Black Canyon Hydro, LLC; Notice of Environmental Site Review, 59607 [2012-23936]
Download as PDF
Federal Register / Vol. 77, No. 189 / Friday, September 28, 2012 / Notices
pipeline/expansion-projects/northwestpipeline-expansion-projects/
washington-expansion/. Northwest can
be contacted on its toll-free hotline:
888–892–8905 or by sending an email to
WashingtonExpansion@williams.com.
Dated: September 24, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012–23935 Filed 9–27–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14110–001]
Black Canyon Hydro, LLC; Notice of
Environmental Site Review
On Wednesday, October 3, 2012, at 3
p.m., Commission staff will be
participating in an environmental site
review for the proposed Black Canyon
Hydroelectric Project. All interested
participants should meet at 44937
Southeast 70th Street, Snoqualmie,
Washington 98065. For additional
information, please contact Brandon
Cherry at 202–502–8328.
Dated: September 24, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012–23936 Filed 9–27–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER12–2676–000]
Piedmont Green Power, LLC;
Supplemental Notice That Initial
Market-Based Rate Filing Includes
Request for Blanket Section 204
Authorization
This is a supplemental notice in the
above-referenced proceeding, of
Piedmont Green Power, LLC’s
application for market-based rate
authority, with an accompanying rate
schedule, noting that such application
includes a request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability is October 15,
2012.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://www.ferc.
gov. To facilitate electronic service,
persons with Internet access who will
eFile a document and/or be listed as a
contact for an intervenor must create
and validate an eRegistration account
using the eRegistration link. Select the
eFiling link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 14 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
The filings in the above-referenced
proceeding(s) are accessible in the
Commission’s eLibrary system by
clicking on the appropriate link in the
above list. They are also available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an eSubscription link on the
Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov or call
59607
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Dated: September 24, 2012.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2012–23942 Filed 9–27–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. PF12–11–000]
El Paso Natural Gas Company; Notice
of Public Scoping Meetings for the
Planned SASABE Lateral Project
On October 18 and 20, 2012, the
Federal Energy Regulatory Commission
(FERC or Commission) Office of Energy
Project’s staff will hold public scoping
meetings for El Paso Natural Gas
Company’s (El Paso) Sasabe Lateral
Project (Project). The Project is a
planned 60-mile-long natural gas
pipeline that would link El Paso’s
existing South Mainline System near
Tucson, Arizona, to a point at the U.S.Mexico border near the town of Sasabe,
Arizona. FERC staff will conduct public
scoping meetings as part of their
preparation of an environmental impact
statement (EIS) on the Project. The
scoping meetings are designed to
provide the public with an opportunity
to offer verbal comments on the Project
and on the issues they believe should be
addressed in the EIS.
More information about this Project
and the Commission’s EIS process is
available in the Notice of Intent to
Prepare an Environmental Impact
Statement for the Planned Sasabe
Lateral Project and Request for
Comments on Environmental Issues
(NOI), issued on August 1, 2012. The
NOI also provides details on how to
submit written comments in lieu of or
in addition to verbal comments on the
Project.
The public scoping meetings are
scheduled as follows:
Date and time
Location
Thursday, October 18, 2012 6:00 p.m. local time ...................................
Robles Elementary School, Cafeteria, 9875 South Sasabe Road, Tucson, AZ 85735.
San Fernando Elementary School, 1 Schoolhouse Drive, Sasabe, AZ
85633.
srobinson on DSK4SPTVN1PROD with NOTICES
Saturday, October 20, 2012 10:00 a.m. local time 1 ................................
1A
Spanish-English translator will be provided at this meeting.
All public meetings will be posted on
the Commission’s calendar located at
www.ferc.gov/EventCalendar/
VerDate Mar<15>2010
17:28 Sep 27, 2012
Jkt 226001
EventsList.aspx along with other related
information. Please note that the
scoping period for the Project will close
PO 00000
Frm 00018
Fmt 4703
Sfmt 4703
on October 27, 2012, 7 days after the last
scoping meeting, as mentioned in the
NOI.
E:\FR\FM\28SEN1.SGM
28SEN1
Agencies
[Federal Register Volume 77, Number 189 (Friday, September 28, 2012)]
[Notices]
[Page 59607]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-23936]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 14110-001]
Black Canyon Hydro, LLC; Notice of Environmental Site Review
On Wednesday, October 3, 2012, at 3 p.m., Commission staff will be
participating in an environmental site review for the proposed Black
Canyon Hydroelectric Project. All interested participants should meet
at 44937 Southeast 70th Street, Snoqualmie, Washington 98065. For
additional information, please contact Brandon Cherry at 202-502-8328.
Dated: September 24, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012-23936 Filed 9-27-12; 8:45 am]
BILLING CODE 6717-01-P