Combined Notice of Filings, 60416-60417 [2012-24227]
Download as PDF
60416
Federal Register / Vol. 77, No. 192 / Wednesday, October 3, 2012 / Notices
Revisions to the schedule may be made
as appropriate.
Milestone
Target date
Filing of recommendations,
preliminary terms and
conditions, and preliminary fishway prescriptions.
Commission issues EA ......
Comments on EA ..............
Modified terms and conditions.
November 2012.
March 2013.
April 2013.
June 2013.
p. Final amendments to the
application must be filed with the
Commission no later than 30 days from
the issuance date of this notice.
q. A license applicant must file no
later than 60 days following the date of
issuance of the notice of acceptance and
ready for environmental analysis
provided for in 18 CFR 5.22: (1) A copy
of the water quality certification; (2) a
copy of the request for certification,
including proof of the date on which the
certifying agency received the request;
or (3) evidence of waiver of water
quality certification.
r. Any qualified applicant desiring to
file a competing application must
submit to the Commission, on or before
the specified intervention deadline date,
a competing development application,
or a notice of intent to file such an
application. Submission of a timely
notice of intent allows an interested
person to file the competing
development application no later than
120 days after the specified intervention
deadline date. Applications for
preliminary permits will not be
accepted in response to this notice.
A notice of intent must specify the
exact name, business address, and
telephone number of the prospective
applicant, and must include an
unequivocal statement of intent to
submit a development application. A
notice of intent must be served on the
applicant(s) named in this public notice.
Dated: September 26, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012–24365 Filed 10–2–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
erowe on DSK2VPTVN1PROD with
[Docket No. CP12–524–000]
Questar Pipeline Company; Notice of
Application
On September 18, 2012, Questar
Pipeline Company (Questar) filed with
VerDate Mar<15>2010
15:03 Oct 02, 2012
Jkt 229001
the Federal Energy Regulatory
Commission (Commission) an
application under section 7(c) of the
Natural Gas Act and section 157.7 of the
Commission’s Regulations for authority
to modify existing natural gas facilities
in Carbon and Utah Counties, Utah on
its southern pipeline transmission
system. The Main Line 41 Compression
Project involves upgrades to
compression station equipment and
associated facilities as more fully
detailed in the Application.
Questions concerning this application
may be directed to Greg Williams,
Senior Regulatory Affairs Analyst, 180
East 100 South, P.O. Box 45360, Salt
Lake City, Utah 84145–0360 or by
calling 801–324–5370, 801–324–5623
(fax) or by emailing
greg.williams@questar.com.
Pursuant to section 157.9 of the
Commission’s rules, 18 CFR 157.9,
within 90 days of this Notice the
Commission staff will either: complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding; or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or EA for this proposal. The filing of the
EA in the Commission’s public record
for this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s FEIS or EA.
There are two ways to become
involved in the Commission’s review of
this project. First, any person wishing to
obtain legal status by becoming a party
to the proceedings for this project
should, on or before the comment date
stated below, file with the Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426,
a motion to intervene in accordance
with the requirements of the
Commission’s Rules of Practice and
Procedure (18 CFR 385.214 or 385.211)
and the Regulations under the NGA (18
CFR 157.10). A person obtaining party
status will be placed on the service list
maintained by the Secretary of the
Commission and will receive copies of
all documents filed by the applicant and
by all other parties. A party must submit
7 copies of filings made with the
Commission and must mail a copy to
the applicant and to every other party in
PO 00000
Frm 00044
Fmt 4703
Sfmt 4703
the proceeding. Only parties to the
proceeding can ask for court review of
Commission orders in the proceeding.
However, a person does not have to
intervene in order to have comments
considered. The second way to
participate is by filing with the
Secretary of the Commission, as soon as
possible, an original and two copies of
comments in support of or in opposition
to this project. The Commission will
consider these comments in
determining the appropriate action to be
taken, but the filing of a comment alone
will not serve to make the filer a party
to the proceeding. The Commission’s
rules require that persons filing
comments in opposition to the project
provide copies of their protests only to
the party or parties directly involved in
the protest.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.fere.gov.
Persons unable to file electronically
should submit an original and 7 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426. This filing is accessible on-line
at https://www.ferc.gov.using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5 p.m. Eastern Time
on October 18, 2012.
Dated: September 27, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012–24371 Filed 10–2–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Filings Instituting Proceedings
Docket Numbers: RP12–1052–000.
Applicants: Natural Gas Pipeline
Company of America.
E:\FR\FM\03OCN1.SGM
03OCN1
erowe on DSK2VPTVN1PROD with
Federal Register / Vol. 77, No. 192 / Wednesday, October 3, 2012 / Notices
Description: Negotiated Rate—
Tenaska LPS–ROs to be effective 10/1/
2012.
Filed Date: 9/24/12.
Accession Number: 20120924–5035.
Comments Due: 5 p.m. ET 10/9/12.
Docket Numbers: RP12–1053–000.
Applicants: Natural Gas Pipeline
Company of America.
Description: Penalty Revenue
Crediting Report of Natural Gas Pipeline
Company of America LLC.
Filed Date: 9/24/12.
Accession Number: 20120924–5062.
Comments Due: 5 p.m. ET 10/9/12.
Docket Numbers: RP12–1054–000.
Applicants: Cameron Interstate
Pipeline, LLC.
Description: Cameron Interstate
Pipeline LLC Compliance Filing per
FERC Order 587–V NAESB 2.0 to be
effective 12/1/2012.
Filed Date: 9/24/12.
Accession Number: 20120924–5066.
Comments Due: 5 p.m. ET 10/9/12.
Docket Numbers: RP12–1055–000.
Applicants: LA Storage, LLC.
Description: LA Storage Compliance
Filing per FERC Order 587–V NAESB V.
2.0 to be effective 12/1/2012.
Filed Date: 9/24/12.
Accession Number: 20120924–5067.
Comments Due: 5 p.m. ET 10/9/12.
Docket Numbers: RP12–1056–000.
Applicants: Mississippi Hub, LLC.
Description: Mississippi Hub
Compliance Filing per FERC Order 587–
V NAESB V. 2.0 to be effective 12/1/
2012.
Filed Date: 9/24/12.
Accession Number: 20120924–5068.
Comments Due: 5 p.m. ET 10/9/12.
Docket Numbers: RP12–1057–000.
Applicants: Natural Gas Pipeline
Company of America.
Description: Negotiated Rate Filing—
J–W Gathering to be effective 10/1/2012.
Filed Date: 9/24/12.
Accession Number: 20120924–5148.
Comments Due: 5 p.m. ET 10/9/12.
Docket Numbers: RP12–1058–000.
Applicants: Pine Prairie Energy
Center, LLC.
Description: Pine Prairie Enhanced
Services to be effective 11/1/2012.
Filed Date: 9/25/12.
Accession Number: 20120925–5002.
Comments Due: 5 p.m. ET 10/9/12.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
VerDate Mar<15>2010
15:03 Oct 02, 2012
Jkt 229001
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
and service can be found at: https://
www.ferc.gov/docs-filing/efiling/filingreq.pdf. For other information, call (866)
208–3676 (toll free). For TTY, call (202)
502–8659.
Dated September 25, 2012.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2012–24227 Filed 10–2–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC12–145–000.
Applicants: ITC Holdings Corp.,
Entergy Corporation, Midwest
Independent Transmission System.
Description: Joint Application Under
Sections 203 and 205 of the Federal
Power Act and Petition for Declaratory
Order on Application of Section 305(a)
of the Federal Power Act of ITC
Holdings Corp., Entergy Corporation et
al.
Filed Date: 9/24/12.
Accession Number: 20120924–5181
Comments Due: 5 p.m. ET 11/8/12.
Take notice that the Commission
received the following exempt
wholesale generator filings:
Docket Numbers: EG12–113–000.
Applicants: Groton Wind, LLC.
Description: Self-Certification of
Exempt Wholesale Generator Status of
Groton Wind, LLC.
Filed Date: 9/24/12.
Accession Number: 20120924–5053.
Comments Due: 5 p.m. ET 10/15/12.
Docket Numbers: EG12–114–000.
Applicants: New England Wind, LLC.
Description: Self-Certification of
Exempt Wholesale Generator Status of
New England Wind, LLC.
Filed Date: 9/24/12.
Accession Number: 20120924–5054.
Comments Due: 5 p.m. ET 10/15/12.
Docket Numbers: EG12–115–000.
Applicants: Penascal II Wind Project,
LLC.
Description: Notice of SelfCertification of Exempt Wholesale
Generator Status of Penascal II Wind
Project, LLC.
PO 00000
Frm 00045
Fmt 4703
Sfmt 4703
60417
Filed Date: 9/25/12.
Accession Number: 20120925–5014.
Comments Due: 5 p.m. ET 10/16/12.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER12–1753–000.
Applicants: Wyoming Colorado
Intertie, LLC.
Description: Wyoming Colorado
Intertie, LLC. and Wyoming Wind &
Power, LLC. submit additional
information and request expedited
action under ER12–1753.
Filed Date: 9/21/12.
Accession Number: 20120921–5160.
Comments Due: 5 p.m. ET 10/1/12.
Docket Numbers: ER12–2514–000.
Applicants: Susterra Energy, LLC.
Description: Susterra Energy, LLC.
submits supplement to application for
market based authority.
Filed Date: 9/20/12.
Accession Number: 20120920–5162.
Comments Due: 5 p.m. ET 10/11/12.
Docket Numbers: ER12–2523–001.
Applicants: Midwest Independent
Transmission System.
Description: Amend Brownton-GRE–
NSP T–T to be effective 7/31/2012
under.
Filed Date: 9/24/12.
Accession Number: 20120924–5138.
Comments Due: 5 p.m. ET 10/15/12.
Docket Numbers: ER12–2524–001.
Applicants: Midwest Independent
Transmission System.
Description: Sheas Lake-GRE–NSP T–
T Amendment to be effective 8/10/2012.
Filed Date: 9/25/12.
Accession Number: 20120925–5059.
Comments Due: 5 p.m. ET 10/16/12.
Docket Numbers: ER12–2680–000.
Applicants: Wells Fargo
Commodities, LLC.
Description: WFCLLC. Notice of
Cancellation to be effective 9/30/2012.
Filed Date: 9/25/12.
Accession Number: 20120925–5001.
Comments Due: 5 p.m. ET 10/16/12.
Docket Numbers: ER12–2681–000.
Applicants: ITC Holdings Corp.,
Entergy Corporation, Midwest
Independent Transmission System.
Description: Joint Application Under
Sections 203 and 205 of the Federal
Power Act and Petition for Declaratory
Order on Application of Section 305(a)
of the Federal Power Act of ITC
Holdings Corp., Entergy Corporation et
al.
Filed Date: 9/24/12.
Accession Number: 20120924–5181.
Comments Due: 5 p.m. ET 11/8/12.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
E:\FR\FM\03OCN1.SGM
03OCN1
Agencies
[Federal Register Volume 77, Number 192 (Wednesday, October 3, 2012)]
[Notices]
[Pages 60416-60417]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-24227]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings
Take notice that the Commission has received the following Natural
Gas Pipeline Rate and Refund Report filings:
Filings Instituting Proceedings
Docket Numbers: RP12-1052-000.
Applicants: Natural Gas Pipeline Company of America.
[[Page 60417]]
Description: Negotiated Rate--Tenaska LPS-ROs to be effective 10/1/
2012.
Filed Date: 9/24/12.
Accession Number: 20120924-5035.
Comments Due: 5 p.m. ET 10/9/12.
Docket Numbers: RP12-1053-000.
Applicants: Natural Gas Pipeline Company of America.
Description: Penalty Revenue Crediting Report of Natural Gas
Pipeline Company of America LLC.
Filed Date: 9/24/12.
Accession Number: 20120924-5062.
Comments Due: 5 p.m. ET 10/9/12.
Docket Numbers: RP12-1054-000.
Applicants: Cameron Interstate Pipeline, LLC.
Description: Cameron Interstate Pipeline LLC Compliance Filing per
FERC Order 587-V NAESB 2.0 to be effective 12/1/2012.
Filed Date: 9/24/12.
Accession Number: 20120924-5066.
Comments Due: 5 p.m. ET 10/9/12.
Docket Numbers: RP12-1055-000.
Applicants: LA Storage, LLC.
Description: LA Storage Compliance Filing per FERC Order 587-V
NAESB V. 2.0 to be effective 12/1/2012.
Filed Date: 9/24/12.
Accession Number: 20120924-5067.
Comments Due: 5 p.m. ET 10/9/12.
Docket Numbers: RP12-1056-000.
Applicants: Mississippi Hub, LLC.
Description: Mississippi Hub Compliance Filing per FERC Order 587-V
NAESB V. 2.0 to be effective 12/1/2012.
Filed Date: 9/24/12.
Accession Number: 20120924-5068.
Comments Due: 5 p.m. ET 10/9/12.
Docket Numbers: RP12-1057-000.
Applicants: Natural Gas Pipeline Company of America.
Description: Negotiated Rate Filing--J-W Gathering to be effective
10/1/2012.
Filed Date: 9/24/12.
Accession Number: 20120924-5148.
Comments Due: 5 p.m. ET 10/9/12.
Docket Numbers: RP12-1058-000.
Applicants: Pine Prairie Energy Center, LLC.
Description: Pine Prairie Enhanced Services to be effective 11/1/
2012.
Filed Date: 9/25/12.
Accession Number: 20120925-5002.
Comments Due: 5 p.m. ET 10/9/12.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
The filings are accessible in the Commission's eLibrary system by
clicking on the links or querying the docket number.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, and service can be found at:
https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other
information, call (866) 208-3676 (toll free). For TTY, call (202) 502-
8659.
Dated September 25, 2012.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2012-24227 Filed 10-2-12; 8:45 am]
BILLING CODE 6717-01-P