PetroLogistics Natural Gas Storage, LLC; Notice of Request Under Blanket Authorization, 52713-52714 [2012-21441]
Download as PDF
52713
Federal Register / Vol. 77, No. 169 / Thursday, August 30, 2012 / Notices
Target date
Commission issues draft EIS ..........................................................................................................................................................
Comments on draft EIS (45-day comment period) ........................................................................................................................
Commission issues final EIS (assumes modified terms and conditions would not be necessary) ...............................................
mstockstill on DSK4VPTVN1PROD with NOTICES
Milestone
April 2013
June 2013
September 2013
p. Final amendments to the
application must be filed with the
Commission no later than 30 days from
the issuance date of this notice.
q. Other Agency Authorizations: A
Texas Commission on Environmental
Quality (Texas CEQ) section 401 Water
Quality Certification is required. As part
of its processing of the license
application, the Texas CEQ is reviewing
the application under Section 401 of the
Clean Water Act (CWA), and in
accordance with Title 30, Texas
Administrative Code Section 279.1–13,
to determine if the project would
comply with State water quality
standards. Based on an understanding
between the Federal Energy Regulatory
Commission (FERC) and the Texas CEQ,
this public notice is also issued for the
purpose of advising all known
interested persons that there is, pending
before the Texas CEQ, a decision on the
request for section 401 water quality
certification for this FERC license
application. Any comments concerning
this certification request may be
submitted to the Texas Commission on
Environmental Quality, 401
Coordinator, MSC–150, P.O. Box 13087,
Austin, Texas 78711–3087. The public
comment period extends 30 days from
the date of publication of this notice. A
copy of the public notice with a
description of the project is made
available for review in the Texas CEQ’s
Austin office. The complete application
may be reviewed at the address listed in
paragraph h. The Texas CEQ may
conduct a public meeting to consider all
comments concerning water quality if
requested in writing. A request for a
public meeting must contain the
following information: the name,
mailing address, application number, or
other recognizable reference to the
application, a brief description of the
interest of the requester, or of persons
represented by the requester; and a brief
description of how the certification, if
granted, would adversely affect such
interest.
Dated: August 23, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012–21439 Filed 8–29–12; 8:45 am]
BILLING CODE 6717–01–P
VerDate Mar<15>2010
17:07 Aug 29, 2012
Jkt 226001
Combined Notice of Filings
requirements, interventions, protests,
and service can be found at: https://
www.ferc.gov/docs-filing/efiling/filingreq.pdf. For other information, call (866)
208–3676 (toll free). For TTY, call (202)
502–8659.
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Dated: August 23, 2012.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
Filings Instituting Proceedings
[FR Doc. 2012–21407 Filed 8–29–12; 8:45 am]
Docket Numbers: RP12–952–000.
Applicants: Columbia Gas
Transmission, LLC.
Description: Columbia Gas
Transmission, LLC Request for Waiver
of Capacity Release Regulations.
Filed Date: 8/17/12.
Accession Number: 20120817–5173.
Comments Due: 5 p.m. ET 8/29/12.
Docket Numbers: RP12–953–000.
Applicants: Colorado Interstate Gas
Company LLC.
Description: Penalties Assessed
Compliance Filing of Colorado Interstate
Gas Company LLC.
Filed Date: 8/20/12.
Accession Number: 20120820–5050.
Comments Due: 5 p.m. ET 9/4/12.
Docket Numbers: RP12–955–000.
Applicants: CenterPoint Energy—
Mississippi River T.
Description: MRT Rate Case 2012 to
be effective 10/1/2012.
Filed Date: 8/22/12.
Accession Number: 20120822–5087.
Comments Due: 5 p.m. ET 9/4/12.
Docket Numbers: RP12–956–000.
Applicants: LA Storage, LLC.
Description: LA Storage Corrected
Tariff Filing—ACA Surcharge to be
effective 10/11/2011.
Filed Date: 8/23/12.
Accession Number: 20120823–5001.
Comments Due: 5 p.m. ET 9/4/12.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
eFiling is encouraged. More detailed
information relating to filing
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
PO 00000
Frm 00038
Fmt 4703
Sfmt 4703
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP12–502–000]
PetroLogistics Natural Gas Storage,
LLC; Notice of Request Under Blanket
Authorization
Take notice that on August 17, 2012,
PetroLogistics Natural Gas Storage, LLC
(PetroLogistics), 4470 Bluebonnet Blvd.,
Baton Rouge, LA 70809, filed in Docket
No. CP12–502–000, an application
pursuant to Sections 157.205 and
157.213 of the Commission’s
Regulations under the Natural Gas Act
(NGA) as amended, to increase its
maximum daily deliverability rate at the
Choctaw Gas Storage Hub, located in
Iberville Parish, Louisiana, under
PetroLogistics’ blanket certificate issued
in Docket No. CP07–427–000, et al.1 all
as more fully set forth in the application
which is on file with the Commission
and open to the public for inspection.
PetroLogistics proposes to increase its
maximum daily deliverability rate from
450 MMcf per day to 550 MMcf per day,
at the Choctaw Gas Storage Hub, in
order to allow full utilization of its
existing facility. PetroLogistics states
that the increase will not require any
construction or modification of any
existing facility, nor any revision of the
system operating pressures.
Any questions concerning this
application may be directed to Kevin M.
Miller PetroLogistics Natural Gas
Storage, LLC, 4470 Bluebonnet Blvd.,
Baton Rouge, LA 70809, or via
telephone at (225) 706–7690, or at
kmiller@petrologistics.com.
This filing is available for review at
the Commission or may be viewed on
1 PetroLogistics Natural Gas Storage, LLC, 122
FERC ¶ 61,193 (2008).
E:\FR\FM\30AUN1.SGM
30AUN1
52714
Federal Register / Vol. 77, No. 169 / Thursday, August 30, 2012 / Notices
the Commission’s Web site at https://
www.ferc.gov, using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
filed to access the document. For
assistance, please contact FERC Online
Support at
FERCOnlineSupport@ferc.gov or call
toll-free at (866) 206–3676, or, for TTY,
contact (202) 502–8659. Comments,
protests and interventions may be filed
electronically via the Internet in lieu of
paper. See, 18 CFR 385.2001(a)(1)(iii)
and the instructions on the
Commission’s Web site under the ‘‘eFiling’’ link. The Commission strongly
encourages intervenors to file
electronically.
Any person or the Commission’s staff
may, within 60 days after issuance of
the instant notice by the Commission,
file pursuant to Rule 214 of the
Commission’s Procedural Rules (18 CFR
385.214) a motion to intervene or notice
of intervention and pursuant to Section
157.205 of the regulations under the
NGA (18 CFR 157.205), a protest to the
request. If no protest is filed within the
time allowed therefore, the proposed
activity shall be deemed to be
authorized effective the day after the
time allowed for filing a protest. If a
protest is filed and not withdrawn
within 30 days after the allowed time
for filing a protest, the instant request
shall be treated as an application for
authorization pursuant to Section 7 of
the NGA.
Dated: August 23, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012–21441 Filed 8–29–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Commission Staff
Attendance
mstockstill on DSK4VPTVN1PROD with NOTICES
The Federal Energy Regulatory
Commission hereby gives notice that
members of the Commission’s staff may
attend the following meeting related to
the transmission planning activities of
the PJM Interconnection, L.L.C. (PJM):
PJM Regional Transmission Planning
Task Force Conference Call
August 27, 2012, 1 p.m.–4 p.m., Local
Time.
The above-referenced meeting will be
held over conference call.
The above-referenced meeting is open
to stakeholders.
VerDate Mar<15>2010
17:07 Aug 29, 2012
Jkt 226001
Further information may be found at
www.pjm.com.
The discussions at the meeting
described above may address matters at
issue in the following proceedings:
Docket No. EL05–121, PJM
Interconnection, L.L.C.
Docket No. ER10–253 and EL10–14,
Primary Power, L.L.C.
Docket No. EL10–52, Central
Transmission, LLC v. PJM
Interconnection, L.L.C.
Docket No. ER11–4070, RITELine
Indiana et al.
Docket No. ER11–2875 and EL11–20,
PJM Interconnection, L.L.C.
Docket No. ER09–1256, PotomacAppalachian Transmission
Highline, L.L.C.
Docket No. ER09–1589, FirstEnergy
Service Company
Docket No. ER10–549, PJM
Interconnection, L.L.C.
Docket No. EL11–56, FirstEnergy
Service Company
Docket No. EL12–38, New York
Independent System Operator, Inc.
Docket No. ER11–1844, Midwest
Independent Transmission System
Operator, Inc.
Docket No. ER11–2140, PJM
Interconnection, L.L.C.
Docket No. ER11–2622, PJM
Interconnection, L.L.C.
Docket No. ER11–3106, PJM
Interconnection, L.L.C.
Docket No. ER11–4379, PJM
Interconnection, L.L.C.
Docket No. ER12–445, PJM
Interconnection, L.L.C.
Docket No. ER12–773, PJM
Interconnection, L.L.C.
Docket No. ER12–718, New York
Independent System Operator, Inc.
Docket No. ER12–1177, PJM
Interconnection, L.L.C.
Docket No. ER12–1178, PJM
Interconnection, L.L.C.
Docket No. ER12–1693, PJM
Interconnection, L.L.C.
Docket No. EL12–69, Primary Power
LLC v. PJM Interconnection, L.L.C.
Docket No. ER12–1700, PJM
Interconnection, L.L.C.
Docket No. ER12–1901, GenOn Power
Midwest, LP
Docket No. ER12–2080, GenOn Power
Midwest, LP
Docket No. ER12–2085, PJM
Interconnection, L.L.C.
Docket No. ER12–2260, New York
Independent System Operator, Inc
Docket No. ER12–2288, PJM
Interconnection, L.L.C.
Docket No. ER12–2438, PJM
Interconnection, L.L.C.
Docket No. ER12–2440, PJM
Interconnection, L.L.C.
For more information, contact
Jonathan Fernandez, Office of Energy
PO 00000
Frm 00039
Fmt 4703
Sfmt 4703
Market Regulation, Federal Energy
Regulatory Commission at (202) 502–
6604 or jonathan.fernandez@ferc.gov.
Dated: August 23, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012–21442 Filed 8–29–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket Nos. QF87–560–011; EL12–99–000]
Applied Energy LLC; Notice of Waiver
Request
Take notice that on August 17, 2012,
pursuant to section 292.205(c) of the
Commission’s Rules of Practices and
Procedures, 18 CFR 292.205(c) (2011)
and the amended Public Utility
Regulatory Policies Act of 1978,
Applied Energy LLC (Applied Energy)
requested a limited waiver of the
efficiency standard set forth in section
292.205(a)(2)(B) of the Commission’s
regulations for the topping-cycle
cogeneration facility owned and
operated by Applied Energy located at
the United States Naval Station in San
Diego, California (‘‘Facility’’).
Specifically, Applied Energy requests
waiver of the efficiency standard for
calendar year 2012.
Any person desiring to intervene or to
protest in this proceedings must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211 and
385.214) on or before 5 p.m. Eastern
time on the specified comment date.
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Anyone filing a motion
to intervene or protest must serve a copy
of that document on the Petitioner.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 14 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
E:\FR\FM\30AUN1.SGM
30AUN1
Agencies
[Federal Register Volume 77, Number 169 (Thursday, August 30, 2012)]
[Notices]
[Pages 52713-52714]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-21441]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP12-502-000]
PetroLogistics Natural Gas Storage, LLC; Notice of Request Under
Blanket Authorization
Take notice that on August 17, 2012, PetroLogistics Natural Gas
Storage, LLC (PetroLogistics), 4470 Bluebonnet Blvd., Baton Rouge, LA
70809, filed in Docket No. CP12-502-000, an application pursuant to
Sections 157.205 and 157.213 of the Commission's Regulations under the
Natural Gas Act (NGA) as amended, to increase its maximum daily
deliverability rate at the Choctaw Gas Storage Hub, located in
Iberville Parish, Louisiana, under PetroLogistics' blanket certificate
issued in Docket No. CP07-427-000, et al.\1\ all as more fully set
forth in the application which is on file with the Commission and open
to the public for inspection.
---------------------------------------------------------------------------
\1\ PetroLogistics Natural Gas Storage, LLC, 122 FERC ] 61,193
(2008).
---------------------------------------------------------------------------
PetroLogistics proposes to increase its maximum daily
deliverability rate from 450 MMcf per day to 550 MMcf per day, at the
Choctaw Gas Storage Hub, in order to allow full utilization of its
existing facility. PetroLogistics states that the increase will not
require any construction or modification of any existing facility, nor
any revision of the system operating pressures.
Any questions concerning this application may be directed to Kevin
M. Miller PetroLogistics Natural Gas Storage, LLC, 4470 Bluebonnet
Blvd., Baton Rouge, LA 70809, or via telephone at (225) 706-7690, or at
kmiller@petrologistics.com.
This filing is available for review at the Commission or may be
viewed on
[[Page 52714]]
the Commission's Web site at https://www.ferc.gov, using the
``eLibrary'' link. Enter the docket number excluding the last three
digits in the docket number filed to access the document. For
assistance, please contact FERC Online Support at
FERCOnlineSupport@ferc.gov or call toll-free at (866) 206-3676, or, for
TTY, contact (202) 502-8659. Comments, protests and interventions may
be filed electronically via the Internet in lieu of paper. See, 18 CFR
385.2001(a)(1)(iii) and the instructions on the Commission's Web site
under the ``e-Filing'' link. The Commission strongly encourages
intervenors to file electronically.
Any person or the Commission's staff may, within 60 days after
issuance of the instant notice by the Commission, file pursuant to Rule
214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to
intervene or notice of intervention and pursuant to Section 157.205 of
the regulations under the NGA (18 CFR 157.205), a protest to the
request. If no protest is filed within the time allowed therefore, the
proposed activity shall be deemed to be authorized effective the day
after the time allowed for filing a protest. If a protest is filed and
not withdrawn within 30 days after the allowed time for filing a
protest, the instant request shall be treated as an application for
authorization pursuant to Section 7 of the NGA.
Dated: August 23, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012-21441 Filed 8-29-12; 8:45 am]
BILLING CODE 6717-01-P