revised process plan and schedule, as
well as a list of issues, identified
through the scoping process.
Federal Energy Regulatory
Commission
[Project No. 3021–088]
Pennamaquan Power will conduct a
site visit for the proposed project on
Thursday, October 25, 2012, starting at
1 p.m. The site visit will begin at the
boat ramp parking lot on Boat Landing
Road (off of Garnet Head Road),
Pembroke, Maine 04666. For
information about the meeting location
for the site visit, please call Ramez Atiya
from Pennamaquan Power at 801–583–
1054.
Meeting Objectives
At the scoping meetings, staff will: (1)
Initiate scoping of the issues; (2) review
and discuss existing conditions and
resource management objectives; (3)
review and discuss existing information
and identify preliminary information
and study needs; (4) review and discuss
the process plan and schedule for prefiling activity that incorporates the time
frames provided for in Part 5 of the
Commission’s regulations and, to the
extent possible, maximizes coordination
of federal, state, and tribal permitting
and certification processes; and (5)
discuss the appropriateness of any
federal or state agency or Indian tribe
acting as a cooperating agency for
development of an environmental
document.
Meeting participants should come
prepared to discuss their issues and/or
concerns. Please review the PAD in
preparation for the scoping meetings.
Directions on how to obtain a copy of
the PAD and SD1 are included in item
n. of this document.
Meeting Procedures
The meetings will be recorded by a
stenographer and will be placed in the
public records of the project.
Dated: September 14, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012–23229 Filed 9–19–12; 8:45 am]
mstockstill on DSK4VPTVN1PROD with NOTICES
BILLING CODE 6717–01–P
VerDate Mar<15>2010
link of Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–3021) in the docket number field to
access the document. For assistance,
call toll-free 1–866–208–3372.
DEPARTMENT OF ENERGY
Site Visit
16:11 Sep 19, 2012
Jkt 226001
Allegheny Hydro No. 8, L.P., Allegheny
Hydro No. 9, L.P., and U.S. Bank
National Association Allegheny Hydro,
LLC; Notice of Application for Transfer
of License, and Soliciting Comments
and Motions To Intervene
On August 31, 2012, Allegheny Hydro
No. 8, L.P., Allegheny Hydro No. 9, L.P.,
and U.S. Bank National Association (in
its capacity as owner trustee) (colicensees) and Allegheny Hydro, LLC
(transferee) filed an application for
transfer of license for the Allegheny
River Lock and Dam Nos. 8 and 9
Hydroelectric Project No. 3021, located
at the U.S. Army Corps of Engineers’
Allegheny River Lock and Dam No. 8
and Allegheny River Lock and Dam No.
9 on the Allegheny River in Armstrong
County, Pennsylvania.
Applicants seek Commission approval
to transfer the license for the Allegheny
River Lock and Dam Nos. 8 and 9
Hydroelectric Project from Allegheny
Hydro No. 8, L.P., Allegheny Hydro No.
9, L.P., and the U.S. Bank National
Association as co-licensees to Allegheny
Hydro, LLC as sole licensee.
Applicants’ Contact: Mr. Curt
Whittaker, Rath, Young and Pignatelli,
P.C., One Capital Plaza, Concord, NH
03302, phone: (603) 226–2600 and Mr.
Mark C. Williams, Bingham McCutchen
LLP, 2020 K Street NW., Suite 1100,
Washington, DC 20006, phone (202)
373–6181.
FERC Contact: Patricia W. Gillis (202)
502–8735, patricia.gillis@ferc.gov.
Deadline for filing comments and
motions to intervene: 15 days from the
issuance date of this notice. Comments
and motions to intervene may be filed
electronically via the Internet. See 18
CFR 385.2001(a)(1) and the instructions
on the Commission’s Web site under
https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. If unable to be filed
electronically, documents may be paperfiled. To paper-file, an original plus
seven copies should be mailed to:
Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
More information about this project can
be viewed or printed on the eLibrary
PO 00000
Frm 00018
Fmt 4703
Sfmt 4703
58371
Dated: September 13, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012–23228 Filed 9–19–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP12–516–000]
Discovery Gas Transmission LLC;
Notice of Application
Take notice that on September 7,
2012, Discovery Gas Transmission LLC
(Discovery), 2800 Post Oak Boulevard,
Houston, Texas 77056, filed in Docket
No. CP12–516–000 an application
pursuant to section 7 of the Natural Gas
Act and Part 157 the Commission’s
Rules and Regulations for all the
necessary authorizations required to
construct, own and operate its Junction
Platform Project (Project) in the Gulf of
Mexico offshore Louisiana, all as more
fully set forth in the application which
is on file with the Commission and open
to public inspection.
Discovery proposes construction and
operation of a new junction platform
located in South Timbalier Area (ST)
Block 283; construction and operation
of approximately 10 miles of 30-inch
pipeline connecting the new platform to
a subsea interconnect with Discovery’s
existing 30-inch mainline in Ewing
Banks Area Block 873; construction and
operation of approximately 10 miles of
12-inch pipeline connecting the new
platform to Sea Robin Pipeline
Company, LLC’s offshore pipeline
system in ST Block 280; and
appurtenant facilities on the new
platform to provide pigging and other
necessary functions to enhance efficient
operations. The estimated cost of the
Project is approximately $126 million.
Copies of this filing are available for
review at the Commission in the Public
Reference Room, or may be viewed on
the Commission’s Web site web at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, contact FERC
at FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TTY, (202)
502–8659.
E:\FR\FM\20SEN1.SGM
20SEN1
Agencies
[Federal Register Volume 77, Number 183 (Thursday, September 20, 2012)]
[Notices]
[Page 58371]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-23228]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 3021-088]
Allegheny Hydro No. 8, L.P., Allegheny Hydro No. 9, L.P., and
U.S. Bank National Association Allegheny Hydro, LLC; Notice of
Application for Transfer of License, and Soliciting Comments and
Motions To Intervene
On August 31, 2012, Allegheny Hydro No. 8, L.P., Allegheny Hydro
No. 9, L.P., and U.S. Bank National Association (in its capacity as
owner trustee) (co-licensees) and Allegheny Hydro, LLC (transferee)
filed an application for transfer of license for the Allegheny River
Lock and Dam Nos. 8 and 9 Hydroelectric Project No. 3021, located at
the U.S. Army Corps of Engineers' Allegheny River Lock and Dam No. 8
and Allegheny River Lock and Dam No. 9 on the Allegheny River in
Armstrong County, Pennsylvania.
Applicants seek Commission approval to transfer the license for the
Allegheny River Lock and Dam Nos. 8 and 9 Hydroelectric Project from
Allegheny Hydro No. 8, L.P., Allegheny Hydro No. 9, L.P., and the U.S.
Bank National Association as co-licensees to Allegheny Hydro, LLC as
sole licensee.
Applicants' Contact: Mr. Curt Whittaker, Rath, Young and
Pignatelli, P.C., One Capital Plaza, Concord, NH 03302, phone: (603)
226-2600 and Mr. Mark C. Williams, Bingham McCutchen LLP, 2020 K Street
NW., Suite 1100, Washington, DC 20006, phone (202) 373-6181.
FERC Contact: Patricia W. Gillis (202) 502-8735,
patricia.gillis@ferc.gov.
Deadline for filing comments and motions to intervene: 15 days from
the issuance date of this notice. Comments and motions to intervene may
be filed electronically via the Internet. See 18 CFR 385.2001(a)(1) and
the instructions on the Commission's Web site under https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief
comments up to 6,000 characters, without prior registration, using the
eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You
must include your name and contact information at the end of your
comments. If unable to be filed electronically, documents may be paper-
filed. To paper-file, an original plus seven copies should be mailed
to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC 20426. More information about this
project can be viewed or printed on the eLibrary link of Commission's
Web site at https://www.ferc.gov/docs-filing/elibrary.asp. Enter the
docket number (P-3021) in the docket number field to access the
document. For assistance, call toll-free 1-866-208-3372.
Dated: September 13, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012-23228 Filed 9-19-12; 8:45 am]
BILLING CODE 6717-01-P