Enbridge Pipelines (North Texas) L.P.; Notice of Compliance Filing, 44610 [2012-18501]
Download as PDF
44610
Federal Register / Vol. 77, No. 146 / Monday, July 30, 2012 / Notices
Dated: July 23, 2012.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[FR Doc. 2012–18501 Filed 7–27–12; 8:45 am]
BILLING CODE 6717–01–P
[Docket No. PR12–31–000]
mstockstill on DSK4VPTVN1PROD with NOTICES
Enbridge Pipelines (North Texas) L.P.;
Notice of Compliance Filing
Take notice that on July 13, 2012,
Enbridge Pipelines (North Texas) L.P.
filed a revised Statement of Operating
Conditions to comply with a
Commission order issued in Docket No.
PR09–26–000 on June 13, 2012, (139
FERC ¶ 61,216) as more fully detailed
in the filing.
Any person desiring to participate in
this rate proceeding must file a motion
to intervene or to protest this filing must
file in accordance with Rules 211 and
214 of the Commission’s Rules of
Practice and Procedure (18 CFR 385.211
and 385.214). Protests will be
considered by the Commission in
determining the appropriate action to be
taken, but will not serve to make
protestants parties to the proceeding.
Any person wishing to become a party
must file a notice of intervention or
motion to intervene, as appropriate.
Such notices, motions, or protests must
be filed on or before the date as
indicated below. Anyone filing an
intervention or protest must serve a
copy of that document on the Applicant.
Anyone filing an intervention or protest
on or before the intervention or protest
date need not serve motions to intervene
or protests on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 7 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5:00 p.m. Eastern
Time on Monday, July 30, 2012.
VerDate Mar<15>2010
19:33 Jul 27, 2012
Jkt 226001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2662–012–CT; Project No.
12968–001–CT]
Notice of Availability of Draft
Environmental Assessment
FirstLight Hydro Generating Company,
Project No. 2662–012–CT.
City of Norwich Dept. of Public Utilities,
Project No. 12968–001–CT.
In accordance with the National
Environmental Policy Act of 1969 and
the Federal Energy Regulatory
Commission (Commission) regulations,
18 CFR part 380 (Order No. 486, 52 FR
47897), the Office of Energy Projects has
reviewed competing applications for a
new license for the Scotland
Hydroelectric Project (Commission
Project Nos. 2662–012 and 12968–001).
The Scotland Hydroelectric Project is
located on the Shetucket River, in
Windham County, Connecticut. The
existing licensee for the Scotland
Hydroelectric Project No. 2662 is
FirstLight Hydro Generating Company
(FirstLight). The competitor applicant
for the Scotland Hydroelectric Project
No. 12968 is the City of Norwich
Department of Public Utilities (Norwich
Public Utilities).
Staff prepared a draft environmental
assessment (EA), which analyzes the
potential environmental effects of
licensing the project with either
FirstLight’s or Norwich Public Utilities’
proposals, and concludes that licensing
the project with either proposal, with
appropriate environmental protection
measures, would not constitute a major
federal action that would significantly
affect the quality of the human
environment.
A copy of the draft EA is available for
review at the Commission in the Public
Reference Room or may be viewed on
the Commission’s Web site at
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number for either
project, excluding the last three digits,
in the docket number field to access the
document. For assistance, contact
Commission Online Support at
CommissionOnlineSupport@ferc.gov;
toll-free at 1–866–208–3676; or for TTY,
202–502–8659.
PO 00000
Frm 00032
Fmt 4703
Sfmt 4703
You may also register online at
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to these or other pending
projects. For assistance, contact
Commission Online Support.
Any comments should be filed within
30 days from the date of this notice.
Comments may be filed electronically
via the Internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site https://
www.ferc.gov/doc-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact Commission Online
Support. Although the Commission
strongly encourages electronic filing,
documents may also be paper-filed. To
paper-file, mail an original and seven
copies to: Kimberly D. Bose, Secretary,
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426. Please affix Scotland
Hydroelectric Project, P–2662–012 and
P–12968–001 to all comments.
For further information, contact Janet
Hutzel at (202) 502–8675 or by email at
janet.hutzel@ferc.gov.
Dated: July 20, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012–18438 Filed 7–27–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. RC08–5–003]
Notice of Filing; North American
Electric Reliability Corporation
Take notice that on July 18, 2012,
North American Electric Reliability
Corporation (NERC) submitted a filing
to comply with the Commission’s
directive in its April 19, 2012 Order to
show cause why the Ohio Valley
Electric Corporation (OVEC) should not
be registered as a load-serving entity, if
NERC did not register OVEC through its
compliance registration process. U.S.
Department of Energy, Portsmouth/
E:\FR\FM\30JYN1.SGM
30JYN1
Agencies
[Federal Register Volume 77, Number 146 (Monday, July 30, 2012)]
[Notices]
[Page 44610]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-18501]
[[Page 44610]]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. PR12-31-000]
Enbridge Pipelines (North Texas) L.P.; Notice of Compliance
Filing
Take notice that on July 13, 2012, Enbridge Pipelines (North Texas)
L.P. filed a revised Statement of Operating Conditions to comply with a
Commission order issued in Docket No. PR09-26-000 on June 13, 2012,
(139 FERC ] 61,216) as more fully detailed in the filing.
Any person desiring to participate in this rate proceeding must
file a motion to intervene or to protest this filing must file in
accordance with Rules 211 and 214 of the Commission's Rules of Practice
and Procedure (18 CFR 385.211 and 385.214). Protests will be considered
by the Commission in determining the appropriate action to be taken,
but will not serve to make protestants parties to the proceeding. Any
person wishing to become a party must file a notice of intervention or
motion to intervene, as appropriate. Such notices, motions, or protests
must be filed on or before the date as indicated below. Anyone filing
an intervention or protest must serve a copy of that document on the
Applicant. Anyone filing an intervention or protest on or before the
intervention or protest date need not serve motions to intervene or
protests on persons other than the Applicant.
The Commission encourages electronic submission of protests and
interventions in lieu of paper using the ``eFiling'' link at https://www.ferc.gov. Persons unable to file electronically should submit an
original and 7 copies of the protest or intervention to the Federal
Energy Regulatory Commission, 888 First Street NE., Washington, DC
20426.
This filing is accessible on-line at https://www.ferc.gov, using the
``eLibrary'' link and is available for review in the Commission's
Public Reference Room in Washington, DC. There is an ``eSubscription''
link on the web site that enables subscribers to receive email
notification when a document is added to a subscribed docket(s). For
assistance with any FERC Online service, please email
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For
TTY, call (202) 502-8659.
Comment Date: 5:00 p.m. Eastern Time on Monday, July 30, 2012.
Dated: July 23, 2012.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2012-18501 Filed 7-27-12; 8:45 am]
BILLING CODE 6717-01-P