Tier 1 Environmental Impact Statement for the Oregon Portion of the Pacific Northwest Rail Corridor (Portland to Eugene), 49854-49856 [2012-20227]

Download as PDF 49854 Federal Register / Vol. 77, No. 160 / Friday, August 17, 2012 / Notices AMENDMENTS TO PFC APPROVALS Amendment approved date Amendment No., City, State 10–08–C–01–SAV, Savannah, GA .................................................. *02–02–C–01–GGG, Longview, TX ................................................. 08–04–C–01–CHA, Chattanooga, TN ............................................. 12–04–C–01–SBY, Salisbury, MD ................................................... 09–04–C–01–ACT, Waco, TX ......................................................... 11–09–C–01–GEG, Spokane, WA .................................................. 09–09–C–01–EAT, Wenatchee, WA ............................................... 95–02–C–08–STL, Saint Louis, MO ................................................ 97–03–U–05–STL, Saint Louis, MO ................................................ 08–09–C–01–STL, Saint Louis, MO ................................................ *09–02–C–01–FLG, Flagstaff, AZ ................................................... 92–01–C–02–SMF, Sacramento, CA .............................................. 95–02–C–02–SMF, Sacramento, CA .............................................. 02–07–C–01–SMF, Sacramento, CA .............................................. 02–05–C–01–RNO, Reno, NV ......................................................... 08–02–C–03–PIE, Clearwater, FL ................................................... 05/03/12 07/10/12 07/11/12 07/12/12 07/12/12 07/13/12 07/13/12 07/16/12 07/16/12 07/16/12 07/17/12 07/19/12 07/19/12 07/19/12 07/19/12 07/23/12 Original approved net PFC revenue $4,066,265 699,232 2,413,001 937,983 790,163 10,215,000 105,268 67,032,109 NA 783,625,492 1,157,023 27,651,750 2,677,360 4,208,200 6,734,192 6,628,510 Amended approved net PFC revenue $6,669,248 699,232 2,520,376 937,983 754,153 16,365,000 104,916 73,311,090 NA 755,733,688 1,208,991 20,010,436 1,390,230 2,041,219 6,940,843 10,528,075 Original estimated charge exp. date 04/01/16 12/01/12 10/01/12 02/01/17 09/01/12 09/01/14 04/01/10 07/01/97 07/01/97 02/01/22 02/01/15 01/01/96 03/01/97 07/01/11 02/01/03 11/01/12 Amended estimated charge exp. date 12/01/16 01/01/13 10/01/12 02/01/17 12/01/12 11/01/15 04/01/10 07/01/97 07/01/97 02/01/22 04/01/15 01/01/96 03/01/97 07/01/11 02/01/03 08/01/14 Notes: The amendments denoted by an asterisk (*) include a change to the PFC level charged from $3.00 per enplaned passenger to $4.50 per enplaned passenger. For Longview, TX and Flagstaff, AZ, this change is effective on September 1, 2012. Issued in Washington, DC, on August 13, 2012. Joe Hebert, Manager, Financial Analysis and Passenger Facility Charge Branch. [FR Doc. 2012–20169 Filed 8–16–12; 8:45 am] BILLING CODE 4910–13–M DEPARTMENT OF TRANSPORTATION Federal Railroad Administration Tier 1 Environmental Impact Statement for the Oregon Portion of the Pacific Northwest Rail Corridor (Portland to Eugene) Federal Railroad Administration (FRA), U.S. Department of Transportation (DOT). ACTION: Notice of Intent to Prepare an Environmental Impact Statement. AGENCY: FRA is issuing this notice to advise the public that FRA and the Oregon Department of Transportation (ODOT) will jointly prepare a Tier 1 Environmental Impact Statement (EIS) in compliance with the National Environmental Policy Act of 1969 (NEPA) to study potential infrastructure investments along the Oregon portion of the Pacific Northwest Rail Corridor (PNWRC). The objective of the Tier 1 EIS is to evaluate a reasonable range of alternatives and select a rail corridor as well as making decisions regarding the level of intercity passenger rail service provided in the corridor, including variations in train frequency, trip time, and on-time performance. Alternatives under consideration will include taking no action (No-Build Alternative), as well as multiple build alternatives between erowe on DSK2VPTVN1PROD with NOTICES SUMMARY: VerDate Mar<15>2010 15:13 Aug 16, 2012 Jkt 226001 Eugene-Springfield and the Columbia River in Portland. The build alternatives may include infrastructure improvements to the existing rail corridor, the development of a new rail corridor, or a combination of both. FRA is also issuing this notice to solicit public and agency input in the development of the scope of the EIS and to advise the public that outreach activities conducted by FRA and ODOT will be considered in the preparation of the EIS. Written comments on the scope of the Tier 1 EIS for the Oregon Passenger Rail Project should be provided to ODOT by October 31, 2012. Public scoping meetings are scheduled from September 6, 2012 through September 19, 2012 at the times and locations identified in the Addresses section below. DATES: Written comments on the scope of this study should be sent to Michael Holthoff, Environmental Project Manager, Major Projects Branch, Oregon Department of Transportation, 3210 Del Webb Avenue NE., Suite 110, Salem, OR 97301, or via email to OregonPassengerRail@odot.state.or.us. Comments may also be provided orally or in writing at the public scoping meetings scheduled at the following locations: • Salem at ODOT ‘‘T’’ Building, Gail Achterman Conference Room, 355 Capitol Street NE., Salem, OR 97301 on September 6, 2012 from 5 p.m. through 7 p.m. • Oregon City at Clackamas Community College—Gregory Forum Room A, 19600 Molalla Avenue, Oregon ADDRESSES: PO 00000 Frm 00081 Fmt 4703 Sfmt 4703 City, OR 97045 on September 11, 2012 from 5 p.m. through 7 p.m. • Albany at Albany Public Library, 2450 14th Avenue SE., Albany, OR 97322 on September 12, 2012 from 5 p.m. through 7 p.m. • Lake Oswego at Phoenix Inn, 14905 SW. Bangy Road, Lake Oswego, OR 97035 on September 13, 2012 from 5 p.m. through 7 p.m. • Portland at Metro Council Chambers, 600 NE. Grand Avenue, Portland, OR 97232 on September 18, 2012 from 5 p.m. through 7 p.m. • Eugene at Atrium Building Lobby, 99 W. 10th Avenue, Eugene, Oregon 97401 on September 19, 2012 from 5 p.m. through 7 p.m. FOR FURTHER INFORMATION CONTACT: Jim Cox, Assistant Manager, Major Projects Branch, Oregon Department of Transportation, 3210 Del Webb Avenue NE., Suite 110, Salem, OR 97301, (telephone: (503) 986–6612); or Ms. Colleen Vaughn, Office of Railroad Policy and Development, Federal Railroad Administration (FRA), 1200 New Jersey Avenue SE., MS–20/W38– 221, Washington, DC 20590, (telephone: (202) 493–6096). SUPPLEMENTARY INFORMATION: The federally designated PNWRC has been the subject of high-speed passenger rail planning and implementation strategies for more than 30 years. The 466-mile corridor serves the most densely populated regions of British Columbia (B.C.), Washington, and Oregon, linking Vancouver, B.C., Seattle, WA, and Portland and Eugene, OR, with growing intermediate communities, including the capital cities of Olympia, WA and Salem, OR. Oregon and Washington have planned, studied, and coordinated E:\FR\FM\17AUN1.SGM 17AUN1 erowe on DSK2VPTVN1PROD with NOTICES Federal Register / Vol. 77, No. 160 / Friday, August 17, 2012 / Notices State-sponsored passenger service on the PNWRC since 1994. Project Background: Oregon initiated a daily passenger rail round trip between Portland and Eugene in 1994. Since that time, Oregon has invested over $77 million in capital improvements including railroad infrastructure, stations, and rolling stock. A second State-sponsored daily round trip was added in 2000, resulting in ridership growth of 139% between 2000 and 2008. Current intercity passenger rail service in Oregon includes two Amtrak Cascades train roundtrips per day. Additionally, Amtrak sponsors one daily roundtrip of the Coast Starlight between Los Angeles and Seattle and one daily roundtrip of the Empire Builder between Portland and Chicago. The Cascades station stops include Eugene, Albany, Salem, Oregon City and Portland and continue north to Vancouver, BC. The Coast Starlight stops in Klamath Falls, Chemult, Eugene, Albany, Salem and Portland. The only stop for the Empire Builder in Oregon is in Portland. Over the next 25 years, the population of the Willamette Valley is expected to grow by approximately 35% with the population anticipated to reach 3.6 million by the year 2035. During the same period, freight volume in the state is expected to grow by approximately 60%. These increases will result in transportation demand that exceeds the available freight and passenger rail capacity in the Willamette Valley. A comprehensive approach to identifying the appropriate rail infrastructure is needed to provide additional passenger and freight rail capacity and to attain the principal service objectives of more reliable passenger trains, more frequent trains, and shortened travel times between Portland and Eugene (a distance of approximately 125 miles). Environmental Review Process: FRA and ODOT will use a tiered process, as provided for in 40 CFR 1508.28, in the completion of the environmental review of the Project. ‘‘Tiering’’ is a staged environmental review process applied to environmental reviews for complex projects. The Tier 1 EIS will address broad corridor-level issues and alternatives. Subsequent phases or tiers will analyze, at a greater level of detail, narrower site-specific proposals based on the decisions made in Tier 1. The Tier 1 EIS and any subsequent environmental documents will be developed in accordance with Council on Environmental Quality (CEQ) regulations (40 CFR part 1500 et seq.) implementing NEPA, and FRA’s Procedures for Considering VerDate Mar<15>2010 15:13 Aug 16, 2012 Jkt 226001 Environmental Impacts (64 FR 28545; May 26, 1999). Tier 1: The Tier 1 assessment will result in an EIS with the appropriate level of detail for corridor-level decisions and will address broad overall issues of concern, including but not limited to: • Confirm the purpose and need for the proposed action. • Confirm the study area appropriate to assess reasonable alternatives. • Identify a comprehensive set of goals and objectives for the corridor in conjunction with Project stakeholders. These goals and objectives will be crafted to allow comprehensive evaluation of all aspects of the Project necessary to achieve the goals, including train operations, vehicles, and infrastructure. • Identify the range of reasonable alternatives to be considered, consistent with the current and planned use of the corridor and the existing services within and adjacent to the study area, as well as considering a no action/no build alternative. • Develop alternative evaluation criteria to identify alternatives that meet the purpose and need of the proposed action and those that do not. • Identify the general alignment(s) of the reasonable build alternatives. • Identify general right-of-way requirements for the reasonable build alternatives. • Identify, at a corridor planning level, the infrastructure and equipment investment requirements for the reasonable build alternatives. • Include the consideration of the NoBuild Alternative which will be studied as the baseline for comparison with the build alternatives. The No-Build Alternative represents other transportation modes such as auto, air travel, intercity bus, and existing rail and the physical characteristics and capacities as they exist at the time of the Tier 1 EIS, with planned and funded improvements that will be in place at the time the Project becomes operational. • Evaluate and describe, at a corridor planning level, the potential environmental consequences (benefits and impacts to the built and natural environment) associated with the reasonable alternative alignments and proposed changes in passenger rail train frequency, speed, and on-time performance. • Establish the timing and sequencing of independent actions to maintain a state of good repair and to implement the proposed action. • Identify a preferred alternative for corridor route alignment. PO 00000 Frm 00082 Fmt 4703 Sfmt 4703 49855 • Address subsequent component actions for Tier 2 NEPA documentation as described below. Tier 2: The second tier assessment(s) will address component projects to be implemented within the general corridor identified in the Tier 1 EIS, and will incorporate by reference the data and evaluations included in the Tier 1 EIS. Subsequent evaluations will concentrate on the issues specific to the component of the selected alternative identified in the Tier 1 EIS, identify the Project alternatives that meet the purpose and need for each component project, and analyze the specific environmental consequences and measures necessary to mitigate environmental impacts at a site-specific level of detail. Scoping and Public Involvement: FRA encourages broad participation in the EIS process during scoping and subsequent review of the resulting environmental documents. Comments and suggestions are invited from all interested agencies and the public at large to ensure the full range of issues related to the proposed action and all reasonable alternatives are addressed and all significant issues are identified. In particular, FRA is interested in determining whether there are areas of environmental concern where there might be the potential for significant impacts identifiable at a corridor level. Letters describing the proposed Project and soliciting comments were sent to appropriate Federal, State, and local agencies, and appropriate railroads. Public agencies with jurisdiction are requested to advise the FRA and ODOT of the applicable permit and environmental review requirements of each agency, and the scope and content of the environmental information that is germane to the agency’s statutory responsibilities in connection with the proposed improvements. An iterative public involvement/ information program will support the process. The program will involve advisory group meetings, newsletters, a Project Web site, public open houses, stakeholder group meetings, and other methods to solicit and incorporate public input throughout the Tier 1 EIS process. To ensure that the full range of issues relating to the proposed action is addressed, comments and suggestions are invited from all interested parties. Comments and questions concerning the proposed action should be directed to ODOT or to the FRA at the addresses provided above. Additional information can be obtained by visiting the Project Web site at www.oregonpassengerrail. org or sending an email to OregonPassengerRail@odot.state.or.us. E:\FR\FM\17AUN1.SGM 17AUN1 49856 Federal Register / Vol. 77, No. 160 / Friday, August 17, 2012 / Notices The buildings used for the scoping meetings are accessible to persons with disabilities. Any individual who requires special assistance, such as a sign language interpreter, to participate in the meetings should contact Jyll Smith at Oregon Department of Transportation, telephone (503) 986– 3985, five days prior to the meeting. Issued in Washington, DC on August 13, 2012. Corey Hill, Director, Rail Project Development and Delivery. Salinas Tuesday, August 28, 2012, 3:30 p.m.– 6:00 p.m., Transportation Authority for Monterey County (TAMC), TAMC Conference Room, 55 Plaza Circle #B, Salinas, CA 93901. [FR Doc. 2012–20227 Filed 8–16–12; 8:45 am] BILLING CODE 4910–06–P DEPARTMENT OF TRANSPORTATION Federal Railroad Administration Environmental Impact Statement for the Salinas to San Luis Obispo Portion of the Coast Corridor: Monterey and San Luis Obispo Counties, CA Federal Railroad Administration (FRA), U.S. Department of Transportation (DOT). ACTION: Notice of Intent to Prepare an Environmental Impact Statement. AGENCY: FRA is issuing this notice to advise the public that FRA and the California Department of Transportation (Caltrans) will jointly prepare an Environmental Impact Statement (EIS)/ Environmental Impact Report (EIR) to study potential service upgrades and rail corridor improvements to the Salinas to San Luis Obispo portion of the Coast Corridor. The objective of the EIS/EIR is to evaluate alternatives and present environmental analysis to help make decisions regarding the type of service upgrades and rail improvements to be provided in the corridor, including variations in train frequency, trip time, and on-time performance. FRA is also issuing this notice to solicit public and agency input into the development of the scope of the EIS/EIR, whether to tier the environmental process, and to advise the public that public and agency participation resulting from outreach activities conducted by Caltrans and its representatives will be considered in the preparation of the EIS/EIR. DATES: Written comments on the scope of the EIS/EIR for the Salinas to San Luis Obispo Portion of the Coast Corridor should be provided to Caltrans no later than September 10, 2012. Public scoping meetings are scheduled on August 28 and August 29, 2012 at the times and locations identified in the Addresses section below. erowe on DSK2VPTVN1PROD with NOTICES SUMMARY: VerDate Mar<15>2010 15:13 Aug 16, 2012 Jkt 226001 Written comments on the scope of this study should be sent to Ms. Emily Burstein, Division of Rail, Office of Planning and Policy, California Department of Transportation, 1120 N Street, MS 74, Sacramento, CA 95814 or via email to coastcorridorscoping comments@circlepoint.com. Comments may also be provided orally or in writing at the public scoping meetings scheduled at the following locations: ADDRESSES: San Luis Obispo Wednesday, August 29, 2012, 3:30 p.m.–6:00 p.m., San Luis Obispo County Library Community Room, 995 Palm Street, San Luis Obispo, CA 93401. FOR FURTHER INFORMATION CONTACT: Regarding the environmental review please contact: Ms. Emily Burstein, Division of Rail, Office of Planning and Policy, California Department of Transportation, 1120 N Street, MS 74, Sacramento, CA 95814 (telephone: (916) 654–6932) or Ms. Stephanie Perez, Environmental Protection Specialist, Office of Railroad Policy and Development, Federal Railroad Administration, 1200 New Jersey Avenue SE., Mail Stop 20, Washington, DC 20590 (telephone: (202) 493–0388). SUPPLEMENTARY INFORMATION: Purpose and Need The greater Coast Corridor region from San Jose, California to Los Angeles, California faces significant mobility challenges today. These challenges are likely to continue in the future as continued growth in population, employment, and tourism activity is expected to generate increased travel demand. By 2040, statewide population is expected to grow substantially, further straining the existing transportation network. An effective rail system is necessary to meet the future mobility needs of residents, businesses, and visitors. The Coast Corridor faces continuing transportation challenges as evidenced by the following: • Constrained Travel Options—While the Coast Corridor is served by a transportation system that includes air, highway, and rail modes system access and capacity is insufficient to meet future travel demand. Air access is limited for many residents because major airports are located at a substantial distance outside the Salinas to San Luis Obispo portion of the PO 00000 Frm 00083 Fmt 4703 Sfmt 4703 corridor. This portion of the corridor is served by a single major highway—US 101—which experiences frequent congestion and travel delays. Amtrak offers a single daily Coast Starlight passenger service along the corridor and trains are often delayed due to the primarily single-track rail system operating beyond its design capacity. • Significant Highway Congestion— While travel by automobile is expected to meet the majority of future travel demand, this increased use will result in worsening of existing congestion. Congestion is particularly acute at the corridor’s urban chokepoints and is likely to worsen, making travel times unreliable. In addition, space constraints limit the potential to expand the highway system. • Constrained Rail System Capacity— Corridor rail service could accommodate an increasing portion of projected travel demand growth by providing an alternative mode to automobile travel, but rail service is constrained by infrastructure that is significantly undersized for the volumes it currently accommodates, much less future service, without significant system improvements. Moreover, the existing Coast Starlight service is often fully booked during peak travel periods. • Aging Rail Infrastructure— Investment in corridor rail service has not kept pace with population and travel demand growth, and many tracks, signals and bridges have not been upgraded or improved in decades. Improvements would allow shorter travel times and greater reliability, making rail a more attractive and competitive choice. • Safety Concerns – Increasing potential for accidents in congested rail chokepoints underscores the need for upgraded signaling and infrastructure investments. Growing frequency of railrelated collisions call for improved highway/rail crossings and new or upgraded pedestrian crossings. • Need for Increased Travel Capacity Without Impacting Air Quality and Natural Resources—Highway capacity improvements can have negative impacts on regional and local air quality as well as the efficient use of natural resources. Simultaneously expanding travel capacity while meeting federal and state air quality standards will likely require reductions in total vehicle miles traveled. Rail system improvements offer the opportunity to achieve air quality benefits with minimal impact on natural resources. In light of the transportation challenges listed above, Caltrans has identified rail improvements to the Coast Corridor as an opportunity to E:\FR\FM\17AUN1.SGM 17AUN1

Agencies

[Federal Register Volume 77, Number 160 (Friday, August 17, 2012)]
[Notices]
[Pages 49854-49856]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-20227]


-----------------------------------------------------------------------

DEPARTMENT OF TRANSPORTATION

Federal Railroad Administration


Tier 1 Environmental Impact Statement for the Oregon Portion of 
the Pacific Northwest Rail Corridor (Portland to Eugene)

AGENCY: Federal Railroad Administration (FRA), U.S. Department of 
Transportation (DOT).

ACTION: Notice of Intent to Prepare an Environmental Impact Statement.

-----------------------------------------------------------------------

SUMMARY: FRA is issuing this notice to advise the public that FRA and 
the Oregon Department of Transportation (ODOT) will jointly prepare a 
Tier 1 Environmental Impact Statement (EIS) in compliance with the 
National Environmental Policy Act of 1969 (NEPA) to study potential 
infrastructure investments along the Oregon portion of the Pacific 
Northwest Rail Corridor (PNWRC). The objective of the Tier 1 EIS is to 
evaluate a reasonable range of alternatives and select a rail corridor 
as well as making decisions regarding the level of intercity passenger 
rail service provided in the corridor, including variations in train 
frequency, trip time, and on-time performance. Alternatives under 
consideration will include taking no action (No-Build Alternative), as 
well as multiple build alternatives between Eugene-Springfield and the 
Columbia River in Portland. The build alternatives may include 
infrastructure improvements to the existing rail corridor, the 
development of a new rail corridor, or a combination of both. FRA is 
also issuing this notice to solicit public and agency input in the 
development of the scope of the EIS and to advise the public that 
outreach activities conducted by FRA and ODOT will be considered in the 
preparation of the EIS.

DATES: Written comments on the scope of the Tier 1 EIS for the Oregon 
Passenger Rail Project should be provided to ODOT by October 31, 2012. 
Public scoping meetings are scheduled from September 6, 2012 through 
September 19, 2012 at the times and locations identified in the 
Addresses section below.

ADDRESSES: Written comments on the scope of this study should be sent 
to Michael Holthoff, Environmental Project Manager, Major Projects 
Branch, Oregon Department of Transportation, 3210 Del Webb Avenue NE., 
Suite 110, Salem, OR 97301, or via email to 
OregonPassengerRail@odot.state.or.us. Comments may also be provided 
orally or in writing at the public scoping meetings scheduled at the 
following locations:
     Salem at ODOT ``T'' Building, Gail Achterman Conference 
Room, 355 Capitol Street NE., Salem, OR 97301 on September 6, 2012 from 
5 p.m. through 7 p.m.
     Oregon City at Clackamas Community College--Gregory Forum 
Room A, 19600 Molalla Avenue, Oregon City, OR 97045 on September 11, 
2012 from 5 p.m. through 7 p.m.
     Albany at Albany Public Library, 2450 14th Avenue SE., 
Albany, OR 97322 on September 12, 2012 from 5 p.m. through 7 p.m.
     Lake Oswego at Phoenix Inn, 14905 SW. Bangy Road, Lake 
Oswego, OR 97035 on September 13, 2012 from 5 p.m. through 7 p.m.
     Portland at Metro Council Chambers, 600 NE. Grand Avenue, 
Portland, OR 97232 on September 18, 2012 from 5 p.m. through 7 p.m.
     Eugene at Atrium Building Lobby, 99 W. 10th Avenue, 
Eugene, Oregon 97401 on September 19, 2012 from 5 p.m. through 7 p.m.

FOR FURTHER INFORMATION CONTACT: Jim Cox, Assistant Manager, Major 
Projects Branch, Oregon Department of Transportation, 3210 Del Webb 
Avenue NE., Suite 110, Salem, OR 97301, (telephone: (503) 986-6612); or 
Ms. Colleen Vaughn, Office of Railroad Policy and Development, Federal 
Railroad Administration (FRA), 1200 New Jersey Avenue SE., MS-20/W38- 
221, Washington, DC 20590, (telephone: (202) 493-6096).

SUPPLEMENTARY INFORMATION: The federally designated PNWRC has been the 
subject of high-speed passenger rail planning and implementation 
strategies for more than 30 years. The 466-mile corridor serves the 
most densely populated regions of British Columbia (B.C.), Washington, 
and Oregon, linking Vancouver, B.C., Seattle, WA, and Portland and 
Eugene, OR, with growing intermediate communities, including the 
capital cities of Olympia, WA and Salem, OR. Oregon and Washington have 
planned, studied, and coordinated

[[Page 49855]]

State-sponsored passenger service on the PNWRC since 1994.
    Project Background: Oregon initiated a daily passenger rail round 
trip between Portland and Eugene in 1994. Since that time, Oregon has 
invested over $77 million in capital improvements including railroad 
infrastructure, stations, and rolling stock. A second State-sponsored 
daily round trip was added in 2000, resulting in ridership growth of 
139% between 2000 and 2008.
    Current intercity passenger rail service in Oregon includes two 
Amtrak Cascades train roundtrips per day. Additionally, Amtrak sponsors 
one daily roundtrip of the Coast Starlight between Los Angeles and 
Seattle and one daily roundtrip of the Empire Builder between Portland 
and Chicago. The Cascades station stops include Eugene, Albany, Salem, 
Oregon City and Portland and continue north to Vancouver, BC. The Coast 
Starlight stops in Klamath Falls, Chemult, Eugene, Albany, Salem and 
Portland. The only stop for the Empire Builder in Oregon is in 
Portland.
    Over the next 25 years, the population of the Willamette Valley is 
expected to grow by approximately 35% with the population anticipated 
to reach 3.6 million by the year 2035. During the same period, freight 
volume in the state is expected to grow by approximately 60%. These 
increases will result in transportation demand that exceeds the 
available freight and passenger rail capacity in the Willamette Valley. 
A comprehensive approach to identifying the appropriate rail 
infrastructure is needed to provide additional passenger and freight 
rail capacity and to attain the principal service objectives of more 
reliable passenger trains, more frequent trains, and shortened travel 
times between Portland and Eugene (a distance of approximately 125 
miles).
    Environmental Review Process: FRA and ODOT will use a tiered 
process, as provided for in 40 CFR 1508.28, in the completion of the 
environmental review of the Project. ``Tiering'' is a staged 
environmental review process applied to environmental reviews for 
complex projects. The Tier 1 EIS will address broad corridor-level 
issues and alternatives. Subsequent phases or tiers will analyze, at a 
greater level of detail, narrower site-specific proposals based on the 
decisions made in Tier 1. The Tier 1 EIS and any subsequent 
environmental documents will be developed in accordance with Council on 
Environmental Quality (CEQ) regulations (40 CFR part 1500 et seq.) 
implementing NEPA, and FRA's Procedures for Considering Environmental 
Impacts (64 FR 28545; May 26, 1999).
    Tier 1: The Tier 1 assessment will result in an EIS with the 
appropriate level of detail for corridor-level decisions and will 
address broad overall issues of concern, including but not limited to:
     Confirm the purpose and need for the proposed action.
     Confirm the study area appropriate to assess reasonable 
alternatives.
     Identify a comprehensive set of goals and objectives for 
the corridor in conjunction with Project stakeholders. These goals and 
objectives will be crafted to allow comprehensive evaluation of all 
aspects of the Project necessary to achieve the goals, including train 
operations, vehicles, and infrastructure.
     Identify the range of reasonable alternatives to be 
considered, consistent with the current and planned use of the corridor 
and the existing services within and adjacent to the study area, as 
well as considering a no action/no build alternative.
     Develop alternative evaluation criteria to identify 
alternatives that meet the purpose and need of the proposed action and 
those that do not.
     Identify the general alignment(s) of the reasonable build 
alternatives.
     Identify general right-of-way requirements for the 
reasonable build alternatives.
     Identify, at a corridor planning level, the infrastructure 
and equipment investment requirements for the reasonable build 
alternatives.
     Include the consideration of the No-Build Alternative 
which will be studied as the baseline for comparison with the build 
alternatives. The No-Build Alternative represents other transportation 
modes such as auto, air travel, intercity bus, and existing rail and 
the physical characteristics and capacities as they exist at the time 
of the Tier 1 EIS, with planned and funded improvements that will be in 
place at the time the Project becomes operational.
     Evaluate and describe, at a corridor planning level, the 
potential environmental consequences (benefits and impacts to the built 
and natural environment) associated with the reasonable alternative 
alignments and proposed changes in passenger rail train frequency, 
speed, and on-time performance.
     Establish the timing and sequencing of independent actions 
to maintain a state of good repair and to implement the proposed 
action.
     Identify a preferred alternative for corridor route 
alignment.
     Address subsequent component actions for Tier 2 NEPA 
documentation as described below.
    Tier 2: The second tier assessment(s) will address component 
projects to be implemented within the general corridor identified in 
the Tier 1 EIS, and will incorporate by reference the data and 
evaluations included in the Tier 1 EIS. Subsequent evaluations will 
concentrate on the issues specific to the component of the selected 
alternative identified in the Tier 1 EIS, identify the Project 
alternatives that meet the purpose and need for each component project, 
and analyze the specific environmental consequences and measures 
necessary to mitigate environmental impacts at a site-specific level of 
detail.
    Scoping and Public Involvement: FRA encourages broad participation 
in the EIS process during scoping and subsequent review of the 
resulting environmental documents. Comments and suggestions are invited 
from all interested agencies and the public at large to ensure the full 
range of issues related to the proposed action and all reasonable 
alternatives are addressed and all significant issues are identified. 
In particular, FRA is interested in determining whether there are areas 
of environmental concern where there might be the potential for 
significant impacts identifiable at a corridor level. Letters 
describing the proposed Project and soliciting comments were sent to 
appropriate Federal, State, and local agencies, and appropriate 
railroads. Public agencies with jurisdiction are requested to advise 
the FRA and ODOT of the applicable permit and environmental review 
requirements of each agency, and the scope and content of the 
environmental information that is germane to the agency's statutory 
responsibilities in connection with the proposed improvements.
    An iterative public involvement/information program will support 
the process. The program will involve advisory group meetings, 
newsletters, a Project Web site, public open houses, stakeholder group 
meetings, and other methods to solicit and incorporate public input 
throughout the Tier 1 EIS process. To ensure that the full range of 
issues relating to the proposed action is addressed, comments and 
suggestions are invited from all interested parties. Comments and 
questions concerning the proposed action should be directed to ODOT or 
to the FRA at the addresses provided above. Additional information can 
be obtained by visiting the Project Web site at 
www.oregonpassengerrail.org org or sending an email to 
OregonPassengerRail@odot.state.or.us.

[[Page 49856]]

    The buildings used for the scoping meetings are accessible to 
persons with disabilities. Any individual who requires special 
assistance, such as a sign language interpreter, to participate in the 
meetings should contact Jyll Smith at Oregon Department of 
Transportation, telephone (503) 986-3985, five days prior to the 
meeting.

    Issued in Washington, DC on August 13, 2012.
Corey Hill,
Director, Rail Project Development and Delivery.
[FR Doc. 2012-20227 Filed 8-16-12; 8:45 am]
BILLING CODE 4910-06-P