Combined Notice of Filings #1, 59599-59601 [2012-23943]

Download as PDF Federal Register / Vol. 77, No. 189 / Friday, September 28, 2012 / Notices Issued at Washington, DC on September 21, 2012. LaTanya R. Butler, Acting Deputy Committee Management Officer. [FR Doc. 2012–23909 Filed 9–27–12; 8:45 am] BILLING CODE 6450–01–P DEPARTMENT OF ENERGY Office of Energy Efficiency and Renewable Energy Notice of Public Meeting: Designing for Impact IV: Workshop on Building the National Network for Manufacturing Innovation Advanced Manufacturing Office, Office of Energy Efficiency and Renewable Energy, Department of Energy (DOE). ACTION: Notice of public meeting. AGENCY: DOE’s Advanced Manufacturing Office, as part of the inter-agency Advanced Manufacturing National Program Office (AMNPO) announces the fourth of a series of public workshops entitled ‘‘Designing for Impact: Workshop on Building the National Network for Manufacturing Innovation. This workshop series provides a forum for the AMPNO to present on the proposed National Network for Manufacturing Innovation (NNMI) and its regional components, Institutes for Manufacturing Innovation (IMIs) and to provide an opportunity for public comment on the proposal. The discussion at the workshop will focus on the following topics: Technologies with Broad Impact, Institute Structure and Governance, Strategies for Sustainable Institute Operations, and Education and Workforce Development. The Designing for Impact workshop series is organized by representatives from the Department of Commerce, NIST; Department of Defense; Department of Energy; National Aeronautics and Space Administration; and National Science Foundation. DATES: The meeting will be held Thursday, October, 18 2012, from 7:30 a.m. to 4:30 p.m. ADDRESSES: University of Colorado at Boulder, Law School, 2450 Kittredge Loop Road, Boulder, CO 80309. Additional information can be found at https://manufacturing.gov/amp/ ampevents.html. FOR FURTHER INFORMATION CONTACT: Robert Ivester or Bhima Sastri, 202– 586–9488, NNMI4@sra.com. SUPPLEMENTARY INFORMATION: The President has proposed that the federal government catalyze the creation of a srobinson on DSK4SPTVN1PROD with NOTICES SUMMARY: VerDate Mar<15>2010 17:28 Sep 27, 2012 Jkt 226001 NNMI as a central element of the U.S. response to the manufacturing competitiveness challenge.1 The proposed NNMI initiative focuses on strengthening and ensuring the long term competitiveness and job-creating power of U.S. manufacturing. The constituent IMIs would bring together industry, universities and community colleges, federal agencies, and U.S. states to accelerate innovation by investing in industrially-relevant manufacturing technologies with broad applications to bridge the gap between basic research and product development, provide shared assets to help companies—particularly small manufacturers—access cutting-edge capabilities and equipment, and create an unparalleled environment to educate and train students and workers in advanced manufacturing skills. Each IMI would serve as a regional hub of manufacturing excellence, providing the innovation infrastructure to support regional manufacturing and ensuring that our manufacturing sector is a key pillar in an economy that is built to last. Each IMI also would have a welldefined technology focus to address industrially-relevant manufacturing challenges on a large scale and to provide the capabilities and facilities required to reduce the cost and risk of commercializing new technologies. In his March 9, 2012 announcement, President Obama proposed building a national network consisting of up to 15 IMIs. On May 4, 2012 the AMNPO issued a Request for Information (RFI), seeking public comment on specific questions related to the structure and operations of the NNMI and IMIs. (77 FR 26509) The RFI was published in the Federal Register and may be found at: https:// www.gpo.gov/fdsys/pkg/FR-2012-05-04/ pdf/2012-10809.pdf. Comments in response to the RFI are due on or before 11:59 p.m. Eastern Time on October 25, 2012. Those interested in providing written comments in response to the RFI should refer to the May 4, 2012 notice for information regarding submission of comments. Tentative Agenda (Subject To Change) An agenda will be posted online when available at: https://manufacturing. gov/amp/ampevents.html. This meeting is an opportunity for participants to provide, based on their individual experience, individual information and facts regarding this topic. It is not the object of this session to obtain any 1 See https://www.whitehouse.gov/sites/default/ files/omb/budget/fy2013/assets/budget.pdf, page 217. PO 00000 Frm 00010 Fmt 4703 Sfmt 4703 59599 group position or consensus. Rather, the Department is seeking as many recommendations as possible from all individuals at this meeting. Registration and Accommodations Individuals planning to attend the fourth public workshop must sign-up in advance. Announcements of additional workshops may be found at: https:// www.manufacturing.gov/amp/ ampevents.html. Future workshops will also be announced in the Federal Register. Issued in Washington, DC, on September 21, 2012. Kathleen Hogan, Deputy Assistant Secretary, Energy Efficiency and Renewable Energy. [FR Doc. 2012–23887 Filed 9–27–12; 8:45 am] BILLING CODE 6450–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #1 Take notice that the Commission received the following electric rate filings: Docket Numbers: ER10–1720–003; ER10–2285–003; ER10–2404–002; ER10–2423–002; ER10–2942–003; ER10–2994–007; ER10–3158–003; ER10–3159–002; ER10–3161–003; ER10–3162–003; ER11–2112–004; ER11–2196–004; ER11–2462–003; ER11–2463–003; ER11–2464–003; ER11–2465–003; ER11–2466–003; ER11–2467–003; ER11–2468–003; ER11–2469–003; ER11–2470–003; ER11–2471–003; ER11–2472–003; ER11–2473–003; ER11–2474–005; ER11–2475–003; ER11–2482–004; ER11–2483–003; ER11–2484–003; ER11–2485–004; ER11–2486–003; ER11–2487–004; ER11–2488–003; ER11–2507–003; ER11–2514–003; ER11–2563–004; ER11–2564–004; ER12–2075–002; ER12–2076–002; ER12–2077–002; ER12–2078–002; ER12–2081–002; ER12–2083–002; ER12–2084–002; ER12–2086–002; ER12–2097–002; ER12–2101–002; ER12–2102–002; ER12–2106–002; ER12–2107–002; ER12–2108–002; ER12–2109–002; ER12–308–003; ER12– 422–002; ER12–96–002. Applicants: Dry Lake Wind Power II LLC, Central Maine Power Company, Flat Rock Windpower II LLC, Flat Rock Windpower LLC, Elk River Windfarm, LLC, Iberdrola Renewables, LLC, Dillion Wind LLC, Dry Lake Wind Power, LLC, Shiloh I Wind Project, LLC, Mountain View Power Partners III, LLC, Blue E:\FR\FM\28SEN1.SGM 28SEN1 srobinson on DSK4SPTVN1PROD with NOTICES 59600 Federal Register / Vol. 77, No. 189 / Friday, September 28, 2012 / Notices Creek Wind Farm LLC, San Luis Solar LLC, Big Horn Wind Project LLC, Big Horn II Wind Project LLC, Colorado Green Holdings LLC, Hay Canyon Wind LLC, Juniper Canyon Wind Power LLC, Klamath Energy LLC, Klamath Generation LLC, Klondike Wind Power, LLC, Klondike Wind Power II LLC, Klondike Wind Power III LLC, Leaning Juniper Wind Power II LLC, Pebble Springs Wind LLC, Star Point Wind Project LLC, Twin Buttes Wind LLC, Casselman Windpower LLC, Hardscrabble Wind Power LLC, Lempster Wind, LLC, Locust Ridge Wind Farm, LLC, Locust Ridge Wind Farm II, LLC, Providence Heights Wind, LLC, Streator-Cayuga Ridge Wind Power LLC, Carthage Energy, LLC, PEI Power II, LLC, New York State Electric & Gas Corporation, Rochester Gas & Electric Corporation, Atlantic Renewable Projects II LLC, Barton Windpower LLC, Buffalo Ridge I LLC, Buffalo Ridge II LLC, Elm Creek Wind, LLC, Elm Creek Wind II LLC, Farmers City Wind, LLC, Flying Cloud Power Partners, LLC, Moraine Wind LLC, Moraine Wind II LLC, New Harvest Wind Project LLC, Rugby Wind LLC, Trimont Wind I LLC, MinnDakota Wind LLC, Northern Iowa Windpower II LLC, Manzana Wind LLC, New England Wind, LLC, South Chestnut LLC. Description: Notice of Change in Status of the Iberdrola MBR Sellers, et al. Filed Date: 9/20/12. Accession Number: 20120920–5164. Comments Due: 5 p.m. ET 10/11/12. Docket Numbers: ER10–1997–001. Applicants: Midwest Independent Transmission System. Description: 9–20–12 Baseline CleanUp to be effective 7/28/2010. Filed Date: 9/20/12. Accession Number: 20120920–5001. Comments Due: 5 p.m. ET 10/11/12. Docket Numbers: ER11–4711–001. Applicants: R&R Energy, Inc. Description: R&R Energy Compliance Filing to be effective 10/29/2012. Filed Date: 9/20/12. Accession Number: 20120920–5008. Comments Due: 5 p.m. ET 10/11/12. Docket Numbers: ER12–1986–001. Applicants: Tucson Electric Power Company. Description: TEP Compliance Filing— Amended and Restated Balancing Authority Agreement to be effective 8/ 7/2012. Filed Date: 9/20/12. Accession Number: 20120920–5003. Comments Due: 5 p.m. ET 10/11/12. Docket Numbers: ER12–2104–001. Applicants: Michigan Electric Transmission Company. VerDate Mar<15>2010 18:17 Sep 27, 2012 Jkt 226001 Description: Michigan Electric Transmission Company, LLC submits tariff filing per 35: METC Compliance Filing to be effective 8/27/2012. Filed Date: 9/20/12. Accession Number: 20120920–5100. Comments Due: 5 p.m. ET 10/11/12. Docket Numbers: ER12–2132–001. Applicants: ITC Midwest LLC. Description: ITC Midwest LLC submits tariff filing per 35: Compliance Filing of ITC Midwest to be effective 8/ 28/2012. Filed Date: 9/20/12. Accession Number: 20120920–5141. Comments Due: 5 p.m. ET 10/11/12. Docket Numbers: ER12–2263–001. Applicants: Arizona Public Service Company. Description: Arizona Public Service Company submits tariff filing per 35: REFILE Rate Schedule No. 217 Compliance Filing to be effective 10/1/ 2012. Filed Date: 9/20/12. Accession Number: 20120920–5106. Comments Due: 5 p.m. ET 10/11/12. Docket Numbers: ER12–2297–002. Applicants: BFE Scheduling, LLC. Description: Inquiry Response to be effective 9/24/2012. Filed Date: 9/20/12. Accession Number: 20120920–5004. Comments Due: 5 p.m. ET 10/11/12. Docket Numbers: ER12–2661–000. Applicants: PJM Interconnection, L.L.C. Description: Original Service Agreement No. 3397; Queue No. W2– 030 to be effective 8/23/2012. Filed Date: 9/20/12. Accession Number: 20120920–5032. Comments Due: 5 p.m. ET 10/11/12. Docket Numbers: ER12–2662–000. Applicants: Park Power LLC. Description: Application for MarketBased Rate Authorization to be effective 11/19/2012. Filed Date: 9/20/12. Accession Number: 20120920–5074. Comments Due: 5 p.m. ET 10/11/12. Docket Numbers: ER12–2663–000. Applicants: PJM Interconnection, L.L.C. Description: Queue Position V3–045; Original Service Agreement Nos. 3398 & 3399 to be effective 8/20/2012. Filed Date: 9/20/12. Accession Number: 20120920–5079. Comments Due: 5 p.m. ET 10/11/12. Docket Numbers: ER12–2664–000. Applicants: PJM Interconnection, L.L.C. Description: Notice of Cancellation of Service Agreement 3197 in Docket No. ER12–1000–000 to be effective 8/20/ 2012. PO 00000 Frm 00011 Fmt 4703 Sfmt 4703 Filed Date: 9/20/12. Accession Number: 20120920–5087. Comments Due: 5 p.m. ET 10/11/12. Docket Numbers: ER12–2665–000. Applicants: El Paso Electric Company. Description: Concurrence of EPE to TEP Rate Schedule No. 321 to be effective 12/28/2011. Filed Date: 9/20/12. Accession Number: 20120920–5094. Comments Due: 5 p.m. ET 10/11/12. Docket Numbers: ER12–2666–000. Applicants: Bangor Hydro Electric Company. Description: Bangor Hydro Electric Company submits tariff filing per 35.13(a)(2)(iii: Filing of E&P Agreement with Passadumkeag Windpark to be effective 9/13/2012. Filed Date: 9/20/12. Accession Number: 20120920–5103. Comments Due: 5 p.m. ET 10/11/12. Docket Numbers: ER12–2668–000. Applicants: Arizona Public Service Company. Description: Arizona Public Service Company submits tariff filing per 35.13(a)(2)(iii: Southwest Reserve Sharing Group Certificate of Concurrence to be effective 12/28/2011. Filed Date: 9/20/12. Accession Number: 20120920–5143. Comments Due: 5 p.m. ET 10/11/12. Docket Numbers: ER12–2669–000. Applicants: California Independent System Operator C. Description: California Independent System Operator Corporation submits tariff filing per 35.13(a)(2)(iii: 2012–09– 20 Replacement Requirement for RA Maintenance Outages Amendment to be effective 11/20/2012. Filed Date: 9/20/12. Accession Number: 20120920–5148. Comments Due: 5 p.m. ET 10/11/12. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. E:\FR\FM\28SEN1.SGM 28SEN1 Federal Register / Vol. 77, No. 189 / Friday, September 28, 2012 / Notices Dated: September 21, 2012. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2012–23943 Filed 9–27–12; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. PF12–16–000] Dominion Cove Point LNG, LP; Notice of Intent To Prepare an Environmental Assessment for the Planned Cove Point Liquefaction Project, Request for Comments on Environmental Issues, Notice of On-Site Environmental Review, and Notice of Public Scoping Meetings The staff of the Federal Energy Regulatory Commission (FERC or Commission) will prepare an environmental assessment (EA) that will discuss the environmental impacts of the Cove Point Liquefaction Project (Project) involving construction and operation of facilities by Dominion Cove Point LNG, LP (Dominion) in Maryland and Virginia. This EA will be used by the Commission in its decision-making process to determine whether the construction and operation of the proposed facilities is in the public convenience and necessity. This notice announces the opening of the scoping process the Commission will use to gather input from the public and interested agencies on the Project. Your input during the scoping process will help the Commission staff determine what issues need to be evaluated in the EA. The Commission staff will also use the scoping process to help determine whether preparation of 59601 an environmental impact statement is more appropriate for this Project based upon the potential significance of the anticipated levels of impact. Please note that the scoping period will close on October 24, 2012. This is not your only public input opportunity; please refer to the Environmental Review Process flow chart in Appendix 1.1 Comments may be submitted in written form or verbally. Further details on how to submit written comments are provided in the Public Participation section of this notice. In lieu of or in addition to sending written comments, you are invited to attend the public scoping meetings listed below. Date and time Location Tuesday, October 9, 2012 7:00 p.m. Eastern .......................................... Patuxent High School Auditorium, 12485 Southern Connector Boulevard, Lusby, MD 20657, (410) 535–7865. Creighton’s Corner Elementary School, Multi-Purpose Room, 23171 Minerva Drive, Ashburn, VA 20148, (703) 957–4480. Wednesday, October 10, 2012 7:00 p.m. Eastern .................................. This notice is being sent to the Commission’s current environmental mailing list for this Project. State and local government officials are asked to notify their constituents of this planned Project and encourage them to comment on their areas of concern. On-Site Environmental Review In addition to the public scoping meetings noticed above, the FERC staff will conduct an on-site review of environmental issues associated with the potential addition of compression at two existing compressor stations in Loudoun and Fairfax Counties, Virginia. You are invited to attend the on-site environmental review at the location listed below. Date and time Location Wednesday, October 10, 2012 1:00 p.m. Eastern .................................. Greene Mill Preserve Community Center, 41080 Solti Way, Leesburg, VA 20175. srobinson on DSK4SPTVN1PROD with NOTICES Involvement of the U.S. Department of Energy The FERC is the lead federal agency in preparing the EA to satisfy the requirements of the National Environmental Policy Act (NEPA). The U.S. Department of Energy, Office of Fossil Energy (DOE) has agreed to participate as a cooperating agency in the preparation of the EA to satisfy its NEPA responsibilities. Under section 3 of the Natural Gas Act of 1938, as amended (NGA), 15 USC 717b, DOE would authorize the export of natural gas, including liquefied natural gas (LNG), to countries with which the United States has not entered into a free trade agreement providing for 1 The appendices referenced in this notice are not being printed in the Federal Register. Copies of appendices were sent to all those receiving this VerDate Mar<15>2010 17:28 Sep 27, 2012 Jkt 226001 national treatment for trade in natural gas, unless it finds that the proposed export will not be consistent with the public interest. For the Project, the purpose and need for DOE action is to respond to Dominion’s application filed with DOE on October 3, 2011 (FE Docket No. 11–128–LNG) seeking authorization to export domestic natural gas as LNG for a 25-year period commencing the earlier of the date of first export or six years from the date that the requested authorization is issued. DOE authorization of Dominion’s application would allow the export of LNG to any country with the capacity to import LNG and with which trade is not prohibited by U.S. law or policy. notice in the mail and are available at www.ferc.gov using the link called ‘‘eLibrary’’ or from the Commission’s Public Reference Room, 888 First Street NE., Washington, DC 20426, or call (202) 502–8371. For instructions on connecting to eLibrary, refer to the last page of this notice. PO 00000 Frm 00012 Fmt 4703 Sfmt 4703 Summary of the Planned Project Before FERC Dominion plans to add natural gas liquefaction and exportation capabilities to its existing Cove Point LNG Terminal located on the Chesapeake Bay in Lusby, Maryland. The liquefaction facilities would consist of new natural gas-fired turbines to drive the main refrigerant compressors, one or two LNG drive trains, and associated new and modified processing facilities. The Project would be capable of processing an average of 750 million standard cubic feet of natural gas per day for a nominal LNG train capacity of approximately 4.5 E:\FR\FM\28SEN1.SGM 28SEN1

Agencies

[Federal Register Volume 77, Number 189 (Friday, September 28, 2012)]
[Notices]
[Pages 59599-59601]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-23943]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Combined Notice of Filings 1

    Take notice that the Commission received the following electric 
rate filings:
    Docket Numbers: ER10-1720-003; ER10-2285-003; ER10-2404-002; ER10-
2423-002; ER10-2942-003; ER10-2994-007; ER10-3158-003; ER10-3159-002; 
ER10-3161-003; ER10-3162-003; ER11-2112-004; ER11-2196-004; ER11-2462-
003; ER11-2463-003; ER11-2464-003; ER11-2465-003; ER11-2466-003; ER11-
2467-003; ER11-2468-003; ER11-2469-003; ER11-2470-003; ER11-2471-003; 
ER11-2472-003; ER11-2473-003; ER11-2474-005; ER11-2475-003; ER11-2482-
004; ER11-2483-003; ER11-2484-003; ER11-2485-004; ER11-2486-003; ER11-
2487-004; ER11-2488-003; ER11-2507-003; ER11-2514-003; ER11-2563-004; 
ER11-2564-004; ER12-2075-002; ER12-2076-002; ER12-2077-002; ER12-2078-
002; ER12-2081-002; ER12-2083-002; ER12-2084-002; ER12-2086-002; ER12-
2097-002; ER12-2101-002; ER12-2102-002; ER12-2106-002; ER12-2107-002; 
ER12-2108-002; ER12-2109-002; ER12-308-003; ER12-422-002; ER12-96-002.
    Applicants: Dry Lake Wind Power II LLC, Central Maine Power 
Company, Flat Rock Windpower II LLC, Flat Rock Windpower LLC, Elk River 
Windfarm, LLC, Iberdrola Renewables, LLC, Dillion Wind LLC, Dry Lake 
Wind Power, LLC, Shiloh I Wind Project, LLC, Mountain View Power 
Partners III, LLC, Blue

[[Page 59600]]

Creek Wind Farm LLC, San Luis Solar LLC, Big Horn Wind Project LLC, Big 
Horn II Wind Project LLC, Colorado Green Holdings LLC, Hay Canyon Wind 
LLC, Juniper Canyon Wind Power LLC, Klamath Energy LLC, Klamath 
Generation LLC, Klondike Wind Power, LLC, Klondike Wind Power II LLC, 
Klondike Wind Power III LLC, Leaning Juniper Wind Power II LLC, Pebble 
Springs Wind LLC, Star Point Wind Project LLC, Twin Buttes Wind LLC, 
Casselman Windpower LLC, Hardscrabble Wind Power LLC, Lempster Wind, 
LLC, Locust Ridge Wind Farm, LLC, Locust Ridge Wind Farm II, LLC, 
Providence Heights Wind, LLC, Streator-Cayuga Ridge Wind Power LLC, 
Carthage Energy, LLC, PEI Power II, LLC, New York State Electric & Gas 
Corporation, Rochester Gas & Electric Corporation, Atlantic Renewable 
Projects II LLC, Barton Windpower LLC, Buffalo Ridge I LLC, Buffalo 
Ridge II LLC, Elm Creek Wind, LLC, Elm Creek Wind II LLC, Farmers City 
Wind, LLC, Flying Cloud Power Partners, LLC, Moraine Wind LLC, Moraine 
Wind II LLC, New Harvest Wind Project LLC, Rugby Wind LLC, Trimont Wind 
I LLC, MinnDakota Wind LLC, Northern Iowa Windpower II LLC, Manzana 
Wind LLC, New England Wind, LLC, South Chestnut LLC.
    Description: Notice of Change in Status of the Iberdrola MBR 
Sellers, et al.
    Filed Date: 9/20/12.
    Accession Number: 20120920-5164.
    Comments Due: 5 p.m. ET 10/11/12.

    Docket Numbers: ER10-1997-001.
    Applicants: Midwest Independent Transmission System.
    Description: 9-20-12 Baseline Clean-Up to be effective 7/28/2010.
    Filed Date: 9/20/12.
    Accession Number: 20120920-5001.
    Comments Due: 5 p.m. ET 10/11/12.

    Docket Numbers: ER11-4711-001.
    Applicants: R&R Energy, Inc.
    Description: R&R Energy Compliance Filing to be effective 10/29/
2012.
    Filed Date: 9/20/12.
    Accession Number: 20120920-5008.
    Comments Due: 5 p.m. ET 10/11/12.

    Docket Numbers: ER12-1986-001.
    Applicants: Tucson Electric Power Company.
    Description: TEP Compliance Filing--Amended and Restated Balancing 
Authority Agreement to be effective 8/7/2012.
    Filed Date: 9/20/12.
    Accession Number: 20120920-5003.
    Comments Due: 5 p.m. ET 10/11/12.

    Docket Numbers: ER12-2104-001.
    Applicants: Michigan Electric Transmission Company.
    Description: Michigan Electric Transmission Company, LLC submits 
tariff filing per 35: METC Compliance Filing to be effective 8/27/2012.
    Filed Date: 9/20/12.
    Accession Number: 20120920-5100.
    Comments Due: 5 p.m. ET 10/11/12.

    Docket Numbers: ER12-2132-001.
    Applicants: ITC Midwest LLC.
    Description: ITC Midwest LLC submits tariff filing per 35: 
Compliance Filing of ITC Midwest to be effective 8/28/2012.
    Filed Date: 9/20/12.
    Accession Number: 20120920-5141.
    Comments Due: 5 p.m. ET 10/11/12.

    Docket Numbers: ER12-2263-001.
    Applicants: Arizona Public Service Company.
    Description: Arizona Public Service Company submits tariff filing 
per 35: REFILE Rate Schedule No. 217 Compliance Filing to be effective 
10/1/2012.
    Filed Date: 9/20/12.
    Accession Number: 20120920-5106.
    Comments Due: 5 p.m. ET 10/11/12.

    Docket Numbers: ER12-2297-002.
    Applicants: BFE Scheduling, LLC.
    Description: Inquiry Response to be effective 9/24/2012.
    Filed Date: 9/20/12.
    Accession Number: 20120920-5004.
    Comments Due: 5 p.m. ET 10/11/12.

    Docket Numbers: ER12-2661-000.
    Applicants: PJM Interconnection, L.L.C.
    Description: Original Service Agreement No. 3397; Queue No. W2-030 
to be effective 8/23/2012.
    Filed Date: 9/20/12.
    Accession Number: 20120920-5032.
    Comments Due: 5 p.m. ET 10/11/12.

    Docket Numbers: ER12-2662-000.
    Applicants: Park Power LLC.
    Description: Application for Market-Based Rate Authorization to be 
effective 11/19/2012.
    Filed Date: 9/20/12.
    Accession Number: 20120920-5074.
    Comments Due: 5 p.m. ET 10/11/12.

    Docket Numbers: ER12-2663-000.
    Applicants: PJM Interconnection, L.L.C.
    Description: Queue Position V3-045; Original Service Agreement Nos. 
3398 & 3399 to be effective 8/20/2012.
    Filed Date: 9/20/12.
    Accession Number: 20120920-5079.
    Comments Due: 5 p.m. ET 10/11/12.

    Docket Numbers: ER12-2664-000.
    Applicants: PJM Interconnection, L.L.C.
    Description: Notice of Cancellation of Service Agreement 3197 in 
Docket No. ER12-1000-000 to be effective 8/20/2012.
    Filed Date: 9/20/12.
    Accession Number: 20120920-5087.
    Comments Due: 5 p.m. ET 10/11/12.

    Docket Numbers: ER12-2665-000.
    Applicants: El Paso Electric Company.
    Description: Concurrence of EPE to TEP Rate Schedule No. 321 to be 
effective 12/28/2011.
    Filed Date: 9/20/12.
    Accession Number: 20120920-5094.
    Comments Due: 5 p.m. ET 10/11/12.

    Docket Numbers: ER12-2666-000.
    Applicants: Bangor Hydro Electric Company.
    Description: Bangor Hydro Electric Company submits tariff filing 
per 35.13(a)(2)(iii: Filing of E&P Agreement with Passadumkeag Windpark 
to be effective 9/13/2012.
    Filed Date: 9/20/12.
    Accession Number: 20120920-5103.
    Comments Due: 5 p.m. ET 10/11/12.

    Docket Numbers: ER12-2668-000.
    Applicants: Arizona Public Service Company.
    Description: Arizona Public Service Company submits tariff filing 
per 35.13(a)(2)(iii: Southwest Reserve Sharing Group Certificate of 
Concurrence to be effective 12/28/2011.
    Filed Date: 9/20/12.
    Accession Number: 20120920-5143.
    Comments Due: 5 p.m. ET 10/11/12.

    Docket Numbers: ER12-2669-000.
    Applicants: California Independent System Operator C.
    Description: California Independent System Operator Corporation 
submits tariff filing per 35.13(a)(2)(iii: 2012-09-20 Replacement 
Requirement for RA Maintenance Outages Amendment to be effective 11/20/
2012.
    Filed Date: 9/20/12.
    Accession Number: 20120920-5148.
    Comments Due: 5 p.m. ET 10/11/12.

    The filings are accessible in the Commission's eLibrary system by 
clicking on the links or querying the docket number.
    Any person desiring to intervene or protest in any of the above 
proceedings must file in accordance with Rules 211 and 214 of the 
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5 
p.m. Eastern time on the specified comment date. Protests may be 
considered, but intervention is necessary to become a party to the 
proceeding.
    eFiling is encouraged. More detailed information relating to filing 
requirements, interventions, protests, service, and qualifying 
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676 
(toll free). For TTY, call (202) 502-8659.


[[Page 59601]]


    Dated: September 21, 2012.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2012-23943 Filed 9-27-12; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.