Combined Notice of Filings #1, 59599-59601 [2012-23943]
Download as PDF
Federal Register / Vol. 77, No. 189 / Friday, September 28, 2012 / Notices
Issued at Washington, DC on September
21, 2012.
LaTanya R. Butler,
Acting Deputy Committee Management
Officer.
[FR Doc. 2012–23909 Filed 9–27–12; 8:45 am]
BILLING CODE 6450–01–P
DEPARTMENT OF ENERGY
Office of Energy Efficiency and
Renewable Energy
Notice of Public Meeting: Designing for
Impact IV: Workshop on Building the
National Network for Manufacturing
Innovation
Advanced Manufacturing
Office, Office of Energy Efficiency and
Renewable Energy, Department of
Energy (DOE).
ACTION: Notice of public meeting.
AGENCY:
DOE’s Advanced
Manufacturing Office, as part of the
inter-agency Advanced Manufacturing
National Program Office (AMNPO)
announces the fourth of a series of
public workshops entitled ‘‘Designing
for Impact: Workshop on Building the
National Network for Manufacturing
Innovation. This workshop series
provides a forum for the AMPNO to
present on the proposed National
Network for Manufacturing Innovation
(NNMI) and its regional components,
Institutes for Manufacturing Innovation
(IMIs) and to provide an opportunity for
public comment on the proposal. The
discussion at the workshop will focus
on the following topics: Technologies
with Broad Impact, Institute Structure
and Governance, Strategies for
Sustainable Institute Operations, and
Education and Workforce Development.
The Designing for Impact workshop
series is organized by representatives
from the Department of Commerce,
NIST; Department of Defense;
Department of Energy; National
Aeronautics and Space Administration;
and National Science Foundation.
DATES: The meeting will be held
Thursday, October, 18 2012, from 7:30
a.m. to 4:30 p.m.
ADDRESSES: University of Colorado at
Boulder, Law School, 2450 Kittredge
Loop Road, Boulder, CO 80309.
Additional information can be found at
https://manufacturing.gov/amp/
ampevents.html.
FOR FURTHER INFORMATION CONTACT:
Robert Ivester or Bhima Sastri, 202–
586–9488, NNMI4@sra.com.
SUPPLEMENTARY INFORMATION: The
President has proposed that the federal
government catalyze the creation of a
srobinson on DSK4SPTVN1PROD with NOTICES
SUMMARY:
VerDate Mar<15>2010
17:28 Sep 27, 2012
Jkt 226001
NNMI as a central element of the U.S.
response to the manufacturing
competitiveness challenge.1 The
proposed NNMI initiative focuses on
strengthening and ensuring the long
term competitiveness and job-creating
power of U.S. manufacturing. The
constituent IMIs would bring together
industry, universities and community
colleges, federal agencies, and U.S.
states to accelerate innovation by
investing in industrially-relevant
manufacturing technologies with broad
applications to bridge the gap between
basic research and product
development, provide shared assets to
help companies—particularly small
manufacturers—access cutting-edge
capabilities and equipment, and create
an unparalleled environment to educate
and train students and workers in
advanced manufacturing skills. Each
IMI would serve as a regional hub of
manufacturing excellence, providing the
innovation infrastructure to support
regional manufacturing and ensuring
that our manufacturing sector is a key
pillar in an economy that is built to last.
Each IMI also would have a welldefined technology focus to address
industrially-relevant manufacturing
challenges on a large scale and to
provide the capabilities and facilities
required to reduce the cost and risk of
commercializing new technologies. In
his March 9, 2012 announcement,
President Obama proposed building a
national network consisting of up to 15
IMIs.
On May 4, 2012 the AMNPO issued
a Request for Information (RFI), seeking
public comment on specific questions
related to the structure and operations
of the NNMI and IMIs. (77 FR 26509)
The RFI was published in the Federal
Register and may be found at: https://
www.gpo.gov/fdsys/pkg/FR-2012-05-04/
pdf/2012-10809.pdf. Comments in
response to the RFI are due on or before
11:59 p.m. Eastern Time on October 25,
2012. Those interested in providing
written comments in response to the RFI
should refer to the May 4, 2012 notice
for information regarding submission of
comments.
Tentative Agenda (Subject To Change)
An agenda will be posted online
when available at: https://manufacturing.
gov/amp/ampevents.html. This meeting
is an opportunity for participants to
provide, based on their individual
experience, individual information and
facts regarding this topic. It is not the
object of this session to obtain any
1 See https://www.whitehouse.gov/sites/default/
files/omb/budget/fy2013/assets/budget.pdf, page
217.
PO 00000
Frm 00010
Fmt 4703
Sfmt 4703
59599
group position or consensus. Rather, the
Department is seeking as many
recommendations as possible from all
individuals at this meeting.
Registration and Accommodations
Individuals planning to attend the
fourth public workshop must sign-up in
advance. Announcements of additional
workshops may be found at: https://
www.manufacturing.gov/amp/
ampevents.html. Future workshops will
also be announced in the Federal
Register.
Issued in Washington, DC, on September
21, 2012.
Kathleen Hogan,
Deputy Assistant Secretary, Energy Efficiency
and Renewable Energy.
[FR Doc. 2012–23887 Filed 9–27–12; 8:45 am]
BILLING CODE 6450–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER10–1720–003;
ER10–2285–003; ER10–2404–002;
ER10–2423–002; ER10–2942–003;
ER10–2994–007; ER10–3158–003;
ER10–3159–002; ER10–3161–003;
ER10–3162–003; ER11–2112–004;
ER11–2196–004; ER11–2462–003;
ER11–2463–003; ER11–2464–003;
ER11–2465–003; ER11–2466–003;
ER11–2467–003; ER11–2468–003;
ER11–2469–003; ER11–2470–003;
ER11–2471–003; ER11–2472–003;
ER11–2473–003; ER11–2474–005;
ER11–2475–003; ER11–2482–004;
ER11–2483–003; ER11–2484–003;
ER11–2485–004; ER11–2486–003;
ER11–2487–004; ER11–2488–003;
ER11–2507–003; ER11–2514–003;
ER11–2563–004; ER11–2564–004;
ER12–2075–002; ER12–2076–002;
ER12–2077–002; ER12–2078–002;
ER12–2081–002; ER12–2083–002;
ER12–2084–002; ER12–2086–002;
ER12–2097–002; ER12–2101–002;
ER12–2102–002; ER12–2106–002;
ER12–2107–002; ER12–2108–002;
ER12–2109–002; ER12–308–003; ER12–
422–002; ER12–96–002.
Applicants: Dry Lake Wind Power II
LLC, Central Maine Power Company,
Flat Rock Windpower II LLC, Flat Rock
Windpower LLC, Elk River Windfarm,
LLC, Iberdrola Renewables, LLC, Dillion
Wind LLC, Dry Lake Wind Power, LLC,
Shiloh I Wind Project, LLC, Mountain
View Power Partners III, LLC, Blue
E:\FR\FM\28SEN1.SGM
28SEN1
srobinson on DSK4SPTVN1PROD with NOTICES
59600
Federal Register / Vol. 77, No. 189 / Friday, September 28, 2012 / Notices
Creek Wind Farm LLC, San Luis Solar
LLC, Big Horn Wind Project LLC, Big
Horn II Wind Project LLC, Colorado
Green Holdings LLC, Hay Canyon Wind
LLC, Juniper Canyon Wind Power LLC,
Klamath Energy LLC, Klamath
Generation LLC, Klondike Wind Power,
LLC, Klondike Wind Power II LLC,
Klondike Wind Power III LLC, Leaning
Juniper Wind Power II LLC, Pebble
Springs Wind LLC, Star Point Wind
Project LLC, Twin Buttes Wind LLC,
Casselman Windpower LLC,
Hardscrabble Wind Power LLC,
Lempster Wind, LLC, Locust Ridge
Wind Farm, LLC, Locust Ridge Wind
Farm II, LLC, Providence Heights Wind,
LLC, Streator-Cayuga Ridge Wind Power
LLC, Carthage Energy, LLC, PEI Power
II, LLC, New York State Electric & Gas
Corporation, Rochester Gas & Electric
Corporation, Atlantic Renewable
Projects II LLC, Barton Windpower LLC,
Buffalo Ridge I LLC, Buffalo Ridge II
LLC, Elm Creek Wind, LLC, Elm Creek
Wind II LLC, Farmers City Wind, LLC,
Flying Cloud Power Partners, LLC,
Moraine Wind LLC, Moraine Wind II
LLC, New Harvest Wind Project LLC,
Rugby Wind LLC, Trimont Wind I LLC,
MinnDakota Wind LLC, Northern Iowa
Windpower II LLC, Manzana Wind LLC,
New England Wind, LLC, South
Chestnut LLC.
Description: Notice of Change in
Status of the Iberdrola MBR Sellers, et
al.
Filed Date: 9/20/12.
Accession Number: 20120920–5164.
Comments Due: 5 p.m. ET 10/11/12.
Docket Numbers: ER10–1997–001.
Applicants: Midwest Independent
Transmission System.
Description: 9–20–12 Baseline CleanUp to be effective 7/28/2010.
Filed Date: 9/20/12.
Accession Number: 20120920–5001.
Comments Due: 5 p.m. ET 10/11/12.
Docket Numbers: ER11–4711–001.
Applicants: R&R Energy, Inc.
Description: R&R Energy Compliance
Filing to be effective 10/29/2012.
Filed Date: 9/20/12.
Accession Number: 20120920–5008.
Comments Due: 5 p.m. ET 10/11/12.
Docket Numbers: ER12–1986–001.
Applicants: Tucson Electric Power
Company.
Description: TEP Compliance Filing—
Amended and Restated Balancing
Authority Agreement to be effective 8/
7/2012.
Filed Date: 9/20/12.
Accession Number: 20120920–5003.
Comments Due: 5 p.m. ET 10/11/12.
Docket Numbers: ER12–2104–001.
Applicants: Michigan Electric
Transmission Company.
VerDate Mar<15>2010
18:17 Sep 27, 2012
Jkt 226001
Description: Michigan Electric
Transmission Company, LLC submits
tariff filing per 35: METC Compliance
Filing to be effective 8/27/2012.
Filed Date: 9/20/12.
Accession Number: 20120920–5100.
Comments Due: 5 p.m. ET 10/11/12.
Docket Numbers: ER12–2132–001.
Applicants: ITC Midwest LLC.
Description: ITC Midwest LLC
submits tariff filing per 35: Compliance
Filing of ITC Midwest to be effective 8/
28/2012.
Filed Date: 9/20/12.
Accession Number: 20120920–5141.
Comments Due: 5 p.m. ET 10/11/12.
Docket Numbers: ER12–2263–001.
Applicants: Arizona Public Service
Company.
Description: Arizona Public Service
Company submits tariff filing per 35:
REFILE Rate Schedule No. 217
Compliance Filing to be effective 10/1/
2012.
Filed Date: 9/20/12.
Accession Number: 20120920–5106.
Comments Due: 5 p.m. ET 10/11/12.
Docket Numbers: ER12–2297–002.
Applicants: BFE Scheduling, LLC.
Description: Inquiry Response to be
effective 9/24/2012.
Filed Date: 9/20/12.
Accession Number: 20120920–5004.
Comments Due: 5 p.m. ET 10/11/12.
Docket Numbers: ER12–2661–000.
Applicants: PJM Interconnection,
L.L.C.
Description: Original Service
Agreement No. 3397; Queue No. W2–
030 to be effective 8/23/2012.
Filed Date: 9/20/12.
Accession Number: 20120920–5032.
Comments Due: 5 p.m. ET 10/11/12.
Docket Numbers: ER12–2662–000.
Applicants: Park Power LLC.
Description: Application for MarketBased Rate Authorization to be effective
11/19/2012.
Filed Date: 9/20/12.
Accession Number: 20120920–5074.
Comments Due: 5 p.m. ET 10/11/12.
Docket Numbers: ER12–2663–000.
Applicants: PJM Interconnection,
L.L.C.
Description: Queue Position V3–045;
Original Service Agreement Nos. 3398 &
3399 to be effective 8/20/2012.
Filed Date: 9/20/12.
Accession Number: 20120920–5079.
Comments Due: 5 p.m. ET 10/11/12.
Docket Numbers: ER12–2664–000.
Applicants: PJM Interconnection,
L.L.C.
Description: Notice of Cancellation of
Service Agreement 3197 in Docket No.
ER12–1000–000 to be effective 8/20/
2012.
PO 00000
Frm 00011
Fmt 4703
Sfmt 4703
Filed Date: 9/20/12.
Accession Number: 20120920–5087.
Comments Due: 5 p.m. ET 10/11/12.
Docket Numbers: ER12–2665–000.
Applicants: El Paso Electric Company.
Description: Concurrence of EPE to
TEP Rate Schedule No. 321 to be
effective 12/28/2011.
Filed Date: 9/20/12.
Accession Number: 20120920–5094.
Comments Due: 5 p.m. ET 10/11/12.
Docket Numbers: ER12–2666–000.
Applicants: Bangor Hydro Electric
Company.
Description: Bangor Hydro Electric
Company submits tariff filing per
35.13(a)(2)(iii: Filing of E&P Agreement
with Passadumkeag Windpark to be
effective 9/13/2012.
Filed Date: 9/20/12.
Accession Number: 20120920–5103.
Comments Due: 5 p.m. ET 10/11/12.
Docket Numbers: ER12–2668–000.
Applicants: Arizona Public Service
Company.
Description: Arizona Public Service
Company submits tariff filing per
35.13(a)(2)(iii: Southwest Reserve
Sharing Group Certificate of
Concurrence to be effective 12/28/2011.
Filed Date: 9/20/12.
Accession Number: 20120920–5143.
Comments Due: 5 p.m. ET 10/11/12.
Docket Numbers: ER12–2669–000.
Applicants: California Independent
System Operator C.
Description: California Independent
System Operator Corporation submits
tariff filing per 35.13(a)(2)(iii: 2012–09–
20 Replacement Requirement for RA
Maintenance Outages Amendment to be
effective 11/20/2012.
Filed Date: 9/20/12.
Accession Number: 20120920–5148.
Comments Due: 5 p.m. ET 10/11/12.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
E:\FR\FM\28SEN1.SGM
28SEN1
Federal Register / Vol. 77, No. 189 / Friday, September 28, 2012 / Notices
Dated: September 21, 2012.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2012–23943 Filed 9–27–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. PF12–16–000]
Dominion Cove Point LNG, LP; Notice
of Intent To Prepare an Environmental
Assessment for the Planned Cove
Point Liquefaction Project, Request for
Comments on Environmental Issues,
Notice of On-Site Environmental
Review, and Notice of Public Scoping
Meetings
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) will prepare an
environmental assessment (EA) that will
discuss the environmental impacts of
the Cove Point Liquefaction Project
(Project) involving construction and
operation of facilities by Dominion Cove
Point LNG, LP (Dominion) in Maryland
and Virginia. This EA will be used by
the Commission in its decision-making
process to determine whether the
construction and operation of the
proposed facilities is in the public
convenience and necessity.
This notice announces the opening of
the scoping process the Commission
will use to gather input from the public
and interested agencies on the Project.
Your input during the scoping process
will help the Commission staff
determine what issues need to be
evaluated in the EA. The Commission
staff will also use the scoping process to
help determine whether preparation of
59601
an environmental impact statement is
more appropriate for this Project based
upon the potential significance of the
anticipated levels of impact. Please note
that the scoping period will close on
October 24, 2012. This is not your only
public input opportunity; please refer to
the Environmental Review Process flow
chart in Appendix 1.1
Comments may be submitted in
written form or verbally. Further details
on how to submit written comments are
provided in the Public Participation
section of this notice. In lieu of or in
addition to sending written comments,
you are invited to attend the public
scoping meetings listed below.
Date and time
Location
Tuesday, October 9, 2012 7:00 p.m. Eastern ..........................................
Patuxent High School Auditorium, 12485 Southern Connector Boulevard, Lusby, MD 20657, (410) 535–7865.
Creighton’s Corner Elementary School, Multi-Purpose Room, 23171
Minerva Drive, Ashburn, VA 20148, (703) 957–4480.
Wednesday, October 10, 2012 7:00 p.m. Eastern ..................................
This notice is being sent to the
Commission’s current environmental
mailing list for this Project. State and
local government officials are asked to
notify their constituents of this planned
Project and encourage them to comment
on their areas of concern.
On-Site Environmental Review
In addition to the public scoping
meetings noticed above, the FERC staff
will conduct an on-site review of
environmental issues associated with
the potential addition of compression at
two existing compressor stations in
Loudoun and Fairfax Counties, Virginia.
You are invited to attend the on-site
environmental review at the location
listed below.
Date and time
Location
Wednesday, October 10, 2012 1:00 p.m. Eastern ..................................
Greene Mill Preserve Community Center, 41080 Solti Way, Leesburg,
VA 20175.
srobinson on DSK4SPTVN1PROD with NOTICES
Involvement of the U.S. Department of
Energy
The FERC is the lead federal agency
in preparing the EA to satisfy the
requirements of the National
Environmental Policy Act (NEPA). The
U.S. Department of Energy, Office of
Fossil Energy (DOE) has agreed to
participate as a cooperating agency in
the preparation of the EA to satisfy its
NEPA responsibilities.
Under section 3 of the Natural Gas
Act of 1938, as amended (NGA), 15 USC
717b, DOE would authorize the export
of natural gas, including liquefied
natural gas (LNG), to countries with
which the United States has not entered
into a free trade agreement providing for
1 The appendices referenced in this notice are not
being printed in the Federal Register. Copies of
appendices were sent to all those receiving this
VerDate Mar<15>2010
17:28 Sep 27, 2012
Jkt 226001
national treatment for trade in natural
gas, unless it finds that the proposed
export will not be consistent with the
public interest. For the Project, the
purpose and need for DOE action is to
respond to Dominion’s application filed
with DOE on October 3, 2011 (FE
Docket No. 11–128–LNG) seeking
authorization to export domestic natural
gas as LNG for a 25-year period
commencing the earlier of the date of
first export or six years from the date
that the requested authorization is
issued. DOE authorization of
Dominion’s application would allow the
export of LNG to any country with the
capacity to import LNG and with which
trade is not prohibited by U.S. law or
policy.
notice in the mail and are available at www.ferc.gov
using the link called ‘‘eLibrary’’ or from the
Commission’s Public Reference Room, 888 First
Street NE., Washington, DC 20426, or call (202)
502–8371. For instructions on connecting to
eLibrary, refer to the last page of this notice.
PO 00000
Frm 00012
Fmt 4703
Sfmt 4703
Summary of the Planned Project Before
FERC
Dominion plans to add natural gas
liquefaction and exportation capabilities
to its existing Cove Point LNG Terminal
located on the Chesapeake Bay in
Lusby, Maryland. The liquefaction
facilities would consist of new natural
gas-fired turbines to drive the main
refrigerant compressors, one or two LNG
drive trains, and associated new and
modified processing facilities. The
Project would be capable of processing
an average of 750 million standard cubic
feet of natural gas per day for a nominal
LNG train capacity of approximately 4.5
E:\FR\FM\28SEN1.SGM
28SEN1
Agencies
[Federal Register Volume 77, Number 189 (Friday, September 28, 2012)]
[Notices]
[Pages 59599-59601]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-23943]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings 1
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER10-1720-003; ER10-2285-003; ER10-2404-002; ER10-
2423-002; ER10-2942-003; ER10-2994-007; ER10-3158-003; ER10-3159-002;
ER10-3161-003; ER10-3162-003; ER11-2112-004; ER11-2196-004; ER11-2462-
003; ER11-2463-003; ER11-2464-003; ER11-2465-003; ER11-2466-003; ER11-
2467-003; ER11-2468-003; ER11-2469-003; ER11-2470-003; ER11-2471-003;
ER11-2472-003; ER11-2473-003; ER11-2474-005; ER11-2475-003; ER11-2482-
004; ER11-2483-003; ER11-2484-003; ER11-2485-004; ER11-2486-003; ER11-
2487-004; ER11-2488-003; ER11-2507-003; ER11-2514-003; ER11-2563-004;
ER11-2564-004; ER12-2075-002; ER12-2076-002; ER12-2077-002; ER12-2078-
002; ER12-2081-002; ER12-2083-002; ER12-2084-002; ER12-2086-002; ER12-
2097-002; ER12-2101-002; ER12-2102-002; ER12-2106-002; ER12-2107-002;
ER12-2108-002; ER12-2109-002; ER12-308-003; ER12-422-002; ER12-96-002.
Applicants: Dry Lake Wind Power II LLC, Central Maine Power
Company, Flat Rock Windpower II LLC, Flat Rock Windpower LLC, Elk River
Windfarm, LLC, Iberdrola Renewables, LLC, Dillion Wind LLC, Dry Lake
Wind Power, LLC, Shiloh I Wind Project, LLC, Mountain View Power
Partners III, LLC, Blue
[[Page 59600]]
Creek Wind Farm LLC, San Luis Solar LLC, Big Horn Wind Project LLC, Big
Horn II Wind Project LLC, Colorado Green Holdings LLC, Hay Canyon Wind
LLC, Juniper Canyon Wind Power LLC, Klamath Energy LLC, Klamath
Generation LLC, Klondike Wind Power, LLC, Klondike Wind Power II LLC,
Klondike Wind Power III LLC, Leaning Juniper Wind Power II LLC, Pebble
Springs Wind LLC, Star Point Wind Project LLC, Twin Buttes Wind LLC,
Casselman Windpower LLC, Hardscrabble Wind Power LLC, Lempster Wind,
LLC, Locust Ridge Wind Farm, LLC, Locust Ridge Wind Farm II, LLC,
Providence Heights Wind, LLC, Streator-Cayuga Ridge Wind Power LLC,
Carthage Energy, LLC, PEI Power II, LLC, New York State Electric & Gas
Corporation, Rochester Gas & Electric Corporation, Atlantic Renewable
Projects II LLC, Barton Windpower LLC, Buffalo Ridge I LLC, Buffalo
Ridge II LLC, Elm Creek Wind, LLC, Elm Creek Wind II LLC, Farmers City
Wind, LLC, Flying Cloud Power Partners, LLC, Moraine Wind LLC, Moraine
Wind II LLC, New Harvest Wind Project LLC, Rugby Wind LLC, Trimont Wind
I LLC, MinnDakota Wind LLC, Northern Iowa Windpower II LLC, Manzana
Wind LLC, New England Wind, LLC, South Chestnut LLC.
Description: Notice of Change in Status of the Iberdrola MBR
Sellers, et al.
Filed Date: 9/20/12.
Accession Number: 20120920-5164.
Comments Due: 5 p.m. ET 10/11/12.
Docket Numbers: ER10-1997-001.
Applicants: Midwest Independent Transmission System.
Description: 9-20-12 Baseline Clean-Up to be effective 7/28/2010.
Filed Date: 9/20/12.
Accession Number: 20120920-5001.
Comments Due: 5 p.m. ET 10/11/12.
Docket Numbers: ER11-4711-001.
Applicants: R&R Energy, Inc.
Description: R&R Energy Compliance Filing to be effective 10/29/
2012.
Filed Date: 9/20/12.
Accession Number: 20120920-5008.
Comments Due: 5 p.m. ET 10/11/12.
Docket Numbers: ER12-1986-001.
Applicants: Tucson Electric Power Company.
Description: TEP Compliance Filing--Amended and Restated Balancing
Authority Agreement to be effective 8/7/2012.
Filed Date: 9/20/12.
Accession Number: 20120920-5003.
Comments Due: 5 p.m. ET 10/11/12.
Docket Numbers: ER12-2104-001.
Applicants: Michigan Electric Transmission Company.
Description: Michigan Electric Transmission Company, LLC submits
tariff filing per 35: METC Compliance Filing to be effective 8/27/2012.
Filed Date: 9/20/12.
Accession Number: 20120920-5100.
Comments Due: 5 p.m. ET 10/11/12.
Docket Numbers: ER12-2132-001.
Applicants: ITC Midwest LLC.
Description: ITC Midwest LLC submits tariff filing per 35:
Compliance Filing of ITC Midwest to be effective 8/28/2012.
Filed Date: 9/20/12.
Accession Number: 20120920-5141.
Comments Due: 5 p.m. ET 10/11/12.
Docket Numbers: ER12-2263-001.
Applicants: Arizona Public Service Company.
Description: Arizona Public Service Company submits tariff filing
per 35: REFILE Rate Schedule No. 217 Compliance Filing to be effective
10/1/2012.
Filed Date: 9/20/12.
Accession Number: 20120920-5106.
Comments Due: 5 p.m. ET 10/11/12.
Docket Numbers: ER12-2297-002.
Applicants: BFE Scheduling, LLC.
Description: Inquiry Response to be effective 9/24/2012.
Filed Date: 9/20/12.
Accession Number: 20120920-5004.
Comments Due: 5 p.m. ET 10/11/12.
Docket Numbers: ER12-2661-000.
Applicants: PJM Interconnection, L.L.C.
Description: Original Service Agreement No. 3397; Queue No. W2-030
to be effective 8/23/2012.
Filed Date: 9/20/12.
Accession Number: 20120920-5032.
Comments Due: 5 p.m. ET 10/11/12.
Docket Numbers: ER12-2662-000.
Applicants: Park Power LLC.
Description: Application for Market-Based Rate Authorization to be
effective 11/19/2012.
Filed Date: 9/20/12.
Accession Number: 20120920-5074.
Comments Due: 5 p.m. ET 10/11/12.
Docket Numbers: ER12-2663-000.
Applicants: PJM Interconnection, L.L.C.
Description: Queue Position V3-045; Original Service Agreement Nos.
3398 & 3399 to be effective 8/20/2012.
Filed Date: 9/20/12.
Accession Number: 20120920-5079.
Comments Due: 5 p.m. ET 10/11/12.
Docket Numbers: ER12-2664-000.
Applicants: PJM Interconnection, L.L.C.
Description: Notice of Cancellation of Service Agreement 3197 in
Docket No. ER12-1000-000 to be effective 8/20/2012.
Filed Date: 9/20/12.
Accession Number: 20120920-5087.
Comments Due: 5 p.m. ET 10/11/12.
Docket Numbers: ER12-2665-000.
Applicants: El Paso Electric Company.
Description: Concurrence of EPE to TEP Rate Schedule No. 321 to be
effective 12/28/2011.
Filed Date: 9/20/12.
Accession Number: 20120920-5094.
Comments Due: 5 p.m. ET 10/11/12.
Docket Numbers: ER12-2666-000.
Applicants: Bangor Hydro Electric Company.
Description: Bangor Hydro Electric Company submits tariff filing
per 35.13(a)(2)(iii: Filing of E&P Agreement with Passadumkeag Windpark
to be effective 9/13/2012.
Filed Date: 9/20/12.
Accession Number: 20120920-5103.
Comments Due: 5 p.m. ET 10/11/12.
Docket Numbers: ER12-2668-000.
Applicants: Arizona Public Service Company.
Description: Arizona Public Service Company submits tariff filing
per 35.13(a)(2)(iii: Southwest Reserve Sharing Group Certificate of
Concurrence to be effective 12/28/2011.
Filed Date: 9/20/12.
Accession Number: 20120920-5143.
Comments Due: 5 p.m. ET 10/11/12.
Docket Numbers: ER12-2669-000.
Applicants: California Independent System Operator C.
Description: California Independent System Operator Corporation
submits tariff filing per 35.13(a)(2)(iii: 2012-09-20 Replacement
Requirement for RA Maintenance Outages Amendment to be effective 11/20/
2012.
Filed Date: 9/20/12.
Accession Number: 20120920-5148.
Comments Due: 5 p.m. ET 10/11/12.
The filings are accessible in the Commission's eLibrary system by
clicking on the links or querying the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
[[Page 59601]]
Dated: September 21, 2012.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2012-23943 Filed 9-27-12; 8:45 am]
BILLING CODE 6717-01-P