Drawbridge Operation Regulations; Cheesequake Creek, South Amboy, NJ, 47525 [2012-19486]
Download as PDF
Federal Register / Vol. 77, No. 154 / Thursday, August 9, 2012 / Rules and Regulations
Notice of temporary deviation
from regulations.
ACTION:
The Commander, First Coast
Guard District, has issued a temporary
deviation from the regulation governing
the operation of the Route 35 Bridge
across Cheesequake Creek, mile 0.0, at
Morgan, South Amboy, New Jersey. The
deviation allows the bridge to remain in
the closed position for an hour and a
half to facilitate a public event, the
Rolling Thunder Freedom Ride.
SUMMARY:
This deviation is effective from
12 p.m. through 1:30 p.m. on September
16, 2012.
DATES:
Documents mentioned in
this preamble as being available in the
docket are part of docket USCG–2012–
0724 and are available online at www.
regulations.gov, inserting USCG–2012–
0724 in the ‘‘Keyword’’ and then
clicking ‘‘Search’’. They are also
available for inspection or copying at
the Docket Management Facility (M–30),
U.S. Department of Transportation,
West Building Ground Floor, Room
W12–140, 1200 New Jersey Avenue SE.,
Washington, DC, 20590, between 9 a.m.
and 5 p.m., Monday through Friday,
except Federal holidays.
ADDRESSES:
The Route
35 Bridge, across the Cheesequake Creek
at mile 0.0, at Morgan, South Amboy,
New Jersey, has a vertical clearance in
the closed position of 25 feet at mean
high water and 30 feet at mean low
water. The drawbridge operation
regulations are listed at 33 CFR 117.709.
The Coast Guard received a request
from the owner of the bridge, New
Jersey Department of Transportation, to
allow the bridge to remain in the closed
position for an hour and a half, 12 p.m.
through 1:30 p.m., on September 16,
2012, to facilitate the Rolling Thunder
Freedom Ride, public event.
Vessels that can pass under the draw
in the closed position may do so at all
times. There are no alternate routes
available for vessel traffic. The bridge
can be opened in the event of an
emergency.
Under this temporary deviation the
Route 35 Bridge may remain in the
closed position between 12 p.m. and
1:30 p.m. on September 16, 2012.
In accordance with 33 CFR 117.35(e),
the bridge must return to its regular
operating schedule immediately at the
end of the designated time period. This
deviation from the operating regulations
is authorized under 33 CFR 117.35.
mstockstill on DSK4VPTVN1PROD with RULES
SUPPLEMENTARY INFORMATION:
VerDate Mar<15>2010
15:53 Aug 08, 2012
Jkt 226001
Dated: July 31, 2012.
Gary Kassof,
Bridge Program Manager, First Coast Guard
District.
[FR Doc. 2012–19481 Filed 8–8–12; 8:45 am]
BILLING CODE 9110–04–P
DEPARTMENT OF HOMELAND
SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG–2012–0684]
Drawbridge Operation Regulations;
Cheesequake Creek, South Amboy, NJ
Coast Guard, DHS.
Notice of temporary deviation
from regulations.
AGENCY:
ACTION:
The Commander, First Coast
Guard District, has issued a temporary
deviation from the regulation governing
the operation of the Route 35 Bridge
across Cheesequake Creek, mile 0.0, at
South Amboy, New Jersey. The
deviation allows the bridge to remain in
the closed position from December
through March to facilitate bridge
rehabilitation construction.
DATES: This deviation is effective from
December 1, 2012 through March 31,
2013.
SUMMARY:
Documents mentioned in
this preamble as being available in the
docket are part of docket USCG–2012–
0684 and are available online at
www.regulations.gov, inserting USCG–
2012–0684 in the ‘‘Keyword’’ and then
clicking ‘‘Search’’. They are also
available for inspection or copying at
the Docket Management Facility (M–30),
U.S. Department of Transportation,
West Building Ground Floor, Room
W12–140, 1200 New Jersey Avenue SE.,
Washington, DC 20590, between 9 a.m.
and 5 p.m., Monday through Friday,
except Federal holidays.
SUPPLEMENTARY INFORMATION: The Route
35 Bridge, across the Cheesequake Creek
at mile 0.0, at Morgan, South Amboy,
New Jersey, has a vertical clearance in
the closed position of 25 feet at mean
high water and 30 feet at mean low
water. The drawbridge operation
regulations are listed at 33 CFR 117.709.
The Coast Guard published a previous
temporary deviation (76 FR 35349) in
the Federal Register that allowed the
bridge to remain closed from December
1, 2011 through March 31, 2012, to
facilitate phase one of a bridge
rehabilitation project at the Route 35
Bridge. The first temporary deviation
achieved successful results and no
ADDRESSES:
PO 00000
Frm 00015
Fmt 4700
Sfmt 4700
47525
problems or complaints were received
from the mariners that normally transit
Cheesequake Creek.
On June 20, 2012, the owner of the
bridge, the New Jersey Department of
Transportation, requested a second
temporary deviation to facilitate
completion of phase two of the bridge
rehabilitation construction at the bridge.
The Coast Guard published an article
in the Local Notice to Mariners on June
28, 2012, concerning the phase two
bridge closure, with a request for public
comment due on or before July 16, 2012.
No comments were received.
Under this second temporary
deviation the Route 35 Bridge may
remain in the closed position from
December 1, 2012 through March 31,
2013. Vessels that can pass under the
draw in the closed position may do so
at all times.
In accordance with 33 CFR 117.35(e),
the bridge must return to its regular
operating schedule immediately at the
end of the designated time period. This
deviation from the operating regulations
is authorized under 33 CFR 117.35.
Dated: July 31, 2012.
Gary Kassof,
Bridge Program Manager, First Coast Guard
District.
[FR Doc. 2012–19486 Filed 8–8–12; 8:45 am]
BILLING CODE 9110–04–P
DEPARTMENT OF HOMELAND
SECURITY
Coast Guard
33 CFR Part 165
[Docket Number USCG–2012–0662]
RIN 1625–AA00
Safety Zone, Mississippi River, Mile
Marker 291 to 295
Coast Guard, DHS.
Temporary final rule.
AGENCY:
ACTION:
The Coast Guard is
establishing a temporary safety zone for
all waters of the Lower Mississippi
River, extending the entire width of the
river from Mile Marker (MM) 291.0 to
MM 295.0. This safety zone is needed to
protect vessel traffic from the safety
hazards associated with dredging
operations being conducted in the area
by the Army Corps of Engineers. When
vessels are allowed by the Captain of the
Port (COTP), entry into this zone is
restricted to one way traffic unless
authorized by the (COTP) New Orleans
or a designated representative. Any full
closures will be announced via
Broadcast Notice to Mariners.
SUMMARY:
E:\FR\FM\09AUR1.SGM
09AUR1
Agencies
[Federal Register Volume 77, Number 154 (Thursday, August 9, 2012)]
[Rules and Regulations]
[Page 47525]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-19486]
-----------------------------------------------------------------------
DEPARTMENT OF HOMELAND SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG-2012-0684]
Drawbridge Operation Regulations; Cheesequake Creek, South Amboy,
NJ
AGENCY: Coast Guard, DHS.
ACTION: Notice of temporary deviation from regulations.
-----------------------------------------------------------------------
SUMMARY: The Commander, First Coast Guard District, has issued a
temporary deviation from the regulation governing the operation of the
Route 35 Bridge across Cheesequake Creek, mile 0.0, at South Amboy, New
Jersey. The deviation allows the bridge to remain in the closed
position from December through March to facilitate bridge
rehabilitation construction.
DATES: This deviation is effective from December 1, 2012 through March
31, 2013.
ADDRESSES: Documents mentioned in this preamble as being available in
the docket are part of docket USCG-2012-0684 and are available online
at www.regulations.gov, inserting USCG-2012-0684 in the ``Keyword'' and
then clicking ``Search''. They are also available for inspection or
copying at the Docket Management Facility (M-30), U.S. Department of
Transportation, West Building Ground Floor, Room W12-140, 1200 New
Jersey Avenue SE., Washington, DC 20590, between 9 a.m. and 5 p.m.,
Monday through Friday, except Federal holidays.
SUPPLEMENTARY INFORMATION: The Route 35 Bridge, across the Cheesequake
Creek at mile 0.0, at Morgan, South Amboy, New Jersey, has a vertical
clearance in the closed position of 25 feet at mean high water and 30
feet at mean low water. The drawbridge operation regulations are listed
at 33 CFR 117.709.
The Coast Guard published a previous temporary deviation (76 FR
35349) in the Federal Register that allowed the bridge to remain closed
from December 1, 2011 through March 31, 2012, to facilitate phase one
of a bridge rehabilitation project at the Route 35 Bridge. The first
temporary deviation achieved successful results and no problems or
complaints were received from the mariners that normally transit
Cheesequake Creek.
On June 20, 2012, the owner of the bridge, the New Jersey
Department of Transportation, requested a second temporary deviation to
facilitate completion of phase two of the bridge rehabilitation
construction at the bridge.
The Coast Guard published an article in the Local Notice to
Mariners on June 28, 2012, concerning the phase two bridge closure,
with a request for public comment due on or before July 16, 2012. No
comments were received.
Under this second temporary deviation the Route 35 Bridge may
remain in the closed position from December 1, 2012 through March 31,
2013. Vessels that can pass under the draw in the closed position may
do so at all times.
In accordance with 33 CFR 117.35(e), the bridge must return to its
regular operating schedule immediately at the end of the designated
time period. This deviation from the operating regulations is
authorized under 33 CFR 117.35.
Dated: July 31, 2012.
Gary Kassof,
Bridge Program Manager, First Coast Guard District.
[FR Doc. 2012-19486 Filed 8-8-12; 8:45 am]
BILLING CODE 9110-04-P