Drawbridge Operation Regulation; Willamette River, Portland, OR, 58491 [2012-23291]
Download as PDF
Federal Register / Vol. 77, No. 184 / Friday, September 21, 2012 / Rules and Regulations
Electronic copies of the agreement are
available at: https://www.osha.gov/dcsp/
osp/stateprogs/hawaii.html.
[FR Doc. 2012–23366 Filed 9–20–12; 8:45 am]
BILLING CODE 4510–26–P
DEPARTMENT OF HOMELAND
SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG–2012–0862]
Drawbridge Operation Regulation;
Willamette River, Portland, OR
Coast Guard, DHS.
Notice of temporary deviation
from regulations.
AGENCY:
ACTION:
The Coast Guard has issued a
temporary deviation from the operating
schedule that governs the Broadway
Bridge across the Willamette River, mile
11.7, at Portland, OR. This deviation is
necessary to accommodate the running
of the Portland Marathon. This
deviation allows the bridge to remain in
the down or closed position during the
marathon.
DATES: This deviation is effective from
7:30 a.m. October 7, 2012 through 3
p.m. October 7, 2012.
ADDRESSES: Documents mentioned in
this preamble as being available in the
docket are part of docket USCG–2012–
0862 and are available online by going
to https://www.regulations.gov, inserting
USCG–2012–0862 in the ‘‘Keyword’’
box and then clicking ‘‘Search’’. They
are also available for inspection or
copying at the Docket Management
Facility (M–30), U.S. Department of
Transportation, West Building Ground
Floor, Room W12–140, 1200 New Jersey
Avenue SE., Washington, DC 20590,
between 9 a.m. and 5 p.m., Monday
through Friday, except Federal holidays.
FOR FURTHER INFORMATION CONTACT: If
you have questions on this rule, call or
email the Bridge Administrator, Coast
Guard Thirteenth District; telephone
206–220–7282, email
randall.d.overton@uscg.mil. If you have
questions on viewing the docket, call
Renee V. Wright, Program Manager,
Docket Operations, telephone 202–366–
9826.
SUPPLEMENTARY INFORMATION:
Multnomah County has requested that
the Broadway Bascule Bridge remain
closed to vessel traffic to facilitate safe,
uninterrupted roadway passage of
participants of the Portland Marathon.
The Broadway Bridge crosses the
Willamette River at mile 11.7 and
pmangrum on DSK3VPTVN1PROD with RULES
SUMMARY:
VerDate Mar<15>2010
14:45 Sep 20, 2012
Jkt 226001
provides 90 feet of vertical clearance
above Columbia River Datum 0.0 while
in the closed position. Vessels which do
not require a bridge opening may
continue to transit beneath the bridge
during this closure period. Under
normal conditions this bridge operates
in accordance with 33 CFR 117.897
which allows for the bridge to remain
closed between 7 a.m. and 9 a.m. and
4 p.m. and 6 p.m. Monday through
Friday and also requires advance
notification when a bridge opening is
needed. This deviation period is from
7:30 a.m. October 7, 2012 through 3
p.m. October 7, 2012. The deviation
allows the bascule span of the Broadway
Bridge across the Willamette River, mile
11.7, to remain in the closed position
and need not open for maritime traffic
from 7:30 a.m. October 7, 2012 through
3 p.m. October 7, 2012. The bridge shall
operate in accordance to 33 CFR
117.897 at all other times. Waterway
usage on this stretch of the Willamette
River includes vessels ranging from
commercial tug and barge to small
pleasure craft. Mariners will be notified
and kept informed of the bridge’s
operational status via the Coast Guard
Notice to Mariners publication and
Broadcast Notice to Mariners as
appropriate. The draw span will be
required to open, if needed, for vessels
engaged in emergency response
operations during this closure period.
In accordance with 33 CFR 117.35(e),
the drawbridge must return to its regular
operating schedule immediately at the
end of the designated time period. This
deviation from the operating regulations
is authorized under 33 CFR 117.35.
Dated: September 7, 2012.
Randall D. Overton,
Bridge Administrator.
[FR Doc. 2012–23291 Filed 9–20–12; 8:45 am]
BILLING CODE 9110–04–P
DEPARTMENT OF HOMELAND
SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG–2012–0808]
Drawbridge Operation Regulation; Old
River, Orwood, CA
Coast Guard, DHS.
Notice of temporary deviation
from regulations.
AGENCY:
ACTION:
The Coast Guard has issued a
temporary deviation from the operating
regulation that governs the Burlington
Northern & Santa Fe Railroad (BNSF)
SUMMARY:
PO 00000
Frm 00023
Fmt 4700
Sfmt 4700
58491
Drawbridge across Old River, mile 10.4,
at Orwood, CA. The deviation is to
allow the bridge owner to perform
essential mechanical repairs on the
bridge. This deviation allows the bridge
to remain in the closed-to-navigation
position during the event.
This deviation is effective from
8 a.m. October 22, 2012 to 4 p.m. on
October 26, 2012.
DATES:
Documents mentioned in
this preamble as being available in the
docket are part of the docket USCG–
2012–0808 and are available online by
going to https://www.regulations.gov,
inserting USCG–2012–0808 in the
‘‘Keyword’’ box and then clicking
‘‘Search’’. They are also available for
inspection or copying at the Docket
Management Facility (M–30), U.S.
Department of Transportation, West
Building Ground Floor, Room W12–140,
1200 New Jersey Avenue SE.,
Washington, DC 20590, between 9 a.m.
and 5 p.m., Monday through Friday,
except Federal holidays.
ADDRESSES:
If
you have questions on this rule, call or
email David H. Sulouff, Chief, Bridge
Section, Eleventh Coast Guard District;
telephone 510–437–3516, email
David.H.Sulouff@uscg.mil. If you have
questions on viewing the docket, call
Renee V. Wright, Program Manager,
Docket Operations, telephone 202–366–
9826.
FOR FURTHER INFORMATION CONTACT:
BNSF has
requested a temporary change to the
operation of the BNSF Railroad
Drawbridge, mile 10.4, over Old River,
at Orwood, CA. The drawbridge
navigation span provides a vertical
clearance of 11.2 feet above Mean High
Water in the closed-to-navigation
position. The draw opens promptly and
fully when a request to open is given.
Navigation on the waterway is
commercial and recreational.
This temporary deviation has been
coordinated with commercial operators
and various marinas. No objections to
the proposed temporary deviation were
raised. Vessels that can transit the
bridge, while in the closed-to-navigation
position, may continue to do so at any
time. The BNSF drawbridge across
Middle River provides alternative access
for vessel transits.
In accordance with 33 CFR 117.35(e),
the drawbridge must return to its regular
operating schedule immediately at the
end of the designated time period. This
deviation from the operating regulations
is authorized under 33 CFR 117.35.
SUPPLEMENTARY INFORMATION:
E:\FR\FM\21SER1.SGM
21SER1
Agencies
[Federal Register Volume 77, Number 184 (Friday, September 21, 2012)]
[Rules and Regulations]
[Page 58491]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-23291]
=======================================================================
-----------------------------------------------------------------------
DEPARTMENT OF HOMELAND SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG-2012-0862]
Drawbridge Operation Regulation; Willamette River, Portland, OR
AGENCY: Coast Guard, DHS.
ACTION: Notice of temporary deviation from regulations.
-----------------------------------------------------------------------
SUMMARY: The Coast Guard has issued a temporary deviation from the
operating schedule that governs the Broadway Bridge across the
Willamette River, mile 11.7, at Portland, OR. This deviation is
necessary to accommodate the running of the Portland Marathon. This
deviation allows the bridge to remain in the down or closed position
during the marathon.
DATES: This deviation is effective from 7:30 a.m. October 7, 2012
through 3 p.m. October 7, 2012.
ADDRESSES: Documents mentioned in this preamble as being available in
the docket are part of docket USCG-2012-0862 and are available online
by going to https://www.regulations.gov, inserting USCG-2012-0862 in the
``Keyword'' box and then clicking ``Search''. They are also available
for inspection or copying at the Docket Management Facility (M-30),
U.S. Department of Transportation, West Building Ground Floor, Room
W12-140, 1200 New Jersey Avenue SE., Washington, DC 20590, between 9
a.m. and 5 p.m., Monday through Friday, except Federal holidays.
FOR FURTHER INFORMATION CONTACT: If you have questions on this rule,
call or email the Bridge Administrator, Coast Guard Thirteenth
District; telephone 206-220-7282, email randall.d.overton@uscg.mil. If
you have questions on viewing the docket, call Renee V. Wright, Program
Manager, Docket Operations, telephone 202-366-9826.
SUPPLEMENTARY INFORMATION: Multnomah County has requested that the
Broadway Bascule Bridge remain closed to vessel traffic to facilitate
safe, uninterrupted roadway passage of participants of the Portland
Marathon. The Broadway Bridge crosses the Willamette River at mile 11.7
and provides 90 feet of vertical clearance above Columbia River Datum
0.0 while in the closed position. Vessels which do not require a bridge
opening may continue to transit beneath the bridge during this closure
period. Under normal conditions this bridge operates in accordance with
33 CFR 117.897 which allows for the bridge to remain closed between 7
a.m. and 9 a.m. and 4 p.m. and 6 p.m. Monday through Friday and also
requires advance notification when a bridge opening is needed. This
deviation period is from 7:30 a.m. October 7, 2012 through 3 p.m.
October 7, 2012. The deviation allows the bascule span of the Broadway
Bridge across the Willamette River, mile 11.7, to remain in the closed
position and need not open for maritime traffic from 7:30 a.m. October
7, 2012 through 3 p.m. October 7, 2012. The bridge shall operate in
accordance to 33 CFR 117.897 at all other times. Waterway usage on this
stretch of the Willamette River includes vessels ranging from
commercial tug and barge to small pleasure craft. Mariners will be
notified and kept informed of the bridge's operational status via the
Coast Guard Notice to Mariners publication and Broadcast Notice to
Mariners as appropriate. The draw span will be required to open, if
needed, for vessels engaged in emergency response operations during
this closure period.
In accordance with 33 CFR 117.35(e), the drawbridge must return to
its regular operating schedule immediately at the end of the designated
time period. This deviation from the operating regulations is
authorized under 33 CFR 117.35.
Dated: September 7, 2012.
Randall D. Overton,
Bridge Administrator.
[FR Doc. 2012-23291 Filed 9-20-12; 8:45 am]
BILLING CODE 9110-04-P