Eagle Mountain Pumped Storage Hydroelectric Project, Eagle Crest Energy; Notice of Meeting With the Bureau of Land Management, 43280 [2012-17920]
Download as PDF
43280
Federal Register / Vol. 77, No. 142 / Tuesday, July 24, 2012 / Notices
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER10–2460–001;
ER10–2461–001; ER12–682–002; ER10–
2463–001; ER11–2201–005; ER12–1311–
001; ER10–2466–002; ER11–4029–001.
Applicants: Evergreen Wind Power,
LLC, Canandaigua Power Partners, LLC,
Evergreen Wind Power III, LLC, Stetson
Wind II, LLC, Vermont Wind, LLC,
Stetson Holdings, LLC, Erie Wind, LLC,
Canandaigua Power Partners II, LLC.
Description: Notice of Change in
Status of Canandaigua Power Partners,
LLC, et al.
Filed Date: 7/16/12.
Accession Number: 20120716–5158.
Comments Due: 5 p.m. ET 8/6/12.
Docket Numbers: ER11–4267–001;
ER11–4270–001; ER11–4269–001;
ER11–4268–001; ER11–113–001; ER10–
2682–001.
Applicants: Algonquin Northern
Maine Gen Co., Algonquin Tinker Gen
Co., Algonquin Energy Services Inc.,
Granite State Electric Company, Sandy
Ridge Wind, LLC, Algonquin Windsor
Locks LLC.
Description: Notice of Change in
Status of Algonquin Energy Services
Inc., et al.
Filed Date: 7/16/12.
Accession Number: 20120716–5149.
Comments Due: 5 p.m. ET 8/6/12.
Docket Numbers: ER12–2245–000.
Applicants: California Independent
System Operator Corporation.
Description: 2012–07–16 CAISO CRR
Enhancement and Clarification
Amendment to be effective 9/15/2012.
Filed Date: 7/16/12.
Accession Number: 20120716–5121.
Comments Due: 5 p.m. ET 8/6/12.
Docket Numbers: ER12–2246–000.
Applicants: New England Power
Company.
Description: Notice of Effective Date
of Service Agreement No. 6 to be
effective 7/3/2012.
Filed Date: 7/16/12.
Accession Number: 20120716–5128.
Comments Due: 5 p.m. ET 8/6/12.
Docket Numbers: ER12–2247–000.
Applicants: Midwest Independent
Transmission System Operator, Inc.
Description: SA 2430 TVA–IPL FCA
F098 7–16–2012 to be effective 7/17/
2012.
Filed Date: 7/16/12.
Accession Number: 20120716–5132.
Comments Due: 5 p.m. ET 8/6/12.
Docket Numbers: ER12–2248–000.
Applicants: Idaho Power Company.
Description: Idaho Power Company
submits tariff filing per 35.13(a)(2)(iii):
OATT 2012 Depreciation Update to be
effective 6/1/2012.
Filed Date: 7/16/12.
Accession Number: 20120716–5137.
Comments Due: 5 p.m. ET 8/6/12.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: July 17, 2012.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[P–13123–002–CA]
Eagle Mountain Pumped Storage
Hydroelectric Project, Eagle Crest
Energy; Notice of Meeting With the
Bureau of Land Management
a. Date and Time of Meeting:
Wednesday, August 15, 2012, at 9 a.m.
sroberts on DSK5SPTVN1PROD with NOTICES
August 6, 2012 ..............................
Northeast .........................................
August 20, 2012 ............................
Southeast ........................................
August 23, 2012 ............................
1 Coordination between Natural Gas and
Electricity Markets, Docket No. AD12–12–000 (July
5, 2012) (Notice of Technical Conferences) (https://
VerDate Mar<15>2010
21:06 Jul 23, 2012
Jkt 226001
Frm 00053
Fmt 4703
[FR Doc. 2012–17920 Filed 7–23–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Coordination Between Natural Gas and
Electricity Markets; Supplemental
Notice of Technical Conferences
On July 5, 2012, the Federal Energy
Regulatory Commission (Commission)
issued a notice scheduling a series of
regional technical conferences on the
issue of gas-electric coordination.1 This
supplemental notice contains additional
information regarding the time and
venue of each conference. The
conferences are free of charge and open
to the public. Commission members
may participate in the conferences.
The regional technical conferences
will be held on the following dates, at
the following venues:
St. Louis, MO, Hilton St. Louis at the Ballpark, 1 South Broadway, St.
Louis, MO, 63102, USA, Tel: 1–314–421–1776, 1–877–845–7354
(toll free).
Boston, MA, Hyatt Harborside at Boston’s Logan International Airport,
101 Harborside Drive, Boston, MA, 02128, USA, Tel: 1–617–568–
1234, 1–888–421–1442 (toll free).
Washington, DC, FERC HQ.
elibrary.ferc.gov/idmws/common/opennat.
asp?fileID=13023450); 77 FR 41184 (July 12, 2012)
PO 00000
Dated: July 17, 2012.
Kimberly D. Bose,
Secretary.
[ Docket No. AD12–12–000]
[FR Doc. 2012–18010 Filed 7–23–12; 8:45 am]
Central .............................................
(Pacific Time) and Thursday, August 16,
2012, at 9 a.m. (if needed).
b. Location: Hilton Palm Springs, 400
East Tahquitz Canyon Way, Palm
Springs, California 92262–6605,
Telephone: (760) 320–6868.
c. FERC Contact: Kenneth Hogan,
(202) 502–8434:
Kenneth.Hogan@ferc.gov.
d. Purpose of the Meeting:
Commission staff will meet with the
staff of the Bureau of Land Management
to improve agency coordination and
discuss the agencies’ overlapping
jurisdictions (pursuant to the Federal
Land Policy and Management Act and
the Federal Power Act), on the Eagle
Mountain Pumped Storage
Hydroelectric Project.
e. All local, state, and federal
agencies, tribes, and interested parties,
are hereby invited to observe the
meeting in person.
Sfmt 4703
(https://www.gpo.gov/fdsys/pkg/FR-2012-07-12/pdf/
2012-16997.pdf).
E:\FR\FM\24JYN1.SGM
24JYN1
Agencies
[Federal Register Volume 77, Number 142 (Tuesday, July 24, 2012)]
[Notices]
[Page 43280]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-17920]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[P-13123-002-CA]
Eagle Mountain Pumped Storage Hydroelectric Project, Eagle Crest
Energy; Notice of Meeting With the Bureau of Land Management
a. Date and Time of Meeting: Wednesday, August 15, 2012, at 9 a.m.
(Pacific Time) and Thursday, August 16, 2012, at 9 a.m. (if needed).
b. Location: Hilton Palm Springs, 400 East Tahquitz Canyon Way,
Palm Springs, California 92262-6605, Telephone: (760) 320-6868.
c. FERC Contact: Kenneth Hogan, (202) 502-8434:
Kenneth.Hogan@ferc.gov.
d. Purpose of the Meeting: Commission staff will meet with the
staff of the Bureau of Land Management to improve agency coordination
and discuss the agencies' overlapping jurisdictions (pursuant to the
Federal Land Policy and Management Act and the Federal Power Act), on
the Eagle Mountain Pumped Storage Hydroelectric Project.
e. All local, state, and federal agencies, tribes, and interested
parties, are hereby invited to observe the meeting in person.
Dated: July 17, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012-17920 Filed 7-23-12; 8:45 am]
BILLING CODE 6717-01-P