FirstEnergy Generation Corporation, FirstEnergy Generation, LLC; Notice of Application for Transfer of License, and Soliciting Comments and Motions To Intervene, 56827-56828 [2012-22668]
Download as PDF
mstockstill on DSK4VPTVN1PROD with NOTICES
Federal Register / Vol. 77, No. 179 / Friday, September 14, 2012 / Notices
The existing Overton Dam is a
concrete gravity structure that is 104
feet in height and 914 feet in length. The
spillway consists of five 60-foot-wide
Tainter gates. The navigation lock is 84
feet wide by 685 feet long. The primary
purpose of the Corps’ lock and dam
system is navigation. The upper pool
above the dam is commonly referred to
as ‘‘Pool 2,’’ and the Corps maintains it
at an elevation of 64 feet NGVD. Pool 2
has a surface area of approximately
3,750 acres and a storage capacity of
about 67,500 acre-feet at an elevation of
64 feet NGVD.
The proposed Overton Lock and Dam
Project would consist of: (1) A
powerhouse located on the southwest
bank of the river at the existing dam’s
right abutment; (2) a headrace; (3) a
tailrace; (4) a switchyard; (5) 3.9 miles
of 138-kilovolt (kV) above-ground
transmission line; (6) three turbinegenerator units for a combined installed
capacity of 78 megawatts; and (7)
appurtenant facilities. The projected
annual energy generation would be
255.7 gigawatt-hours.
The project would operate in a run-ofrelease mode by utilizing releases from
Pool 2 as they are dictated by the Corps,
with no proposed change to the Corps’
operation. In addition, no changes to the
reservoir pool elevations or downstream
river flows are proposed. The project
would generate power using flows
between 2,700 and 49,800 cubic feet per
second (cfs). If flows are less than 2,700
cfs, all flow would go through the
Corps’ gates, and the project would then
be offline. When flows are greater than
49,800 cfs, the excess flow would be
directed through the Corps’ gates.
m. A copy of the application is
available for review at the Commission
in the Public Reference Room or may be
viewed on the Commission’s Web site at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, contact FERC
Online Support. A copy is also available
for inspection and reproduction at the
address in item h above.
Register online at https://www.ferc.
gov/docs-filing/esubscription.asp to be
notified via email of new filings and
issuances related to this or other
pending projects. For assistance, contact
FERC Online Support.
n. Anyone may submit comments, a
protest, or a motion to intervene in
accordance with the requirements of
Rules of Practice and Procedure, 18 CFR
385.210, .211, and .214. In determining
the appropriate action to take, the
Commission will consider all protests or
other comments filed, but only those
VerDate Mar<15>2010
16:39 Sep 13, 2012
Jkt 226001
who file a motion to intervene in
accordance with the Commission’s
Rules may become a party to the
proceeding. Any comments, protests, or
motions to intervene must be received
on or before the specified comment date
for the particular application.
All filings must (1) bear in all capital
letters the title ‘‘PROTEST’’ or
‘‘MOTION TO INTERVENE,’’ ‘‘NOTICE
OF INTENT TO FILE COMPETING
APPLICATION,’’ ‘‘COMPETING
APPLICATION,’’ ‘‘COMMENTS,’’
‘‘REPLY COMMENTS,’’
‘‘RECOMMENDATIONS,’’ ‘‘TERMS
AND CONDITIONS,’’ or
‘‘PRESCRIPTIONS;’’ (2) set forth in the
heading the name of the applicant and
the project number of the application to
which the filing responds; (3) furnish
the name, address, and telephone
number of the person protesting or
intervening; and (4) otherwise comply
with the requirements of 18 CFR
385.2001 through 385.2005. All
comments, recommendations, terms and
conditions or prescriptions must set
forth their evidentiary basis and
otherwise comply with the requirements
of 18 CFR 4.34(b). Agencies may obtain
copies of the application directly from
the applicant. A copy of any protest or
motion to intervene must be served
upon the representative of the applicant.
A copy of all other filings must be
accompanied by proof of service on all
persons listed in the service list
prepared by the Commission in this
proceeding, in accordance with 18 CFR
4.34(b) and 385.2010.
o. Procedural Schedule:
The application will be processed
according to the following Hydro
Licensing Schedule. Revisions to the
schedule may be made as appropriate.
Milestone
Target date
Filing of recommendations,
preliminary terms and
conditions, and preliminary fishway prescriptions.
Commission issues EA ......
Comments on EA or EIS ...
Modified terms and conditions.
November 2012.
March 2013.
April 2013.
June 2013.
p. Final amendments to the
application must be filed with the
Commission no later than 30 days from
the issuance date of this notice.
q. A license applicant must file no
later than 60 days following the date of
issuance of the notice of acceptance and
ready for environmental analysis
provided for in § 5.22: (1) A copy of the
water quality certification; (2) a copy of
the request for certification, including
proof of the date on which the certifying
PO 00000
Frm 00020
Fmt 4703
Sfmt 4703
56827
agency received the request; or (3)
evidence of waiver of water quality
certification.
r. Any qualified applicant desiring to
file a competing application must
submit to the Commission, on or before
the specified intervention deadline date,
a competing development application,
or a notice of intent to file such an
application. Submission of a timely
notice of intent allows an interested
person to file the competing
development application no later than
120 days after the specified intervention
deadline date. Applications for
preliminary permits will not be
accepted in response to this notice.
A notice of intent must specify the
exact name, business address, and
telephone number of the prospective
applicant, and must include an
unequivocal statement of intent to
submit a development application. A
notice of intent must be served on the
applicant(s) named in this public notice.
Dated: September 7, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012–22669 Filed 9–13–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2280–015]
FirstEnergy Generation Corporation,
FirstEnergy Generation, LLC; Notice of
Application for Transfer of License,
and Soliciting Comments and Motions
To Intervene
On July 6, 2012, FirstEnergy
Generation Corporation (transferor) and
FirstEnergy Generation, LLC (transferee)
filed an application for the transfer of
license for the Kinzua Pumped Storage
Project (FERC No. 2280), located on the
Allegheny River in Warren County,
Pennsylvania.
Applicants seek Commission approval
to transfer the license for the Kinzua
Pumped Storage Project from the
transferor to the transferee.
Applicants’ Contact: Mr. Morgan E.
Parke, Sr. Corporate Counsel,
FirstEnergy Service Company, 76 South
Main Street, A–GO–15, Akron, OH
44308, Telephone (330) 384–4595 and
Mr. John A. Whittaker IV, Winston &
Strawn LLP, 1700 K Street NW.,
Washington, DC 20006–3817,
Telephone (202) 282–5766.
FERC Contact: Patricia W. Gillis (202)
502–8735, patricia.gillis@ferc.gov.
Deadline for filing comments and
motions to intervene: October 1, 2012.
E:\FR\FM\14SEN1.SGM
14SEN1
56828
Federal Register / Vol. 77, No. 179 / Friday, September 14, 2012 / Notices
Comments and motions to intervene
may be filed electronically via the
Internet. See 18 CFR 385.2001(a)(1) and
the instructions on the Commission’s
Web site under https://www.ferc.gov/
docs-filing/efiling.asp. Commenters can
submit brief comments up to 6,000
characters, without prior registration,
using the eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. If unable to be filed
electronically, documents may be paperfiled.
To paper-file, an original plus seven
copies should be mailed to: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE., Washington, DC 20426. More
information about this project can be
viewed or printed on the eLibrary link
of Commission’s Web site at https://
www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P–2280) in
the docket number field to access the
document. For assistance, call toll-free
1–866–208–3372.
Dated: September 10, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012–22668 Filed 9–13–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
mstockstill on DSK4VPTVN1PROD with NOTICES
Combined Notice of Filings #1
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC12–139–000.
Applicants: Dogwood Energy LLC.
Description: Application for
Authorization Under Section 203 of the
Federal Power Act and Request for
Waivers, Expedited Action and
Shortened Comment Period of Dogwood
Energy LLC.
Filed Date: 9/7/12.
Accession Number: 20120907–5152.
Comments Due: 5 p.m. ET 9/28/12.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER12–1355–002.
Applicants: Iron Energy LLC.
Description: Notice of Non-Material
Change in Status and Tariff Revisions to
be effective 9/7/2012.
Filed Date: 9/6/12.
Accession Number: 20120906–5107.
Comments Due: 5 p.m. ET 9/27/12.
Docket Numbers: ER12–2206–000.
VerDate Mar<15>2010
16:39 Sep 13, 2012
Jkt 226001
Applicants: Southern California
Edison Company.
Description: Southern California
Edison Company’s Response to August
10, 2012 letter requesting additional
information.
Filed Date: 9/7/12.
Accession Number: 20120907–5121.
Comments Due: 5 p.m. ET 9/28/12.
Docket Numbers: ER12–2208–000.
Applicants: Southern California
Edison Company.
Description: Southern California
Edison Company’s Response to August
10, 2012 letter requesting additional
information.
Filed Date: 9/7/12.
Accession Number: 20120907–5121.
Comments Due: 5 p.m. ET 9/28/12.
Docket Numbers: ER12–2398–000.
Applicants: NRG Solar Borrego I LLC.
Description: NRG Solar Borrego I
LLC’s Amendment to Application for
Market-Based Rate Authority and
Associated Waivers and Blanket
Approvals.
Filed Date: 8/15/12.
Accession Number: 20120815–5132.
Comments Due: 5 p.m. ET 9/28/12.
Docket Numbers: ER12–2590–000.
Applicants: DR Power, LLC.
Description: DR Power, LLC MBR
Application Filing to be effective 11/1/
2012.
Filed Date: 9/6/12.
Accession Number: 20120906–5102.
Comments Due: 5 p.m. ET 9/27/12.
Docket Numbers: ER12–2591–000.
Applicants: Monongahela Power
Company.
Description: Facilities Lease and
Assignment Agreement including
Revised Exhibit A to be effective 9/1/
2012.
Filed Date: 9/6/12.
Accession Number: 20120906–5103.
Comments Due: 5 p.m. ET 9/21/12.
Docket Numbers: ER12–2592–000.
Applicants: Southern California
Edison Company.
Description: SGIA SCE–SCE,
Tehachapi Wind Energy Storage Project
to be effective 9/8/2012 under.
Filed Date: 9/7/12.
Accession Number: 20120907–5000.
Comments Due: 5 p.m. ET 9/28/12.
Docket Numbers: ER12–2593–000.
Applicants: PPL EnergyPlus, LLC.
Description: Hourly Coordination
Agreement—Addendum to be effective
9/7/2012.
Filed Date: 9/7/12.
Accession Number: 20120907–5004.
Comments Due: 5 p.m. ET 9/28/12.
Docket Numbers: ER12–2594–000.
Applicants: PJM Interconnection,
L.L.C.
PO 00000
Frm 00021
Fmt 4703
Sfmt 4703
Description: Original Service
Agreement No. 3392; Queue No. Y1–045
to be effective 8/10/2012.
Filed Date: 9/7/12.
Accession Number: 20120907–5083.
Comments Due: 5 p.m. ET 9/28/12.
Docket Numbers: ER12–2595–000.
Applicants: Southern California
Edison Company.
Description: Notice of Cancellation to
SGIA and DSA 13048 Valley Blvd.,
Fontana Roof Top Solar to be effective
7/27/2011.
Filed Date: 9/7/12.
Accession Number: 20120907–5084.
Comments Due: 5 p.m. ET 9/28/12.
Docket Numbers: ER12–2596–000.
Applicants: MidAmerican Energy
Company.
Description: MEAN-MidAmerican
Transmission Revenue Credits to be
effective 9/1/2012.
Filed Date: 9/7/12.
Accession Number: 20120907–5110.
Comments Due: 5 p.m. ET 9/28/12.
Docket Numbers: ER12–2597–000.
Applicants: PPL Montana, LLC, PPL
Colstrip II, LLC.
Description: Notice of Cancellation of
PPL Montana, LLC and PPL Colstrip, II,
LLC.
Filed Date: 9/7/12.
Accession Number: 20120907–5137.
Comments Due: 5 p.m. ET 9/28/12.
Docket Numbers: ER12–2598–000.
Applicants: New York Independent
System Operator, In NYISO Tariff
Revisions: OATT RS1—Operating Cost
Funding Shortfall Resolution to be
effective 1/1/2013.
Filed Date: 9/7/12.
Accession Number: 20120907–5153.
Comments Due: 5 p.m. ET 9/28/12.
Docket Numbers: ER12–2599–000.
Applicants: PJM Interconnection,
L.L.C.
Description: Reqeust for Waiver of
PJM. Interconnection, L.L.C.
Filed Date: 9/7/12.
Accession Number: 20120907–5154.
Comments Due: 5 p.m. ET 9/28/12.
Take notice that the Commission
received the following electric securities
filings:
Docket Numbers: ES12–54–000.
Applicants: Brookfield Smoky
Mountain Hydropower LLC, Smoky
Mountain Transmission LLC.
Description: Application for
Authorization of the Assumption of
Liabilities and the Issuance of Securities
under FPA Sec. 204 of Smoky Mountain
Transmission LLC and Brookfield
Smoky Mountain Hydropower LLC.
Filed Date: 9/6/12.
Accession Number: 20120906–5114.
Comments Due: 5 p.m. ET 9/27/12.
E:\FR\FM\14SEN1.SGM
14SEN1
Agencies
[Federal Register Volume 77, Number 179 (Friday, September 14, 2012)]
[Notices]
[Pages 56827-56828]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-22668]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2280-015]
FirstEnergy Generation Corporation, FirstEnergy Generation, LLC;
Notice of Application for Transfer of License, and Soliciting Comments
and Motions To Intervene
On July 6, 2012, FirstEnergy Generation Corporation (transferor)
and FirstEnergy Generation, LLC (transferee) filed an application for
the transfer of license for the Kinzua Pumped Storage Project (FERC No.
2280), located on the Allegheny River in Warren County, Pennsylvania.
Applicants seek Commission approval to transfer the license for the
Kinzua Pumped Storage Project from the transferor to the transferee.
Applicants' Contact: Mr. Morgan E. Parke, Sr. Corporate Counsel,
FirstEnergy Service Company, 76 South Main Street, A-GO-15, Akron, OH
44308, Telephone (330) 384-4595 and Mr. John A. Whittaker IV, Winston &
Strawn LLP, 1700 K Street NW., Washington, DC 20006-3817, Telephone
(202) 282-5766.
FERC Contact: Patricia W. Gillis (202) 502-8735,
patricia.gillis@ferc.gov.
Deadline for filing comments and motions to intervene: October 1,
2012.
[[Page 56828]]
Comments and motions to intervene may be filed electronically via the
Internet. See 18 CFR 385.2001(a)(1) and the instructions on the
Commission's Web site under https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000
characters, without prior registration, using the eComment system at
https://www.ferc.gov/docs-filing/ecomment.asp. You must include your
name and contact information at the end of your comments. If unable to
be filed electronically, documents may be paper-filed.
To paper-file, an original plus seven copies should be mailed to:
Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426. More information about this
project can be viewed or printed on the eLibrary link of Commission's
Web site at https://www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P-2280) in the docket number field to
access the document. For assistance, call toll-free 1-866-208-3372.
Dated: September 10, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012-22668 Filed 9-13-12; 8:45 am]
BILLING CODE 6717-01-P