Black Canyon Hydro, LLC; Notice of Environmental Site Review, 59607 [2012-23936]

Download as PDF Federal Register / Vol. 77, No. 189 / Friday, September 28, 2012 / Notices pipeline/expansion-projects/northwestpipeline-expansion-projects/ washington-expansion/. Northwest can be contacted on its toll-free hotline: 888–892–8905 or by sending an email to WashingtonExpansion@williams.com. Dated: September 24, 2012. Kimberly D. Bose, Secretary. [FR Doc. 2012–23935 Filed 9–27–12; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14110–001] Black Canyon Hydro, LLC; Notice of Environmental Site Review On Wednesday, October 3, 2012, at 3 p.m., Commission staff will be participating in an environmental site review for the proposed Black Canyon Hydroelectric Project. All interested participants should meet at 44937 Southeast 70th Street, Snoqualmie, Washington 98065. For additional information, please contact Brandon Cherry at 202–502–8328. Dated: September 24, 2012. Kimberly D. Bose, Secretary. [FR Doc. 2012–23936 Filed 9–27–12; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER12–2676–000] Piedmont Green Power, LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization This is a supplemental notice in the above-referenced proceeding, of Piedmont Green Power, LLC’s application for market-based rate authority, with an accompanying rate schedule, noting that such application includes a request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability. Any person desiring to intervene or to protest should file with the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426, in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. Notice is hereby given that the deadline for filing protests with regard to the applicant’s request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability is October 15, 2012. The Commission encourages electronic submission of protests and interventions in lieu of paper, using the FERC Online links at https://www.ferc. gov. To facilitate electronic service, persons with Internet access who will eFile a document and/or be listed as a contact for an intervenor must create and validate an eRegistration account using the eRegistration link. Select the eFiling link to log on and submit the intervention or protests. Persons unable to file electronically should submit an original and 14 copies of the intervention or protest to the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. The filings in the above-referenced proceeding(s) are accessible in the Commission’s eLibrary system by clicking on the appropriate link in the above list. They are also available for review in the Commission’s Public Reference Room in Washington, DC. There is an eSubscription link on the Web site that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov or call 59607 (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: September 24, 2012. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2012–23942 Filed 9–27–12; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. PF12–11–000] El Paso Natural Gas Company; Notice of Public Scoping Meetings for the Planned SASABE Lateral Project On October 18 and 20, 2012, the Federal Energy Regulatory Commission (FERC or Commission) Office of Energy Project’s staff will hold public scoping meetings for El Paso Natural Gas Company’s (El Paso) Sasabe Lateral Project (Project). The Project is a planned 60-mile-long natural gas pipeline that would link El Paso’s existing South Mainline System near Tucson, Arizona, to a point at the U.S.Mexico border near the town of Sasabe, Arizona. FERC staff will conduct public scoping meetings as part of their preparation of an environmental impact statement (EIS) on the Project. The scoping meetings are designed to provide the public with an opportunity to offer verbal comments on the Project and on the issues they believe should be addressed in the EIS. More information about this Project and the Commission’s EIS process is available in the Notice of Intent to Prepare an Environmental Impact Statement for the Planned Sasabe Lateral Project and Request for Comments on Environmental Issues (NOI), issued on August 1, 2012. The NOI also provides details on how to submit written comments in lieu of or in addition to verbal comments on the Project. The public scoping meetings are scheduled as follows: Date and time Location Thursday, October 18, 2012 6:00 p.m. local time ................................... Robles Elementary School, Cafeteria, 9875 South Sasabe Road, Tucson, AZ 85735. San Fernando Elementary School, 1 Schoolhouse Drive, Sasabe, AZ 85633. srobinson on DSK4SPTVN1PROD with NOTICES Saturday, October 20, 2012 10:00 a.m. local time 1 ................................ 1A Spanish-English translator will be provided at this meeting. All public meetings will be posted on the Commission’s calendar located at www.ferc.gov/EventCalendar/ VerDate Mar<15>2010 17:28 Sep 27, 2012 Jkt 226001 EventsList.aspx along with other related information. Please note that the scoping period for the Project will close PO 00000 Frm 00018 Fmt 4703 Sfmt 4703 on October 27, 2012, 7 days after the last scoping meeting, as mentioned in the NOI. E:\FR\FM\28SEN1.SGM 28SEN1

Agencies

[Federal Register Volume 77, Number 189 (Friday, September 28, 2012)]
[Notices]
[Page 59607]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-23936]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 14110-001]


Black Canyon Hydro, LLC; Notice of Environmental Site Review

    On Wednesday, October 3, 2012, at 3 p.m., Commission staff will be 
participating in an environmental site review for the proposed Black 
Canyon Hydroelectric Project. All interested participants should meet 
at 44937 Southeast 70th Street, Snoqualmie, Washington 98065. For 
additional information, please contact Brandon Cherry at 202-502-8328.

    Dated: September 24, 2012.
 Kimberly D. Bose,
 Secretary.
[FR Doc. 2012-23936 Filed 9-27-12; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.