City of Hillsboro, Oregon; Notice of Application Accepted for Filing and Soliciting Comments, Motions To Intervene, Protests, Recommendations, and Terms and Conditions, 55815-55816 [2012-22321]

Download as PDF Federal Register / Vol. 77, No. 176 / Tuesday, September 11, 2012 / Notices in the particular application. If an intervener files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. A copy of all other filings in reference to this application must be accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010. Dated: September 5, 2012. Kimberly D. Bose, Secretary. [FR Doc. 2012–22327 Filed 9–10–12; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14371–000] srobinson on DSK4SPTVN1PROD with NOTICES City of Hillsboro, Oregon; Notice of Application Accepted for Filing and Soliciting Comments, Motions To Intervene, Protests, Recommendations, and Terms and Conditions Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection: a. Type of Application: Conduit Exemption. b. Project No.: 14371–000. c. Date filed: August 6, 2012. d. Applicant: City of Hillsboro, Oregon. e. Name of Project: Will Crandall Reservoir and Pump Station Hydroelectric Project. f. Location: The proposed project would be located within a pump station at the Will Crandall Reservoir and Pump Station near the city of Hillsboro, Washington County, Oregon. The land on which all the project facilities will be located is owned by the applicant. g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791a—825r. h. Applicant Contact: Erika Murphy, P.E., 150 East Main Street, Hillsboro, OR 97123, phone (503) 615–6720. i. FERC Contact: Christopher Chaney, (202) 502–6778, christopher.chaney@ferc.gov. j. Status of Environmental Analysis: This application is ready for environmental analysis at this time, and the Commission is requesting comments, reply comments, recommendations, terms and conditions, and prescriptions. VerDate Mar<15>2010 19:10 Sep 10, 2012 Jkt 226001 k. Deadline for filing responsive documents: Due to the small size of the proposed project, as well as the resource agency consultation letters filed with the application, the 60-day timeframe specified in 18 CFR 4.34(b) for filing all comments, motions to intervene, protests, recommendations, terms and conditions, and prescriptions is shortened to 30 days from the issuance date of this notice. All reply comments filed in response to comments submitted by any resource agency, Indian tribe, or person, must be filed with the Commission within 45 days from the issuance date of this notice. Comments, protests, and interventions may be filed electronically via the Internet in lieu of paper; see 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site under https://www.ferc.gov/docsfiling/efiling.asp. The Commission strongly encourages electronic filings. The Commission’s Rules of Practice and Procedure require all intervenors filing documents with the Commission to serve a copy of that document on each person on the official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, it must also serve a copy of the document on that resource agency. l. Description of Project: The Will Crandall Reservoir and Pump Station Hydroelectric Project would consist of: (1) A powerhouse containing one proposed Francis type generating unit with an installed capacity of 94 kilowatts and (2) appurtenant facilities. The applicant estimates the project would have an average annual generation of 60,000 kilowatt-hours. m. This filing is available for review and reproduction at the Commission in the Public Reference Room, Room 2A, 888 First Street NE., Washington, DC 20426. The filing may also be viewed on the web at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number, P–14371, in the docket number field to access the document. For assistance, call toll-free 1–866–208– 3676 or email FERCOnlineSupport@ferc.gov. For TTY, call (202) 502–8659. A copy is also available for review and reproduction at the address in item h above. n. Development Application—Any qualified applicant desiring to file a competing application must submit to the Commission, on or before the specified deadline date for the particular application, a competing development application, or a notice of intent to file such an application. PO 00000 Frm 00022 Fmt 4703 Sfmt 4703 55815 Submission of a timely notice of intent allows an interested person to file the competing development application no later than 120 days after the specified deadline date for the particular application. Applications for preliminary permits will not be accepted in response to this notice. o. Notice of Intent—A notice of intent must specify the exact name, business address, and telephone number of the prospective applicant, and must include an unequivocal statement of intent to submit a competing development application. A notice of intent must be served on the applicant(s) named in this public notice. p. Protests or Motions to Intervene— Anyone may submit a protest or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, 385.211, and 385.214. In determining the appropriate action to take, the Commission will consider all protests filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any protests or motions to intervene must be received on or before the specified deadline date for the particular application. q. All filings must (1) bear in all capital letters the title ‘‘PROTEST’’, ‘‘MOTION TO INTERVENE’’, ‘‘NOTICE OF INTENT TO FILE COMPETING APPLICATION’’, ‘‘COMPETING APPLICATION’’, ‘‘COMMENTS’’, ‘‘REPLY COMMENTS,’’ ‘‘RECOMMENDATIONS,’’ ‘‘TERMS AND CONDITIONS,’’ or ‘‘PRESCRIPTIONS;’’ (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person protesting or intervening; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. All comments, recommendations, terms and conditions or prescriptions must set forth their evidentiary basis and otherwise comply with the requirements of 18 CFR 4.34(b). Agencies may obtain copies of the application directly from the applicant. Any of these documents must be filed by providing the original and seven copies to: The Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. An additional copy must be sent to Director, Division of Hydropower Administration and Compliance, Office of Energy Projects, Federal Energy Regulatory Commission, at the above address. A copy of any protest or motion to intervene must be served upon each representative of the applicant specified E:\FR\FM\11SEN1.SGM 11SEN1 55816 Federal Register / Vol. 77, No. 176 / Tuesday, September 11, 2012 / Notices in the particular application. A copy of all other filings in reference to this application must be accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010. Dated: September 5, 2012. Kimberly D. Bose, Secretary. [FR Doc. 2012–22321 Filed 9–10–12; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP12–504–000] srobinson on DSK4SPTVN1PROD with NOTICES WBI Energy Transmission, Inc.; Notice of Application Take notice that on August 23, 2012, WBI EnergyTransmission, Inc. (WBI) filed in Docket No. CP12–504–000 an application pursuant to section 7 of the Natural Gas Act and Part 157 the Commission’s Rules and Regulations for all the necessary authorizations required to recertify the minimum bottom hole pressure and to operate four acquired production wells as observation wells at its Elk Basin Storage Reservoir in Park County, Wyoming and Carbon County, Montana, all as more fully set forth in the application which is on file with the Commission and open to public inspection. Copies of this filing are available for review at the Commission in the Public Reference Room, or may be viewed on the Commission’s Web site web at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC at FERCOnlineSupport@ferc.gov or call toll-free, (886) 208–3676 or TTY, (202) 502–8659. Questions regarding this application should be directed to Keith A. Tiggelaar, Director of Regulatory Affairs, WBI Energy Transmission, Inc., Inc., 1250 West Century Avenue, Bismarck, North Dakota 58503, telephone (701) 530– 1560, email keith.tiggelaar@wbienergy. com. There are two ways to become involved in the Commission’s review of this project. First, any person wishing to obtain legal status by becoming a party to the proceedings for this project should, before the comment date of this notice, file with the Federal Energy Regulatory Commission, 888 First Street VerDate Mar<15>2010 19:10 Sep 10, 2012 Jkt 226001 NE., Washington, DC 20426, a motion to intervene in accordance with the requirements of the Commission’s Rules of Practice and Procedure (18 CFR 385.214 or 385.211) and the Regulations under the NGA (18 CFR 157.10). A person obtaining party status will be placed on the service list maintained by the Secretary of the Commission and will receive copies of all documents filed by the applicant and by all other parties. A party must submit 14 copies of filings made with the Commission and must mail a copy to the applicant and to every other party in the proceeding. Only parties to the proceeding can ask for court review of Commission orders in the proceeding. However, a person does not have to intervene in order to have comments considered. The second way to participate is by filing with the Secretary of the Commission, as soon as possible, an original and two copies of comments in support of or in opposition to this project. The Commission will consider these comments in determining the appropriate action to be taken, but the filing of a comment alone will not serve to make the filer a party to the proceeding. The Commission’s rules require that persons filing comments in opposition to the project provide copies of their protests only to the party or parties directly involved in the protest. The Commission strongly encourages electronic filings of comments, protests, and interventions via the internet in lieu of paper. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site (www.ferc.gov) under the ‘‘e-Filing’’ link. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. Comment Date: September 26, 2012 Dated: September 5, 2012. Kimberly D. Bose, Secretary. [FR Doc. 2012–22323 Filed 9–10–12; 8:45 am] BILLING CODE 6717–01–P PO 00000 Frm 00023 Fmt 4703 Sfmt 4703 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER12–2573–000] Visage Energy Corp.; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization This is a supplemental notice in the above-referenced proceeding, of Visage Energy Corp.’s application for marketbased rate authority, with an accompanying rate schedule, noting that such application includes a request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability. Any person desiring to intervene or to protest should file with the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426, in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. Notice is hereby given that the deadline for filing protests with regard to the applicant’s request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability is September 25, 2012. The Commission encourages electronic submission of protests and interventions in lieu of paper, using the FERC Online links at https:// www.ferc.gov. To facilitate electronic service, persons with Internet access who will eFile a document and/or be listed as a contact for an intervenor must create and validate an eRegistration account using the eRegistration link. Select the eFiling link to log on and submit the intervention or protests. Persons unable to file electronically should submit an original and 14 copies of the intervention or protest to the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. The filings in the above-referenced proceeding(s) are accessible in the Commission’s eLibrary system by clicking on the appropriate link in the above list. They are also available for review in the Commission’s Public Reference Room in Washington, DC. There is an eSubscription link on the Web site that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email E:\FR\FM\11SEN1.SGM 11SEN1

Agencies

[Federal Register Volume 77, Number 176 (Tuesday, September 11, 2012)]
[Notices]
[Pages 55815-55816]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-22321]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 14371-000]


City of Hillsboro, Oregon; Notice of Application Accepted for 
Filing and Soliciting Comments, Motions To Intervene, Protests, 
Recommendations, and Terms and Conditions

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection:
    a. Type of Application: Conduit Exemption.
    b. Project No.: 14371-000.
    c. Date filed: August 6, 2012.
    d. Applicant: City of Hillsboro, Oregon.
    e. Name of Project: Will Crandall Reservoir and Pump Station 
Hydroelectric Project.
    f. Location: The proposed project would be located within a pump 
station at the Will Crandall Reservoir and Pump Station near the city 
of Hillsboro, Washington County, Oregon. The land on which all the 
project facilities will be located is owned by the applicant.
    g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791a--825r.
    h. Applicant Contact: Erika Murphy, P.E., 150 East Main Street, 
Hillsboro, OR 97123, phone (503) 615-6720.
    i. FERC Contact: Christopher Chaney, (202) 502-6778, 
christopher.chaney@ferc.gov.
    j. Status of Environmental Analysis: This application is ready for 
environmental analysis at this time, and the Commission is requesting 
comments, reply comments, recommendations, terms and conditions, and 
prescriptions.
    k. Deadline for filing responsive documents: Due to the small size 
of the proposed project, as well as the resource agency consultation 
letters filed with the application, the 60-day timeframe specified in 
18 CFR 4.34(b) for filing all comments, motions to intervene, protests, 
recommendations, terms and conditions, and prescriptions is shortened 
to 30 days from the issuance date of this notice. All reply comments 
filed in response to comments submitted by any resource agency, Indian 
tribe, or person, must be filed with the Commission within 45 days from 
the issuance date of this notice.
    Comments, protests, and interventions may be filed electronically 
via the Internet in lieu of paper; see 18 CFR 385.2001(a)(1)(iii) and 
the instructions on the Commission's Web site under https://www.ferc.gov/docs-filing/efiling.asp. The Commission strongly 
encourages electronic filings.
    The Commission's Rules of Practice and Procedure require all 
intervenors filing documents with the Commission to serve a copy of 
that document on each person on the official service list for the 
project. Further, if an intervenor files comments or documents with the 
Commission relating to the merits of an issue that may affect the 
responsibilities of a particular resource agency, it must also serve a 
copy of the document on that resource agency.
    l. Description of Project: The Will Crandall Reservoir and Pump 
Station Hydroelectric Project would consist of: (1) A powerhouse 
containing one proposed Francis type generating unit with an installed 
capacity of 94 kilowatts and (2) appurtenant facilities. The applicant 
estimates the project would have an average annual generation of 60,000 
kilowatt-hours.
    m. This filing is available for review and reproduction at the 
Commission in the Public Reference Room, Room 2A, 888 First Street NE., 
Washington, DC 20426. The filing may also be viewed on the web at 
https://www.ferc.gov using the ``eLibrary'' link. Enter the docket 
number, P-14371, in the docket number field to access the document. For 
assistance, call toll-free 1-866-208-3676 or email 
FERCOnlineSupport@ferc.gov. For TTY, call (202) 502-8659. A copy is 
also available for review and reproduction at the address in item h 
above.
    n. Development Application--Any qualified applicant desiring to 
file a competing application must submit to the Commission, on or 
before the specified deadline date for the particular application, a 
competing development application, or a notice of intent to file such 
an application. Submission of a timely notice of intent allows an 
interested person to file the competing development application no 
later than 120 days after the specified deadline date for the 
particular application. Applications for preliminary permits will not 
be accepted in response to this notice.
    o. Notice of Intent--A notice of intent must specify the exact 
name, business address, and telephone number of the prospective 
applicant, and must include an unequivocal statement of intent to 
submit a competing development application. A notice of intent must be 
served on the applicant(s) named in this public notice.
    p. Protests or Motions to Intervene--Anyone may submit a protest or 
a motion to intervene in accordance with the requirements of Rules of 
Practice and Procedure, 18 CFR 385.210, 385.211, and 385.214. In 
determining the appropriate action to take, the Commission will 
consider all protests filed, but only those who file a motion to 
intervene in accordance with the Commission's Rules may become a party 
to the proceeding. Any protests or motions to intervene must be 
received on or before the specified deadline date for the particular 
application.
    q. All filings must (1) bear in all capital letters the title 
``PROTEST'', ``MOTION TO INTERVENE'', ``NOTICE OF INTENT TO FILE 
COMPETING APPLICATION'', ``COMPETING APPLICATION'', ``COMMENTS'', 
``REPLY COMMENTS,'' ``RECOMMENDATIONS,'' ``TERMS AND CONDITIONS,'' or 
``PRESCRIPTIONS;'' (2) set forth in the heading the name of the 
applicant and the project number of the application to which the filing 
responds; (3) furnish the name, address, and telephone number of the 
person protesting or intervening; and (4) otherwise comply with the 
requirements of 18 CFR 385.2001 through 385.2005. All comments, 
recommendations, terms and conditions or prescriptions must set forth 
their evidentiary basis and otherwise comply with the requirements of 
18 CFR 4.34(b). Agencies may obtain copies of the application directly 
from the applicant. Any of these documents must be filed by providing 
the original and seven copies to: The Secretary, Federal Energy 
Regulatory Commission, 888 First Street NE., Washington, DC 20426. An 
additional copy must be sent to Director, Division of Hydropower 
Administration and Compliance, Office of Energy Projects, Federal 
Energy Regulatory Commission, at the above address. A copy of any 
protest or motion to intervene must be served upon each representative 
of the applicant specified

[[Page 55816]]

in the particular application. A copy of all other filings in reference 
to this application must be accompanied by proof of service on all 
persons listed in the service list prepared by the Commission in this 
proceeding, in accordance with 18 CFR 4.34(b) and 385.2010.

    Dated: September 5, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012-22321 Filed 9-10-12; 8:45 am]
BILLING CODE 6717-01-P