Japan Lessons-Learned Project Directorate Interim Staff Guidance JLD-ISG-2012-03; Compliance With Order EA-12-051, Order Modifying Licenses With Regard to Reliable Spent Fuel Pool Instrumentation, 55232-55233 [2012-22069]
Download as PDF
55232
Federal Register / Vol. 77, No. 174 / Friday, September 7, 2012 / Notices
staff received comments from five
commenters which were considered in
the development of the final JLD–ISG–
12–02. The questions, comments and
staff resolutions of those comments are
contained in ‘‘NRC Responses to Public
Comments, Japan Lessons-Learned
Project Directorate Interim Staff
Guidance, JLD–ISG–2012–02:
Compliance with Order EA–12–050,
Order Modifying Licenses with Regard
to Reliable Hardened Containment
Vents,’’ which can be found in ADAMS
as Accession No. ML122229A477.
Backfitting and Issue Finality
This ISG does not constitute
backfitting as defined in Title 10 of the
Code of Federal Regulations (10 CFR)
50.109 (the Backfit Rule) and is not
otherwise inconsistent with the issue
finality provisions in Part 52, ‘‘Licenses,
Certifications, and Approvals for
Nuclear Power Plants,’’ of 10 CFR. This
ISG provides guidance on an acceptable
method for implementing the
requirements contained in Order EA–
12–050, which was issued as ensuring
adequate protection under the
provisions of the backfit rule.
Applicants and licensees may
voluntarily use the guidance in JLD–
ISG–2012–02 to demonstrate
compliance with Order EA–12–050.
Methods or solutions that differ from
those described in this ISG may be
deemed acceptable if they provide
sufficient basis and information for the
NRC staff to verify that the proposed
alternative demonstrates compliance
with Order EA–12–050.
Congressional Review Act
This interim staff guidance is a rule as
designated in the Congressional Review
Act (5 U.S.C. 801–808). OMB has found
that this is not a major rule in
accordance with the Congressional
Review Act.
Dated at Rockville, Maryland, this 29th day
of August 2012.
For the Nuclear Regulatory Commission.
John D. Monninger,
Associate Director, Japan Lessons-Learned
Project Directorate, Office of Nuclear Reactor
Regulation.
srobinson on DSK4SPTVN1PROD with NOTICES
[FR Doc. 2012–22078 Filed 9–6–12; 8:45 am]
BILLING CODE 7590–01–P
VerDate Mar<15>2010
17:40 Sep 06, 2012
Jkt 226001
NUCLEAR REGULATORY
COMMISSION
[NRC–2012–0067]
Japan Lessons-Learned Project
Directorate Interim Staff Guidance
JLD–ISG–2012–03; Compliance With
Order EA–12–051, Order Modifying
Licenses With Regard to Reliable
Spent Fuel Pool Instrumentation
Nuclear Regulatory
Commission (NRC).
ACTION: Japan Lessons-Learned Project
Directorate Interim Staff Guidance;
issuance.
AGENCY:
The U.S. Nuclear Regulatory
Commission (NRC or the Commission)
is issuing the Final Japan LessonsLearned Project Directorate (JLD)
Interim Staff Guidance (ISG), JLD–ISG–
2012–03, ‘‘Compliance with Order EA–
12–051, Order Modifying Licenses with
Regard to Reliable Spent Fuel Pool
Instrumentation’’ (Agencywide
Documents Access and Management
System (ADAMS) Accession No.
ML12221A339). This JLD–ISG provides
guidance and clarification to assist
nuclear power reactors applicants and
licensees with the identification of
measures needed to comply with
requirements to install enhanced spent
fuel pool monitoring capability. These
requirements are contained in Order
EA–12–051, ‘‘Order Modifying Licenses
with Regard to Reliable Spent Fuel Pool
Instrumentation,’’ (ADAMS Accession
No. ML12054A679).
ADDRESSES: You may access information
and comment submissions related to
this document, which the NRC
possesses and are publicly available, by
searching on https://www.regulations.gov
under Docket ID NRC–2012–0067.
• Federal Rulemaking Web site: Go to
https://www.regulations.gov and search
for Docket ID NRC–2012–0067. Address
questions about NRC dockets to Carol
Gallagher; telephone: 301–492–3668;
email: Carol.Gallagher@nrc.gov.
• NRC’s Agencywide Documents
Access and Management System
(ADAMS): You may access publiclyavailable documents online in the NRC
Library at https://www.nrc.gov/readingrm/adams.html. To begin the search,
select ‘‘ADAMS Public Documents’’ and
then select ‘‘Begin Web-based ADAMS
Search.’’ For problems with ADAMS,
please contact the NRC’s Public
Document Room (PDR) reference staff at
1–800–397–4209, 301–415–4737, or by
email to pdr.resource@nrc.gov. The
JLD–ISG–2012–03 is available under
ADAMS Accession No. ML12221A339.
• NRC’s PDR: You may examine and
purchase copies of public documents at
SUMMARY:
PO 00000
Frm 00053
Fmt 4703
Sfmt 4703
the NRC’s PDR, Room O1–F21, One
White Flint North, 11555 Rockville
Pike, Rockville, MD 20852.
• NRC’s Interim Staff Guidance Web
Site: Go to https://www.nrc.gov/readingrm/doc-collections/isg/japan-lessonslearned.html and refer to JLD–ISG–
2012–03.
FOR FURTHER INFORMATION CONTACT: Mrs.
Lisa M. Regner, Japan Lessons-Learned
Project Directorate, Office of Nuclear
Reactor Regulation, U.S. Nuclear
Regulatory Commission, Washington,
DC 20555–0001; telephone: 301–415–
1906; email: Lisa.Regner@nrc.gov.
SUPPLEMENTARY INFORMATION:
II. Background Information
JLD–ISG–2012–03 is being issued to
describe to the public methods
acceptable to the Nuclear Regulatory
Commission (NRC) staff for complying
with Order EA–12–051, ‘‘Order
Modifying Licenses With Regard to
Reliable Spent Fuel Pool
Instrumentation (Effective
Immediately)’’ (Order EA–12–051),
issued March 12, 2012. This ISG
endorses with clarifications and
exceptions, the methodologies described
in the industry guidance document,
Nuclear Energy Institute (NEI) 12–02,
Industry Guidance for Compliance with
NRC Order EA–12–051, ‘‘To Modify
Licenses With Regard to Reliable Spent
Fuel Pool Instrumentation’’ (NEI 12–02),
Revision 1 (ADAMS Accession No.
ML122400399). The ISG is not a
substitute for the requirements in Order
EA–12–051, and compliance with this
ISG is not required.
The NRC issued Order EA–12–051
following the NRC staff’s evaluation of
the earthquake and tsunami, and
resulting nuclear accident, at the
Fukushima Dai-ichi nuclear power plant
in March 2011. Order EA–12–051
requires all licensees and construction
permit (CP) holders to provide safety
enhancements in the form of reliable
spent fuel pool instrumentation for
beyond-design-basis external events.
Order EA–12–051 also specified that the
NRC staff would issue final interim staff
guidance in August 2012 to provide
additional details on an acceptable
approach for complying with Order EA–
12–051.
Numerous public meetings were held
to receive stakeholder input on the
proposed requirement for spent fuel
pool instrumentation enhancements
prior to issuance of Order EA–12–051.
Following issuance of Order EA–12–
051, several more public meetings were
held with representatives from the NEI
task force and public stakeholders to
discuss development of the guidance for
E:\FR\FM\07SEN1.SGM
07SEN1
Federal Register / Vol. 77, No. 174 / Friday, September 7, 2012 / Notices
compliance with Order EA–12–051. On
June 7, 2012 (77 FR 33780), the NRC
requested public comments on draft
JLD–ISG–12–03. The staff received
comments from seven stakeholders, and
these were considered in the
development of the final JLD–ISG–12–
03. The questions, comments and staff
resolutions of those comments are
contained in ‘‘NRC Responses to Public
Comments,’’ for JLD–ISG–2012–03,
which can be found in ADAMS at
Accession No. ML122221A319.
Backfitting and Issue Finality
This ISG does not constitute
backfitting as defined in 10 CFR 50.109
(the Backfit Rule) and is not otherwise
inconsistent with the issue finality
provisions in Part 52, ‘‘Licenses,
Certifications, and Approvals for
Nuclear Power Plants,’’ of 10 CFR. This
ISG provides guidance on an acceptable
method for implementing the
requirements contained in Order EA–
12–051, which was issued under an
administrative exemption to the backfit
rule and the issue finality requirements
in 10 CFR 52.63 and 10 CFR Part 52,
Appendix D, Paragraph VIII. Applicants
and licensees may voluntarily use the
guidance in JLD–ISG–2012–03 to
demonstrate compliance with Order
EA–12–051. Methods or solutions that
differ from those described in this ISG
may be deemed acceptable if they
provide sufficient basis and information
for the NRC staff to verify that the
proposed alternative demonstrates
compliance with Order EA–12–051.
Congressional Review Act
This interim staff guidance is a rule as
designated in the Congressional Review
Act (5 U.S.C. 801–808). OMB has found
that this is not a major rule in
accordance with the Congressional
Review Act.
Dated at Rockville, Maryland, this 29th day
of August 2012.
For the Nuclear Regulatory Commission.
John D. Monninger,
Associate Director, Japan Lessons-Learned
Project Directorate, Office of Nuclear Reactor
Regulation.
[FR Doc. 2012–22069 Filed 9–6–12; 8:45 am]
The Hispanic Council on
Federal Employment (HCFE) will hold a
meeting on Friday, September 21, 2012,
at the time and location shown below.
The Council is an advisory committee
composed of representatives from
Hispanic organizations and senior
government officials. Along with its
other responsibilities, the Council shall
advise the Director of the Office of
Personnel Management on matters
involving the recruitment, hiring, and
advancement of Hispanics in the
Federal workforce. The Council is cochaired by the Chief of Staff of the
Office of Personnel Management and the
Assistant Secretary for Human
Resources and Administration at the
Department of Veterans Affairs.
The meeting is open to the public.
Please contact the Office of Personnel
Management at the address shown
below if you wish to present material to
the Council at the meeting. The manner
and time prescribed for presentations
may be limited, depending upon the
number of parties that express interest
in presenting information.
DATES: September, 21st 2012, from 2:00–
4:00 p.m.
Location: U.S. Department of the
Interior, Secretary’s Conference Room #
5160, 1849 C St. NW., Washington, DC
20240.
FOR FURTHER INFORMATION CONTACT:
Veronica E. Villalobos, Director for the
Office of Diversity and Inclusion, Office
of Personnel Management, 1900 E St.
NW., Suite 5H35, Washington, DC
20415. Phone (202) 606–0040 FAX (202)
606–2183 or email at
Jesse.Frank@opm.gov.
SUMMARY:
U.S. Office of Personnel Management.
John Berry,
Director.
[FR Doc. 2012–22091 Filed 9–6–12; 8:45 am]
BILLING CODE 6325–46–P
POSTAL REGULATORY COMMISSION
[Docket Nos. MC2012–46 and CP2012–55;
Order No. 1458]
Product List Changes
srobinson on DSK4SPTVN1PROD with NOTICES
ACTION:
Hispanic Council on Federal
Employment
Office of Personnel
Management.
ACTION: Scheduling of Council Meeting.
AGENCY:
17:04 Sep 06, 2012
The Commission is noticing a
recently-filed Postal Service request to
add Express Mail, Priority Mail & FirstClass Package Service Contract 1 to the
competitive product list. This notice
addresses procedural steps associated
with this filing.
DATES: Comments are due: September
10, 2012.
SUMMARY:
OFFICE OF PERSONNEL
MANAGEMENT
VerDate Mar<15>2010
Postal Regulatory Commission.
Notice.
AGENCY:
BILLING CODE 7590–01–P
Jkt 226001
PO 00000
Frm 00054
Fmt 4703
Sfmt 4703
55233
Submit comments
electronically via the Commission’s
Filing Online system at https://
www.prc.gov. Commenters who cannot
submit their views electronically should
contact the person identified in FOR
FURTHER INFORMATION CONTACT by
telephone for advice on alternatives to
electronic filing.
FOR FURTHER INFORMATION CONTACT:
Stephen L. Sharfman, General Counsel
at 202–789–6820.
SUPPLEMENTARY INFORMATION:
ADDRESSES:
Table of Contents
I. Introduction
II. Notice of Filings
III. Ordering Paragraphs
I. Introduction
In accordance with 39 U.S.C. 3642
and 39 CFR 3020.30 et seq., the Postal
Service filed a formal request and
associated supporting information to
add Express Mail, Priority Mail & FirstClass Package Service Contract 1 to the
competitive product list.1 The Postal
Service asserts that Express Mail,
Priority Mail & First-Class Package
Service Contract 1 is a competitive
product ‘‘not of general applicability’’
within the meaning of 39 U.S.C.
3632(b)(3). Request at 1. The Request
has been assigned Docket No. MC2012–
46.
The Postal Service
contemporaneously filed a redacted
contract related to the proposed new
product under 39 U.S.C. 3632(b)(3) and
39 CFR 3015.5. Id. Attachment B. The
instant contract has been assigned
Docket No. CP2012–55.
Request. To support its Request, the
Postal Service filed six attachments as
follows:
• Attachment A—a redacted copy of
Governors’ Decision No. 11–6,
authorizing the new product;
• Attachment B—a redacted copy of
the contract;
• Attachment C—proposed changes
to the Mail Classification Schedule
competitive product list with the
addition underlined;
• Attachment D—a Statement of
Supporting Justification as required by
39 CFR 3020.32;
• Attachment E—a certification of
compliance with 39 U.S.C. 3633(a); and
• Attachment F—an application for
non-public treatment of materials to
maintain redacted portions of the
1 Request of the United States Postal Service to
Add Express Mail, Priority Mail & First-Class
Package Service Contract 1 to Competitive Product
List and Notice of Filing (Under Seal) of Unredacted
Governors’ Decision, Contract, and Supporting
Data, August 30, 2012 (Request).
E:\FR\FM\07SEN1.SGM
07SEN1
Agencies
[Federal Register Volume 77, Number 174 (Friday, September 7, 2012)]
[Notices]
[Pages 55232-55233]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-22069]
-----------------------------------------------------------------------
NUCLEAR REGULATORY COMMISSION
[NRC-2012-0067]
Japan Lessons-Learned Project Directorate Interim Staff Guidance
JLD-ISG-2012-03; Compliance With Order EA-12-051, Order Modifying
Licenses With Regard to Reliable Spent Fuel Pool Instrumentation
AGENCY: Nuclear Regulatory Commission (NRC).
ACTION: Japan Lessons-Learned Project Directorate Interim Staff
Guidance; issuance.
-----------------------------------------------------------------------
SUMMARY: The U.S. Nuclear Regulatory Commission (NRC or the Commission)
is issuing the Final Japan Lessons-Learned Project Directorate (JLD)
Interim Staff Guidance (ISG), JLD-ISG-2012-03, ``Compliance with Order
EA-12-051, Order Modifying Licenses with Regard to Reliable Spent Fuel
Pool Instrumentation'' (Agencywide Documents Access and Management
System (ADAMS) Accession No. ML12221A339). This JLD-ISG provides
guidance and clarification to assist nuclear power reactors applicants
and licensees with the identification of measures needed to comply with
requirements to install enhanced spent fuel pool monitoring capability.
These requirements are contained in Order EA-12-051, ``Order Modifying
Licenses with Regard to Reliable Spent Fuel Pool Instrumentation,''
(ADAMS Accession No. ML12054A679).
ADDRESSES: You may access information and comment submissions related
to this document, which the NRC possesses and are publicly available,
by searching on https://www.regulations.gov under Docket ID NRC-2012-
0067.
Federal Rulemaking Web site: Go to https://www.regulations.gov and search for Docket ID NRC-2012-0067. Address
questions about NRC dockets to Carol Gallagher; telephone: 301-492-
3668; email: Carol.Gallagher@nrc.gov.
NRC's Agencywide Documents Access and Management System
(ADAMS): You may access publicly-available documents online in the NRC
Library at https://www.nrc.gov/reading-rm/adams.html. To begin the
search, select ``ADAMS Public Documents'' and then select ``Begin Web-
based ADAMS Search.'' For problems with ADAMS, please contact the NRC's
Public Document Room (PDR) reference staff at 1-800-397-4209, 301-415-
4737, or by email to pdr.resource@nrc.gov. The JLD-ISG-2012-03 is
available under ADAMS Accession No. ML12221A339.
NRC's PDR: You may examine and purchase copies of public
documents at the NRC's PDR, Room O1-F21, One White Flint North, 11555
Rockville Pike, Rockville, MD 20852.
NRC's Interim Staff Guidance Web Site: Go to https://www.nrc.gov/reading-rm/doc-collections/isg/japan-lessons-learned.html
and refer to JLD-ISG-2012-03.
FOR FURTHER INFORMATION CONTACT: Mrs. Lisa M. Regner, Japan Lessons-
Learned Project Directorate, Office of Nuclear Reactor Regulation, U.S.
Nuclear Regulatory Commission, Washington, DC 20555-0001; telephone:
301-415-1906; email: Lisa.Regner@nrc.gov.
SUPPLEMENTARY INFORMATION:
II. Background Information
JLD-ISG-2012-03 is being issued to describe to the public methods
acceptable to the Nuclear Regulatory Commission (NRC) staff for
complying with Order EA-12-051, ``Order Modifying Licenses With Regard
to Reliable Spent Fuel Pool Instrumentation (Effective Immediately)''
(Order EA-12-051), issued March 12, 2012. This ISG endorses with
clarifications and exceptions, the methodologies described in the
industry guidance document, Nuclear Energy Institute (NEI) 12-02,
Industry Guidance for Compliance with NRC Order EA-12-051, ``To Modify
Licenses With Regard to Reliable Spent Fuel Pool Instrumentation'' (NEI
12-02), Revision 1 (ADAMS Accession No. ML122400399). The ISG is not a
substitute for the requirements in Order EA-12-051, and compliance with
this ISG is not required.
The NRC issued Order EA-12-051 following the NRC staff's evaluation
of the earthquake and tsunami, and resulting nuclear accident, at the
Fukushima Dai-ichi nuclear power plant in March 2011. Order EA-12-051
requires all licensees and construction permit (CP) holders to provide
safety enhancements in the form of reliable spent fuel pool
instrumentation for beyond-design-basis external events. Order EA-12-
051 also specified that the NRC staff would issue final interim staff
guidance in August 2012 to provide additional details on an acceptable
approach for complying with Order EA-12-051.
Numerous public meetings were held to receive stakeholder input on
the proposed requirement for spent fuel pool instrumentation
enhancements prior to issuance of Order EA-12-051. Following issuance
of Order EA-12-051, several more public meetings were held with
representatives from the NEI task force and public stakeholders to
discuss development of the guidance for
[[Page 55233]]
compliance with Order EA-12-051. On June 7, 2012 (77 FR 33780), the NRC
requested public comments on draft JLD-ISG-12-03. The staff received
comments from seven stakeholders, and these were considered in the
development of the final JLD-ISG-12-03. The questions, comments and
staff resolutions of those comments are contained in ``NRC Responses to
Public Comments,'' for JLD-ISG-2012-03, which can be found in ADAMS at
Accession No. ML122221A319.
Backfitting and Issue Finality
This ISG does not constitute backfitting as defined in 10 CFR
50.109 (the Backfit Rule) and is not otherwise inconsistent with the
issue finality provisions in Part 52, ``Licenses, Certifications, and
Approvals for Nuclear Power Plants,'' of 10 CFR. This ISG provides
guidance on an acceptable method for implementing the requirements
contained in Order EA-12-051, which was issued under an administrative
exemption to the backfit rule and the issue finality requirements in 10
CFR 52.63 and 10 CFR Part 52, Appendix D, Paragraph VIII. Applicants
and licensees may voluntarily use the guidance in JLD-ISG-2012-03 to
demonstrate compliance with Order EA-12-051. Methods or solutions that
differ from those described in this ISG may be deemed acceptable if
they provide sufficient basis and information for the NRC staff to
verify that the proposed alternative demonstrates compliance with Order
EA-12-051.
Congressional Review Act
This interim staff guidance is a rule as designated in the
Congressional Review Act (5 U.S.C. 801-808). OMB has found that this is
not a major rule in accordance with the Congressional Review Act.
Dated at Rockville, Maryland, this 29th day of August 2012.
For the Nuclear Regulatory Commission.
John D. Monninger,
Associate Director, Japan Lessons-Learned Project Directorate, Office
of Nuclear Reactor Regulation.
[FR Doc. 2012-22069 Filed 9-6-12; 8:45 am]
BILLING CODE 7590-01-P