FirstLight Hydro Generating Company; Notice of Authorization for Continued Project Operation, 56637-56638 [2012-22513]
Download as PDF
Federal Register / Vol. 77, No. 178 / Thursday, September 13, 2012 / Notices
and wildlife, the protection of
recreational opportunities, and the
preservation of other aspects of
environmental quality when approving
licenses. Finally, 16 U.S.C. 799
stipulates conditions upon which the
Commission issues hydroelectric
licenses.
The Commission requires all
hydroelectric license applications to
address a variety of environmental
concerns. Many of these concerns
address environmental requirements
developed by other agencies. The
applicants must provide facts in order
for the Commission to understand and
resolve potential environmental
problems associated with the
application in the interests of the United
States public.
56637
Types of Respondents: Non-federal
hydroelectric plants greater than 5
megawatt capacity (FERC–500); nonfederal hydroelectric plants less than 5
megawatts capacity (FERC–505).
Estimate of Annual Burden: 1 The
Commission estimates the total Public
Reporting Burden for each information
collection as:
FERC–500 (IC12–18–000): APPLICATION FOR LICENSE/RELICENSE FOR WATER PROJECTS WITH GREATER THAN 5
MEGAWATT CAPACITY
Number of
respondents
Number of
responses per
respondent
Total number
of responses
Average
burden hours
per response
Estimated total
annual burden
(A)
(B)
(A) * (B) = (C)
(D)
(C) * (D)
219
1
219
87
19,053
FERC–505 (IC12–18–000): APPLICATION FOR LICENSE/RELICENSE FOR WATER PROJECTS WITH 5 MEGAWATT OR LESS
CAPACITY
Number of
responses per
respondent
Total number
of responses
Average
burden hours
per response
Estimated total
annual burden
(A)
(B)
(A) * (B) = (C)
(D)
(C) * (D)
16
mstockstill on DSK4VPTVN1PROD with NOTICES
Number of
respondents
1
16
273
4,369
FERC–500: Total estimated annual
cost burden to respondents is
$1,314,839.32 [19,053 hours ÷ 2080
hours/year 2 = 9.16009 * $143,540/year 3
= $1,314,839.32].
FERC–505: Total estimated annual
cost burden to respondents is
$301,502.90 [4,369 hours ÷ 2080 hours/
year = 2.10048 years * $143,540/year =
$301,502.90].
Comments: Comments are invited on:
(1) Whether the collections of
information are necessary for the proper
performance of the functions of the
Commission, including whether the
information will have practical utility;
(2) the accuracy of the agency’s estimate
of the burden and cost of the collections
of information, including the validity of
the methodology and assumptions used;
(3) ways to enhance the quality, utility
and clarity of the information
collections; and (4) ways to minimize
the burden of the collections of
information on those who are to
respond, including the use of automated
collection techniques or other forms of
information technology.
Dated: September 6, 2012.
Kimberly D. Bose,
Secretary.
1 The Commission defines burden as the total
time, effort, or financial resources expended by
persons to generate, maintain, retain, or disclose or
provide information to or for a Federal agency. For
further explanation of what is included in the
information collection burden, reference 5 Code of
Federal Regulations 1320.3.
VerDate Mar<15>2010
19:13 Sep 12, 2012
Jkt 226001
[FR Doc. 2012–22514 Filed 9–12–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2662–000]
FirstLight Hydro Generating Company;
Notice of Authorization for Continued
Project Operation
On August 30, 2007, the FirstLight
Hydro Generating Company, licensee for
the Scotland Hydroelectric Project, filed
an Application for a New License
pursuant to the Federal Power Act
(FPA) and the Commission’s regulations
thereunder. The Scotland Hydroelectric
Project is located on the Shetucket
River, in Windham County,
Connecticut.
The license for Project No. 2662 was
issued for a period ending August 31,
2012. Section 15(a)(1) of the FPA, 16
U.S.C. 808(a)(1), requires the
PO 00000
Frm 00032
Fmt 4703
Sfmt 4703
Commission, at the expiration of a
license term, to issue from year-to-year
an annual license to the then licensee
under the terms and conditions of the
prior license until a new license is
issued, or the project is otherwise
disposed of as provided in section 15 or
any other applicable section of the FPA.
If the project’s prior license waived the
applicability of section 15 of the FPA,
then, based on section 9(b) of the
Administrative Procedure Act, 5 U.S.C.
558(c), and as set forth at 18 CFR
16.21(a), if the licensee of such project
has filed an application for a subsequent
license, the licensee may continue to
operate the project in accordance with
the terms and conditions of the license
after the minor or minor part license
expires, until the Commission acts on
its application. If the licensee of such a
project has not filed an application for
a subsequent license, then it may be
required, pursuant to 18 CFR 16.21(b),
to continue project operations until the
Commission issues someone else a
license for the project or otherwise
orders disposition of the project.
If the project is subject to section 15
of the FPA, notice is hereby given that
an annual license for Project No. 2662
2 2080 hours = 52 weeks * 40 hours per week (i.e.
1 year of full-time employment).
3 Average salary plus benefits per full-time
equivalent employee.
E:\FR\FM\13SEN1.SGM
13SEN1
56638
Federal Register / Vol. 77, No. 178 / Thursday, September 13, 2012 / Notices
is issued to the FirstLight Hydro
Generating Company for a period
effective September 1, 2012 through
August 31, 2013, or until the issuance
of a new license for the project or other
disposition under the FPA, whichever
comes first. If issuance of a new license
(or other disposition) does not take
place on or before August 31, 2013,
notice is hereby given that, pursuant to
18 CFR 16.18(c), an annual license
under section 15(a)(1) of the FPA is
renewed automatically without further
order or notice by the Commission,
unless the Commission orders
otherwise.
If the project is not subject to section
15 of the FPA, notice is hereby given
that the FirstLight Hydro Generating
Company is authorized to continue
operation of the Scotland Hydroelectric
Project, until such time as the
Commission acts on its application for
a subsequent license.
Dated: September 6, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012–22513 Filed 9–12–12; 8:45 am]
BILLING CODE 6717–01–P
Applicants: Southern LNG Company,
L.L.C.
Description: ACA Surcharge—SLNG 3
Service to be effective 10/1/2012.
Filed Date: 9/4/12.
Accession Number: 20120904–5201.
Comments Due: 5 p.m. e.t. 9/17/12.
Docket Numbers: RP12–1020–000.
Applicants: Granite State Gas
Transmission, Inc.
Description: Revised System Maps to
be effective 9/5/2012.
Filed Date: 9/4/12.
Accession Number: 20120904–5298.
Comments Due: 5 p.m. e.t. 9/17/12.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
Filings in Existing Proceedings
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
mstockstill on DSK4VPTVN1PROD with NOTICES
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Filings Instituting Proceedings
Docket Numbers: RP12–1015–000.
Applicants: WTG Hugoton, LP.
Description: WTGH Address Change
Filing to be effective 10/1/2012.
Filed Date: 9/4/12.
Accession Number: 20120904–5000.
Comments Due: 5 p.m. e.t. 9/17/12.
Docket Numbers: RP12–1016–000.
Applicants: Gulf Crossing Pipeline
Company LLC.
Description: Antero to Vanguard
Permanent Capacity Releases on Neg
Rate Agmts to be effective 9/1/2012.
Filed Date: 9/4/12.
Accession Number: 20120904–5023.
Comments Due: 5 p.m. e.t. 9/17/12.
Docket Numbers: RP12–1017–000.
Applicants: Gulf Crossing Pipeline
Company LLC.
Description: Cap Rel Neg Rate Agmts
Filing—Vanguard Permian to Tenaska to
be effective 9/1/2012.
Filed Date: 9/4/12.
Accession Number: 20120904–5024.
Comments Due: 5 p.m. e.t. 9/17/12.
Docket Numbers: RP12–1019–000.
VerDate Mar<15>2010
19:13 Sep 12, 2012
Jkt 226001
Docket Numbers: RP12–88–006.
Applicants: National Fuel Gas Supply
Corporation.
Description: RP12–88 Final Tariff
Records Rate Case (09–05–12) to be
effective 11/1/2012.
Filed Date: 9/5/12.
Accession Number: 20120905–5082.
Comments Due: 5 p.m. e.t. 9/17/12.
Any person desiring to protest in any
the above proceedings must file in
accordance with Rule 211 of the
Commission’s Regulations (18 CFR
385.211) on or before 5 p.m. Eastern
time on the specified comment date.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
and service can be found at: https://
www.ferc.gov/docs-filing/efiling/filingreq.pdf. For other information, call (866)
208–3676 (toll free). For TTY, call (202)
502–8659.
Dated: September 6, 2012.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2012–22546 Filed 9–12–12; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00033
Fmt 4703
Sfmt 4703
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER12–2303–001.
Applicants: New York Independent
System Operator, Inc.
Description: Amendment to NYISO
OATT, Attachment Y Filing to be
effective 9/24/2012.
Filed Date: 9/6/12.
Accession Number: 20120906–5039.
Comments Due: 5 p.m. e.t. 9/17/12.
Docket Numbers: ER12–2368–000.
Applicants: Denver City Energy
Associates, LP.
Description: Golden Spread Electric
Cooperative, Inc. submits additional
information regarding cancellation of
Denver City Energy Associates, L.P.
tariff.
Filed Date: 9/5/12.
Accession Number: 20120905–5122.
Comments Due: 5 p.m. e.t. 9/26/12.
Docket Numbers: ER12–2583–000.
Applicants: PacifiCorp.
Description: UMPA ARTSOA Rev 3 to
be effective 11/5/2012.
Filed Date: 9/5/12.
Accession Number: 20120905–5104.
Comments Due: 5 p.m. e.t. 9/26/12.
Docket Numbers: ER12–2586–000.
Applicants: PacifiCorp.
Description: BPA Agmt for Pilot Butte
Sub Mtring and Trnsfr CEC to BPA BAA
to be effective 11/6/2012.
Filed Date: 9/6/12.
Accession Number: 20120906–5058.
Comments Due: 5 p.m. e.t. 9/27/12.
Docket Numbers: ER12–2587–000.
Applicants: PacifiCorp.
Description: OATT Revisions to
Remove MEC References to be effective
11/6/2012.
Filed Date: 9/6/12.
Accession Number: 20120906–5059.
Comments Due: 5 p.m. e.t. 9/27/12.
Docket Numbers: ER12–2588–000.
Applicants: Hess Small Business
Services LLC.
Description: Category Seller Change to
be effective 11/5/2012.
Filed Date: 9/6/12.
Accession Number: 20120906–5060.
Comments Due: 5 p.m. e.t. 9/27/12.
Docket Numbers: ER12–2589–000.
Applicants: Hess Corporation.
Description: Category Seller Change to
be effective 11/5/2012.
Filed Date: 9/6/12.
Accession Number: 20120906–5061.
Comments Due: 5 p.m. e.t. 9/27/12.
E:\FR\FM\13SEN1.SGM
13SEN1
Agencies
[Federal Register Volume 77, Number 178 (Thursday, September 13, 2012)]
[Notices]
[Pages 56637-56638]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-22513]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2662-000]
FirstLight Hydro Generating Company; Notice of Authorization for
Continued Project Operation
On August 30, 2007, the FirstLight Hydro Generating Company,
licensee for the Scotland Hydroelectric Project, filed an Application
for a New License pursuant to the Federal Power Act (FPA) and the
Commission's regulations thereunder. The Scotland Hydroelectric Project
is located on the Shetucket River, in Windham County, Connecticut.
The license for Project No. 2662 was issued for a period ending
August 31, 2012. Section 15(a)(1) of the FPA, 16 U.S.C. 808(a)(1),
requires the Commission, at the expiration of a license term, to issue
from year-to-year an annual license to the then licensee under the
terms and conditions of the prior license until a new license is
issued, or the project is otherwise disposed of as provided in section
15 or any other applicable section of the FPA. If the project's prior
license waived the applicability of section 15 of the FPA, then, based
on section 9(b) of the Administrative Procedure Act, 5 U.S.C. 558(c),
and as set forth at 18 CFR 16.21(a), if the licensee of such project
has filed an application for a subsequent license, the licensee may
continue to operate the project in accordance with the terms and
conditions of the license after the minor or minor part license
expires, until the Commission acts on its application. If the licensee
of such a project has not filed an application for a subsequent
license, then it may be required, pursuant to 18 CFR 16.21(b), to
continue project operations until the Commission issues someone else a
license for the project or otherwise orders disposition of the project.
If the project is subject to section 15 of the FPA, notice is
hereby given that an annual license for Project No. 2662
[[Page 56638]]
is issued to the FirstLight Hydro Generating Company for a period
effective September 1, 2012 through August 31, 2013, or until the
issuance of a new license for the project or other disposition under
the FPA, whichever comes first. If issuance of a new license (or other
disposition) does not take place on or before August 31, 2013, notice
is hereby given that, pursuant to 18 CFR 16.18(c), an annual license
under section 15(a)(1) of the FPA is renewed automatically without
further order or notice by the Commission, unless the Commission orders
otherwise.
If the project is not subject to section 15 of the FPA, notice is
hereby given that the FirstLight Hydro Generating Company is authorized
to continue operation of the Scotland Hydroelectric Project, until such
time as the Commission acts on its application for a subsequent
license.
Dated: September 6, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012-22513 Filed 9-12-12; 8:45 am]
BILLING CODE 6717-01-P