Town of Stuyvesant, New York and Albany Engineering Corporation; Notice of Availability of Draft Environmental Assessment, 60418-60419 [2012-24363]

Download as PDF 60418 Federal Register / Vol. 77, No. 192 / Wednesday, October 3, 2012 / Notices Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: September 25, 2012. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2012–24226 Filed 10–2–12; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings erowe on DSK2VPTVN1PROD with Take notice that the Commission has received the following Natural Gas Pipeline Rate and Refund Report filings: Filings Instituting Proceedings Docket Numbers: RP12–1059–000. Applicants: Dominion Transmission, Inc. Description: DTI—September 25, 2012 Negotiated Rate Agreements to be effective 10/1/2012. Filed Date: 9/25/12. Accession Number: 20120925–5026. Comments Due: 5 p.m. ET 10/9/12. Docket Numbers: RP12–1060–000. Applicants: Kinder Morgan Interstate Gas Transmission. Description: Neg Rate 2012–09–21. MGE to be effective 10/1/2012. Filed Date: 9/25/12. Accession Number: 20120925–5034. Comments Due: 5 p.m. ET 10/9/12. Docket Numbers: RP12–1061–000. Applicants: Tres Palacios Gas Storage LLC. Description: Tres Palacios Gas Storage LLC—Modify Enhanced Interruptible Wheeling Service to be effective 11/1/ 2012. Filed Date: 9/25/12. Accession Number: 20120925–5104. Comments Due: 5 p.m. ET 10/9/12. Docket Numbers: RP12–1062–000. Applicants: Texas Eastern Transmission, LP. Description: Order 587–V Compliance Filing (NAESB Version 2.0 Standards) TETLP to be effective 12/1/2012. VerDate Mar<15>2010 15:03 Oct 02, 2012 Jkt 229001 Filed Date: 9/25/12. Accession Number: 20120925–5131. Comments Due: 5 p.m. ET 10/9/12. Docket Numbers: RP12–1063–000. Applicants: Algonquin Gas Transmission, LLC. Description: Order 587–V Compliance Filing (NAESB Version 2.0 Standards) AGT to be effective 12/1/2012. Filed Date: 9/25/12. Accession Number: 20120925–5132. Comments Due: 5 p.m. ET 10/9/12. Docket Numbers: RP12–1064–000. Applicants: Venice Gathering System, L.L.C. Description: NAESB 2.0 Compliance Filing to be effective 12/1/2012. Filed Date: 9/25/12. Accession Number: 20120925–5133. Comments Due: 5 p.m. ET 10/9/12. Docket Numbers: RP12–1065–000. Applicants: Steckman Ridge, LP. Description: Order 587–V Compliance Filing (NAESB Version 2.0 Standards) SR to be effective 12/1/2012. Filed Date: 9/25/12. Accession Number: 20120925–5134. Comments Due: 5 p.m. ET 10/9/12. Docket Numbers: RP12–1066–000. Applicants: Big Sandy Pipeline, LLC. Description: Order 587–V Compliance Filing (NAESB Version 2.0 Standards) BSP to be effective 12/1/2012. Filed Date: 9/25/12. Accession Number: 20120925–5135. Comments Due: 5 p.m. ET 10/9/12. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. Filings in Existing Proceedings Docket Numbers: RP12–130–003. Applicants: Paiute Pipeline Company. Description: NAESB 2.0 Revision to be effective 12/1/2012. Filed Date: 9/26/12. Accession Number: 20120926–5001. Comments Due: 5 p.m. ET 10/9/12. Any person desiring to protest in any the above proceedings must file in accordance with Rule 211 of the Commission’s Regulations (18 CFR 385.211) on or before 5 p.m. Eastern time on the specified comment date. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, PO 00000 Frm 00046 Fmt 4703 Sfmt 4703 and service can be found at: https:// www.ferc.gov/docs-filing/efiling/filingreq.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: September 26, 2012. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2012–24224 Filed 10–2–12; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2696–033–NY] Town of Stuyvesant, New York and Albany Engineering Corporation; Notice of Availability of Draft Environmental Assessment In accordance with the National Environmental Policy Act of 1969 and the Federal Energy Regulatory Commission’s regulations, 18 CFR part 380 (Order No. 486, 52 FR 47897), the Office of Energy Projects has reviewed the application for a new license for the 4,320-kilowatt (kW) Stuyvesant Falls Hydroelectric Project located on Kinderhook Creek in Columbia County, New York, and prepared a draft Environmental Assessment (draft EA). In the draft EA, Commission staff analyzes the potential environmental effects of relicensing the project and concludes that issuing a new license for the project, with appropriate environmental measures, would not constitute a major federal action significantly affecting the quality of the human environment. A copy of the draft EA is on file with the Commission and is available for public inspection. The draft EA may also be viewed on the Commission’s Web site at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support at FERCOnlineSupport@ferc.gov or tollfree at (866) 208–3676, or for TTY, (202) 502–8659. You may also register online at https://www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support. Comments on the draft EA should be filed within 30 days from the date of this notice. Comments may be filed electronically via the Internet. See 18 E:\FR\FM\03OCN1.SGM 03OCN1 Federal Register / Vol. 77, No. 192 / Wednesday, October 3, 2012 / Notices CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site https://www.ferc.gov/docs-filing/ efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support. Although the Commission strongly encourages electronic filing, documents may also be paper-filed. To paper-file, mail an original and seven copies to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. Please affix ‘‘Stuyvesant Falls Hydroelectric Project No. 2696–033’’ to all comments. For further information, contact Andy Bernick at (202) 502–8660. Dated: September 27, 2012. Kimberly D. Bose, Secretary. [FR Doc. 2012–24363 Filed 10–2–12; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13519–001] erowe on DSK2VPTVN1PROD with Lock + Hydro Friends Fund XIX, LLC; Notice of Intent To File License Application, Filing of Pre-Application Document, and Approving Use of the Traditional Licensing Process a. Type of Filing: Notice of Intent to File License Application and Request to Use the Traditional Licensing Process. b. Project No.: 13519–001. c. Date Filed: August 7, 2012. d. Submitted By: Lock + Hydro Friends Fund XIX, LLC. e. Name of Project: Claiborne Hydroelectric Project. f. Location: At the U.S. Army Corps of Engineers’ (Corps) Claiborne Lock and Dam on the Alabama River, in Monroe County, Alabama. The project would occupy approximately 3 acres of United States lands administered by the Corps. g. Filed Pursuant to: 18 CFR 5.3 of the Commission’s regulations. h. Potential Applicant Contact: Mark R. Stover, Vice President of Corporate Affairs, Hydro Green Energy, LLC, 900 Oakmont Lane, Suite 310, Westmont, IL 60559; (877) 556–6566 x 711; mark@hgenergy.com. i. FERC Contact: Rachel McNamara at (202) 502–8340l or email at rachel.mcnamara@ferc.gov. VerDate Mar<15>2010 15:03 Oct 02, 2012 Jkt 229001 j. Lock + Hydro Friends Fund XIX, LLC filed its request to use the Traditional Licensing Process on August 7, 2012. Lock + Hydro Friends Fund XIX, LLC provided public notice of its request on August 9, 2012. In a letter dated September 27, 2012, the Director of the Division of Hydropower Licensing approved Lock + Hydro Friends Fund XIX, LLC’s request to use the Traditional Licensing Process. k. With this notice, we are initiating informal consultation with: (a) The U.S. Fish and Wildlife Service and NOAA Fisheries under section 7 of the Endangered Species Act and the joint agency regulations thereunder at 50 CFR, Part 402; (b) NOAA Fisheries under section 305(b) of the MagnusonStevens Fishery Conservation and Management Act and implementing regulations at 50 CFR 600.920; and (c) the Alabama State Historic Preservation Officer, as required by section 106, National Historical Preservation Act, and the implementing regulations of the Advisory Council on Historic Preservation at 36 CFR 800.2. l. With this notice, we are designating Lock + Hydro Friends Fund XIX as the Commission’s non-federal representative for carrying out informal consultation, pursuant to section 7 of the Endangered Species Act, section 305 of the Magnuson-Stevens Fishery Conservation and Management Act, and section 106 of the National Historic Preservation Act. m. Lock + Hydro Friends Fund XIX, LLC filed a Pre-Application Document (PAD; including a proposed process plan and schedule) with the Commission, pursuant to 18 CFR 5.6 of the Commission’s regulations. n. A copy of the PAD is available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s Web site (https:// www.ferc.gov), using the ‘‘eLibrary’’ link. Enter the docket number, excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support at FERCONlineSupport@ferc.gov or toll free at 1–866–208–3676, or for TTY, (202) 502–8659. A copy is also available for inspection and reproduction at the address in paragraph h. o. Register online at https:// www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filing and issuances related to this or other pending projects. For assistance, contact FERC Online Support. PO 00000 Frm 00047 Fmt 4703 Sfmt 4703 60419 Dated: September 27, 2012. Kimberly D. Bose, Secretary. [FR Doc. 2012–24346 Filed 10–2–12; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL12–107–000] ITC Holdings Corp., Entergy Corporation, Midwest Independent Transmission System Operator, Inc.; Notice of Petition for Declaratory Order Take notice that on September 24, 2012, ITC Holdings Corp., Entergy Corporation, and Midwest Independent Transmission System Operator, Inc., pursuant to section 207 of the Federal Energy Regulatory Commission’s (Commission) Rules of Practice and Procedure, 18 CFR 385.207 and section 305 of the Federal Power Act (FPA), 16 U.S.C. 825d(a), filed a petition for declaratory order requesting that the Commission declare that the Separation Plan, as more fully described in the petition, will not violate section 305(a) of the FPA. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. On or before the comment date, it is not necessary to serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the web site that enables subscribers to receive email notification when a E:\FR\FM\03OCN1.SGM 03OCN1

Agencies

[Federal Register Volume 77, Number 192 (Wednesday, October 3, 2012)]
[Notices]
[Pages 60418-60419]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-24363]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 2696-033-NY]


Town of Stuyvesant, New York and Albany Engineering Corporation; 
Notice of Availability of Draft Environmental Assessment

    In accordance with the National Environmental Policy Act of 1969 
and the Federal Energy Regulatory Commission's regulations, 18 CFR part 
380 (Order No. 486, 52 FR 47897), the Office of Energy Projects has 
reviewed the application for a new license for the 4,320-kilowatt (kW) 
Stuyvesant Falls Hydroelectric Project located on Kinderhook Creek in 
Columbia County, New York, and prepared a draft Environmental 
Assessment (draft EA). In the draft EA, Commission staff analyzes the 
potential environmental effects of relicensing the project and 
concludes that issuing a new license for the project, with appropriate 
environmental measures, would not constitute a major federal action 
significantly affecting the quality of the human environment.
    A copy of the draft EA is on file with the Commission and is 
available for public inspection. The draft EA may also be viewed on the 
Commission's Web site at https://www.ferc.gov using the ``eLibrary'' 
link. Enter the docket number excluding the last three digits in the 
docket number field to access the document. For assistance, contact 
FERC Online Support at FERCOnlineSupport@ferc.gov or toll-free at (866) 
208-3676, or for TTY, (202) 502-8659.
    You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances 
related to this or other pending projects. For assistance, contact FERC 
Online Support.
    Comments on the draft EA should be filed within 30 days from the 
date of this notice. Comments may be filed electronically via the 
Internet. See 18

[[Page 60419]]

CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web 
site https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit 
brief comments up to 6,000 characters, without prior registration, 
using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information at the 
end of your comments. For assistance, please contact FERC Online 
Support. Although the Commission strongly encourages electronic filing, 
documents may also be paper-filed. To paper-file, mail an original and 
seven copies to: Kimberly D. Bose, Secretary, Federal Energy Regulatory 
Commission, 888 First Street NE., Washington, DC 20426. Please affix 
``Stuyvesant Falls Hydroelectric Project No. 2696-033'' to all 
comments.
    For further information, contact Andy Bernick at (202) 502-8660.

    Dated: September 27, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012-24363 Filed 10-2-12; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.