Notice of Commission Staff Attendance, 52714 [2012-21442]
Download as PDF
52714
Federal Register / Vol. 77, No. 169 / Thursday, August 30, 2012 / Notices
the Commission’s Web site at https://
www.ferc.gov, using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
filed to access the document. For
assistance, please contact FERC Online
Support at
FERCOnlineSupport@ferc.gov or call
toll-free at (866) 206–3676, or, for TTY,
contact (202) 502–8659. Comments,
protests and interventions may be filed
electronically via the Internet in lieu of
paper. See, 18 CFR 385.2001(a)(1)(iii)
and the instructions on the
Commission’s Web site under the ‘‘eFiling’’ link. The Commission strongly
encourages intervenors to file
electronically.
Any person or the Commission’s staff
may, within 60 days after issuance of
the instant notice by the Commission,
file pursuant to Rule 214 of the
Commission’s Procedural Rules (18 CFR
385.214) a motion to intervene or notice
of intervention and pursuant to Section
157.205 of the regulations under the
NGA (18 CFR 157.205), a protest to the
request. If no protest is filed within the
time allowed therefore, the proposed
activity shall be deemed to be
authorized effective the day after the
time allowed for filing a protest. If a
protest is filed and not withdrawn
within 30 days after the allowed time
for filing a protest, the instant request
shall be treated as an application for
authorization pursuant to Section 7 of
the NGA.
Dated: August 23, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012–21441 Filed 8–29–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Commission Staff
Attendance
mstockstill on DSK4VPTVN1PROD with NOTICES
The Federal Energy Regulatory
Commission hereby gives notice that
members of the Commission’s staff may
attend the following meeting related to
the transmission planning activities of
the PJM Interconnection, L.L.C. (PJM):
PJM Regional Transmission Planning
Task Force Conference Call
August 27, 2012, 1 p.m.–4 p.m., Local
Time.
The above-referenced meeting will be
held over conference call.
The above-referenced meeting is open
to stakeholders.
VerDate Mar<15>2010
17:07 Aug 29, 2012
Jkt 226001
Further information may be found at
www.pjm.com.
The discussions at the meeting
described above may address matters at
issue in the following proceedings:
Docket No. EL05–121, PJM
Interconnection, L.L.C.
Docket No. ER10–253 and EL10–14,
Primary Power, L.L.C.
Docket No. EL10–52, Central
Transmission, LLC v. PJM
Interconnection, L.L.C.
Docket No. ER11–4070, RITELine
Indiana et al.
Docket No. ER11–2875 and EL11–20,
PJM Interconnection, L.L.C.
Docket No. ER09–1256, PotomacAppalachian Transmission
Highline, L.L.C.
Docket No. ER09–1589, FirstEnergy
Service Company
Docket No. ER10–549, PJM
Interconnection, L.L.C.
Docket No. EL11–56, FirstEnergy
Service Company
Docket No. EL12–38, New York
Independent System Operator, Inc.
Docket No. ER11–1844, Midwest
Independent Transmission System
Operator, Inc.
Docket No. ER11–2140, PJM
Interconnection, L.L.C.
Docket No. ER11–2622, PJM
Interconnection, L.L.C.
Docket No. ER11–3106, PJM
Interconnection, L.L.C.
Docket No. ER11–4379, PJM
Interconnection, L.L.C.
Docket No. ER12–445, PJM
Interconnection, L.L.C.
Docket No. ER12–773, PJM
Interconnection, L.L.C.
Docket No. ER12–718, New York
Independent System Operator, Inc.
Docket No. ER12–1177, PJM
Interconnection, L.L.C.
Docket No. ER12–1178, PJM
Interconnection, L.L.C.
Docket No. ER12–1693, PJM
Interconnection, L.L.C.
Docket No. EL12–69, Primary Power
LLC v. PJM Interconnection, L.L.C.
Docket No. ER12–1700, PJM
Interconnection, L.L.C.
Docket No. ER12–1901, GenOn Power
Midwest, LP
Docket No. ER12–2080, GenOn Power
Midwest, LP
Docket No. ER12–2085, PJM
Interconnection, L.L.C.
Docket No. ER12–2260, New York
Independent System Operator, Inc
Docket No. ER12–2288, PJM
Interconnection, L.L.C.
Docket No. ER12–2438, PJM
Interconnection, L.L.C.
Docket No. ER12–2440, PJM
Interconnection, L.L.C.
For more information, contact
Jonathan Fernandez, Office of Energy
PO 00000
Frm 00039
Fmt 4703
Sfmt 4703
Market Regulation, Federal Energy
Regulatory Commission at (202) 502–
6604 or jonathan.fernandez@ferc.gov.
Dated: August 23, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012–21442 Filed 8–29–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket Nos. QF87–560–011; EL12–99–000]
Applied Energy LLC; Notice of Waiver
Request
Take notice that on August 17, 2012,
pursuant to section 292.205(c) of the
Commission’s Rules of Practices and
Procedures, 18 CFR 292.205(c) (2011)
and the amended Public Utility
Regulatory Policies Act of 1978,
Applied Energy LLC (Applied Energy)
requested a limited waiver of the
efficiency standard set forth in section
292.205(a)(2)(B) of the Commission’s
regulations for the topping-cycle
cogeneration facility owned and
operated by Applied Energy located at
the United States Naval Station in San
Diego, California (‘‘Facility’’).
Specifically, Applied Energy requests
waiver of the efficiency standard for
calendar year 2012.
Any person desiring to intervene or to
protest in this proceedings must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211 and
385.214) on or before 5 p.m. Eastern
time on the specified comment date.
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Anyone filing a motion
to intervene or protest must serve a copy
of that document on the Petitioner.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 14 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
E:\FR\FM\30AUN1.SGM
30AUN1
Agencies
[Federal Register Volume 77, Number 169 (Thursday, August 30, 2012)]
[Notices]
[Page 52714]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-21442]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Notice of Commission Staff Attendance
The Federal Energy Regulatory Commission hereby gives notice that
members of the Commission's staff may attend the following meeting
related to the transmission planning activities of the PJM
Interconnection, L.L.C. (PJM):
PJM Regional Transmission Planning Task Force Conference Call
August 27, 2012, 1 p.m.-4 p.m., Local Time.
The above-referenced meeting will be held over conference call.
The above-referenced meeting is open to stakeholders.
Further information may be found at www.pjm.com.
The discussions at the meeting described above may address matters
at issue in the following proceedings:
Docket No. EL05-121, PJM Interconnection, L.L.C.
Docket No. ER10-253 and EL10-14, Primary Power, L.L.C.
Docket No. EL10-52, Central Transmission, LLC v. PJM Interconnection,
L.L.C.
Docket No. ER11-4070, RITELine Indiana et al.
Docket No. ER11-2875 and EL11-20, PJM Interconnection, L.L.C.
Docket No. ER09-1256, Potomac-Appalachian Transmission Highline, L.L.C.
Docket No. ER09-1589, FirstEnergy Service Company
Docket No. ER10-549, PJM Interconnection, L.L.C.
Docket No. EL11-56, FirstEnergy Service Company
Docket No. EL12-38, New York Independent System Operator, Inc.
Docket No. ER11-1844, Midwest Independent Transmission System Operator,
Inc.
Docket No. ER11-2140, PJM Interconnection, L.L.C.
Docket No. ER11-2622, PJM Interconnection, L.L.C.
Docket No. ER11-3106, PJM Interconnection, L.L.C.
Docket No. ER11-4379, PJM Interconnection, L.L.C.
Docket No. ER12-445, PJM Interconnection, L.L.C.
Docket No. ER12-773, PJM Interconnection, L.L.C.
Docket No. ER12-718, New York Independent System Operator, Inc.
Docket No. ER12-1177, PJM Interconnection, L.L.C.
Docket No. ER12-1178, PJM Interconnection, L.L.C.
Docket No. ER12-1693, PJM Interconnection, L.L.C.
Docket No. EL12-69, Primary Power LLC v. PJM Interconnection, L.L.C.
Docket No. ER12-1700, PJM Interconnection, L.L.C.
Docket No. ER12-1901, GenOn Power Midwest, LP
Docket No. ER12-2080, GenOn Power Midwest, LP
Docket No. ER12-2085, PJM Interconnection, L.L.C.
Docket No. ER12-2260, New York Independent System Operator, Inc
Docket No. ER12-2288, PJM Interconnection, L.L.C.
Docket No. ER12-2438, PJM Interconnection, L.L.C.
Docket No. ER12-2440, PJM Interconnection, L.L.C.
For more information, contact Jonathan Fernandez, Office of Energy
Market Regulation, Federal Energy Regulatory Commission at (202) 502-
6604 or jonathan.fernandez@ferc.gov.
Dated: August 23, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012-21442 Filed 8-29-12; 8:45 am]
BILLING CODE 6717-01-P