Wisconsin Public Service Corporation; Notice of Environmental Site Review, 59921-59922 [2012-24105]
Download as PDF
mstockstill on DSK4VPTVN1PROD with NOTICES
Federal Register / Vol. 77, No. 190 / Monday, October 1, 2012 / Notices
Filed Date: 9/20/12.
Accession Number: 20120920–5121.
Comments Due: 5 p.m. ET 10/11/12.
Docket Numbers: ER12–2670–000.
Applicants: Public Service Company
of New Mexico.
Description: Public Service Company
of New Mexico submits tariff filing per
35: Certificate of Concurrence-TEP and
PNM rate schedule 321 to be effective 5/
17/2011.
Filed Date: 9/21/12.
Accession Number: 20120921–5045.
Comments Due: 5 p.m. ET 10/12/12.
Docket Numbers: ER12–2671–000.
Applicants: PJM Interconnection,
L.L.C.
Description: PJM Interconnection,
L.L.C. submits tariff filing per
35.13(a)(2)(iii: RTEP clean-up filing re
accepted language in ER12–2085 &
ER12–2288 to be effective 9/19/2012.
Filed Date: 9/21/12.
Accession Number: 20120921–5057.
Comments Due: 5 p.m. ET 10/12/12.
Docket Numbers: ER12–2672–000.
Applicants: Sempra Energy Trading
LLC.
Description: Sempra Energy Trading
LLC submits Notice of Cancellation.
Filed Date: 9/21/12.
Accession Number: 20120921–5064.
Comments Due: 5 p.m. ET 10/12/12.
Docket Numbers: ER12–2673–000.
Applicants: PacifiCorp.
Description: PacifiCorp submits tariff
filing per 35.13(a)(2)(iii: EWEB NonConforming Point to Point Agreement to
be effective 9/11/2012.
Filed Date: 9/21/12.
Accession Number: 20120921–5065.
Comments Due: 5 p.m. ET 10/12/12.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: September 21, 2012.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2012–23945 Filed 9–28–12; 8:45 am]
BILLING CODE 6717–01–P
VerDate Mar<15>2010
16:48 Sep 28, 2012
Jkt 226001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Filings Instituting Proceedings
Docket Numbers: CP12–517–000.
Applicants: Columbia Gas of
Maryland, Inc.
Description: Application for a Limited
Jurisdictional Blanket Certificate of
Public Convenience and necessity,
pursuant to Section 284.224.
Filed Date: 9/7/12.
Accession Number: 20120907–5132.
Comments Due: 5 p.m. ET 10/5/12.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
and service can be found at: https://
www.ferc.gov/docs-filing/efiling/filingreq.pdf. For other information, call (866)
208–3676 (toll free). For TTY, call (202)
502–8659.
Dated: September 24, 2012.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2012–23946 Filed 9–28–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 1940–000 Wisconsin; Project
No. 1966–000 Wisconsin]
Wisconsin Public Service Corporation;
Notice of Environmental Site Review
In anticipation of the filing of Notices
of Intent (NOI) and Pre-Application
Documents for the Grandfather Falls
Hydroelectric Project No. 1966 and
Tomahawk Hydroelectric Project No.
1940 owned and operated by Wisconsin
Public Service Corporation and located
on the Wisconsin River in Lincoln
PO 00000
Frm 00034
Fmt 4703
Sfmt 4703
59921
County, Wisconsin, the Federal Energy
Regulatory Commission (Commission)
staff will be hosting environmental site
reviews during the third week of
October 2012.
The environmental site reviews are
being held to provide Commission staff
and all stakeholders interested in the
projects’ pending relicensing
proceedings, an opportunity to view the
projects’ facilities and surrounding
areas.
Under the Commission’s Integrated
Licensing Process, Commission staff
conducts its National Environmental
Policy Act (NEPA) scoping meetings
within 90 days of the filing of an
applicant’s Notice of Intent. An
environmental site review is typically
held in conjunction with the scoping
meetings. However, in this instance,
access to some project facilities and
viewing of areas with native vegetation
may be limited by winter weather
during the latter part of 2012 when
scoping for the projects is currently
anticipated. For this reason,
Commission staff has chosen to conduct
the environmental site reviews in
October before the onset of winter and
when natural vegetation is still
apparent. Therefore, Commission staff
will not conduct any environmental site
reviews at the time of the scoping
meetings. The Commission staff
encourages all interested parties to
participate in the October
environmental site reviews to facilitate
productive scoping meetings tentatively
anticipated for later this year. Details of
the project-specific environmental site
reviews follow.
Tomahawk Hydroelectric Project No.
1940
• Tour of Tomahawk Project
Facilities
Date and Time: October 16, 2012 at 9
a.m.
Location: Tomahawk Project
Powerhouse, W6080 Pride Ponds Road,
Tomahawk, WI 54487.
• Tomahawk Project Reservoir Tour
Date and Time: October 16, 2012 at 1
p.m.
Location: Tomahawk Project
Powerhouse, W6080 Pride Ponds Road,
Tomahawk, WI 54487.
Grandfather Falls Hydroelectric Project
No. 1966
• Tour of Grandfather Falls Project
Facilities
Date and Time: October 17, 2012 at 9
a.m.
Location: Grandfather Falls Project
Powerhouse, N5059 Highway 107, Irma,
WI 54442.
E:\FR\FM\01OCN1.SGM
01OCN1
59922
Federal Register / Vol. 77, No. 190 / Monday, October 1, 2012 / Notices
• Tour of Grandfather Falls Bypassed
Reach of the Wisconsin River
Date and Time: October 17, 2012 at 1
p.m.
Location: Grandfather Falls Project
Powerhouse, N5059 Highway 107, Irma,
WI 54442.
If you plan to attend the
environmental site reviews, please
R.S.V.P. to Gregory W. Egtvedt,
Wisconsin Public Service Corporation,
by October 10, 2012, and identify the
number of individuals in your group.
Mr. Egtvedt can be reached at: Mr.
Gregory W. Egtvedt, Manager
Environmental Assets & Licensing,
Integrys Business Support, LLC, 700
North Adams Street, P.O. Box 19001,
Green Bay, WI 54307–9001, Phone:
(920) 433–5713; Cell (920) 655–3785,
Email: GWEgtvedt@integrysgroup.com.
If you need further logistical
information or directions for
participating in the environmental site
reviews, please contact Mr. Egtvedt. All
other questions regarding the
environmental site reviews or the
Commission’s Integrated Licensing
Process may be directed to Lee Emery of
the Commission’s staff at (202) 502–
8379 or via email at lee.emery@ferc.gov.
Dated: September 25, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012–24105 Filed 9–28–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER12–2662–000]
mstockstill on DSK4VPTVN1PROD with NOTICES
Park Power LLC; Supplemental Notice
That Initial Market-Based Rate Filing
Includes Request for Blanket Section
204 Authorization
This is a supplemental notice in the
above-referenced proceeding, of Park
Power LLC’s application for marketbased rate authority, with an
accompanying rate schedule, noting that
such application includes a request for
blanket authorization, under 18 CFR
part 34, of future issuances of securities
and assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
VerDate Mar<15>2010
18:02 Sep 28, 2012
Jkt 226001
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability is October 15,
2012.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 14 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
The filings in the above-referenced
proceeding(s) are accessible in the
Commission’s eLibrary system by
clicking on the appropriate link in the
above list. They are also available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an eSubscription link on the
Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov. or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Dated: September 24, 2012.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2012–23947 Filed 9–28–12; 8:45 am]
BILLING CODE 6717–01–P
EXPORT–IMPORT BANK
Federal Agencies to comment on the
proposed information collection, as
required by the Paperwork Reduction
Act of 1995.
The ‘‘Application for Exporter Short
Term Single Buyer Insurance’’ form will
be used by entities involved in the
export of US goods and services, to
provide Ex-Im Bank with the
information necessary to obtain
legislatively required assurance of
repayment and fulfills other statutory
requirements.
The application can be reviewed at:
www.exim.gov/pub/pending/EIB9264.pdf. Application for Exporter Short
Term Single Buyer Insurance.
DATES: Comments should be received on
or before October 31, 2012 to be assured
of consideration.
ADRESSES: Comments maybe submitted
electronically on
WWW.REGULATIONS.GOV or by mail
to Office of Information and Regulatory
Affairs, 725 17th Street NW.,
Washington, DC 20038 Attn: OMB
3048–0018.
SUPPLEMENTARY INFORMATION:
Titles and Form Number: EIB 92–64.
Application for Exporter Short Term
Single Buyer Insurance.
OMB Number: 3048–0018.
Type of Review: Regular.
Need and Use: The information
requested enables the applicant to
provide Ex-Im Bank with the
information necessary to obtain
legislatively required assurance of
repayment and fulfills other statutory
requirements.
Annual Number of Respondents: 310.
Estimated Time per Respondent: 1.5
hours.
Government Annual Burden Hours:
465 hours.
Frequency of Reporting or Use: As
needed.
Government Review Time: 6 hours.
Total Hours: 1,860.
Cost to the Government: $72,020.
Sharon A. Whitt,
Agency Clearance Officer.
[Public Notice 2012–0523]
Agency Information Collection
Activities: Comment Request
Export-Import Bank of the
United States.
ACTION: Submission for OMB Review
and comments request.
[FR Doc. 2012–24053 Filed 9–28–12; 8:45 am]
BILLING CODE 6690–01–P
AGENCY:
Form Title: EIB 92–64 Application for
Exporter Short Term Single Buyer
Insurance.
SUMMARY: The Export-Import Bank of
the United States (Ex-Im Bank), as a part
of its continuing effort to reduce
paperwork and respondent burden,
invites the general public and other
PO 00000
Frm 00035
Fmt 4703
Sfmt 4703
EXPORT–IMPORT BANK OF THE
UNITED STATES
[Public Notice 2012–0521]
Agency Information Collection
Activities: Comment Request
Export-Import Bank of the
United States.
ACTION: Submission for OMB Review
and comments request.
AGENCY:
E:\FR\FM\01OCN1.SGM
01OCN1
Agencies
[Federal Register Volume 77, Number 190 (Monday, October 1, 2012)]
[Notices]
[Pages 59921-59922]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-24105]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 1940-000 Wisconsin; Project No. 1966-000 Wisconsin]
Wisconsin Public Service Corporation; Notice of Environmental
Site Review
In anticipation of the filing of Notices of Intent (NOI) and Pre-
Application Documents for the Grandfather Falls Hydroelectric Project
No. 1966 and Tomahawk Hydroelectric Project No. 1940 owned and operated
by Wisconsin Public Service Corporation and located on the Wisconsin
River in Lincoln County, Wisconsin, the Federal Energy Regulatory
Commission (Commission) staff will be hosting environmental site
reviews during the third week of October 2012.
The environmental site reviews are being held to provide Commission
staff and all stakeholders interested in the projects' pending
relicensing proceedings, an opportunity to view the projects'
facilities and surrounding areas.
Under the Commission's Integrated Licensing Process, Commission
staff conducts its National Environmental Policy Act (NEPA) scoping
meetings within 90 days of the filing of an applicant's Notice of
Intent. An environmental site review is typically held in conjunction
with the scoping meetings. However, in this instance, access to some
project facilities and viewing of areas with native vegetation may be
limited by winter weather during the latter part of 2012 when scoping
for the projects is currently anticipated. For this reason, Commission
staff has chosen to conduct the environmental site reviews in October
before the onset of winter and when natural vegetation is still
apparent. Therefore, Commission staff will not conduct any
environmental site reviews at the time of the scoping meetings. The
Commission staff encourages all interested parties to participate in
the October environmental site reviews to facilitate productive scoping
meetings tentatively anticipated for later this year. Details of the
project-specific environmental site reviews follow.
Tomahawk Hydroelectric Project No. 1940
Tour of Tomahawk Project Facilities
Date and Time: October 16, 2012 at 9 a.m.
Location: Tomahawk Project Powerhouse, W6080 Pride Ponds Road,
Tomahawk, WI 54487.
Tomahawk Project Reservoir Tour
Date and Time: October 16, 2012 at 1 p.m.
Location: Tomahawk Project Powerhouse, W6080 Pride Ponds Road,
Tomahawk, WI 54487.
Grandfather Falls Hydroelectric Project No. 1966
Tour of Grandfather Falls Project Facilities
Date and Time: October 17, 2012 at 9 a.m.
Location: Grandfather Falls Project Powerhouse, N5059 Highway 107,
Irma, WI 54442.
[[Page 59922]]
Tour of Grandfather Falls Bypassed Reach of the Wisconsin
River
Date and Time: October 17, 2012 at 1 p.m.
Location: Grandfather Falls Project Powerhouse, N5059 Highway 107,
Irma, WI 54442.
If you plan to attend the environmental site reviews, please
R.S.V.P. to Gregory W. Egtvedt, Wisconsin Public Service Corporation,
by October 10, 2012, and identify the number of individuals in your
group. Mr. Egtvedt can be reached at: Mr. Gregory W. Egtvedt, Manager
Environmental Assets & Licensing, Integrys Business Support, LLC, 700
North Adams Street, P.O. Box 19001, Green Bay, WI 54307-9001, Phone:
(920) 433-5713; Cell (920) 655-3785, Email:
GWEgtvedt@integrysgroup.com.
If you need further logistical information or directions for
participating in the environmental site reviews, please contact Mr.
Egtvedt. All other questions regarding the environmental site reviews
or the Commission's Integrated Licensing Process may be directed to Lee
Emery of the Commission's staff at (202) 502-8379 or via email at
lee.emery@ferc.gov.
Dated: September 25, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012-24105 Filed 9-28-12; 8:45 am]
BILLING CODE 6717-01-P