Allegheny Hydro No. 8, L.P., Allegheny Hydro No. 9, L.P., and U.S. Bank National Association Allegheny Hydro, LLC; Notice of Application for Transfer of License, and Soliciting Comments and Motions To Intervene, 58371 [2012-23228]

Download as PDF Federal Register / Vol. 77, No. 183 / Thursday, September 20, 2012 / Notices revised process plan and schedule, as well as a list of issues, identified through the scoping process. Federal Energy Regulatory Commission [Project No. 3021–088] Pennamaquan Power will conduct a site visit for the proposed project on Thursday, October 25, 2012, starting at 1 p.m. The site visit will begin at the boat ramp parking lot on Boat Landing Road (off of Garnet Head Road), Pembroke, Maine 04666. For information about the meeting location for the site visit, please call Ramez Atiya from Pennamaquan Power at 801–583– 1054. Meeting Objectives At the scoping meetings, staff will: (1) Initiate scoping of the issues; (2) review and discuss existing conditions and resource management objectives; (3) review and discuss existing information and identify preliminary information and study needs; (4) review and discuss the process plan and schedule for prefiling activity that incorporates the time frames provided for in Part 5 of the Commission’s regulations and, to the extent possible, maximizes coordination of federal, state, and tribal permitting and certification processes; and (5) discuss the appropriateness of any federal or state agency or Indian tribe acting as a cooperating agency for development of an environmental document. Meeting participants should come prepared to discuss their issues and/or concerns. Please review the PAD in preparation for the scoping meetings. Directions on how to obtain a copy of the PAD and SD1 are included in item n. of this document. Meeting Procedures The meetings will be recorded by a stenographer and will be placed in the public records of the project. Dated: September 14, 2012. Kimberly D. Bose, Secretary. [FR Doc. 2012–23229 Filed 9–19–12; 8:45 am] mstockstill on DSK4VPTVN1PROD with NOTICES BILLING CODE 6717–01–P VerDate Mar<15>2010 link of Commission’s Web site at https://www.ferc.gov/docs-filing/ elibrary.asp. Enter the docket number (P–3021) in the docket number field to access the document. For assistance, call toll-free 1–866–208–3372. DEPARTMENT OF ENERGY Site Visit 16:11 Sep 19, 2012 Jkt 226001 Allegheny Hydro No. 8, L.P., Allegheny Hydro No. 9, L.P., and U.S. Bank National Association Allegheny Hydro, LLC; Notice of Application for Transfer of License, and Soliciting Comments and Motions To Intervene On August 31, 2012, Allegheny Hydro No. 8, L.P., Allegheny Hydro No. 9, L.P., and U.S. Bank National Association (in its capacity as owner trustee) (colicensees) and Allegheny Hydro, LLC (transferee) filed an application for transfer of license for the Allegheny River Lock and Dam Nos. 8 and 9 Hydroelectric Project No. 3021, located at the U.S. Army Corps of Engineers’ Allegheny River Lock and Dam No. 8 and Allegheny River Lock and Dam No. 9 on the Allegheny River in Armstrong County, Pennsylvania. Applicants seek Commission approval to transfer the license for the Allegheny River Lock and Dam Nos. 8 and 9 Hydroelectric Project from Allegheny Hydro No. 8, L.P., Allegheny Hydro No. 9, L.P., and the U.S. Bank National Association as co-licensees to Allegheny Hydro, LLC as sole licensee. Applicants’ Contact: Mr. Curt Whittaker, Rath, Young and Pignatelli, P.C., One Capital Plaza, Concord, NH 03302, phone: (603) 226–2600 and Mr. Mark C. Williams, Bingham McCutchen LLP, 2020 K Street NW., Suite 1100, Washington, DC 20006, phone (202) 373–6181. FERC Contact: Patricia W. Gillis (202) 502–8735, patricia.gillis@ferc.gov. Deadline for filing comments and motions to intervene: 15 days from the issuance date of this notice. Comments and motions to intervene may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1) and the instructions on the Commission’s Web site under https://www.ferc.gov/docs-filing/ efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. If unable to be filed electronically, documents may be paperfiled. To paper-file, an original plus seven copies should be mailed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. More information about this project can be viewed or printed on the eLibrary PO 00000 Frm 00018 Fmt 4703 Sfmt 4703 58371 Dated: September 13, 2012. Kimberly D. Bose, Secretary. [FR Doc. 2012–23228 Filed 9–19–12; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP12–516–000] Discovery Gas Transmission LLC; Notice of Application Take notice that on September 7, 2012, Discovery Gas Transmission LLC (Discovery), 2800 Post Oak Boulevard, Houston, Texas 77056, filed in Docket No. CP12–516–000 an application pursuant to section 7 of the Natural Gas Act and Part 157 the Commission’s Rules and Regulations for all the necessary authorizations required to construct, own and operate its Junction Platform Project (Project) in the Gulf of Mexico offshore Louisiana, all as more fully set forth in the application which is on file with the Commission and open to public inspection. Discovery proposes construction and operation of a new junction platform located in South Timbalier Area (ST) Block 283; construction and operation of approximately 10 miles of 30-inch pipeline connecting the new platform to a subsea interconnect with Discovery’s existing 30-inch mainline in Ewing Banks Area Block 873; construction and operation of approximately 10 miles of 12-inch pipeline connecting the new platform to Sea Robin Pipeline Company, LLC’s offshore pipeline system in ST Block 280; and appurtenant facilities on the new platform to provide pigging and other necessary functions to enhance efficient operations. The estimated cost of the Project is approximately $126 million. Copies of this filing are available for review at the Commission in the Public Reference Room, or may be viewed on the Commission’s Web site web at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC at FERCOnlineSupport@ferc.gov or call toll-free, (886) 208–3676 or TTY, (202) 502–8659. E:\FR\FM\20SEN1.SGM 20SEN1

Agencies

[Federal Register Volume 77, Number 183 (Thursday, September 20, 2012)]
[Notices]
[Page 58371]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-23228]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 3021-088]


Allegheny Hydro No. 8, L.P., Allegheny Hydro No. 9, L.P., and 
U.S. Bank National Association Allegheny Hydro, LLC; Notice of 
Application for Transfer of License, and Soliciting Comments and 
Motions To Intervene

    On August 31, 2012, Allegheny Hydro No. 8, L.P., Allegheny Hydro 
No. 9, L.P., and U.S. Bank National Association (in its capacity as 
owner trustee) (co-licensees) and Allegheny Hydro, LLC (transferee) 
filed an application for transfer of license for the Allegheny River 
Lock and Dam Nos. 8 and 9 Hydroelectric Project No. 3021, located at 
the U.S. Army Corps of Engineers' Allegheny River Lock and Dam No. 8 
and Allegheny River Lock and Dam No. 9 on the Allegheny River in 
Armstrong County, Pennsylvania.
    Applicants seek Commission approval to transfer the license for the 
Allegheny River Lock and Dam Nos. 8 and 9 Hydroelectric Project from 
Allegheny Hydro No. 8, L.P., Allegheny Hydro No. 9, L.P., and the U.S. 
Bank National Association as co-licensees to Allegheny Hydro, LLC as 
sole licensee.
    Applicants' Contact: Mr. Curt Whittaker, Rath, Young and 
Pignatelli, P.C., One Capital Plaza, Concord, NH 03302, phone: (603) 
226-2600 and Mr. Mark C. Williams, Bingham McCutchen LLP, 2020 K Street 
NW., Suite 1100, Washington, DC 20006, phone (202) 373-6181.
    FERC Contact: Patricia W. Gillis (202) 502-8735, 
patricia.gillis@ferc.gov.
    Deadline for filing comments and motions to intervene: 15 days from 
the issuance date of this notice. Comments and motions to intervene may 
be filed electronically via the Internet. See 18 CFR 385.2001(a)(1) and 
the instructions on the Commission's Web site under https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief 
comments up to 6,000 characters, without prior registration, using the 
eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You 
must include your name and contact information at the end of your 
comments. If unable to be filed electronically, documents may be paper-
filed. To paper-file, an original plus seven copies should be mailed 
to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 
888 First Street NE., Washington, DC 20426. More information about this 
project can be viewed or printed on the eLibrary link of Commission's 
Web site at https://www.ferc.gov/docs-filing/elibrary.asp. Enter the 
docket number (P-3021) in the docket number field to access the 
document. For assistance, call toll-free 1-866-208-3372.

    Dated: September 13, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012-23228 Filed 9-19-12; 8:45 am]
BILLING CODE 6717-01-P