Topaz Solar Farms LLC; High Plains Ranch II, LLC; Bethel Wind Energy LLC; Rippey Wind Energy LLC; Pacific Wind, LLC; Colorado Highlands Wind, LLC; Shooting Star Wind Project, LLC; Notice of Effectiveness of Exempt Wholesale Generator or Foreign Utility Company Status, 48138 [2012-19780]

Download as PDF 48138 Federal Register / Vol. 77, No. 156 / Monday, August 13, 2012 / Notices mstockstill on DSK4VPTVN1PROD with NOTICES Take notice that on August 6, 2012, OREG 1, Inc., OREG 2, Inc., OREG 3, Inc., and OREG 4, Inc. submitted a supplement to the compliance refund reports filed on March 19, 2012, pursuant to the Federal Energy Regulatory Commission’s (Commission) Orders issued in this proceeding on May 19, 2011, 135 FERC ¶ 61,150 (2011), and February 16, 2012, 138 FERC ¶ 61,110 (2012). Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant and all the parties in this proceeding. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5:00 p.m. Eastern Time on August 27, 2012. Dated: August 7, 2012. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2012–19757 Filed 8–10–12; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket Nos. EG12–63–000; EG12–64–000; EG12–65–000; EG12–66–000; EG12–67–000; EG12–68–000; EG12–69–000] Topaz Solar Farms LLC; High Plains Ranch II, LLC; Bethel Wind Energy LLC; Rippey Wind Energy LLC; Pacific Wind, LLC; Colorado Highlands Wind, LLC; Shooting Star Wind Project, LLC; Notice of Effectiveness of Exempt Wholesale Generator or Foreign Utility Company Status Take notice that during the month of May 2012, the status of the abovecaptioned entities as Exempt Wholesale Generators became effective by operation of the Commission’s regulations. 18 CFR 366.7(a). Dated: August 6, 2012. Kimberly D. Bose, Secretary. [FR Doc. 2012–19780 Filed 8–10–12; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Jordan Cove Energy Project LP—Docket No. PF12–7–000: Pacific Connector Gas Pipeline LP—Docket No. PF12–17–000] Notice of Intent To Prepare an Environmental Impact Statement for the Planned Jordan Cove Liquefaction and Pacific Connector Pipeline Projects, Request for Comments on Environmental Issues, and Notice of Public Scoping Meetings The staff of the Federal Energy Regulatory Commission (FERC or Commission), in cooperation with other federal agencies, will prepare an environmental impact statement (EIS) that will discuss the environmental Monday, August 27, 2012, 6:30 p.m. Southwestern Oregon Community College, Hales Performing Arts Center, 1988 Newmark Ave., Coos Bay, OR 97420, 541–888–2525 impacts of Jordan Cove Energy Project LP’s (Jordan Cove) proposed liquefaction project in Coos County, Oregon, and Pacific Connector Gas Pipeline LP’s (Pacific Connector) proposed pipeline project crossing portions of Klamath, Jackson, Douglas, and Coos Counties, Oregon. The FERC is the lead federal agency in the preparation of an EIS to satisfy the requirements of the National Environmental Policy Act (NEPA). The United States (U.S.) Army Corps of Engineers (COE), U.S. Department of Energy Office of Fossil Energy (DOE), U.S. Department of Agriculture Forest Service (Forest Service), and the U.S. Department of the Interior Bureau of Land Management (BLM), Bureau of Reclamation (Reclamation), and Fish and Wildlife Service are cooperating agencies assisting the FERC in preparation of the EIS. The Commission will use this EIS in its decision-making process, to determine whether the Jordan Cove liquefied natural gas (LNG) terminal is in the public interest, and whether the Pacific Connector pipeline is in the public convenience and necessity, in accordance with the Natural Gas Act (NGA). The BLM and Forest Service propose to adopt the FERC EIS in accordance with Title 40 Code of Federal Regulations (CFR) 1506.3 to support decisions and findings that must be made by each agency with respect to the Pacific Connector pipeline project. This notice announces the opening of the scoping process the Commission, Forest Service, BLM, and Reclamation will use to gather input from the public and interested agencies on the planned projects. Your input will help the Commission staff determine what issues should be evaluated in the EIS. Please note that the scoping period will close on September 4, 2012. You may submit comments in written form or verbally. Further details on how to submit written comments are in the Public Participation section of this notice. In lieu of or in addition to sending in written comments, the Commission invites you to make verbal comments 1 at the public scoping meetings scheduled as follows: Tuesday, August 28, 2012, 6:30 p.m. Umpqua Community College, Campus Center Dining Room, 1140 Umpqua College Rd., Roseburg, OR 97470, 541–440–4600 1 Verbal comments at the public scoping meetings will be transcribed by a court reporter and placed into the public record for these proceedings. VerDate Mar<15>2010 16:29 Aug 10, 2012 Jkt 226001 PO 00000 Frm 00016 Fmt 4703 Sfmt 4703 E:\FR\FM\13AUN1.SGM 13AUN1

Agencies

[Federal Register Volume 77, Number 156 (Monday, August 13, 2012)]
[Notices]
[Page 48138]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-19780]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket Nos. EG12-63-000; EG12-64-000; EG12-65-000; EG12-66-000; EG12-
67-000; EG12-68-000; EG12-69-000]


Topaz Solar Farms LLC; High Plains Ranch II, LLC; Bethel Wind 
Energy LLC; Rippey Wind Energy LLC; Pacific Wind, LLC; Colorado 
Highlands Wind, LLC; Shooting Star Wind Project, LLC; Notice of 
Effectiveness of Exempt Wholesale Generator or Foreign Utility Company 
Status

    Take notice that during the month of May 2012, the status of the 
above-captioned entities as Exempt Wholesale Generators became 
effective by operation of the Commission's regulations. 18 CFR 
366.7(a).

    Dated: August 6, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012-19780 Filed 8-10-12; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.