Topaz Solar Farms LLC; High Plains Ranch II, LLC; Bethel Wind Energy LLC; Rippey Wind Energy LLC; Pacific Wind, LLC; Colorado Highlands Wind, LLC; Shooting Star Wind Project, LLC; Notice of Effectiveness of Exempt Wholesale Generator or Foreign Utility Company Status, 48138 [2012-19780]
Download as PDF
48138
Federal Register / Vol. 77, No. 156 / Monday, August 13, 2012 / Notices
mstockstill on DSK4VPTVN1PROD with NOTICES
Take notice that on August 6, 2012,
OREG 1, Inc., OREG 2, Inc., OREG 3,
Inc., and OREG 4, Inc. submitted a
supplement to the compliance refund
reports filed on March 19, 2012,
pursuant to the Federal Energy
Regulatory Commission’s (Commission)
Orders issued in this proceeding on May
19, 2011, 135 FERC ¶ 61,150 (2011), and
February 16, 2012, 138 FERC ¶ 61,110
(2012).
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. Anyone filing a motion
to intervene or protest must serve a copy
of that document on the Applicant and
all the parties in this proceeding.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5:00 p.m. Eastern
Time on August 27, 2012.
Dated: August 7, 2012.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2012–19757 Filed 8–10–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket Nos. EG12–63–000; EG12–64–000;
EG12–65–000; EG12–66–000; EG12–67–000;
EG12–68–000; EG12–69–000]
Topaz Solar Farms LLC; High Plains
Ranch II, LLC; Bethel Wind Energy
LLC; Rippey Wind Energy LLC; Pacific
Wind, LLC; Colorado Highlands Wind,
LLC; Shooting Star Wind Project, LLC;
Notice of Effectiveness of Exempt
Wholesale Generator or Foreign Utility
Company Status
Take notice that during the month of
May 2012, the status of the abovecaptioned entities as Exempt Wholesale
Generators became effective by
operation of the Commission’s
regulations. 18 CFR 366.7(a).
Dated: August 6, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012–19780 Filed 8–10–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Jordan Cove Energy Project LP—Docket
No. PF12–7–000: Pacific Connector Gas
Pipeline LP—Docket No. PF12–17–000]
Notice of Intent To Prepare an
Environmental Impact Statement for
the Planned Jordan Cove Liquefaction
and Pacific Connector Pipeline
Projects, Request for Comments on
Environmental Issues, and Notice of
Public Scoping Meetings
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission), in cooperation with other
federal agencies, will prepare an
environmental impact statement (EIS)
that will discuss the environmental
Monday, August 27, 2012, 6:30 p.m.
Southwestern Oregon Community College, Hales Performing Arts Center, 1988 Newmark Ave., Coos Bay, OR 97420, 541–888–2525
impacts of Jordan Cove Energy Project
LP’s (Jordan Cove) proposed
liquefaction project in Coos County,
Oregon, and Pacific Connector Gas
Pipeline LP’s (Pacific Connector)
proposed pipeline project crossing
portions of Klamath, Jackson, Douglas,
and Coos Counties, Oregon. The FERC
is the lead federal agency in the
preparation of an EIS to satisfy the
requirements of the National
Environmental Policy Act (NEPA). The
United States (U.S.) Army Corps of
Engineers (COE), U.S. Department of
Energy Office of Fossil Energy (DOE),
U.S. Department of Agriculture Forest
Service (Forest Service), and the U.S.
Department of the Interior Bureau of
Land Management (BLM), Bureau of
Reclamation (Reclamation), and Fish
and Wildlife Service are cooperating
agencies assisting the FERC in
preparation of the EIS.
The Commission will use this EIS in
its decision-making process, to
determine whether the Jordan Cove
liquefied natural gas (LNG) terminal is
in the public interest, and whether the
Pacific Connector pipeline is in the
public convenience and necessity, in
accordance with the Natural Gas Act
(NGA). The BLM and Forest Service
propose to adopt the FERC EIS in
accordance with Title 40 Code of
Federal Regulations (CFR) 1506.3 to
support decisions and findings that
must be made by each agency with
respect to the Pacific Connector pipeline
project.
This notice announces the opening of
the scoping process the Commission,
Forest Service, BLM, and Reclamation
will use to gather input from the public
and interested agencies on the planned
projects. Your input will help the
Commission staff determine what issues
should be evaluated in the EIS. Please
note that the scoping period will close
on September 4, 2012.
You may submit comments in written
form or verbally. Further details on how
to submit written comments are in the
Public Participation section of this
notice. In lieu of or in addition to
sending in written comments, the
Commission invites you to make verbal
comments 1 at the public scoping
meetings scheduled as follows:
Tuesday, August 28, 2012, 6:30 p.m.
Umpqua Community College, Campus Center Dining Room, 1140
Umpqua College Rd., Roseburg, OR 97470, 541–440–4600
1 Verbal comments at the public scoping meetings
will be transcribed by a court reporter and placed
into the public record for these proceedings.
VerDate Mar<15>2010
16:29 Aug 10, 2012
Jkt 226001
PO 00000
Frm 00016
Fmt 4703
Sfmt 4703
E:\FR\FM\13AUN1.SGM
13AUN1
Agencies
[Federal Register Volume 77, Number 156 (Monday, August 13, 2012)]
[Notices]
[Page 48138]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-19780]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket Nos. EG12-63-000; EG12-64-000; EG12-65-000; EG12-66-000; EG12-
67-000; EG12-68-000; EG12-69-000]
Topaz Solar Farms LLC; High Plains Ranch II, LLC; Bethel Wind
Energy LLC; Rippey Wind Energy LLC; Pacific Wind, LLC; Colorado
Highlands Wind, LLC; Shooting Star Wind Project, LLC; Notice of
Effectiveness of Exempt Wholesale Generator or Foreign Utility Company
Status
Take notice that during the month of May 2012, the status of the
above-captioned entities as Exempt Wholesale Generators became
effective by operation of the Commission's regulations. 18 CFR
366.7(a).
Dated: August 6, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012-19780 Filed 8-10-12; 8:45 am]
BILLING CODE 6717-01-P