Wisconsin Public Service Corporation; Notice of Environmental Site Review, 59921-59922 [2012-24105]

Download as PDF mstockstill on DSK4VPTVN1PROD with NOTICES Federal Register / Vol. 77, No. 190 / Monday, October 1, 2012 / Notices Filed Date: 9/20/12. Accession Number: 20120920–5121. Comments Due: 5 p.m. ET 10/11/12. Docket Numbers: ER12–2670–000. Applicants: Public Service Company of New Mexico. Description: Public Service Company of New Mexico submits tariff filing per 35: Certificate of Concurrence-TEP and PNM rate schedule 321 to be effective 5/ 17/2011. Filed Date: 9/21/12. Accession Number: 20120921–5045. Comments Due: 5 p.m. ET 10/12/12. Docket Numbers: ER12–2671–000. Applicants: PJM Interconnection, L.L.C. Description: PJM Interconnection, L.L.C. submits tariff filing per 35.13(a)(2)(iii: RTEP clean-up filing re accepted language in ER12–2085 & ER12–2288 to be effective 9/19/2012. Filed Date: 9/21/12. Accession Number: 20120921–5057. Comments Due: 5 p.m. ET 10/12/12. Docket Numbers: ER12–2672–000. Applicants: Sempra Energy Trading LLC. Description: Sempra Energy Trading LLC submits Notice of Cancellation. Filed Date: 9/21/12. Accession Number: 20120921–5064. Comments Due: 5 p.m. ET 10/12/12. Docket Numbers: ER12–2673–000. Applicants: PacifiCorp. Description: PacifiCorp submits tariff filing per 35.13(a)(2)(iii: EWEB NonConforming Point to Point Agreement to be effective 9/11/2012. Filed Date: 9/21/12. Accession Number: 20120921–5065. Comments Due: 5 p.m. ET 10/12/12. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: September 21, 2012. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2012–23945 Filed 9–28–12; 8:45 am] BILLING CODE 6717–01–P VerDate Mar<15>2010 16:48 Sep 28, 2012 Jkt 226001 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings Take notice that the Commission has received the following Natural Gas Pipeline Rate and Refund Report filings: Filings Instituting Proceedings Docket Numbers: CP12–517–000. Applicants: Columbia Gas of Maryland, Inc. Description: Application for a Limited Jurisdictional Blanket Certificate of Public Convenience and necessity, pursuant to Section 284.224. Filed Date: 9/7/12. Accession Number: 20120907–5132. Comments Due: 5 p.m. ET 10/5/12. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, and service can be found at: https:// www.ferc.gov/docs-filing/efiling/filingreq.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: September 24, 2012. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2012–23946 Filed 9–28–12; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 1940–000 Wisconsin; Project No. 1966–000 Wisconsin] Wisconsin Public Service Corporation; Notice of Environmental Site Review In anticipation of the filing of Notices of Intent (NOI) and Pre-Application Documents for the Grandfather Falls Hydroelectric Project No. 1966 and Tomahawk Hydroelectric Project No. 1940 owned and operated by Wisconsin Public Service Corporation and located on the Wisconsin River in Lincoln PO 00000 Frm 00034 Fmt 4703 Sfmt 4703 59921 County, Wisconsin, the Federal Energy Regulatory Commission (Commission) staff will be hosting environmental site reviews during the third week of October 2012. The environmental site reviews are being held to provide Commission staff and all stakeholders interested in the projects’ pending relicensing proceedings, an opportunity to view the projects’ facilities and surrounding areas. Under the Commission’s Integrated Licensing Process, Commission staff conducts its National Environmental Policy Act (NEPA) scoping meetings within 90 days of the filing of an applicant’s Notice of Intent. An environmental site review is typically held in conjunction with the scoping meetings. However, in this instance, access to some project facilities and viewing of areas with native vegetation may be limited by winter weather during the latter part of 2012 when scoping for the projects is currently anticipated. For this reason, Commission staff has chosen to conduct the environmental site reviews in October before the onset of winter and when natural vegetation is still apparent. Therefore, Commission staff will not conduct any environmental site reviews at the time of the scoping meetings. The Commission staff encourages all interested parties to participate in the October environmental site reviews to facilitate productive scoping meetings tentatively anticipated for later this year. Details of the project-specific environmental site reviews follow. Tomahawk Hydroelectric Project No. 1940 • Tour of Tomahawk Project Facilities Date and Time: October 16, 2012 at 9 a.m. Location: Tomahawk Project Powerhouse, W6080 Pride Ponds Road, Tomahawk, WI 54487. • Tomahawk Project Reservoir Tour Date and Time: October 16, 2012 at 1 p.m. Location: Tomahawk Project Powerhouse, W6080 Pride Ponds Road, Tomahawk, WI 54487. Grandfather Falls Hydroelectric Project No. 1966 • Tour of Grandfather Falls Project Facilities Date and Time: October 17, 2012 at 9 a.m. Location: Grandfather Falls Project Powerhouse, N5059 Highway 107, Irma, WI 54442. E:\FR\FM\01OCN1.SGM 01OCN1 59922 Federal Register / Vol. 77, No. 190 / Monday, October 1, 2012 / Notices • Tour of Grandfather Falls Bypassed Reach of the Wisconsin River Date and Time: October 17, 2012 at 1 p.m. Location: Grandfather Falls Project Powerhouse, N5059 Highway 107, Irma, WI 54442. If you plan to attend the environmental site reviews, please R.S.V.P. to Gregory W. Egtvedt, Wisconsin Public Service Corporation, by October 10, 2012, and identify the number of individuals in your group. Mr. Egtvedt can be reached at: Mr. Gregory W. Egtvedt, Manager Environmental Assets & Licensing, Integrys Business Support, LLC, 700 North Adams Street, P.O. Box 19001, Green Bay, WI 54307–9001, Phone: (920) 433–5713; Cell (920) 655–3785, Email: GWEgtvedt@integrysgroup.com. If you need further logistical information or directions for participating in the environmental site reviews, please contact Mr. Egtvedt. All other questions regarding the environmental site reviews or the Commission’s Integrated Licensing Process may be directed to Lee Emery of the Commission’s staff at (202) 502– 8379 or via email at lee.emery@ferc.gov. Dated: September 25, 2012. Kimberly D. Bose, Secretary. [FR Doc. 2012–24105 Filed 9–28–12; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER12–2662–000] mstockstill on DSK4VPTVN1PROD with NOTICES Park Power LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization This is a supplemental notice in the above-referenced proceeding, of Park Power LLC’s application for marketbased rate authority, with an accompanying rate schedule, noting that such application includes a request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability. Any person desiring to intervene or to protest should file with the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426, in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. VerDate Mar<15>2010 18:02 Sep 28, 2012 Jkt 226001 Notice is hereby given that the deadline for filing protests with regard to the applicant’s request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability is October 15, 2012. The Commission encourages electronic submission of protests and interventions in lieu of paper, using the FERC Online links at https:// www.ferc.gov. To facilitate electronic service, persons with Internet access who will eFile a document and/or be listed as a contact for an intervenor must create and validate an eRegistration account using the eRegistration link. Select the eFiling link to log on and submit the intervention or protests. Persons unable to file electronically should submit an original and 14 copies of the intervention or protest to the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. The filings in the above-referenced proceeding(s) are accessible in the Commission’s eLibrary system by clicking on the appropriate link in the above list. They are also available for review in the Commission’s Public Reference Room in Washington, DC. There is an eSubscription link on the Web site that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov. or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: September 24, 2012. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2012–23947 Filed 9–28–12; 8:45 am] BILLING CODE 6717–01–P EXPORT–IMPORT BANK Federal Agencies to comment on the proposed information collection, as required by the Paperwork Reduction Act of 1995. The ‘‘Application for Exporter Short Term Single Buyer Insurance’’ form will be used by entities involved in the export of US goods and services, to provide Ex-Im Bank with the information necessary to obtain legislatively required assurance of repayment and fulfills other statutory requirements. The application can be reviewed at: www.exim.gov/pub/pending/EIB9264.pdf. Application for Exporter Short Term Single Buyer Insurance. DATES: Comments should be received on or before October 31, 2012 to be assured of consideration. ADRESSES: Comments maybe submitted electronically on WWW.REGULATIONS.GOV or by mail to Office of Information and Regulatory Affairs, 725 17th Street NW., Washington, DC 20038 Attn: OMB 3048–0018. SUPPLEMENTARY INFORMATION: Titles and Form Number: EIB 92–64. Application for Exporter Short Term Single Buyer Insurance. OMB Number: 3048–0018. Type of Review: Regular. Need and Use: The information requested enables the applicant to provide Ex-Im Bank with the information necessary to obtain legislatively required assurance of repayment and fulfills other statutory requirements. Annual Number of Respondents: 310. Estimated Time per Respondent: 1.5 hours. Government Annual Burden Hours: 465 hours. Frequency of Reporting or Use: As needed. Government Review Time: 6 hours. Total Hours: 1,860. Cost to the Government: $72,020. Sharon A. Whitt, Agency Clearance Officer. [Public Notice 2012–0523] Agency Information Collection Activities: Comment Request Export-Import Bank of the United States. ACTION: Submission for OMB Review and comments request. [FR Doc. 2012–24053 Filed 9–28–12; 8:45 am] BILLING CODE 6690–01–P AGENCY: Form Title: EIB 92–64 Application for Exporter Short Term Single Buyer Insurance. SUMMARY: The Export-Import Bank of the United States (Ex-Im Bank), as a part of its continuing effort to reduce paperwork and respondent burden, invites the general public and other PO 00000 Frm 00035 Fmt 4703 Sfmt 4703 EXPORT–IMPORT BANK OF THE UNITED STATES [Public Notice 2012–0521] Agency Information Collection Activities: Comment Request Export-Import Bank of the United States. ACTION: Submission for OMB Review and comments request. AGENCY: E:\FR\FM\01OCN1.SGM 01OCN1

Agencies

[Federal Register Volume 77, Number 190 (Monday, October 1, 2012)]
[Notices]
[Pages 59921-59922]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-24105]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 1940-000 Wisconsin; Project No. 1966-000 Wisconsin]


Wisconsin Public Service Corporation; Notice of Environmental 
Site Review

    In anticipation of the filing of Notices of Intent (NOI) and Pre-
Application Documents for the Grandfather Falls Hydroelectric Project 
No. 1966 and Tomahawk Hydroelectric Project No. 1940 owned and operated 
by Wisconsin Public Service Corporation and located on the Wisconsin 
River in Lincoln County, Wisconsin, the Federal Energy Regulatory 
Commission (Commission) staff will be hosting environmental site 
reviews during the third week of October 2012.
    The environmental site reviews are being held to provide Commission 
staff and all stakeholders interested in the projects' pending 
relicensing proceedings, an opportunity to view the projects' 
facilities and surrounding areas.
    Under the Commission's Integrated Licensing Process, Commission 
staff conducts its National Environmental Policy Act (NEPA) scoping 
meetings within 90 days of the filing of an applicant's Notice of 
Intent. An environmental site review is typically held in conjunction 
with the scoping meetings. However, in this instance, access to some 
project facilities and viewing of areas with native vegetation may be 
limited by winter weather during the latter part of 2012 when scoping 
for the projects is currently anticipated. For this reason, Commission 
staff has chosen to conduct the environmental site reviews in October 
before the onset of winter and when natural vegetation is still 
apparent. Therefore, Commission staff will not conduct any 
environmental site reviews at the time of the scoping meetings. The 
Commission staff encourages all interested parties to participate in 
the October environmental site reviews to facilitate productive scoping 
meetings tentatively anticipated for later this year. Details of the 
project-specific environmental site reviews follow.

Tomahawk Hydroelectric Project No. 1940

     Tour of Tomahawk Project Facilities
    Date and Time: October 16, 2012 at 9 a.m.
    Location: Tomahawk Project Powerhouse, W6080 Pride Ponds Road, 
Tomahawk, WI 54487.
     Tomahawk Project Reservoir Tour
    Date and Time: October 16, 2012 at 1 p.m.
    Location: Tomahawk Project Powerhouse, W6080 Pride Ponds Road, 
Tomahawk, WI 54487.

Grandfather Falls Hydroelectric Project No. 1966

     Tour of Grandfather Falls Project Facilities
    Date and Time: October 17, 2012 at 9 a.m.
    Location: Grandfather Falls Project Powerhouse, N5059 Highway 107, 
Irma, WI 54442.

[[Page 59922]]

     Tour of Grandfather Falls Bypassed Reach of the Wisconsin 
River
    Date and Time: October 17, 2012 at 1 p.m.
    Location: Grandfather Falls Project Powerhouse, N5059 Highway 107, 
Irma, WI 54442.
    If you plan to attend the environmental site reviews, please 
R.S.V.P. to Gregory W. Egtvedt, Wisconsin Public Service Corporation, 
by October 10, 2012, and identify the number of individuals in your 
group. Mr. Egtvedt can be reached at: Mr. Gregory W. Egtvedt, Manager 
Environmental Assets & Licensing, Integrys Business Support, LLC, 700 
North Adams Street, P.O. Box 19001, Green Bay, WI 54307-9001, Phone: 
(920) 433-5713; Cell (920) 655-3785, Email: 
GWEgtvedt@integrysgroup.com.
    If you need further logistical information or directions for 
participating in the environmental site reviews, please contact Mr. 
Egtvedt. All other questions regarding the environmental site reviews 
or the Commission's Integrated Licensing Process may be directed to Lee 
Emery of the Commission's staff at (202) 502-8379 or via email at 
lee.emery@ferc.gov.

    Dated: September 25, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012-24105 Filed 9-28-12; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.