Colorado Interstate Gas Company, L.L.C.; Notice of Application, 51792-51793 [2012-20905]
Download as PDF
51792
Federal Register / Vol. 77, No. 166 / Monday, August 27, 2012 / Notices
This
information collection request contains:
(1) OMB No.: 1905–0160; (2)
Information Collection Request Title:
Uranium Data Program; (3) Type of
Request: Extension of a currently
approved collection; (4) Purpose:
Collects basic data necessary to meet
EIA’s legislative mandates as well as the
needs of the Congress, Federal
Government, State and local
governments, industry, and the general
public; (5) Annual Estimated Number of
Respondents: 131; (6) Annual Estimated
Number of Total Responses: 205; (7)
Annual Estimated Number of Burden
Hours: 1,460; (8) Annual Estimated
Reporting and Recordkeeping Cost
Burden: EIA estimates that there are no
additional costs to respondents
associated with the surveys other than
the costs associated with the burden
hours.
Statutory Authority: Section 13(b) of
the Federal Energy Administration Act
of 1974, Public Law 93–275, codified at
15 U.S.C. 772(b).
SUPPLEMENTARY INFORMATION:
Issued in Washington, DC, on August 16,
2012.
Stephanie Brown,
Director, Office of Survey Development and
Statistical Integration, U.S. Energy
Information Administration.
[FR Doc. 2012–21020 Filed 8–24–12; 8:45 am]
BILLING CODE 6450–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP12–496–000]
pmangrum on DSK3VPTVN1PROD with NOTICES
Colorado Interstate Gas Company,
L.L.C.; Notice of Application
Take notice that on August 7, 2012,
Colorado Interstate Gas Company, L.L.C.
(CIG), Post Office Box 1087, Colorado
Springs, Colorado 80944, filed in the
above captioned docket an application
pursuant to section 7(c) of the Natural
Gas Act (NGA) for a certificate of public
convenience and necessity authorizing
the construction of its High Plains 2013
Expansion Project. The project consists
of: (i) A new 7.75 mile, 24-inch diameter
pipeline, the Lancaster Lateral, in Weld
County, Colorado; (ii) an overpressure
protection facility; (iii) two new receipt
meter stations, and (iv) the modification
of existing facilities. Also CIG requests
a predetermination of rolled in rate
treatment related to the cost of service
on the new facilities that will allow CIG
to meet market demand for
transportation service on the High
Plains System from new natural gas
processing facilities to the Cheyenne
VerDate Mar<15>2010
15:04 Aug 24, 2012
Jkt 226001
Hub located in Weld County, Colorado,
all as more fully set forth in the
application which is on file with the
Commission and opens to public
inspection. The filing may also be
viewed on the Web at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, please contact FERC Online
Support at
FERCOnlineSupport@ferc.gov or toll
free at (866) 208–3676, or TTY, contact
(202) 502–8659.
Any questions concerning this
application may be directed to
Francisco Tarin, Director, Regulatory
Affairs, Colorado Interstate Gas
Company, L.L.C.; P.O. Box 1087,
Colorado Springs, Colorado 80944 at
(719) 667–7517 or by fax at (719) 667–
7534 or Mark A. Minich, General
Counsel, Colorado Interstate Gas
Company, L.L.C.; P.O. Box 1087,
Colorado Springs, Colorado 80944 at
(719) 520–4416 or by fax at (719) 520–
4415.
Pursuant to section 157.9 of the
Commission’s rules, 18 CFR 157.9,
within 90 days of this Notice the
Commission staff will either: complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding; or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or EA for this proposal. The filing of the
EA in the Commission’s public record
for this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s FEIS or EA.
There are two ways to become
involved in the Commission’s review of
this project. First, any person wishing to
obtain legal status by becoming a party
to the proceedings for this project
should, on or before the comment date
stated below, file with the Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426,
a motion to intervene in accordance
with the requirements of the
Commission’s Rules of Practice and
Procedure (18 CFR 385.214 or 385.211)
and the Regulations under the NGA (18
CFR 157.10). A person obtaining party
status will be placed on the service list
PO 00000
Frm 00045
Fmt 4703
Sfmt 4703
maintained by the Secretary of the
Commission and will receive copies of
all documents filed by the applicant and
by all other parties. A party must submit
7 copies of filings made with the
Commission and must mail a copy to
the applicant and to every other party in
the proceeding. Only parties to the
proceeding can ask for court review of
Commission orders in the proceeding.
However, a person does not have to
intervene in order to have comments
considered. The second way to
participate is by filing with the
Secretary of the Commission, as soon as
possible, an original and two copies of
comments in support of or in opposition
to this project. The Commission will
consider these comments in
determining the appropriate action to be
taken, but the filing of a comment alone
will not serve to make the filer a party
to the proceeding. The Commission’s
rules require that persons filing
comments in opposition to the project
provide copies of their protests only to
the party or parties directly involved in
the protest.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commentors will be
placed on the Commission’s
environmental mailing list, will receive
copies of the environmental documents,
and will be notified of meetings
associated with the Commission’s
environmental review process.
Environmental commentors will not be
required to serve copies of filed
documents on all other parties.
However, the non-party commentors
will not receive copies of all documents
filed by other parties or issued by the
Commission (except for the mailing of
environmental documents issued by the
Commission) and will not have the right
to seek court review of the
Commission’s final order.
The Commission strongly encourages
electronic filings of comments, protests,
and interventions in lieu of paper using
the ‘‘eFiling’’ link at https://
www.ferc.gov. Persons unable to file
electronically should submit an original
and 14 copies of the protest or
intervention to the Federal Energy
Regulatory Commission, 888 First Street
NE., Washington, DC 20426.
This filing is accessible online at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive email notification when a
E:\FR\FM\27AUN1.SGM
27AUN1
Federal Register / Vol. 77, No. 166 / Monday, August 27, 2012 / Notices
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5 p.m. Eastern Time
on September 10, 2012.
Dated: August 20, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012–20905 Filed 8–24–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No.CP12–497–000]
pmangrum on DSK3VPTVN1PROD with NOTICES
Transcontinental Gas Pipe Line
Company, LLC; Notice of Application
Take notice that on August 8, 2012,
Transcontinental Gas Pipe Line
Company, LLC (Transco), filed in the
above referenced docket an application
pursuant to section 7 of the Natural Gas
Act (NGA) and Part 157 of the
Commission’s regulations, for
authorization to replace approximately
2,167 feet of existing 30-inch pipeline
on Transco’s mainline in East
Brandywine and East Caln Townships,
Chester County, Pennsylvania with a 42inch pipeline, all as more fully set forth
in the application which is on file with
the Commission and open to public
inspection. The filing is available for
review at the Commission in the Public
Reference Room or may be viewed on
the Commission’s Web site at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
Any questions concerning this
application may be directed to Scott
Turkington, Director Rates & Regulatory,
Transcontinental Gas Pipe Line
Company, LLC, Post Office Box 1396,
Houston, TX 77251–1396, by telephone
at (713) 215–3391 or by email at
scott.c.turkington@williams.com and
Stephen A. Hatridge, Senior Counsel,
Transcontinental Gas Pipe Line
Company, LLC, Post Office Box 1396,
Houston, TX 77251–1396, by telephone
at (713) 215–2312 or by email at
stephen.a.hatridge@williams.com.
Pursuant to Section 157.9 of the
Commission’s rules, 18 CFR 157.9,
within 90 days of this Notice the
VerDate Mar<15>2010
15:04 Aug 24, 2012
Jkt 226001
Commission staff will either: complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding, or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or EA for this proposal. The filing of the
EA in the Commission’s public record
for this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s FEIS or EA.
There are two ways to become
involved in the Commission’s review of
this project. First, any person wishing to
obtain legal status by becoming a party
to the proceedings for this project
should, on or before the comment date
stated below, file with the Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426,
a motion to intervene in accordance
with the requirements of the
Commission’s Rules of Practice and
Procedure (18 CFR 385.214 or 385.211)
and the Regulations under the NGA (18
CFR 157.10). A person obtaining party
status will be placed on the service list
maintained by the Secretary of the
Commission and will receive copies of
all documents filed by the applicant and
by all other parties. A party must submit
14 copies of filings made in the
proceeding with the Commission and
must mail a copy to the applicant and
to every other party. Only parties to the
proceeding can ask for court review of
Commission orders in the proceeding.
However, a person does not have to
intervene in order to have comments
considered. The second way to
participate is by filing with the
Secretary of the Commission, as soon as
possible, an original and two copies of
comments in support of or in opposition
to this project. The Commission will
consider these comments in
determining the appropriate action to be
taken, but the filing of a comment alone
will not serve to make the filer a party
to the proceeding. The Commission’s
rules require that persons filing
comments in opposition to the project
provide copies of their protests only to
the party or parties directly involved in
the protest.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
PO 00000
Frm 00046
Fmt 4703
Sfmt 4703
51793
two copies of their comments to the
Secretary of the Commission.
Environmental commentors will be
placed on the Commission’s
environmental mailing list, will receive
copies of the environmental documents,
and will be notified of meetings
associated with the Commission’s
environmental review process.
Environmental commentors will not be
required to serve copies of filed
documents on all other parties.
However, the non-party commentors
will not receive copies of all documents
filed by other parties or issued by the
Commission (except for the mailing of
environmental documents issued by the
Commission) and will not have the right
to seek court review of the
Commission’s final order.
Motions to intervene, protests, and
comments may be filed electronically
via the internet in lieu of paper; see, 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site under the ‘‘e-Filing’’ link. The
Commission strongly encourages
electronic filings.
Comment Date: 5 p.m. Eastern Time
on September 10, 2012.
Dated: August 20, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012–20906 Filed 8–24–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14440–000]
City of Pendleton, Oregon; Notice of
Application Accepted for Filing and
Soliciting Comments, Motions To
Intervene, Protests,
Recommendations, and Terms and
Conditions
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: Conduit
Exemption.
b. Project No.: 14440–000.
c. Date filed: May 14, 2012.
d. Applicant: City of Pendleton,
Oregon.
e. Name of Project: Energy Recovery
Phase II Project.
f. Location: The proposed Energy
Recovery Phase II Project would be
located on a water supply pipeline for
the City of Pendleton in Umatilla
County, Oregon. The land on which all
the project structures are located is
owned by the applicant.
E:\FR\FM\27AUN1.SGM
27AUN1
Agencies
[Federal Register Volume 77, Number 166 (Monday, August 27, 2012)]
[Notices]
[Pages 51792-51793]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-20905]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP12-496-000]
Colorado Interstate Gas Company, L.L.C.; Notice of Application
Take notice that on August 7, 2012, Colorado Interstate Gas
Company, L.L.C. (CIG), Post Office Box 1087, Colorado Springs, Colorado
80944, filed in the above captioned docket an application pursuant to
section 7(c) of the Natural Gas Act (NGA) for a certificate of public
convenience and necessity authorizing the construction of its High
Plains 2013 Expansion Project. The project consists of: (i) A new 7.75
mile, 24-inch diameter pipeline, the Lancaster Lateral, in Weld County,
Colorado; (ii) an overpressure protection facility; (iii) two new
receipt meter stations, and (iv) the modification of existing
facilities. Also CIG requests a predetermination of rolled in rate
treatment related to the cost of service on the new facilities that
will allow CIG to meet market demand for transportation service on the
High Plains System from new natural gas processing facilities to the
Cheyenne Hub located in Weld County, Colorado, all as more fully set
forth in the application which is on file with the Commission and opens
to public inspection. The filing may also be viewed on the Web at
https://www.ferc.gov using the ``eLibrary'' link. Enter the docket
number excluding the last three digits in the docket number field to
access the document. For assistance, please contact FERC Online Support
at FERCOnlineSupport@ferc.gov or toll free at (866) 208-3676, or TTY,
contact (202) 502-8659.
Any questions concerning this application may be directed to
Francisco Tarin, Director, Regulatory Affairs, Colorado Interstate Gas
Company, L.L.C.; P.O. Box 1087, Colorado Springs, Colorado 80944 at
(719) 667-7517 or by fax at (719) 667-7534 or Mark A. Minich, General
Counsel, Colorado Interstate Gas Company, L.L.C.; P.O. Box 1087,
Colorado Springs, Colorado 80944 at (719) 520-4416 or by fax at (719)
520-4415.
Pursuant to section 157.9 of the Commission's rules, 18 CFR 157.9,
within 90 days of this Notice the Commission staff will either:
complete its environmental assessment (EA) and place it into the
Commission's public record (eLibrary) for this proceeding; or issue a
Notice of Schedule for Environmental Review. If a Notice of Schedule
for Environmental Review is issued, it will indicate, among other
milestones, the anticipated date for the Commission staff's issuance of
the final environmental impact statement (FEIS) or EA for this
proposal. The filing of the EA in the Commission's public record for
this proceeding or the issuance of a Notice of Schedule for
Environmental Review will serve to notify federal and state agencies of
the timing for the completion of all necessary reviews, and the
subsequent need to complete all federal authorizations within 90 days
of the date of issuance of the Commission staff's FEIS or EA.
There are two ways to become involved in the Commission's review of
this project. First, any person wishing to obtain legal status by
becoming a party to the proceedings for this project should, on or
before the comment date stated below, file with the Federal Energy
Regulatory Commission, 888 First Street NE., Washington, DC 20426, a
motion to intervene in accordance with the requirements of the
Commission's Rules of Practice and Procedure (18 CFR 385.214 or
385.211) and the Regulations under the NGA (18 CFR 157.10). A person
obtaining party status will be placed on the service list maintained by
the Secretary of the Commission and will receive copies of all
documents filed by the applicant and by all other parties. A party must
submit 7 copies of filings made with the Commission and must mail a
copy to the applicant and to every other party in the proceeding. Only
parties to the proceeding can ask for court review of Commission orders
in the proceeding.
However, a person does not have to intervene in order to have
comments considered. The second way to participate is by filing with
the Secretary of the Commission, as soon as possible, an original and
two copies of comments in support of or in opposition to this project.
The Commission will consider these comments in determining the
appropriate action to be taken, but the filing of a comment alone will
not serve to make the filer a party to the proceeding. The Commission's
rules require that persons filing comments in opposition to the project
provide copies of their protests only to the party or parties directly
involved in the protest.
Persons who wish to comment only on the environmental review of
this project should submit an original and two copies of their comments
to the Secretary of the Commission. Environmental commentors will be
placed on the Commission's environmental mailing list, will receive
copies of the environmental documents, and will be notified of meetings
associated with the Commission's environmental review process.
Environmental commentors will not be required to serve copies of filed
documents on all other parties. However, the non-party commentors will
not receive copies of all documents filed by other parties or issued by
the Commission (except for the mailing of environmental documents
issued by the Commission) and will not have the right to seek court
review of the Commission's final order.
The Commission strongly encourages electronic filings of comments,
protests, and interventions in lieu of paper using the ``eFiling'' link
at https://www.ferc.gov. Persons unable to file electronically should
submit an original and 14 copies of the protest or intervention to the
Federal Energy Regulatory Commission, 888 First Street NE., Washington,
DC 20426.
This filing is accessible online at https://www.ferc.gov, using the
``eLibrary'' link and is available for review in the Commission's
Public Reference Room in Washington, DC. There is an ``eSubscription''
link on the Web site that enables subscribers to receive email
notification when a
[[Page 51793]]
document is added to a subscribed docket(s). For assistance with any
FERC Online service, please email FERCOnlineSupport@ferc.gov, or call
(866) 208-3676 (toll free). For TTY, call (202) 502-8659.
Comment Date: 5 p.m. Eastern Time on September 10, 2012.
Dated: August 20, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012-20905 Filed 8-24-12; 8:45 am]
BILLING CODE 6717-01-P