FFP Project 66 LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications, 60420 [2012-24349]
Download as PDF
60420
Federal Register / Vol. 77, No. 192 / Wednesday, October 3, 2012 / Notices
document is added to a subscribed
docket(s).
For assistance with any FERC Online
service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5 p.m. Eastern Time
on November 8, 2012.
Dated: September 26, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012–24372 Filed 10–2–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Petition for Enforcement
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5 p.m. Eastern Time
on October 15, 2012.
erowe on DSK2VPTVN1PROD with
In the matter of: EL12–108–000, QF11–46–
001, QF11–47–001, QF11–48–001; Murphy
Flat Energy LLC, Murphy Flat Mesa LLC,
Murphy Flat Wind LLC.
Dated: September 26, 2012.
Kimberly D. Bose,
Secretary.
Take notice that on September 25,
2012, pursuant to section 210(h)(2) of
the Public Utility Regulatory Policies
Act of 1978 (PURPA),1 Murphy Flat
Energy LLC, Murphy Flat Mesa LLC,
and Murphy Flat Wind LLC
(collectively Petitioners), filed a petition
requesting the Federal Energy
Regulatory Commission take
enforcement action under section 210(h)
of PURPA against the Idaho Public
Utilities Commission (Idaho PUC) to
overturn the Idaho PUC’s Murphy Flat
Order 2 and declare that legally
enforceable obligations did arise, as
more fully described in the petition.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. On or before the
comment date, it is not necessary to
serve motions to intervene or protests
on persons other than the Applicant
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
BILLING CODE 6717–01–P
1 16
U.S.C. 824a-3(h).
PUC Order No. 32255, Case No. IPC–E–
10–56 et al. (June 8, 2011) (‘‘Murphy Flat Order’’).
2 Idaho
VerDate Mar<15>2010
15:03 Oct 02, 2012
Jkt 229001
[FR Doc. 2012–24361 Filed 10–2–12; 8:45 am]
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13497–001]
FFP Project 66 LLC; Notice of
Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
On September 4, 2012, FFP Project 66,
LLC filed an application for a
preliminary permit, pursuant to section
4(f) of the Federal Power Act (FPA),
proposing to study the feasibility of a
hydropower project located on the
Mississippi River, near Fairview, in
Concordia Parish, Louisiana, and
Adams County, Mississippi. The sole
purpose of a preliminary permit, if
issued, is to grant the permit holder
priority to file a license application
during the permit term. A preliminary
permit does not authorize the permit
holder to perform any land-disturbing
activities or otherwise enter upon lands
or waters owned by others without the
owners’ express permission.
The proposed Saint Catherine Bend
hydrokinetic project would consist of
the following: (1) Up to 6,382
SmarTurbine generating units installed
in arrays on the bottom of the river; (2)
the total capacity of the installation
would be up to 255,280 kilowatts; (3)
flexible cables would convey each
arrays power to a metering station; and
PO 00000
Frm 00048
Fmt 4703
Sfmt 9990
(4) a transmission line would
interconnect with the power grid. The
proposed project would have an average
annual generation of 580,564,000
kilowatt-hours, which would be sold to
a local utility.
Applicant Contact: Ramya
Swaminathan, Free Flow Power
Corporation, 239 Causeway Street,
Boston, MA 02114; phone (978) 226–
1531.
FERC Contact: Michael Spencer, (202)
502–6093.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36. Comments, motions to
intervene, notices of intent, and
competing applications may be filed
electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://www.ferc
.gov/docs-filing/ecomment.asp. You
must include your name and contact
information at the end of your
comments. For assistance, please
contact FERC Online Support at
FERCOnlineSupport@ferc.gov or toll
free at 1–866–208–3676, or for TTY,
(202) 502–8659. Although the
Commission strongly encourages
electronic filing, documents may also be
paper-filed. To paper-file, mail an
original and seven copies to: Kimberly
D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE., Washington, DC 20426.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of Commission’s Web site at
https://www.ferc.gov/docs-filing/elibrary.
asp. Enter the docket number (P–13497)
in the docket number field to access the
document. For assistance, contact FERC
Online Support.
Dated: September 27, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012–24349 Filed 10–2–12; 8:45 am]
BILLING CODE 6717–01–P
E:\FR\FM\03OCN1.SGM
03OCN1
Agencies
[Federal Register Volume 77, Number 192 (Wednesday, October 3, 2012)]
[Notices]
[Page 60420]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-24349]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 13497-001]
FFP Project 66 LLC; Notice of Preliminary Permit Application
Accepted for Filing and Soliciting Comments, Motions To Intervene, and
Competing Applications
On September 4, 2012, FFP Project 66, LLC filed an application for
a preliminary permit, pursuant to section 4(f) of the Federal Power Act
(FPA), proposing to study the feasibility of a hydropower project
located on the Mississippi River, near Fairview, in Concordia Parish,
Louisiana, and Adams County, Mississippi. The sole purpose of a
preliminary permit, if issued, is to grant the permit holder priority
to file a license application during the permit term. A preliminary
permit does not authorize the permit holder to perform any land-
disturbing activities or otherwise enter upon lands or waters owned by
others without the owners' express permission.
The proposed Saint Catherine Bend hydrokinetic project would
consist of the following: (1) Up to 6,382 SmarTurbine generating units
installed in arrays on the bottom of the river; (2) the total capacity
of the installation would be up to 255,280 kilowatts; (3) flexible
cables would convey each arrays power to a metering station; and (4) a
transmission line would interconnect with the power grid. The proposed
project would have an average annual generation of 580,564,000
kilowatt-hours, which would be sold to a local utility.
Applicant Contact: Ramya Swaminathan, Free Flow Power Corporation,
239 Causeway Street, Boston, MA 02114; phone (978) 226-1531.
FERC Contact: Michael Spencer, (202) 502-6093.
Deadline for filing comments, motions to intervene, competing
applications (without notices of intent), or notices of intent to file
competing applications: 60 days from the issuance of this notice.
Competing applications and notices of intent must meet the requirements
of 18 CFR 4.36. Comments, motions to intervene, notices of intent, and
competing applications may be filed electronically via the Internet.
See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's
Web site https://www.ferc.gov/docs-filing/efiling.asp. Commenters can
submit brief comments up to 6,000 characters, without prior
registration, using the eComment system at https://www.ferc .gov/docs-
filing/ecomment.asp. You must include your name and contact information
at the end of your comments. For assistance, please contact FERC Online
Support at FERCOnlineSupport@ferc.gov or toll free at 1-866-208-3676,
or for TTY, (202) 502-8659. Although the Commission strongly encourages
electronic filing, documents may also be paper-filed. To paper-file,
mail an original and seven copies to: Kimberly D. Bose, Secretary,
Federal Energy Regulatory Commission, 888 First Street NE., Washington,
DC 20426.
More information about this project, including a copy of the
application, can be viewed or printed on the ``eLibrary'' link of
Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P-13497) in the docket number field to access
the document. For assistance, contact FERC Online Support.
Dated: September 27, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012-24349 Filed 10-2-12; 8:45 am]