Telephonic Prehearing Conference Cancellation, 59180 [2012-23664]

Download as PDF 59180 Federal Register / Vol. 77, No. 187 / Wednesday, September 26, 2012 / Notices deposit rate will be 5.53 percent; (2) for subject merchandise exported by Golden Dragon but not manufactured by Golden Dragon, the cash deposit rate will be the all others rate (i.e., 26.03 percent); (3) for subject merchandise manufactured by Golden Dragon but exported by any party other than Golden Dragon, the cash deposit rate will be the all others rate. These requirements, when imposed, shall remain in effect until further notice. Further, effective upon publication of the final results, we intend to instruct CBP that importers may no longer post a bond or other security in lieu of a cash deposit on imports of seamless refined copper pipe and tube from Mexico, manufactured and exported by Golden Dragon. These cash deposit requirements, when imposed, shall remain in effect until further notice. Notifications to Interested Parties mstockstill on DSK4VPTVN1PROD with NOTICES This notice also serves as a final reminder to importers of their responsibility under 19 CFR 351.402(f)(2) to file a certificate regarding the reimbursement of antidumping duties prior to liquidation of the relevant entries during this POR. Failure to comply with this requirement could result in the Department’s presumption that reimbursement of antidumping duties has occurred and the subsequent assessment of doubled antidumping duties. In accordance with 19 CFR 351.305(a)(3), this notice also serves as a reminder to parties subject to administrative protective order (‘‘APO’’) of their responsibility concerning the return or destruction of proprietary information disclosed under the APO, which continues to govern business proprietary information in this segment of the proceeding. Timely written notification of the return/destruction of APO materials or conversion to judicial protective order is hereby requested. Failure to comply with the regulations and terms of an APO is a violation subject to sanction. We are issuing and publishing this new shipper review and notice in accordance with sections 751(a)(1) and 777(i) of the Act. Dated: September 20, 2012. Paul Piquado, Assistant Secretary for Import Administration. Appendix I—Issues and Decision Memorandum Comment 1: Date of Sale Comment 2: Adjustment to U.S. Price VerDate Mar<15>2010 17:27 Sep 25, 2012 Jkt 226001 Comment 3: Entitlement to New Shipper Review [FR Doc. 2012–23686 Filed 9–25–12; 8:45 am] BILLING CODE 3510–DS–P CONSUMER PRODUCT SAFETY COMMISSION [CPSC Docket No. 12–1] Telephonic Prehearing Conference Cancellation U.S. Consumer Product Safety Commission. ACTION: Cancellation of Telephonic prehearing conference. AGENCY: Cancellation of Telephonic prehearing conference on September 25, 2012, in the matter of Maxfield and Oberton Holdings, LLC, CPSC Docket 12–1. FOR FURTHER INFORMATION CONTACT: Katy J.L. Duke, Esq., U.S. Coast Guard ALJ Program, 504/671–2213. SUMMARY: Dated: September 21, 2012. Todd A. Stevenson, Secretary. [FR Doc. 2012–23664 Filed 9–25–12; 8:45 am] BILLING CODE 6355–01–P DEPARTMENT OF DEFENSE Department of the Army, Corps of Engineers Withdrawal of Intent To Prepare a Draft Environmental Impact Statement/ Environmental Impact Report for the Ballona Creek Ecosystem Restoration Feasibility Study, Los Angeles County, CA Department of the Army, U.S. Army Corps of Engineers, DoD. ACTION: Notice of intent. AGENCY: The Los Angeles District of the U.S. Army Corps of Engineers (Corps) published a Notice of Intent to Prepare a Draft Environmental Impact Statement/Environmental Impact Report (EIS/EIR) for the Ballona Creek Ecosystem Restoration Feasibility Study in the Federal Register on September 20, 2005 (70 FR 55116). The study’s purpose is to evaluate structural and non-structural means of restoring diminished ecosystem functions and services within the lower reach of Ballona Creek including coastal wetlands. Santa Monica Bay Restoration Commission (SMBRC) is the local sponsor for the cost-shared study. On September 29, 2005, a public scoping meeting was held pursuant to SUMMARY: PO 00000 Frm 00018 Fmt 4703 Sfmt 4703 requirements of the National Environmental Policy Act and Engineer Regulations 1105–2–100. Baseline conditions portions of the EIS/EIR have been completed as of January, 2012. On July 17, 2012, the SMBRC requested the Corps terminate the study. Therefore, the Corps is withdrawing the Notice of Intent to Prepare a draft EIS/EIR. FOR FURTHER INFORMATION CONTACT: Ms. Jodi Clifford, Chief, Environmental Resources Branch. Mailing Address: Ms. Jodi Clifford, Chief, Environmental Resources Branch, Corps of Engineers, Los Angeles District, CESPL–PD–R, 915 Wilshire Boulevard, Los Angeles, CA 90017. Telephone: (213) 452–3840. Email: Jodi.L.Clifford@usace.army.mil. SUPPLEMENTARY INFORMATION: The Corps is no longer pursing restoration within Ballona Creek as a cost-shared study within its Civil Works program. Although SMBRC requested the Corps terminate the feasibility study, SMBRC, acting on behalf of the California Department of Fish and Game, is moving forward with plans for ecosystem restoration within Ballona Creek. SMBRC must obtain permissions from the Corps to proceed with implementation of its restoration proposals. Therefore, the Corps is initiating an EIS pursuant to its authorities under Section 404 of the Clean Water Act, Section 10 of the 1899 Rivers and Harbors Act, and Title 33, U.S. Code, Section 408 for a project to be planned and carried out by SMBRC. To that end, the Corps published a Notice of Intent to Prepare an EIS in the Federal Register on July 25, 2012 (77 FR 43575). A scoping meeting was held on August 16, 2012. All technical studies and reports prepared under the Civil Works feasibility study authority will be utilized to the maximum practical extent in support of the EIS/EIR process now underway. Dated: September 12, 2012. R. Mark Toy, Colonel, U.S. Army Commander and District Engineer. [FR Doc. 2012–23669 Filed 9–25–12; 8:45 am] BILLING CODE 3720–58–P DEPARTMENT OF DEFENSE Corps of Engineers, Department of the Army Notice of Intent To Prepare a Draft Environmental Impact Statement for a Proposed Aquatic Ecosystem Restoration Project for the Quiver River, MS Department of Defense, U.S. Army Corps of Engineers, DoD. AGENCY: E:\FR\FM\26SEN1.SGM 26SEN1

Agencies

[Federal Register Volume 77, Number 187 (Wednesday, September 26, 2012)]
[Notices]
[Page 59180]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-23664]


=======================================================================
-----------------------------------------------------------------------

CONSUMER PRODUCT SAFETY COMMISSION

[CPSC Docket No. 12-1]


Telephonic Prehearing Conference Cancellation

AGENCY: U.S. Consumer Product Safety Commission.

ACTION: Cancellation of Telephonic prehearing conference.

-----------------------------------------------------------------------

SUMMARY: Cancellation of Telephonic prehearing conference on September 
25, 2012, in the matter of Maxfield and Oberton Holdings, LLC, CPSC 
Docket 12-1.

FOR FURTHER INFORMATION CONTACT: Katy J.L. Duke, Esq., U.S. Coast Guard 
ALJ Program, 504/671-2213.

    Dated: September 21, 2012.
Todd A. Stevenson,
Secretary.
[FR Doc. 2012-23664 Filed 9-25-12; 8:45 am]
BILLING CODE 6355-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.