Federal Register / Vol. 77, No. 176 / Tuesday, September 11, 2012 / Notices
postulated accidents, and data that the
staff needs in its review of applications
for permits and licenses.
Revision 2 of RG1.68.1 was issued
with a temporary identification as Draft
Regulatory Guide, DG–1265. This guide
describes the methods that the NRC staff
considers acceptable to implement
multiple criteria in Appendix A,
‘‘General Design Criteria for Nuclear
Power Plants,’’ to Part 50 of Title 10 of
the Code of Federal Regulations (10
CFR), ‘‘Domestic Licensing of
Production and Utilization Facilities, of
10 CFR Part 50,’’ regarding the initial
test program (ITP) for condensate and
feedwater (FW) systems, including
condensate storage and supply, for lightwater reactors (LWRs) and for startup
feedwater (SFW), auxiliary feedwater
(AFW) or emergency feedwater (EFW)
systems for pressurized-water reactors
(PWRs). This guide also describes
methods that the NRC staff finds
acceptable for testing condensate, FW,
SFW/AFW/EFW (PWR only) structures,
systems, and components (SSCs) in
accordance with Subpart B, ‘‘Standard
Design Certifications,’’ and Subpart C,
‘‘Combined Licenses,’’ of 10 CFR Part
52, ‘‘Licenses, Certifications, and
Approvals for Nuclear Power Plants.’’
srobinson on DSK4SPTVN1PROD with NOTICES
II. Further Information
DG–1265, was published in the
Federal Register on March 16, 2012 (77
FR 15812), for a 60-day public comment
period. The public comment period
closed on May 18, 2012. No public
comments on DG–1265 were received;
therefore no content changes were made
during its conversion to a regulatory
guide.
III. Backfitting and Issue Finality
Issuance of this final regulatory guide
does not constitute backfitting as
defined in 10 CFR 50.109 (the Backfit
Rule) and is not otherwise inconsistent
with the issue finality provisions in 10
CFR Part 52. As discussed in the
‘‘Implementation’’ section of this
regulatory guide, the NRC has no
current intention to impose this
regulatory guide on holders of current
operating licenses or combined licenses.
This regulatory guide may be applied
to applications for operating licenses
and combined licenses docketed by the
NRC as of the date of issuance of the
final regulatory guide, as well as future
applications for operating licenses and
combined licenses submitted after the
issuance of the regulatory guide. Such
action does not constitute backfitting as
defined in 10 CRF 50.109(a)(1) or is
otherwise inconsistent with the
applicable issue finality provision in 10
CFR Part 52, inasmuch as such
VerDate Mar<15>2010
19:10 Sep 10, 2012
Jkt 226001
applicants or potential applicants are
not within the scope of entities
protected by the Backfit Rule or the
relevant issue finality provisions in Part
52.
Dated at Rockville, Maryland, this 30th day
of August, 2012.
For the Nuclear Regulatory Commission.
Thomas H. Boyce,
Chief, Regulatory Guide Development Branch,
Division of Engineering, Office of Nuclear
Regulatory Research.
[FR Doc. 2012–22310 Filed 9–10–12; 8:45 am]
BILLING CODE 7590–01–P
NUCLEAR REGULATORY
COMMISSION
Sunshine Act Meetings
AGENCY HOLDING THE MEETINGS: Nuclear
Regulatory Commission [NRC–2012–
0002]
DATES: Weeks of September 10, 17, 24,
October 1, 8, 15, 2012.
PLACE: Commissioners’ Conference
Room, 11555 Rockville Pike, Rockville,
Maryland.
STATUS: Public and Closed.
Week of September 10, 2012
Tuesday, September 11, 2012
9 a.m. Briefing on Economic
Consequences (Public Meeting)
(Contact: Richard Correia, 301–251–
7430).
This meeting will be webcast live at
the Web address—www.nrc.gov.
Friday, September 14, 2012
11 a.m. Discussion of Management and
Personnel Issues (Closed—Ex. 2 and
6).
Week of September 17, 2012—Tentative
There are no meetings scheduled for
the week of September 17, 2012.
Week of September 24, 2012—Tentative
Tuesday, September 25, 2012
9:30 a.m. Strategic Programmatic
Overview of the New Reactors
Business Line (Public Meeting)
(Contact: Donna Williams, 301–415–
1322).
This meeting will be webcast live at
the Web address—www.nrc.gov.
Week of October 1, 2012—Tentative
Tuesday, October 2, 2012
9:30 a.m. Strategic Programmatic
Overview of the Nuclear Materials
Users and Decommissioning and
Low-Level Waste Business Lines
(Public Meeting)
(Contact: Kimyata Morgan Butler,
PO 00000
Frm 00085
Fmt 4703
Sfmt 4703
301–415–0733).
This meeting will be webcast live at
the Web address—www.nrc.gov.
Week of October 8, 2012—Tentative
There are no meetings scheduled for
the week of October 8, 2012.
Week of October 15, 2012—Tentative
There are no meetings scheduled for
the week of October 15, 2012.
*
*
*
*
*
*The schedule for Commission
meetings is subject to change on short
notice. To verify the status of meetings,
call (recording)—301–415–1292.
Contact person for more information:
Rochelle Bavol, 301–415–1651.
*
*
*
*
*
The NRC Commission Meeting
Schedule can be found on the Internet
at: https://www.nrc.gov/public-involve/
public-meetings/schedule.html.
*
*
*
*
*
The NRC provides reasonable
accommodation to individuals with
disabilities where appropriate. If you
need a reasonable accommodation to
participate in these public meetings, or
need this meeting notice or the
transcript or other information from the
public meetings in another format (e.g.
braille, large print), please notify Bill
Dosch, Chief, Work Life and Benefits
Branch, at 301–415–6200, TDD: 301–
415–2100, or by email at
william.dosch@nrc.gov. Determinations
on requests for reasonable
accommodation will be made on a caseby-case basis.
*
*
*
*
*
This notice is distributed
electronically to subscribers. If you no
longer wish to receive it, or would like
to be added to the distribution, please
contact the Office of the Secretary,
Washington, DC 20555 (301–415–1969),
or send an email to
darlene.wright@nrc.gov.
Dated: September 6, 2012.
Rochelle C. Bavol,
Policy Coordinator, Office of the Secretary.
[FR Doc. 2012–22423 Filed 9–7–12; 4:15 pm]
BILLING CODE 7590–01–P
NUCLEAR REGULATORY
COMMISSION
[Docket Nos.: 50–250, 50–251, 50–335, and
50–389; NRC–2012–0210; License Nos.:
DPR–31, DPR–41, DPR–67, and NPF–16]
Florida Power & Light Company;
Receipt of Request for Action
Notice is hereby given that by petition
dated April 23, 2012, Mr. Thomas King
(petitioner) has requested that the U.S.
E:\FR\FM\11SEN1.SGM
11SEN1
Agencies
[Federal Register Volume 77, Number 176 (Tuesday, September 11, 2012)]
[Notices]
[Page 55878]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-22423]
-----------------------------------------------------------------------
NUCLEAR REGULATORY COMMISSION
Sunshine Act Meetings
AGENCY HOLDING THE MEETINGS: Nuclear Regulatory Commission [NRC-2012-
0002]
DATES: Weeks of September 10, 17, 24, October 1, 8, 15, 2012.
PLACE: Commissioners' Conference Room, 11555 Rockville Pike, Rockville,
Maryland.
STATUS: Public and Closed.
Week of September 10, 2012
Tuesday, September 11, 2012
9 a.m. Briefing on Economic Consequences (Public Meeting)
(Contact: Richard Correia, 301-251-7430).
This meeting will be webcast live at the Web address--www.nrc.gov.
Friday, September 14, 2012
11 a.m. Discussion of Management and Personnel Issues (Closed--Ex. 2
and 6).
Week of September 17, 2012--Tentative
There are no meetings scheduled for the week of September 17, 2012.
Week of September 24, 2012--Tentative
Tuesday, September 25, 2012
9:30 a.m. Strategic Programmatic Overview of the New Reactors Business
Line (Public Meeting)
(Contact: Donna Williams, 301-415-1322).
This meeting will be webcast live at the Web address--www.nrc.gov.
Week of October 1, 2012--Tentative
Tuesday, October 2, 2012
9:30 a.m. Strategic Programmatic Overview of the Nuclear Materials
Users and Decommissioning and Low-Level Waste Business Lines (Public
Meeting)
(Contact: Kimyata Morgan Butler, 301-415-0733).
This meeting will be webcast live at the Web address--www.nrc.gov.
Week of October 8, 2012--Tentative
There are no meetings scheduled for the week of October 8, 2012.
Week of October 15, 2012--Tentative
There are no meetings scheduled for the week of October 15, 2012.
* * * * *
*The schedule for Commission meetings is subject to change on short
notice. To verify the status of meetings, call (recording)--301-415-
1292. Contact person for more information: Rochelle Bavol, 301-415-
1651.
* * * * *
The NRC Commission Meeting Schedule can be found on the Internet
at: https://www.nrc.gov/public-involve/public-meetings/schedule.html.
* * * * *
The NRC provides reasonable accommodation to individuals with
disabilities where appropriate. If you need a reasonable accommodation
to participate in these public meetings, or need this meeting notice or
the transcript or other information from the public meetings in another
format (e.g. braille, large print), please notify Bill Dosch, Chief,
Work Life and Benefits Branch, at 301-415-6200, TDD: 301-415-2100, or
by email at william.dosch@nrc.gov. Determinations on requests for
reasonable accommodation will be made on a case-by-case basis.
* * * * *
This notice is distributed electronically to subscribers. If you no
longer wish to receive it, or would like to be added to the
distribution, please contact the Office of the Secretary, Washington,
DC 20555 (301-415-1969), or send an email to darlene.wright@nrc.gov.
Dated: September 6, 2012.
Rochelle C. Bavol,
Policy Coordinator, Office of the Secretary.
[FR Doc. 2012-22423 Filed 9-7-12; 4:15 pm]
BILLING CODE 7590-01-P