Environmental Impacts Statements; Notice of Availability, 51532 [2012-20913]
Download as PDF
51532
Federal Register / Vol. 77, No. 165 / Friday, August 24, 2012 / Notices
policy.’’ A lead agency request to EPA
to reduce time periods or another
Federal agency (not the lead agency)
request to formally extend a time period
should be submitted in writing to the
Director, Office of Federal Activities,
and outline the reasons for the request.
These requests can be submitted by
email to: EISfiling@epa.gov. EPA will
accept telephone requests; however,
agencies should follow up such requests
in writing so that the documentation
supporting the decision is complete. A
meeting to discuss the consequences for
the project and any decision to change
time periods may be necessary. For this
reason, EPA asks that it be made aware
of any intent to submit requests of this
type as early as possible in the NEPA
process. This is to prevent the
possibility of the time frame for the
decision on the time period
modification from interfering with the
lead agency’s schedule for the EIS. EPA
will notify CEQ of any reduction or
extension granted.
6. Retention
Filed EISs are retained in the e-NEPA
Filing system for two years. After two
years the EISs are sent to the National
Records Center. After a total of twenty
(20) years the EISs are transferred to the
National Archives Records
Administration (NARA).
Please note that EPA maintains a Web
site that will make available copies of
the filed EISs to the public. The
retention schedule does not affect the
availability of these electronic copies.
Dated: August 21, 2012.
Cliff Rader,
Director, NEPA Compliance Division, Office
of Federal Activities.
[FR Doc. 2012–20914 Filed 8–23–12; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–9004–6]
Environmental Impacts Statements;
Notice of Availability
Office of Federal Activities,
General Information (202) 564–7146 or
https://www.epa.gov/compliance/nepa/
Weekly receipt of Environmental Impact
Statements Filed 08/13/2012 Through
08/17/2012 Pursuant to 40 CFR
1506.9.
erowe on DSK2VPTVN1PROD with
AGENCY:
Notice
Section 309(a) of the Clean Air Act
requires that EPA make public its
comments on EISs issued by other
Federal agencies. EPA’s comment letters
VerDate Mar<15>2010
15:22 Aug 23, 2012
Jkt 226001
on EISs are available at: https://
www.epa.gov/compliance/nepa/
eisdata.html.
Starting
October 1, 2012, EPA will not accept
paper copies or CDs of EISs for filing
purposes; all submissions on or after
October 1, 2012 must be made through
e-NEPA. While this system eliminates
the need to submit paper or CD copies
to EPA to meet filing requirements,
electronic submission does not change
requirements for distribution of EISs for
public review and comment. To begin
using e-NEPA, you must first register
with EPA’s electronic reporting site—
https://cdx.epa.gov/epa_home.asp.
EIS No. 20120268, Draft EIS, USFWS,
WV, Proposed Issuance of an
Incidental Take Permit for the Beech
Ridge Energy Wind Project Habitat
Conservation Plan, Implementation,
Greenbrier and Nicholas Counties,
WV, Comment Period Ends: 10/23/
2012, Contact: Laura Hill 304–636–
6586, ext 18.
EIS No. 20120269, Final EIS, FHWA,
CA, State Route 91 Corridor
Improvement Project, Widening SR 91
from SR 91/State Route 241
Interchange in Orange County to
Pierce Street in Riverside County,
Orange and Riverside Counties, CA,
Review Period Ends: 09/24/2012,
Contact: Aaron Burton 909–388–2841.
EIS No. 20120270, Final Supplement,
FHWA, MN, Trunk Highway 60
between Windom and St. James,
Implementation of Transportation
System Improvements, Funding,
USACE Section 404 Permit,
Cottonwood and Watonwan Counties,
MN, Review Period Ends: 09/24/2012,
Contact: Philip Forst 651–291–6110.
EIS No. 20120271, Final EIS, USFWS,
NV, Sheldon National Wildlife Refuge
Project, Draft Resource Conservation
Plan, Implementation, Humboldt and
Washoe Counties, NV and Lake
County, OR, Review Period Ends: 09/
24/2012, Contact: Aaron Collins 541–
947–3315, ext. 223.
EIS No. 20120272, Final EIS, USN, CA,
Marine Corps Base Camp Pendleton
Project, Base wide Water
Infrastructure, Construction and
Operation, San Diego County, CA,
Review Period Ends: 09/24/2012,
Contact: Jesse Martinez 619–532–
3844.
EIS No. 20120273, Final EIS, FHWA,
CO, Breckenridge Ski Resort Peak 6
Project, Implementation, White River
National Forest, Summit County, CO,
Review Period Ends: 09/24/2012,
Contact: Joe Foreman 970–262–3443.
SUPPLEMENTARY INFORMATION:
PO 00000
Frm 00022
Fmt 4703
Sfmt 9990
EIS No. 20120274, Draft EIS, USFS, AZ,
Prescott National Forest Land and
Resource Management Plan,
Implementation, Yavapai and
Coconino Counties, AZ, Comment
Period Ends: 10/08/2012, Contact:
Mary C. Rasmussen 928–443–8265.
EIS No. 20120275, Draft EIS, USFS, MT,
Wild Cramer Forest Health and Fuels
Reduction Project, Swan Lake Ranger
District, Flathead National Forest,
Flathead County, MT, Comment
Period Ends: 10/08/2012, Contact:
Richard Kehr 406–837–7500.
Amended Notices
EIS No. 20120201, Draft Supplement,
USACE, IN, Indianapolis North Flood
Damage Reduction, Modifications to
Project Features and Realignment of
the South Warfleigh Section, Marion
County, IN, Comment Period Ends:
08/31/2012, Contact: Michael Turner
502–315–6900.
Revision to FR Notice Published 07/
20/2012; Extending Comment Period
from 08/31/2012 to 09/28/2012.
EIS No. 20120227, Draft EIS, USMC,
GA, Proposed Modernization and
Expansion of Townsend Bombing
Range, Acquiring Additional Property
and Constructing Infrastructure to
Allow the Use of Precision-Guided
Munitions, McIntosh and Long
Counties, GA, Comment Period Ends:
09/27/2012, Contact: Veronda
Johnson 571–256–2783.
Revision to FR Notice Published 7/13/
2012; Extending Review Period from 8/
27/12 to 09/27/2012.
EIS No. 20120247, Final EIS, USACE,
00, Mississippi River Gulf Outlet
Ecosystem Restoration, To Develop a
Comprehensive Ecosystem
Restoration Plan To Restore the Lake
Borgne Ecosystems, LA and MS,
Review Period Ends: 09/06/2012,
Contact: Tammy Gilmore 504–862–
1002.
Revision to FR Notice Published 7/27/
2012; Extending Review Period from 08/
27/2012 to 09/06/2012.
Dated: August 21, 2012.
Cliff Rader,
Director, NEPA Compliance Division, Office
of Federal Activities.
[FR Doc. 2012–20913 Filed 8–23–12; 8:45 am]
BILLING CODE 6560–50–P
E:\FR\FM\24AUN1.SGM
24AUN1
Agencies
[Federal Register Volume 77, Number 165 (Friday, August 24, 2012)]
[Notices]
[Page 51532]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-20913]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-9004-6]
Environmental Impacts Statements; Notice of Availability
AGENCY: Office of Federal Activities, General Information (202) 564-
7146 or https://www.epa.gov/compliance/nepa/
Weekly receipt of Environmental Impact Statements Filed 08/13/2012
Through 08/17/2012 Pursuant to 40 CFR 1506.9.
Notice
Section 309(a) of the Clean Air Act requires that EPA make public
its comments on EISs issued by other Federal agencies. EPA's comment
letters on EISs are available at: https://www.epa.gov/compliance/nepa/eisdata.html.
SUPPLEMENTARY INFORMATION: Starting October 1, 2012, EPA will not
accept paper copies or CDs of EISs for filing purposes; all submissions
on or after October 1, 2012 must be made through e-NEPA. While this
system eliminates the need to submit paper or CD copies to EPA to meet
filing requirements, electronic submission does not change requirements
for distribution of EISs for public review and comment. To begin using
e-NEPA, you must first register with EPA's electronic reporting site--
https://cdx.epa.gov/epa_home.asp.
EIS No. 20120268, Draft EIS, USFWS, WV, Proposed Issuance of an
Incidental Take Permit for the Beech Ridge Energy Wind Project Habitat
Conservation Plan, Implementation, Greenbrier and Nicholas Counties,
WV, Comment Period Ends: 10/23/2012, Contact: Laura Hill 304-636-6586,
ext 18.
EIS No. 20120269, Final EIS, FHWA, CA, State Route 91 Corridor
Improvement Project, Widening SR 91 from SR 91/State Route 241
Interchange in Orange County to Pierce Street in Riverside County,
Orange and Riverside Counties, CA, Review Period Ends: 09/24/2012,
Contact: Aaron Burton 909-388-2841.
EIS No. 20120270, Final Supplement, FHWA, MN, Trunk Highway 60 between
Windom and St. James, Implementation of Transportation System
Improvements, Funding, USACE Section 404 Permit, Cottonwood and
Watonwan Counties, MN, Review Period Ends: 09/24/2012, Contact: Philip
Forst 651-291-6110.
EIS No. 20120271, Final EIS, USFWS, NV, Sheldon National Wildlife
Refuge Project, Draft Resource Conservation Plan, Implementation,
Humboldt and Washoe Counties, NV and Lake County, OR, Review Period
Ends: 09/24/2012, Contact: Aaron Collins 541-947-3315, ext. 223.
EIS No. 20120272, Final EIS, USN, CA, Marine Corps Base Camp Pendleton
Project, Base wide Water Infrastructure, Construction and Operation,
San Diego County, CA, Review Period Ends: 09/24/2012, Contact: Jesse
Martinez 619-532-3844.
EIS No. 20120273, Final EIS, FHWA, CO, Breckenridge Ski Resort Peak 6
Project, Implementation, White River National Forest, Summit County,
CO, Review Period Ends: 09/24/2012, Contact: Joe Foreman 970-262-3443.
EIS No. 20120274, Draft EIS, USFS, AZ, Prescott National Forest Land
and Resource Management Plan, Implementation, Yavapai and Coconino
Counties, AZ, Comment Period Ends: 10/08/2012, Contact: Mary C.
Rasmussen 928-443-8265.
EIS No. 20120275, Draft EIS, USFS, MT, Wild Cramer Forest Health and
Fuels Reduction Project, Swan Lake Ranger District, Flathead National
Forest, Flathead County, MT, Comment Period Ends: 10/08/2012, Contact:
Richard Kehr 406-837-7500.
Amended Notices
EIS No. 20120201, Draft Supplement, USACE, IN, Indianapolis North Flood
Damage Reduction, Modifications to Project Features and Realignment of
the South Warfleigh Section, Marion County, IN, Comment Period Ends:
08/31/2012, Contact: Michael Turner 502-315-6900.
Revision to FR Notice Published 07/20/2012; Extending Comment
Period from 08/31/2012 to 09/28/2012.
EIS No. 20120227, Draft EIS, USMC, GA, Proposed Modernization and
Expansion of Townsend Bombing Range, Acquiring Additional Property and
Constructing Infrastructure to Allow the Use of Precision-Guided
Munitions, McIntosh and Long Counties, GA, Comment Period Ends: 09/27/
2012, Contact: Veronda Johnson 571-256-2783.
Revision to FR Notice Published 7/13/2012; Extending Review Period
from 8/27/12 to 09/27/2012.
EIS No. 20120247, Final EIS, USACE, 00, Mississippi River Gulf Outlet
Ecosystem Restoration, To Develop a Comprehensive Ecosystem Restoration
Plan To Restore the Lake Borgne Ecosystems, LA and MS, Review Period
Ends: 09/06/2012, Contact: Tammy Gilmore 504-862-1002.
Revision to FR Notice Published 7/27/2012; Extending Review Period
from 08/27/2012 to 09/06/2012.
Dated: August 21, 2012.
Cliff Rader,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. 2012-20913 Filed 8-23-12; 8:45 am]
BILLING CODE 6560-50-P