Pacific Gas and Electric Company; Notice of Receipt of Application, 50681-50682 [2012-20599]
Download as PDF
Federal Register / Vol. 77, No. 163 / Wednesday, August 22, 2012 / Notices
50681
DOE/FE ORDERS GRANTING IMPORT/EXPORT AUTHORIZATIONS—Continued
Order No.
Date issued
FE Docket No.
Authorization holder
Southern LNG Company,
L.L.C.
3106 ..................
06/15/12
12–54–LNG
3107 ..................
06/22/12
12–45–NG
3108 ..................
06/22/12
12–46–NG
3109 ..................
06/22/12
12–49–NG
3110 ..................
06/22/12
12–51–NG
3111 ..................
06/22/12
12–52–NG
Tourmaline Oil Marketing
Corp.
Morgan Stanley Capital
Group Inc.
Empire Natural Gas Corporation.
BP Canada Energy Marketing Corp.
Union Gas Limited ................
3112 ..................
06/22/12
12–53–NG
Summitt Energy LP ...............
3113 ..................
06/22/12
12–55–LNG
Chevron U.S.A. Inc ...............
3114 ..................
06/22/12
12–56–LNG
BP Energy Company ............
3115 ..................
06/22/12
12–57–NG
Southwest Energy, L.P .........
3116 ..................
06/22/12
12–58–NG
Marathon Oil Company .........
3117 ..................
06/22/12
12–59–NG
3118 ..................
06/22/12
12–60–NG
3119 ..................
06/22/12
12–62–NG
Central Valle Hermoso, S.A.
de C.V.
St. Lawrence Gas Company,
Inc.
Irving Oil Terminals, Inc ........
3120 ..................
06/22/12
12–63–LNG
3121 ..................
06/22/12
12–65–NG
3122 ..................
06/22/12
12–66–LNG
S.D. Sunnyland Enterprises,
Inc.
Nexen Energy Marketing
U.S.A. Inc.
Sempra LNG Marketing, LLC
3123 ..................
06/22/12
12–67–NG
ETC Marketing, Ltd ...............
3124 ..................
06/22/12
12–68–NG
Concord Energy LLC ............
3125 ..................
06/22/12
12–70–NG
Moneta Energy Services Ltd
3001–A ..............
06/22/12
11–101–NG
[FR Doc. 2012–20635 Filed 8–21–12; 8:45 am]
BILLING CODE 6450–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2130–066]
mstockstill on DSK4VPTVN1PROD with NOTICES
Pacific Gas and Electric Company;
Notice of Receipt of Application
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Application Type: Pinecrest Lake
Shoreline Management Plan.
b. Project No.: 2130–066.
c. Date Filed: July 23, 2012.
d. Applicant: Pacific Gas and Electric
Company (PG&E).
VerDate Mar<15>2010
16:53 Aug 21, 2012
Jkt 226001
National Fuel Marketing
Company, LLC.
Description of action
Order granting long-term multi-contract authority to export
LNG by vessel from the Elba Island Terminal to free
trade agreement nations.
Order granting blanket authority import natural gas from
Canada.
Order granting blanket authority to import/export natural
gas from/to Canada/Mexico.
Order granting blanket authority to import natural gas from
Canada.
Order granting blanket authority to import/export natural
gas from/to Canada.
Order granting blanket authority to import/export natural
gas from/to Canada.
Order granting blanket authority to import/export natural
gas from/to Canada.
Order granting blanket authority to import LNG from various international sources by vessel.
Order granting blanket authority to import LNG from various international sources by vessel.
Order granting blanket authority to import/export natural
gas from/to Canada/Mexico.
Order granting blanket authority to import/export natural
gas from/to Canada/Mexico.
Order granting blanket authority to import/export natural
gas from/to Mexico.
Order granting blanket authority to import natural gas from
Canada.
Order granting blanket authority to export natural gas to
Canada.
Order granting blanket authority to import LNG from various international sources by vessel.
Order granting blanket authority to import/export natural
gas from/to Canada/Mexico.
Order granting blanket authority to import LNG from various international sources by vessel.
Order granting blanket authority to export natural gas to
Mexico.
Order granting blanket authority to import/export natural
gas from/to Canada.
Order granting blanket authority to import/export natural
gas from/to Canada.
Order vacating blanket authority to import/export natural
gas from/to Canada.
e. Name of Project: Spring Gap—
Stanislaus Hydroelectric Project.
f. Location: The project is located on
the Middle Fork and South Forks of the
Stanislaus River in Calaveras and
Tuolumne Counties, California, and
occupies approximately 1,060 acres
within the Stanislaus National Forest,
managed by the U.S. Department of
Agriculture—Forest Service (Forest
Service).
g. Filed Pursuant to: Federal Power
Act 16 U.S.C. 791(a)–825(r).
h. Applicant Contact: Mr. Richard
Doble, Senior License Coordinator,
PG&E, 245 Market Street, San Francisco,
CA 94105. Phone: (415) 973–4480.
i. Forest Service Contact: Ms. Susan
Skalaski, Forest Supervisor, Stanislaus
National Forest, 19777 Greenley Road,
Sonora, CA 95370. Phone: (209) 532–
3671.
PO 00000
Frm 00008
Fmt 4703
Sfmt 4703
j. FERC Contact: Any questions
regarding this notice should be
addressed to Dr. Mark Ivy at (202) 502–
6156 or by email: Mark.Ivy@ferc.gov.
k. Description of the Application:
After receiving Forest Service approval
on July 18, 2012, PG&E filed a shoreline
management plan (SMP) for Pinecrest
Lake pursuant to a mandatory
requirement of the Forest Service’s
section 4(e) condition No. 29, which
was included as part of the license for
the Spring Gap-Stanislaus Hydroelectric
Project. The Forest Service, which owns
and manages all of the shoreline lands
at Pinecrest Lake as part of the
Stanislaus National Forest, required the
SMP as a sub-plan under condition No.
29 (Recreation Facilities and
Administration) to manage the reservoir
shoreline at Pinecrest Lake and to
address privately owned boat docks and
mooring balls, and include zoning of
E:\FR\FM\22AUN1.SGM
22AUN1
50682
Federal Register / Vol. 77, No. 163 / Wednesday, August 22, 2012 / Notices
certain sections of shoreline for
swimming, fishing, and shoreline boat
access.
Since all of the shoreline at Pinecrest
Lake is owned and managed by the
Forest Service, the Commission has no
authority to dictate how the SMP is to
be implemented. As such, the
Commission views PG&E’s filing as
informational and will not take action
on it. Any comments on the SMP should
be directed to the Forest Service.
l. Locations of the Application: A
copy of the application is available for
inspection and reproduction at the
Commission’s Public Reference Room,
located at 888 First Street, NE., Room
2A, Washington, DC 20426, or by calling
(202) 502–8371. This filing may also be
viewed on the Commission’s Web site at
https://www.ferc.gov/docs-filing/
efiling.asp. Enter the docket number (P–
2130) in the docket number field to
access the document. You may also
register online at https://www.ferc.gov/
docs-filing/esubscription.asp to be
notified via email of new filings and
issuances related to this or other
pending projects. For assistance, call 1–
866–208–3676 or email
FERCOnlineSupport@ferc.gov, for TTY,
call (202) 502–8659. A copy is also
available for inspection and
reproduction at the address in item (h)
above.
Dated: August 15, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012–20599 Filed 8–21–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP12–495–000]
mstockstill on DSK4VPTVN1PROD with NOTICES
Kinder Morgan Interstate Gas
Transmission LLC; Notice of Filing
Take notice that on August 6, 2012,
Kinder Morgan Interstate Gas
Transmission LLC (KMIGT), 370 Van
Gordon Street, Lakewood, Colorado
80228, filed an application pursuant to
Sections 7(b) and 7(c) of the Natural Gas
Act (NGA), for authorization to abandon
a 432-mile segment of the Pony Express
Pipeline system (Pipeline Segment)
located from Platte County, Wyoming to
Lincoln County, Kansas and to construct
new replacement facilities. This filing is
available for review at the Commission
in the Public Reference Room or may be
viewed on the Commission’s Web site at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
VerDate Mar<15>2010
16:53 Aug 21, 2012
Jkt 226001
number excluding the last three digits in
the docket number field to access the
document. For assistance, please contact
FERC Online Support at
FERCOnlineSupport@ferc.gov or toll
free at (866) 208–3676, or for TTY,
contact (202) 502–8659.
KMIGT proposes to abandon the
Pipeline Segment in place and sell it to
Kinder Morgan Pony Express Pipeline
LLC (KMPXP). The proposed
abandonment also includes three
natural gas compressor stations totaling
33,175 horsepower (hp), meter stations,
and appurtenant facilities. These
facilities will be removed. KMPXP will
purchase, convert, own, and operate the
Pipeline Segment as a crude oil pipeline
to meet the increasing demand for
pipeline transportation of crude oil. In
order to maintain gas service of 104,000
Dth/day to existing firm customers,
KMIGT proposes to construct new
replacement facilities: (1) One new
mainline compressor station totaling 14,
200 hp, (2) two lateral pipelines which
will be approximately 3 miles and 22
miles in length, (3) two booster
compressor units, 500 and 350 hp, and
(4) certain auxiliary facilities. KMPXP
will reimburse KMIGT for the costs
associated with the construction of the
new facilities. The total estimated
construction cost of the proposed
facilities is $56,605,800. KMIGT
proposes in-service date of August 1,
2014.
Any questions regarding this
application should be directed to Skip
George, Manager of Regulatory, Kinder
Morgan Interstate Gas Transmission
LLC, 370 Van Gordon Street, Lakewood,
Colorado 80228, phone (303) 914–4969.
Any person wishing to obtain legal
status by becoming a party to the
proceedings for this project should, on
or before the below listed comment
date, file with the Federal Energy
Regulatory Commission, 888 First Street
NE., Washington, DC 20426, a motion to
intervene in accordance with the
requirements of the Commission’s Rules
of Practice and Procedure (18 CFR
385.214 or 385.211) and the Regulations
under the NGA (18 CFR 157.10). A
person obtaining party status will be
placed on the service list maintained by
the Secretary of the Commission and
will receive copies of all documents
filed by the applicant and by all other
parties. A party must submit 14 copies
of filings made with the Commission
and must mail a copy to the applicant
and to every other party in the
proceeding. Only parties to the
proceeding can ask for court review of
Commission orders in the proceeding.
Motions to intervene, protests and
comments may be filed electronically
PO 00000
Frm 00009
Fmt 4703
Sfmt 4703
via the Internet in lieu of paper, see 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site under the ‘‘e-Filing’’ link. The
Commission strongly encourages
electronic filings.
Comment Date: September 5, 2012.
Dated: August 15, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012–20597 Filed 8–21–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14423–000]
KC Scoby Hydro, LLC; Notice of
Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
On June 11, 2012, KC Scoby Hydro,
LLC, filed an application for a
preliminary permit, pursuant to section
4(f) of the Federal Power Act (FPA),
proposing to study the feasibility of
hydropower at the existing Scoby Dam
located on Cattaraugus Creek in Erie
County, New York. The sole purpose of
a preliminary permit, if issued, is to
grant the permit holder priority to file
a license application during the permit
term. A preliminary permit does not
authorize the permit holder to perform
any land-disturbing activities or
otherwise enter upon lands or waters
owned by others without the owners’
express permission.
The proposed Scoby Dam
Hydroelectric Project would redevelop
an abandoned project and would consist
of the following: (1) An existing 338foot-long and 40-foot-high ogee-shaped
concrete gravity dam with a 183-footlong spillway; (2) an existing
impoundment having a surface area of
22 acres and a storage capacity of 52
acre-feet at an elevation of 1,080 feet
mean sea level (msl); (3) a new
powerhouse with two new identical
turbine-generator units with an installed
capacity of 500 kilowatts each; (4) a new
480-volt, approximately 1-mile-long
transmission line extending from the
powerhouse to an existing three-phase
line; and (5) appurtenant facilities. The
proposed project would have an annual
generation of 6.5 gigawatt-hours.
Applicant Contact: Kelly Sackheim,
KC Scoby Hydro, LLC, 5096 Cocoa Palm
Way, Fair Oaks, CA 95628; phone: (301)
401–5978.
FERC Contact: Monir Chowdhury;
phone: (202) 502–6736.
E:\FR\FM\22AUN1.SGM
22AUN1
Agencies
[Federal Register Volume 77, Number 163 (Wednesday, August 22, 2012)]
[Notices]
[Pages 50681-50682]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-20599]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2130-066]
Pacific Gas and Electric Company; Notice of Receipt of
Application
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Application Type: Pinecrest Lake Shoreline Management Plan.
b. Project No.: 2130-066.
c. Date Filed: July 23, 2012.
d. Applicant: Pacific Gas and Electric Company (PG&E).
e. Name of Project: Spring Gap--Stanislaus Hydroelectric Project.
f. Location: The project is located on the Middle Fork and South
Forks of the Stanislaus River in Calaveras and Tuolumne Counties,
California, and occupies approximately 1,060 acres within the
Stanislaus National Forest, managed by the U.S. Department of
Agriculture--Forest Service (Forest Service).
g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)-825(r).
h. Applicant Contact: Mr. Richard Doble, Senior License
Coordinator, PG&E, 245 Market Street, San Francisco, CA 94105. Phone:
(415) 973-4480.
i. Forest Service Contact: Ms. Susan Skalaski, Forest Supervisor,
Stanislaus National Forest, 19777 Greenley Road, Sonora, CA 95370.
Phone: (209) 532-3671.
j. FERC Contact: Any questions regarding this notice should be
addressed to Dr. Mark Ivy at (202) 502-6156 or by email:
Mark.Ivy@ferc.gov.
k. Description of the Application: After receiving Forest Service
approval on July 18, 2012, PG&E filed a shoreline management plan (SMP)
for Pinecrest Lake pursuant to a mandatory requirement of the Forest
Service's section 4(e) condition No. 29, which was included as part of
the license for the Spring Gap-Stanislaus Hydroelectric Project. The
Forest Service, which owns and manages all of the shoreline lands at
Pinecrest Lake as part of the Stanislaus National Forest, required the
SMP as a sub-plan under condition No. 29 (Recreation Facilities and
Administration) to manage the reservoir shoreline at Pinecrest Lake and
to address privately owned boat docks and mooring balls, and include
zoning of
[[Page 50682]]
certain sections of shoreline for swimming, fishing, and shoreline boat
access.
Since all of the shoreline at Pinecrest Lake is owned and managed
by the Forest Service, the Commission has no authority to dictate how
the SMP is to be implemented. As such, the Commission views PG&E's
filing as informational and will not take action on it. Any comments on
the SMP should be directed to the Forest Service.
l. Locations of the Application: A copy of the application is
available for inspection and reproduction at the Commission's Public
Reference Room, located at 888 First Street, NE., Room 2A, Washington,
DC 20426, or by calling (202) 502-8371. This filing may also be viewed
on the Commission's Web site at https://www.ferc.gov/docs-filing/efiling.asp. Enter the docket number (P-2130) in the docket number
field to access the document. You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of
new filings and issuances related to this or other pending projects.
For assistance, call 1-866-208-3676 or email
FERCOnlineSupport@ferc.gov, for TTY, call (202) 502-8659. A copy is
also available for inspection and reproduction at the address in item
(h) above.
Dated: August 15, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012-20599 Filed 8-21-12; 8:45 am]
BILLING CODE 6717-01-P