5 p.m. ET 10/9/12.
Docket Numbers: RP12–1064–000.
Applicants: Venice Gathering System,
L.L.C.
Description: NAESB 2.0 Compliance
Filing to be effective 12/1/2012.
Filed Date: 9/25/12.
Accession Number: 20120925–5133.
Comments Due: 5 p.m. ET 10/9/12.
Docket Numbers: RP12–1065–000.
Applicants: Steckman Ridge, LP.
Description: Order 587–V Compliance
Filing (NAESB Version 2.0 Standards)
SR to be effective 12/1/2012.
Filed Date: 9/25/12.
Accession Number: 20120925–5134.
Comments Due: 5 p.m. ET 10/9/12.
Docket Numbers: RP12–1066–000.
Applicants: Big Sandy Pipeline, LLC.
Description: Order 587–V Compliance
Filing (NAESB Version 2.0 Standards)
BSP to be effective 12/1/2012.
Filed Date: 9/25/12.
Accession Number: 20120925–5135.
Comments Due: 5 p.m. ET 10/9/12.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
Filings in Existing Proceedings
Docket Numbers: RP12–130–003.
Applicants: Paiute Pipeline Company.
Description: NAESB 2.0 Revision to
be effective 12/1/2012.
Filed Date: 9/26/12.
Accession Number: 20120926–5001.
Comments Due: 5 p.m. ET 10/9/12.
Any person desiring to protest in any
the above proceedings must file in
accordance with Rule 211 of the
Commission’s Regulations (18 CFR
385.211) on or before 5 p.m. Eastern
time on the specified comment date.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
PO 00000
Frm 00046
Fmt 4703
Sfmt 4703
and service can be found at: https://
www.ferc.gov/docs-filing/efiling/filingreq.pdf. For other information, call (866)
208–3676 (toll free). For TTY, call (202)
502–8659.
Dated: September 26, 2012.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2012–24224 Filed 10–2–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2696–033–NY]
Town of Stuyvesant, New York and
Albany Engineering Corporation;
Notice of Availability of Draft
Environmental Assessment
In accordance with the National
Environmental Policy Act of 1969 and
the Federal Energy Regulatory
Commission’s regulations, 18 CFR part
380 (Order No. 486, 52 FR 47897), the
Office of Energy Projects has reviewed
the application for a new license for the
4,320-kilowatt (kW) Stuyvesant Falls
Hydroelectric Project located on
Kinderhook Creek in Columbia County,
New York, and prepared a draft
Environmental Assessment (draft EA).
In the draft EA, Commission staff
analyzes the potential environmental
effects of relicensing the project and
concludes that issuing a new license for
the project, with appropriate
environmental measures, would not
constitute a major federal action
significantly affecting the quality of the
human environment.
A copy of the draft EA is on file with
the Commission and is available for
public inspection. The draft EA may
also be viewed on the Commission’s
Web site at https://www.ferc.gov using
the ‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, contact FERC
Online Support at
FERCOnlineSupport@ferc.gov or tollfree at (866) 208–3676, or for TTY, (202)
502–8659.
You may also register online at
https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
Comments on the draft EA should be
filed within 30 days from the date of
this notice. Comments may be filed
electronically via the Internet. See 18
E:\FR\FM\03OCN1.SGM
03OCN1
Federal Register / Vol. 77, No. 192 / Wednesday, October 3, 2012 / Notices
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support.
Although the Commission strongly
encourages electronic filing, documents
may also be paper-filed. To paper-file,
mail an original and seven copies to:
Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
Please affix ‘‘Stuyvesant Falls
Hydroelectric Project No. 2696–033’’ to
all comments.
For further information, contact Andy
Bernick at (202) 502–8660.
Dated: September 27, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012–24363 Filed 10–2–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13519–001]
erowe on DSK2VPTVN1PROD with
Lock + Hydro Friends Fund XIX, LLC;
Notice of Intent To File License
Application, Filing of Pre-Application
Document, and Approving Use of the
Traditional Licensing Process
a. Type of Filing: Notice of Intent to
File License Application and Request to
Use the Traditional Licensing Process.
b. Project No.: 13519–001.
c. Date Filed: August 7, 2012.
d. Submitted By: Lock + Hydro
Friends Fund XIX, LLC.
e. Name of Project: Claiborne
Hydroelectric Project.
f. Location: At the U.S. Army Corps of
Engineers’ (Corps) Claiborne Lock and
Dam on the Alabama River, in Monroe
County, Alabama. The project would
occupy approximately 3 acres of United
States lands administered by the Corps.
g. Filed Pursuant to: 18 CFR 5.3 of the
Commission’s regulations.
h. Potential Applicant Contact: Mark
R. Stover, Vice President of Corporate
Affairs, Hydro Green Energy, LLC, 900
Oakmont Lane, Suite 310, Westmont, IL
60559; (877) 556–6566 x 711;
mark@hgenergy.com.
i. FERC Contact: Rachel McNamara at
(202) 502–8340l or email at
rachel.mcnamara@ferc.gov.
VerDate Mar<15>2010
15:03 Oct 02, 2012
Jkt 229001
j. Lock + Hydro Friends Fund XIX,
LLC filed its request to use the
Traditional Licensing Process on August
7, 2012. Lock + Hydro Friends Fund
XIX, LLC provided public notice of its
request on August 9, 2012. In a letter
dated September 27, 2012, the Director
of the Division of Hydropower
Licensing approved Lock + Hydro
Friends Fund XIX, LLC’s request to use
the Traditional Licensing Process.
k. With this notice, we are initiating
informal consultation with: (a) The U.S.
Fish and Wildlife Service and NOAA
Fisheries under section 7 of the
Endangered Species Act and the joint
agency regulations thereunder at 50
CFR, Part 402; (b) NOAA Fisheries
under section 305(b) of the MagnusonStevens Fishery Conservation and
Management Act and implementing
regulations at 50 CFR 600.920; and (c)
the Alabama State Historic Preservation
Officer, as required by section 106,
National Historical Preservation Act,
and the implementing regulations of the
Advisory Council on Historic
Preservation at 36 CFR 800.2.
l. With this notice, we are designating
Lock + Hydro Friends Fund XIX as the
Commission’s non-federal
representative for carrying out informal
consultation, pursuant to section 7 of
the Endangered Species Act, section 305
of the Magnuson-Stevens Fishery
Conservation and Management Act, and
section 106 of the National Historic
Preservation Act.
m. Lock + Hydro Friends Fund XIX,
LLC filed a Pre-Application Document
(PAD; including a proposed process
plan and schedule) with the
Commission, pursuant to 18 CFR 5.6 of
the Commission’s regulations.
n. A copy of the PAD is available for
review at the Commission in the Public
Reference Room or may be viewed on
the Commission’s Web site (https://
www.ferc.gov), using the ‘‘eLibrary’’
link. Enter the docket number,
excluding the last three digits in the
docket number field to access the
document. For assistance, contact FERC
Online Support at
FERCONlineSupport@ferc.gov or toll
free at 1–866–208–3676, or for TTY,
(202) 502–8659. A copy is also available
for inspection and reproduction at the
address in paragraph h.
o. Register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filing and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
PO 00000
Frm 00047
Fmt 4703
Sfmt 4703
60419
Dated: September 27, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012–24346 Filed 10–2–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. EL12–107–000]
ITC Holdings Corp., Entergy
Corporation, Midwest Independent
Transmission System Operator, Inc.;
Notice of Petition for Declaratory Order
Take notice that on September 24,
2012, ITC Holdings Corp., Entergy
Corporation, and Midwest Independent
Transmission System Operator, Inc.,
pursuant to section 207 of the Federal
Energy Regulatory Commission’s
(Commission) Rules of Practice and
Procedure, 18 CFR 385.207 and section
305 of the Federal Power Act (FPA), 16
U.S.C. 825d(a), filed a petition for
declaratory order requesting that the
Commission declare that the Separation
Plan, as more fully described in the
petition, will not violate section 305(a)
of the FPA.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. On or before the
comment date, it is not necessary to
serve motions to intervene or protests
on persons other than the Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
web site that enables subscribers to
receive email notification when a
E:\FR\FM\03OCN1.SGM
03OCN1
Agencies
[Federal Register Volume 77, Number 192 (Wednesday, October 3, 2012)]
[Notices]
[Pages 60418-60419]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-24363]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2696-033-NY]
Town of Stuyvesant, New York and Albany Engineering Corporation;
Notice of Availability of Draft Environmental Assessment
In accordance with the National Environmental Policy Act of 1969
and the Federal Energy Regulatory Commission's regulations, 18 CFR part
380 (Order No. 486, 52 FR 47897), the Office of Energy Projects has
reviewed the application for a new license for the 4,320-kilowatt (kW)
Stuyvesant Falls Hydroelectric Project located on Kinderhook Creek in
Columbia County, New York, and prepared a draft Environmental
Assessment (draft EA). In the draft EA, Commission staff analyzes the
potential environmental effects of relicensing the project and
concludes that issuing a new license for the project, with appropriate
environmental measures, would not constitute a major federal action
significantly affecting the quality of the human environment.
A copy of the draft EA is on file with the Commission and is
available for public inspection. The draft EA may also be viewed on the
Commission's Web site at https://www.ferc.gov using the ``eLibrary''
link. Enter the docket number excluding the last three digits in the
docket number field to access the document. For assistance, contact
FERC Online Support at FERCOnlineSupport@ferc.gov or toll-free at (866)
208-3676, or for TTY, (202) 502-8659.
You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
Comments on the draft EA should be filed within 30 days from the
date of this notice. Comments may be filed electronically via the
Internet. See 18
[[Page 60419]]
CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web
site https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit
brief comments up to 6,000 characters, without prior registration,
using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information at the
end of your comments. For assistance, please contact FERC Online
Support. Although the Commission strongly encourages electronic filing,
documents may also be paper-filed. To paper-file, mail an original and
seven copies to: Kimberly D. Bose, Secretary, Federal Energy Regulatory
Commission, 888 First Street NE., Washington, DC 20426. Please affix
``Stuyvesant Falls Hydroelectric Project No. 2696-033'' to all
comments.
For further information, contact Andy Bernick at (202) 502-8660.
Dated: September 27, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012-24363 Filed 10-2-12; 8:45 am]
BILLING CODE 6717-01-P