Federal Register / Vol. 77, No. 140 / Friday, July 20, 2012 / Notices
Order 1000 Tariff Draft Task Force
July 24, 2012
2:00 p.m.–6:00 p.m. CDT
July 25, 2012
9:30 a.m.–1 p.m. CDT
The above-referenced meetings will
be held at:
AEP Offices, 1201 Elm Street, 8th Floor,
Dallas, TX 75270.
The above-referenced meetings are
open to stakeholders.
Further information may be found at
www.spp.org.
The discussions at the meetings
described above may address matters at
issue in the following proceedings:
Docket No. ER09–35–001, Tallgrass
Transmission, LLC
Docket No. ER09–36–001, Prairie Wind
Transmission, LLC
Docket No. ER09–548–001, ITC Great
Plains, LLC
Docket No. ER11–4105–000, Southwest
Power Pool, Inc.
Docket No. EL11–34–001, Midwest
Independent Transmission System
Operator, Inc.
Docket No. ER12–1179–000, Southwest
Power Pool, Inc.
Docket No. ER12–1415–000, Southwest
Power Pool, Inc.
Docket No. ER12–1460–000, Southwest
Power Pool, Inc.
Docket No. ER12–1610–000, Southwest
Power Pool, Inc.
Docket No. ER12–1772–000, Southwest
Power Pool, Inc.
Docket No. ER12–2176–000, Southwest
Power Pool, Inc.
For more information, contact
Luciano Lima, Office of Energy Markets
Regulation, Federal Energy Regulatory
Commission at (202) 502–6210 or
luciano.lima@ferc.gov.
Dated: July 12, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012–17655 Filed 7–19–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[EG12–43–000, EG12–53–000, EG12–54–
000, et al.]
Notice of Effectiveness of Exempt
Wholesale Generator or Foreign Utility
Company Status
Docket Nos.
Sherbino I Wind Farm LLC ...............................................................................................................................................................
Eagle Point Power Generation LLC .................................................................................................................................................
Cimarron Windpower II, LLC ............................................................................................................................................................
Ironwood Windpower, LLC ...............................................................................................................................................................
NRG Solar Alpine LLC .....................................................................................................................................................................
Cayuga Operating Company, LLC ...................................................................................................................................................
Somerset Operating Company, LLC ................................................................................................................................................
Copper Mountain Solar 2, LLC .........................................................................................................................................................
Minok Wind, LLC ..............................................................................................................................................................................
Senate Wind, LLC ............................................................................................................................................................................
Canadian Hills Wind, LLC ................................................................................................................................................................
Moore Solar, Inc. ..............................................................................................................................................................................
Sombra Solar, Inc. ............................................................................................................................................................................
Take notice that during the month of
June 2012, the status of the abovecaptioned entities as Exempt Wholesale
Generators or Foreign Utility Companies
became effective by operation of the
Commission’s regulations. 18 CFR
366.7(a).
Dated: July 12, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012–17658 Filed 7–19–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
mstockstill on DSK4VPTVN1PROD with NOTICES
[Docket No. CP12–50–000]
Alliance Pipeline, L.P.; Notice of
Availability of the Environmental
Assessment for the Proposed Tioga
Lateral Project
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) has prepared an
environmental assessment (EA) for the
Tioga Lateral Project, proposed by
VerDate Mar<15>2010
18:18 Jul 19, 2012
Jkt 226001
Alliance Pipeline L.P. (Alliance) in the
above-referenced docket. Alliance
requests authorization to construct and
operate approximately 79.3 miles of
new 12-inch-diameter natural gas
pipeline lateral and appurtenant
facilities in Williams, Mountrail, Burke,
and Renville Counties, North Dakota.
The Tioga Lateral Project would be
designed and constructed to provide
about 106.5 million cubic feet per day
of new transportation capacity to the
Chicago market area.
The EA assesses the potential
environmental effects of the
construction and operation of the Tioga
Lateral Project in accordance with the
requirements of the National
Environmental Policy Act (NEPA). The
FERC staff concludes that approval of
the proposed project, with appropriate
mitigating measures, would not
constitute a major federal action
significantly affecting the quality of the
human environment.
The U.S. Fish and Wildlife Service
(FWS) and the U.S. Army Corps of
Engineers (COE) participated as
cooperating agencies in the preparation
of the EA. Cooperating agencies have
PO 00000
Frm 00028
Fmt 4703
Sfmt 4703
EG12–43–000
EG12–53–000
EG12–54–000
EG12–55–000
EG12–56–000
EG12–57–000
EG12–58–000
EG12–59–000
EG12–60–000
EG12–61–000
EG12–62–000
FC12–6–000
FC12–7–000
jurisdiction by law or special expertise
with respect to resources potentially
affected by the proposal and participate
in the NEPA analysis.
The proposed Tioga Lateral Project
includes the following facilities:
• Approximately 79.3 miles of 12inch-diameter natural gas pipeline
crossing portions of Williams,
Mountrail, Burke, Ward, and Renville
Counties, North Dakota;
• A 6,000 horsepower compressor
station (Tioga Compressor Station)
containing three natural gas-driven
engines/compressors in Williams
County;
• One meter station within the
proposed compressor station site in
Williams County;
• One pressure regulating station
adjacent to the existing Alliance
mainline in Renville County;
• One pig 1 launcher at the proposed
compressor station site and one pig
receiver at the pressure regulating
station site; and
• Five mainline block valves.
1 A ‘‘pig’’ is a tool that is inserted into and moves
through the pipeline, and is used for cleaning the
pipeline, internal inspections, or other purposes.
E:\FR\FM\20JYN1.SGM
20JYN1
Agencies
[Federal Register Volume 77, Number 140 (Friday, July 20, 2012)]
[Notices]
[Page 42719]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-17658]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[EG12-43-000, EG12-53-000, EG12-54-000, et al.]
Notice of Effectiveness of Exempt Wholesale Generator or Foreign
Utility Company Status
------------------------------------------------------------------------
Docket Nos.
------------------------------------------------------------------------
Sherbino I Wind Farm LLC............... EG12-43-000
Eagle Point Power Generation LLC....... EG12-53-000
Cimarron Windpower II, LLC............. EG12-54-000
Ironwood Windpower, LLC................ EG12-55-000
NRG Solar Alpine LLC................... EG12-56-000
Cayuga Operating Company, LLC.......... EG12-57-000
Somerset Operating Company, LLC........ EG12-58-000
Copper Mountain Solar 2, LLC........... EG12-59-000
Minok Wind, LLC........................ EG12-60-000
Senate Wind, LLC....................... EG12-61-000
Canadian Hills Wind, LLC............... EG12-62-000
Moore Solar, Inc....................... FC12-6-000
Sombra Solar, Inc...................... FC12-7-000
------------------------------------------------------------------------
Take notice that during the month of June 2012, the status of the
above-captioned entities as Exempt Wholesale Generators or Foreign
Utility Companies became effective by operation of the Commission's
regulations. 18 CFR 366.7(a).
Dated: July 12, 2012.
Kimberly D. Bose,
Secretary..
[FR Doc. 2012-17658 Filed 7-19-12; 8:45 am]
BILLING CODE 6717-01-P