Proposed International Isotopes Fluorine Extraction Process and Depleted Uranium Deconversion Plant in Lea County, New Mexico, 53236-53237 [2012-21486]

Download as PDF 53236 Federal Register / Vol. 77, No. 170 / Friday, August 31, 2012 / Notices materials will be made available in alternative formats to accommodate individuals with disabilities. Individuals who need other accommodations due to disability in order to attend the meeting in person or telephonically should contact Katherine Ward, at (202) 295–1500 or FR_NOTICE_QUESTIONS@lsc.gov, at least 2 business days in advance of the meeting. If a request is made without advance notice, LSC will make every effort to accommodate the request but cannot guarantee that all requests can be fulfilled. designation of certain animals and certain geographic areas a requiring special protection. The regulations establish such a permit system to designate Antarctic Specially Protected Areas. The applications received are as follows: Dated: August 28, 2012. Victor M. Fortuno, Vice President & General Counsel. Enter Antarctic Specially Protected Areas. The applicant plans to enter ASPA 105-Beaufort Island, ASPA 121Cape Royds, ASPA 122-Arrival Heights, ASPA 124-Cape Crozier, ASPA 130Transway Ridge, ASPA 131-Canada Glacier, ASPA 137-Northwest White Island, ASPA 138-Linnaeus Terrace, and, ASPA 154-Botany Bay to conduct a review of their management plans. The Antarctic Support Contract (ASC) Environmental Health and Safety (EHS) Department would enter the ASPA’s to collect information on site status in anticipation of the 5 year ASPA review, general management and maintenance concerns such as ensuring that all signs and boundary markers are legible and secured, or to address any environmental concerns or potential environmental release with the ASPA. Information would be gathered on any installations or facilities that may be present, verify that the reasons for special protection remain valid, verify that the management measures in place are sufficient to provide protection, and, recommend any management measures that may be necessary to maintain the values being protected. The plan revisions will take into account recent developments within the Antarctic Treaty System to ensure consistency with recently adopted plans, policies and guidelines amongst the Treaty Nations. [FR Doc. 2012–21611 Filed 8–29–12; 11:15 am] BILLING CODE 7050–01–P NATIONAL SCIENCE FOUNDATION Notice of Permit Applications Received Under the Antarctic Conservation Act of 1978 (Pub. L. 95–541) National Science Foundation. Notice of Permit Applications Received under the Antarctic Conservation Act of 1978, Public Law 95–541. AGENCY: ACTION: The National Science Foundation (NSF) is required to publish a notice of permit applications received to conduct activities regulated under the Antarctic Conservation Act of 1978. NSF has published regulations under the Antarctic Conservation Act at Title 45 Part 670 of the Code of Federal Regulations. This is the required notice of permit applications received. DATES: Interested parties are invited to submit written data, comments, or views with respect to this permit application by October 1, 2012. This application may be inspected by interested parties at the Permit Office, address below. ADDRESSES: Comments should be addressed to Permit Office, Room 755, Office of Polar Programs, National Science Foundation, 4201 Wilson Boulevard, Arlington, Virginia 22230. FOR FURTHER INFORMATION CONTACT: Polly A. Penhale at the above address or (703) 292–7420. SUPPLEMENTARY INFORMATION: The National Science Foundation, as directed by the Antarctic Conservation Act of 1978 (Pub. L. 95–541), as amended by the Antarctic Science, Tourism and Conservation Act of 1996, has developed regulations for the establishment of a permit system for various activities in Antarctica and EMCDONALD on DSK67QTVN1PROD with NOTICES SUMMARY: VerDate Mar<15>2010 15:22 Aug 30, 2012 Jkt 226001 Permit Application: 2013–019 1. Applicant: Lockheed Martin IS&GS, Antarctic Support Contract, 7400 S. Tucson Way, Centennial, CO 80112–3938. Activity for Which Permit Is Requested Location ASPA 105-Beaufort Island, ASPA 121Cape Royds, ASPA 122-Arrival Heights, ASPA 124-Cape Crozier, ASPA 130Transway Ridge, ASPA 131-Canada Glacier, ASPA 137-Northwest White Island, ASPA 138-Linnaeus Terrace, and, ASPA 154-Botany Bay. Dates August 15, 2012 to August 31, 2017. Nadene G. Kennedy, Permit Officer, Office of Polar Programs. [FR Doc. 2012–21604 Filed 8–30–12; 8:45 am] BILLING CODE 7555–01–P PO 00000 Frm 00069 Fmt 4703 Sfmt 4703 NEIGHBORHOOD REINVESTMENT CORPORATION Sunshine Act Meeting Notice Corporate Administration Committee Meeting of The Board of Directors 1 p.m., Thursday, September 13, 2012. PLACE: 1325 G Street NW., Suite 800, Boardroom, Washington, DC 20005. STATUS: Open. TIME AND DATE: CONTACT PERSON FOR MORE INFORMATION: Erica Hall, Assistant Corporate Secretary; (202) 220–2376; ehall@nw.org. AGENDA: I. Call to Order II. Nominations III. Employee Performance Management System IV. Policy Changes V. Human Resources Update VI. Washington, DC Lease Update VII. Adjournment Erica Hall, Assistant Corporate Secretary. [FR Doc. 2012–21737 Filed 8–29–12; 4:15 pm] BILLING CODE 7570–02–P NUCLEAR REGULATORY COMMISSION [NRC–2010–0143] Proposed International Isotopes Fluorine Extraction Process and Depleted Uranium Deconversion Plant in Lea County, New Mexico Nuclear Regulatory Commission. ACTION: Final environmental impact statement; issuance. AGENCY: Notice is hereby given that the U.S. Nuclear Regulatory Commission (NRC or the Commission) has published the Final Environmental Impact Statement (EIS) for the proposed International Isotopes Fluorine Extraction Process and Depleted Uranium Deconversion Plant (INIS) in Lea County, New Mexico. On December 30, 2009, International Isotopes Fluorine Products, Inc. (IIFP), a wholly-owned subsidiary of International Isotopes, Inc., submitted a license application that proposes the construction, operation, and decommissioning of a fluorine extraction and depleted uranium deconversion facility (the ‘‘proposed action’’). IIFP proposes to locate the facility near Hobbs, New Mexico. ADDRESSES: Please refer to Docket ID NRC–2010–0143 when contacting the SUMMARY: E:\FR\FM\31AUN1.SGM 31AUN1 Federal Register / Vol. 77, No. 170 / Friday, August 31, 2012 / Notices NRC about the availability of information regarding this document. You may access information related to this document using any of the following methods: • Federal Rulemaking Web site: Go to https://www.regulations.gov and search for Docket ID NRC–2010–0143. Address questions about NRC dockets to Carol Gallagher; telephone: 301–492–3668; email: Carol.Gallagher@nrc.gov. • NRC’s Agencywide Documents Access and Management System (ADAMS): You may access publiclyavailable documents online in the NRC Library at https://www.nrc.gov/readingrm/adams.html. To begin the search, select ‘‘ADAMS Public Documents’’ and then select ‘‘Begin Web-based ADAMS Search.’’ For problems with ADAMS, please contact the NRC’s Public Document Room (PDR) reference staff at 1–800–397–4209, 301–415–4737, or by email to pdr.resource@nrc.gov. Additional information regarding accessing materials related to this action is under the Document Availability heading in the SUPPLEMENTARY INFORMATION section of this document. • NRC’s PDR: You may examine and purchase copies of public documents at the NRC’s PDR, Room O1–F21, One White Flint North, 11555 Rockville Pike, Rockville, Maryland 20852. FOR FURTHER INFORMATION CONTACT: For information about the Final EIS or the environmental review process, please contact Asimios Malliakos, telephone: 301–415–6458; email: Asimios.Malliakos@nrc.gov; Office of Federal and State Materials and Environmental Management Programs, U.S. Nuclear Regulatory Commission, Washington, DC 20555–0001. For general or technical information associated with the licensing process as it relates to the INIS application, please contact Matthew Bartlett, telephone: 301–492–3119; email: Matthew.Bartlett@nrc.gov; Office of Nuclear Material Safety and Safeguards, U.S. Nuclear Regulatory Commission, Washington, DC 20555–0001. SUPPLEMENTARY INFORMATION: EMCDONALD on DSK67QTVN1PROD with NOTICES Discussion IIFP submitted a license application and Environmental Report (ER) in support of its proposed facility on December 30, 2009. The proposed site is located in Lea County, New Mexico, approximately 22.55 kilometers (km) (14 miles [mi]) west of the city of Hobbs. The Final EIS is being issued as part of the NRC’s process to decide whether to issue a license to IIFP, pursuant to Part 40 of Title 10 of the Code of Federal Regulations (10 CFR), to construct and VerDate Mar<15>2010 15:22 Aug 30, 2012 Jkt 226001 operate the proposed depleted uranium deconversion facility. Specifically, IIFP proposes to deconvert depleted uranium hexafluoride (DUF6) into oxide compounds for long-term disposal. In the Final EIS, the NRC staff assessed the potential environmental impacts from construction, operation, and decommissioning of the proposed INIS project. The Final EIS was prepared in compliance with the National Environmental Policy Act of 1969, as amended (NEPA), and the NRC’s regulations for implementing NEPA in 10 CFR Part 51. The NRC staff assessed the impacts of the proposed action on land use, historic and cultural resources, visual resources, climatology, meteorology, and air quality, geology, minerals, and soil, water resources, ecological resources, socioeconomics and environmental justice, traffic and transportation, noise, public and occupational health, and waste management. Additionally, the NRC staff analyzed and compared the benefits and costs of the proposed action. In preparing this Final EIS, the NRC staff also reviewed, considered, evaluated, and addressed the public comments received on the Draft EIS. In addition to the proposed action, the NRC staff considered a reasonable range of alternatives, including the no-action alternative. Under the no-action alternative, the NRC would deny IIFP’s request to construct and operate a depleted uranium deconversion facility in Hobbs, New Mexico. The no-action alternative serves as a baseline for comparison of the potential environmental impacts of the proposed action. Other alternatives the NRC staff considered but eliminated from further analysis include: (1) Alternative sites; (2) alternative technologies; (3) shipment of the U.S. generated DUF6 to overseas facilities; (4) indefinite storage at the enrichment facilities; and (5) construction and operation of deconversion facilities at the four U.S.based uranium enrichment companies. These alternatives were eliminated from further analysis due to economic, environmental, or other reasons. After weighing the impacts of the proposed action and comparing alternatives, the NRC staff, in accordance with 10 CFR 51.91(d), sets forth its recommendation regarding the proposed action. The NRC staff recommends that, unless safety issues mandate otherwise, the proposed license be issued to IIFP. In this regard, the NRC staff has concluded that the environmental impacts of the proposed action are generally small, and taken in combination with the proposed IIFP PO 00000 Frm 00070 Fmt 4703 Sfmt 4703 53237 environmental monitoring program and proposed mitigation measures discussed in the Final EIS would eliminate or substantially lessen any adverse environmental impacts associated with the proposed action. Document Availability Documents related to this notice are available on the NRC’s Licensing Web Site at: https://www.nrc.gov/materials/ fuel-cycle-fac/inisfacility.html. The Final EIS for the proposed INIS project may also be accessed at: https:// www.nrc.gov/reading-rm/doccollections/nuregs/staff/ by selecting ‘‘NUREG–2113.’’ The IIFP’s license application, Environmental Report, and the NRC’s Final EIS are available in ADAMS under Accession Numbers ML100630503, ML100120758, and ML12220A380. A copy of the Final EIS will be available at the Hobbs Public Library, 509 North Shipp, Hobbs, New Mexico 88240. Dated at Rockville, Maryland, this 22nd day of August, 2012. For the Nuclear Regulatory Commission. Gregory Suber, Acting Deputy Director, Environmental Protection and Performance Assessment Directorate, Division of Waste Management and Environmental Protection, Office of Federal and State Materials and Environmental Management Programs. [FR Doc. 2012–21486 Filed 8–30–12; 8:45 am] BILLING CODE 7590–01–P OFFICE OF PERSONNEL MANAGEMENT Submission for Review; Information Collection: Freedom of Information/ Privacy Act Record Request Form (INV 100) U.S. Office of Personnel Management. ACTION: 60-Day Notice and request for comments. AGENCY: Federal Investigative Services (FIS), U.S. Office of Personnel Management (OPM) offers the general public and other federal agencies the opportunity to comment on an information collection request (ICR), Office of Management and Budget (OMB) Control No. 3206–NEW, Freedom of Information/Privacy Act Record Request Form (INV 100). As required by the Paperwork Reduction Act of 1995, (Pub. L. 104–13, 44 U.S.C. chapter 35) as amended by the ClingerCohen Act (Pub. L. 104–106), OPM is soliciting comments for this collection. The Office of Management and Budget SUMMARY: E:\FR\FM\31AUN1.SGM 31AUN1

Agencies

[Federal Register Volume 77, Number 170 (Friday, August 31, 2012)]
[Notices]
[Pages 53236-53237]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-21486]


=======================================================================
-----------------------------------------------------------------------

NUCLEAR REGULATORY COMMISSION

[NRC-2010-0143]


Proposed International Isotopes Fluorine Extraction Process and 
Depleted Uranium Deconversion Plant in Lea County, New Mexico

AGENCY: Nuclear Regulatory Commission.

ACTION: Final environmental impact statement; issuance.

-----------------------------------------------------------------------

SUMMARY: Notice is hereby given that the U.S. Nuclear Regulatory 
Commission (NRC or the Commission) has published the Final 
Environmental Impact Statement (EIS) for the proposed International 
Isotopes Fluorine Extraction Process and Depleted Uranium Deconversion 
Plant (INIS) in Lea County, New Mexico. On December 30, 2009, 
International Isotopes Fluorine Products, Inc. (IIFP), a wholly-owned 
subsidiary of International Isotopes, Inc., submitted a license 
application that proposes the construction, operation, and 
decommissioning of a fluorine extraction and depleted uranium 
deconversion facility (the ``proposed action''). IIFP proposes to 
locate the facility near Hobbs, New Mexico.

ADDRESSES: Please refer to Docket ID NRC-2010-0143 when contacting the

[[Page 53237]]

NRC about the availability of information regarding this document. You 
may access information related to this document using any of the 
following methods:
     Federal Rulemaking Web site: Go to https://www.regulations.gov and search for Docket ID NRC-2010-0143. Address 
questions about NRC dockets to Carol Gallagher; telephone: 301-492-
3668; email: Carol.Gallagher@nrc.gov.
     NRC's Agencywide Documents Access and Management System 
(ADAMS): You may access publicly-available documents online in the NRC 
Library at https://www.nrc.gov/reading-rm/adams.html. To begin the 
search, select ``ADAMS Public Documents'' and then select ``Begin Web-
based ADAMS Search.'' For problems with ADAMS, please contact the NRC's 
Public Document Room (PDR) reference staff at 1-800-397-4209, 301-415-
4737, or by email to pdr.resource@nrc.gov. Additional information 
regarding accessing materials related to this action is under the 
Document Availability heading in the SUPPLEMENTARY INFORMATION section 
of this document.
     NRC's PDR: You may examine and purchase copies of public 
documents at the NRC's PDR, Room O1-F21, One White Flint North, 11555 
Rockville Pike, Rockville, Maryland 20852.

FOR FURTHER INFORMATION CONTACT: For information about the Final EIS or 
the environmental review process, please contact Asimios Malliakos, 
telephone: 301-415-6458; email: Asimios.Malliakos@nrc.gov; Office of 
Federal and State Materials and Environmental Management Programs, U.S. 
Nuclear Regulatory Commission, Washington, DC 20555-0001. For general 
or technical information associated with the licensing process as it 
relates to the INIS application, please contact Matthew Bartlett, 
telephone: 301-492-3119; email: Matthew.Bartlett@nrc.gov; Office of 
Nuclear Material Safety and Safeguards, U.S. Nuclear Regulatory 
Commission, Washington, DC 20555-0001.

SUPPLEMENTARY INFORMATION:

Discussion

    IIFP submitted a license application and Environmental Report (ER) 
in support of its proposed facility on December 30, 2009. The proposed 
site is located in Lea County, New Mexico, approximately 22.55 
kilometers (km) (14 miles [mi]) west of the city of Hobbs.
    The Final EIS is being issued as part of the NRC's process to 
decide whether to issue a license to IIFP, pursuant to Part 40 of Title 
10 of the Code of Federal Regulations (10 CFR), to construct and 
operate the proposed depleted uranium deconversion facility. 
Specifically, IIFP proposes to deconvert depleted uranium hexafluoride 
(DUF6) into oxide compounds for long-term disposal. In the 
Final EIS, the NRC staff assessed the potential environmental impacts 
from construction, operation, and decommissioning of the proposed INIS 
project.
    The Final EIS was prepared in compliance with the National 
Environmental Policy Act of 1969, as amended (NEPA), and the NRC's 
regulations for implementing NEPA in 10 CFR Part 51. The NRC staff 
assessed the impacts of the proposed action on land use, historic and 
cultural resources, visual resources, climatology, meteorology, and air 
quality, geology, minerals, and soil, water resources, ecological 
resources, socioeconomics and environmental justice, traffic and 
transportation, noise, public and occupational health, and waste 
management. Additionally, the NRC staff analyzed and compared the 
benefits and costs of the proposed action. In preparing this Final EIS, 
the NRC staff also reviewed, considered, evaluated, and addressed the 
public comments received on the Draft EIS.
    In addition to the proposed action, the NRC staff considered a 
reasonable range of alternatives, including the no-action alternative. 
Under the no-action alternative, the NRC would deny IIFP's request to 
construct and operate a depleted uranium deconversion facility in 
Hobbs, New Mexico. The no-action alternative serves as a baseline for 
comparison of the potential environmental impacts of the proposed 
action. Other alternatives the NRC staff considered but eliminated from 
further analysis include: (1) Alternative sites; (2) alternative 
technologies; (3) shipment of the U.S. generated DUF6 to 
overseas facilities; (4) indefinite storage at the enrichment 
facilities; and (5) construction and operation of deconversion 
facilities at the four U.S.-based uranium enrichment companies. These 
alternatives were eliminated from further analysis due to economic, 
environmental, or other reasons.
    After weighing the impacts of the proposed action and comparing 
alternatives, the NRC staff, in accordance with 10 CFR 51.91(d), sets 
forth its recommendation regarding the proposed action. The NRC staff 
recommends that, unless safety issues mandate otherwise, the proposed 
license be issued to IIFP. In this regard, the NRC staff has concluded 
that the environmental impacts of the proposed action are generally 
small, and taken in combination with the proposed IIFP environmental 
monitoring program and proposed mitigation measures discussed in the 
Final EIS would eliminate or substantially lessen any adverse 
environmental impacts associated with the proposed action.

Document Availability

    Documents related to this notice are available on the NRC's 
Licensing Web Site at: https://www.nrc.gov/materials/fuel-cycle-fac/inisfacility.html. The Final EIS for the proposed INIS project may also 
be accessed at: https://www.nrc.gov/reading-rm/doc-collections/nuregs/staff/ by selecting ``NUREG-2113.''
    The IIFP's license application, Environmental Report, and the NRC's 
Final EIS are available in ADAMS under Accession Numbers ML100630503, 
ML100120758, and ML12220A380.
    A copy of the Final EIS will be available at the Hobbs Public 
Library, 509 North Shipp, Hobbs, New Mexico 88240.

    Dated at Rockville, Maryland, this 22nd day of August, 2012.

    For the Nuclear Regulatory Commission.
Gregory Suber,
Acting Deputy Director, Environmental Protection and Performance 
Assessment Directorate, Division of Waste Management and Environmental 
Protection, Office of Federal and State Materials and Environmental 
Management Programs.
[FR Doc. 2012-21486 Filed 8-30-12; 8:45 am]