Oliver Hydro LLC; Notice of Application Accepted for Filing and Soliciting Motions To Intervene and Protests, 55202-55203 [2012-22052]
Download as PDF
55202
Federal Register / Vol. 77, No. 174 / Friday, September 7, 2012 / Notices
Orders-2012.html. They are also
available for inspection and copying in
the Office of Fossil Energy, Office of
Natural Gas Regulatory Activities,
Docket Room 3E–033, Forrestal
Building, 1000 Independence Avenue
SW., Washington, DC 20585, (202) 586–
9478. The Docket Room is open between
Order No.
Date issued
the hours of 8:00 a.m. and 4:30 p.m.,
Monday through Friday, except Federal
holidays.
Appendix—DOE/FE Orders Granting
Import/Export Authorizations
FE Docket No.
Authorization holder
Description of action
3126 .........
07/19/12
12–64–NG
J. Aron & Company .............
3127 .........
07/24/12
12–71–NG
Iberdrola Renewables, LLC
[FR Doc. 2012–22081 Filed 9–6–12; 8:45 am]
BILLING CODE 6450–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13005–003]
srobinson on DSK4SPTVN1PROD with NOTICES
Oliver Hydro LLC; Notice of
Application Accepted for Filing and
Soliciting Motions To Intervene and
Protests
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: Original Major
License.
b. Project No.: 13005–003.
c. Date filed: December 14, 2011.
d. Applicant: Oliver Hydro LLC.
e. Name of Project: William Bacon
Oliver Lock and Dam Hydroelectric
Project.
f. Location: At the U.S. Army Corps of
Engineers’ (Corps) William Bacon Oliver
Lock and Dam on the Black Warrior
River, in Tuscaloosa County, Alabama.
The project would occupy 8.7 acres of
United States lands administered by the
Corps’ Mobile District.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791 (a)—825(r).
h. Applicant Contact: Brent Smith,
Symbiotics LLC, 371 Upper Terrace,
Suite 2, Bend, OR 97702; (541) 330–
8779; or email at
brent.smith@symbioticsenergy.com.
i. FERC Contact: Allan Creamer at
(202) 502–8365, or via email at
allan.creamer@ferc.gov.
j. Deadline for filing motions to
intervene and protests: 60 days from the
issuance date of this notice.
All documents may be filed
electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the
VerDate Mar<15>2010
17:04 Sep 06, 2012
Jkt 226001
Issued in Washington, DC, on August 30,
2012.
John A. Anderson,
Manager, Natural Gas Regulatory Activities,
Office of Oil and Gas Global Security and
Supply, Office of Fossil Energy.
Order granting blanket authority to import/export
gas from/to Canada/Mexico and vacating prior
ity, Order 2797.
Order granting blanket authority to import/export
gas from/to Canada/Mexico and vacating prior
ity, Order 2792.
instructions on the Commission’s Web
site https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, or toll
free at 1–866–208–3676, or for TTY,
(202) 502–8659. Although the
Commission strongly encourages
electronic filing, documents may also be
paper-filed. To paper-file, mail an
original and seven copies to: Kimberly
D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE., Washington, DC 20426.
The Commission’s Rules of Practice
require all intervenors filing documents
with the Commission to serve a copy of
that document on each person on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
k. This application has been accepted,
but is not ready for environmental
analysis at this time.
l. The proposed project would utilize
the Corps’ existing William Bacon
Oliver Lock and Dam, and would
consist of the following new facilities:
(1) A forebay; (2) an intake structure; (3)
a powerhouse containing two generating
units with a total capacity of 11.72
megawatts (MW); (4) a 150-foot-long, 68foot-wide tailrace; (5) a proposed 1.7mile-long, 25 kilovolt (kV) transmission
line; (6) a switchyard; and (7)
appurtenant facilities. The proposed
project would have an average annual
generation of 42.6 GWh, and operate in
PO 00000
Frm 00023
Fmt 4703
Sfmt 4703
natural
authornatural
author-
a run-of-river mode utilizing surplus
water from the William Bacon Oliver
Lock and Dam, as directed by the Corps.
m. A copy of the application is
available for review at the Commission
in the Public Reference Room or may be
viewed on the Commission’s Web site at
https://www.ferc.gov, using the
‘‘eLibrary’’ link. Enter the docket
number, excluding the last three digits
in the docket number field to access the
document. For assistance, contact FERC
Online Support. A copy is also available
for inspection and reproduction at the
address in item h above.
You may also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
n. Anyone may submit a protest or a
motion to intervene in accordance with
the requirements of Rules of Practice
and Procedure, 18 CFR 385.210,
385.211, and 385.214. In determining
the appropriate action to take, the
Commission will consider all protests
filed, but only those who file a motion
to intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any protests or
motions to intervene must be received
on, or before, the specified deadline
date for the particular application.
All filings must: (1) Bear in all capital
letters the title ‘‘PROTEST’’ or
‘‘MOTION TO INTERVENE;’’ (2) set
forth in the heading the name of the
applicant and the project number of the
application to which the filing
responds; (3) furnish the name, address,
and telephone number of the person
protesting or intervening; and (4)
otherwise comply with the requirements
of 18 CFR 385.2001 through 385.2005.
Agencies may obtain copies of the
application directly from the applicant.
A copy of any protest or motion to
E:\FR\FM\07SEN1.SGM
07SEN1
Federal Register / Vol. 77, No. 174 / Friday, September 7, 2012 / Notices
intervene must be served upon each
representative of the applicant specified
in the particular application.
o. Procedural schedule and final
amendments: The application will be
processed according to the following
Hydro Licensing Schedule. Revisions to
the schedule will be made as
appropriate.
Issue Scoping Document 1
Issue Scoping Document 2
(if necessary).
Notice of application is
ready for environmental
analysis.
Notice of availability of the
EA.
August 2012.
October 2012.
February 2013.
October 2013.
Final amendments to the application
must be filed with the Commission no
later than 30 days from the issuance
date of the notice of ready for
environmental analysis.
n. Any qualified applicant desiring to
file a competing application must
submit to the Commission, on or before
the specified intervention deadline date,
a competing development application,
or a notice of intent to file such an
application. Submission of a timely
notice of intent allows an interested
person to file the competing
development application no later than
120 days after the specified intervention
deadline date. Applications for
preliminary permits will not be
accepted in response to this notice.
A notice of intent must specify the
exact name, business address, and
telephone number of the prospective
applicant, and must include an
unequivocal statement of intent to
submit a development application. A
notice of intent must be served on the
applicant(s) named in this public notice.
Dated: August 31, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012–22052 Filed 9–6–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
srobinson on DSK4SPTVN1PROD with NOTICES
[Project No. 14441–000]
Monroe City, UT: Notice of Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene,
Protests, Recommendations, and
Terms and Conditions
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
VerDate Mar<15>2010
17:04 Sep 06, 2012
Jkt 226001
a. Type of Application: Conduit
Exemption.
b. Project No.: 14441–000.
c. Date filed: July 27, 2012.
d. Applicant: Monroe City, Utah.
e. Name of Project: Monroe Cold
Spring Hydroelectric Project.
f. Location: The proposed Monroe
Cold Spring Hydroelectric Project
would be located on a water supply
pipeline for Monroe City in Sevier
County, Utah. The land on which all the
project structures are located is owned
by the applicant.
g. Filed Pursuant to: Federal Power
Act 16 U.S.C. 791a–825r.
h. Applicant Contact: Mr. R. Kirk
Nilsson, Monroe City, Utah, 10 North
Main, Monroe, UT 84754, phone (435)
527–4621.
i. FERC Contact: Robert Bell, (202)
502–6062, robert.bell@ferc.gov.
j. Status of Environmental Analysis:
This application is ready for
environmental analysis at this time, and
the Commission is requesting
comments, reply comments,
recommendations, terms and
conditions, and prescriptions.
k. Deadline for filing responsive
documents: Due to the small size of the
proposed project, as well as the resource
agency consultation letters filed with
the application, the 60-day timeframe
specified in 18 CFR 4.34(b) for filing all
comments, motions to intervene,
protests, recommendations, terms and
conditions, and prescriptions is
shortened to 30 days from the issuance
date of this notice. All reply comments
filed in response to comments
submitted by any resource agency,
Indian tribe, or person, must be filed
with the Commission within 45 days
from the issuance date of this notice.
Comments, protests, and
interventions may be filed electronically
via the Internet in lieu of paper; see 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site at https://www.ferc.gov/docs-filing/
efiling.asp. The Commission strongly
encourages electronic filings.
The Commission’s Rules of Practice
and Procedure require all intervenors
filing documents with the Commission
to serve a copy of that document on
each person in the official service list
for the project. Further, if an intervenor
files comments or documents with the
Commission relating to the merits of an
issue that may affect the responsibilities
of a particular resource agency, they
must also serve a copy of the document
on that resource agency.
l. Description of the project: The
proposed Monroe Cold Spring
Hydroelectric Project would consist of:
(1) A proposed powerhouse containing
PO 00000
Frm 00024
Fmt 4703
Sfmt 4703
55203
one proposed generating unit with an
installed capacity of 37 kilowatts; and
(2) appurtenant facilities. The applicant
estimates the project would have an
average annual generation of 0.229
gigawatt-hours.
m. This filing is available for review
and reproduction at the Commission in
the Public Reference Room, Room 2A,
888 First Street NE., Washington, DC
20426. The filing may also be viewed on
the Web at https://www.ferc.gov/docsfiling/elibrary.asp using the ‘‘eLibrary’’
link. Enter the docket number, P–14441,
in the docket number field to access the
document. For assistance, call toll-free
1–866–208–3676 or email
FERCOnlineSupport@ferc.gov. For TTY,
call (202) 502–8659. A copy is also
available for review and reproduction at
the address in item h above.
n. Development Application—Any
qualified applicant desiring to file a
competing application must submit to
the Commission, on or before the
specified deadline date for the
particular application, a competing
development application, or a notice of
intent to file such an application.
Submission of a timely notice of intent
allows an interested person to file the
competing development application no
later than 120 days after the specified
deadline date for the particular
application. Applications for
preliminary permits will not be
accepted in response to this notice.
p. Protests or Motions to Intervene—
Anyone may submit a protest or a
motion to intervene in accordance with
the requirements of Rules of Practice
and Procedure, 18 CFR 385.210,
385.211, and 385.214. In determining
the appropriate action to take, the
Commission will consider all protests
filed, but only those who file a motion
to intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any protests or
motions to intervene must be received
on or before the specified deadline date
for the particular application.
q. All filings must (1) bear in all
capital letters the title ‘‘PROTEST’’,
‘‘MOTION TO INTERVENE’’,
‘‘COMMENTS’’, ‘‘REPLY COMMENTS’’,
‘‘RECOMMENDATIONS’’, ‘‘TERMS
AND CONDITIONS’’, or
‘‘PRESCRIPTIONS’’; (2) set forth in the
heading, the name of the applicant and
the project number of the application to
which the filing responds; (3) furnish
the name, address, and telephone
number of the person protesting or
intervening; and (4) otherwise comply
with the requirements of 18 CFR
385.2001 through 385.2005. All
comments, recommendations, terms and
conditions, or prescriptions must set
E:\FR\FM\07SEN1.SGM
07SEN1
Agencies
[Federal Register Volume 77, Number 174 (Friday, September 7, 2012)]
[Notices]
[Pages 55202-55203]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-22052]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 13005-003]
Oliver Hydro LLC; Notice of Application Accepted for Filing and
Soliciting Motions To Intervene and Protests
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: Original Major License.
b. Project No.: 13005-003.
c. Date filed: December 14, 2011.
d. Applicant: Oliver Hydro LLC.
e. Name of Project: William Bacon Oliver Lock and Dam Hydroelectric
Project.
f. Location: At the U.S. Army Corps of Engineers' (Corps) William
Bacon Oliver Lock and Dam on the Black Warrior River, in Tuscaloosa
County, Alabama. The project would occupy 8.7 acres of United States
lands administered by the Corps' Mobile District.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791 (a)--825(r).
h. Applicant Contact: Brent Smith, Symbiotics LLC, 371 Upper
Terrace, Suite 2, Bend, OR 97702; (541) 330-8779; or email at
brent.smith@symbioticsenergy.com.
i. FERC Contact: Allan Creamer at (202) 502-8365, or via email at
allan.creamer@ferc.gov.
j. Deadline for filing motions to intervene and protests: 60 days
from the issuance date of this notice.
All documents may be filed electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web
site https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit
brief comments up to 6,000 characters, without prior registration,
using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information at the
end of your comments. For assistance, please contact FERC Online
Support at FERCOnlineSupport@ferc.gov, or toll free at 1-866-208-3676,
or for TTY, (202) 502-8659. Although the Commission strongly encourages
electronic filing, documents may also be paper-filed. To paper-file,
mail an original and seven copies to: Kimberly D. Bose, Secretary,
Federal Energy Regulatory Commission, 888 First Street NE., Washington,
DC 20426.
The Commission's Rules of Practice require all intervenors filing
documents with the Commission to serve a copy of that document on each
person on the official service list for the project. Further, if an
intervenor files comments or documents with the Commission relating to
the merits of an issue that may affect the responsibilities of a
particular resource agency, they must also serve a copy of the document
on that resource agency.
k. This application has been accepted, but is not ready for
environmental analysis at this time.
l. The proposed project would utilize the Corps' existing William
Bacon Oliver Lock and Dam, and would consist of the following new
facilities: (1) A forebay; (2) an intake structure; (3) a powerhouse
containing two generating units with a total capacity of 11.72
megawatts (MW); (4) a 150-foot-long, 68-foot-wide tailrace; (5) a
proposed 1.7-mile-long, 25 kilovolt (kV) transmission line; (6) a
switchyard; and (7) appurtenant facilities. The proposed project would
have an average annual generation of 42.6 GWh, and operate in a run-of-
river mode utilizing surplus water from the William Bacon Oliver Lock
and Dam, as directed by the Corps.
m. A copy of the application is available for review at the
Commission in the Public Reference Room or may be viewed on the
Commission's Web site at https://www.ferc.gov, using the ``eLibrary''
link. Enter the docket number, excluding the last three digits in the
docket number field to access the document. For assistance, contact
FERC Online Support. A copy is also available for inspection and
reproduction at the address in item h above.
You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
n. Anyone may submit a protest or a motion to intervene in
accordance with the requirements of Rules of Practice and Procedure, 18
CFR 385.210, 385.211, and 385.214. In determining the appropriate
action to take, the Commission will consider all protests filed, but
only those who file a motion to intervene in accordance with the
Commission's Rules may become a party to the proceeding. Any protests
or motions to intervene must be received on, or before, the specified
deadline date for the particular application.
All filings must: (1) Bear in all capital letters the title
``PROTEST'' or ``MOTION TO INTERVENE;'' (2) set forth in the heading
the name of the applicant and the project number of the application to
which the filing responds; (3) furnish the name, address, and telephone
number of the person protesting or intervening; and (4) otherwise
comply with the requirements of 18 CFR 385.2001 through 385.2005.
Agencies may obtain copies of the application directly from the
applicant. A copy of any protest or motion to
[[Page 55203]]
intervene must be served upon each representative of the applicant
specified in the particular application.
o. Procedural schedule and final amendments: The application will
be processed according to the following Hydro Licensing Schedule.
Revisions to the schedule will be made as appropriate.
------------------------------------------------------------------------
------------------------------------------------------------------------
Issue Scoping Document 1............... August 2012.
Issue Scoping Document 2 (if necessary) October 2012.
Notice of application is ready for February 2013.
environmental analysis.
Notice of availability of the EA....... October 2013.
------------------------------------------------------------------------
Final amendments to the application must be filed with the
Commission no later than 30 days from the issuance date of the notice
of ready for environmental analysis.
n. Any qualified applicant desiring to file a competing application
must submit to the Commission, on or before the specified intervention
deadline date, a competing development application, or a notice of
intent to file such an application. Submission of a timely notice of
intent allows an interested person to file the competing development
application no later than 120 days after the specified intervention
deadline date. Applications for preliminary permits will not be
accepted in response to this notice.
A notice of intent must specify the exact name, business address,
and telephone number of the prospective applicant, and must include an
unequivocal statement of intent to submit a development application. A
notice of intent must be served on the applicant(s) named in this
public notice.
Dated: August 31, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012-22052 Filed 9-6-12; 8:45 am]
BILLING CODE 6717-01-P