Eagle Mountain Pumped Storage Hydroelectric Project; Eagle Crest Energy; Notice of Meeting Postponement, 47628 [2012-19507]
Download as PDF
47628
Federal Register / Vol. 77, No. 154 / Thursday, August 9, 2012 / Notices
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Dated: August 3, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012–19511 Filed 8–8–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER12–2388–000]
tkelley on DSK3SPTVN1PROD with NOTICES
BFES Inc.; Supplemental Notice That
Initial Market-Based Rate Filing
Includes Request for Blanket Section
204 Authorization
This is a supplemental notice in the
above-referenced proceeding, of BFES
Inc.’s application for market-based rate
authority, with an accompanying rate
schedule, noting that such application
includes a request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability is August 24,
2012.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 14 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First St. NE., Washington, DC
20426.
The filings in the above-referenced
proceeding(s) are accessible in the
Commission’s eLibrary system by
VerDate Mar<15>2010
16:38 Aug 08, 2012
Jkt 226001
clicking on the appropriate link in the
above list. They are also available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an eSubscription link on the
Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Dated: August 3, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012–19512 Filed 8–8–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[P–13123–002–CA]
Eagle Mountain Pumped Storage
Hydroelectric Project; Eagle Crest
Energy; Notice of Meeting
Postponement
On July 17, 2012, the Commission
issued a ‘‘NOTICE OF MEETING WITH
THE BUREAU OF LAND
MANAGEMENT’’. That meeting was
scheduled to occur on Wednesday,
August 15, 2012, at 9 a.m. (Pacific
Time), and on Thursday, August 16,
2012, at 9 a.m. (if needed). The purpose
of the meeting is to provide Commission
staff and the staff of the Bureau of Land
Management an opportunity to improve
agency coordination and discuss the
agencies’ overlapping jurisdictions
(pursuant to the Federal Land Policy
and Management Act and the Federal
Power Act), on the Eagle Mountain
Pumped Storage Hydroelectric Project.
However, the meeting has been
postponed.
Notice of the date, time, and location
of the meeting will be provided in a
future notice upon the meeting’s
rescheduling. Any questions regarding
this notice should be directed to
Kenneth Hogan at: (202) 502–8434, or
via email at: Kenneth.Hogan@ferc.gov.
Dated: August 3, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012–19507 Filed 8–8–12; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00040
Fmt 4703
Sfmt 4703
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14432–001]
Archon Energy 1, Inc.; Notice of
Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
On July 18, 2012, Archon Energy 1,
Inc. (Archon or applicant), filed an
application for a preliminary permit,
pursuant to section 4(f) of the Federal
Power Act (FPA), proposing to study the
feasibility of the DaGuerre Point Dam
Hydropower Project (DaGuerre Point
Dam Project or project) to be located at
the U.S. Army Corps of Engineers’
(USACE) DaGuerre Point Dam, on the
Yuba River, near the City of Marysville,
Yuba County, California. The sole
purpose of a preliminary permit, if
issued, is to grant the permit holder
priority to file a license application
during the permit term. A preliminary
permit does not authorize the permit
holder to perform any land-disturbing
activities or otherwise enter upon lands
or waters owned by others without the
owners’ express permission.
The proposed project would consist of
the following: (1) A diversion structure
and intake canal; (2) a powerhouse
containing eight 375 kW Archimedean
screw turbine/generating units with a
total capacity of 3 megawatts; (3) a
tailrace channel; and (4) a 3,500-footlong, 12-kilovolt (kV) transmission line.
The proposed project would have an
average annual generation of 21,000
megawatt-hours.
Applicant Contact: Mr. Paul Grist,
Archon Energy 1, Inc., 101 E. Kennedy
Blvd., Suite 2800, Tampa, Florida
33602. (403) 618–2018.
FERC Contact: Kenneth Hogan,
Kenneth.hogan@ferc.gov, (202) 502–
8434.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36. Comments, motions to
intervene, notices of intent, and
competing applications may be filed
electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
E:\FR\FM\09AUN1.SGM
09AUN1
Agencies
[Federal Register Volume 77, Number 154 (Thursday, August 9, 2012)]
[Notices]
[Page 47628]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-19507]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[P-13123-002-CA]
Eagle Mountain Pumped Storage Hydroelectric Project; Eagle Crest
Energy; Notice of Meeting Postponement
On July 17, 2012, the Commission issued a ``NOTICE OF MEETING WITH
THE BUREAU OF LAND MANAGEMENT''. That meeting was scheduled to occur on
Wednesday, August 15, 2012, at 9 a.m. (Pacific Time), and on Thursday,
August 16, 2012, at 9 a.m. (if needed). The purpose of the meeting is
to provide Commission staff and the staff of the Bureau of Land
Management an opportunity to improve agency coordination and discuss
the agencies' overlapping jurisdictions (pursuant to the Federal Land
Policy and Management Act and the Federal Power Act), on the Eagle
Mountain Pumped Storage Hydroelectric Project. However, the meeting has
been postponed.
Notice of the date, time, and location of the meeting will be
provided in a future notice upon the meeting's rescheduling. Any
questions regarding this notice should be directed to Kenneth Hogan at:
(202) 502-8434, or via email at: Kenneth.Hogan@ferc.gov.
Dated: August 3, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012-19507 Filed 8-8-12; 8:45 am]
BILLING CODE 6717-01-P