Alliance Pipeline, L.P.; Notice of Availability of the Environmental Assessment for the Proposed Tioga Lateral Project, 42719-42720 [2012-17653]
Download as PDF
42719
Federal Register / Vol. 77, No. 140 / Friday, July 20, 2012 / Notices
Order 1000 Tariff Draft Task Force
July 24, 2012
2:00 p.m.–6:00 p.m. CDT
July 25, 2012
9:30 a.m.–1 p.m. CDT
The above-referenced meetings will
be held at:
AEP Offices, 1201 Elm Street, 8th Floor,
Dallas, TX 75270.
The above-referenced meetings are
open to stakeholders.
Further information may be found at
www.spp.org.
The discussions at the meetings
described above may address matters at
issue in the following proceedings:
Docket No. ER09–35–001, Tallgrass
Transmission, LLC
Docket No. ER09–36–001, Prairie Wind
Transmission, LLC
Docket No. ER09–548–001, ITC Great
Plains, LLC
Docket No. ER11–4105–000, Southwest
Power Pool, Inc.
Docket No. EL11–34–001, Midwest
Independent Transmission System
Operator, Inc.
Docket No. ER12–1179–000, Southwest
Power Pool, Inc.
Docket No. ER12–1415–000, Southwest
Power Pool, Inc.
Docket No. ER12–1460–000, Southwest
Power Pool, Inc.
Docket No. ER12–1610–000, Southwest
Power Pool, Inc.
Docket No. ER12–1772–000, Southwest
Power Pool, Inc.
Docket No. ER12–2176–000, Southwest
Power Pool, Inc.
For more information, contact
Luciano Lima, Office of Energy Markets
Regulation, Federal Energy Regulatory
Commission at (202) 502–6210 or
luciano.lima@ferc.gov.
Dated: July 12, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012–17655 Filed 7–19–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[EG12–43–000, EG12–53–000, EG12–54–
000, et al.]
Notice of Effectiveness of Exempt
Wholesale Generator or Foreign Utility
Company Status
Docket Nos.
Sherbino I Wind Farm LLC ...............................................................................................................................................................
Eagle Point Power Generation LLC .................................................................................................................................................
Cimarron Windpower II, LLC ............................................................................................................................................................
Ironwood Windpower, LLC ...............................................................................................................................................................
NRG Solar Alpine LLC .....................................................................................................................................................................
Cayuga Operating Company, LLC ...................................................................................................................................................
Somerset Operating Company, LLC ................................................................................................................................................
Copper Mountain Solar 2, LLC .........................................................................................................................................................
Minok Wind, LLC ..............................................................................................................................................................................
Senate Wind, LLC ............................................................................................................................................................................
Canadian Hills Wind, LLC ................................................................................................................................................................
Moore Solar, Inc. ..............................................................................................................................................................................
Sombra Solar, Inc. ............................................................................................................................................................................
Take notice that during the month of
June 2012, the status of the abovecaptioned entities as Exempt Wholesale
Generators or Foreign Utility Companies
became effective by operation of the
Commission’s regulations. 18 CFR
366.7(a).
Dated: July 12, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012–17658 Filed 7–19–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
mstockstill on DSK4VPTVN1PROD with NOTICES
[Docket No. CP12–50–000]
Alliance Pipeline, L.P.; Notice of
Availability of the Environmental
Assessment for the Proposed Tioga
Lateral Project
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) has prepared an
environmental assessment (EA) for the
Tioga Lateral Project, proposed by
VerDate Mar<15>2010
18:18 Jul 19, 2012
Jkt 226001
Alliance Pipeline L.P. (Alliance) in the
above-referenced docket. Alliance
requests authorization to construct and
operate approximately 79.3 miles of
new 12-inch-diameter natural gas
pipeline lateral and appurtenant
facilities in Williams, Mountrail, Burke,
and Renville Counties, North Dakota.
The Tioga Lateral Project would be
designed and constructed to provide
about 106.5 million cubic feet per day
of new transportation capacity to the
Chicago market area.
The EA assesses the potential
environmental effects of the
construction and operation of the Tioga
Lateral Project in accordance with the
requirements of the National
Environmental Policy Act (NEPA). The
FERC staff concludes that approval of
the proposed project, with appropriate
mitigating measures, would not
constitute a major federal action
significantly affecting the quality of the
human environment.
The U.S. Fish and Wildlife Service
(FWS) and the U.S. Army Corps of
Engineers (COE) participated as
cooperating agencies in the preparation
of the EA. Cooperating agencies have
PO 00000
Frm 00028
Fmt 4703
Sfmt 4703
EG12–43–000
EG12–53–000
EG12–54–000
EG12–55–000
EG12–56–000
EG12–57–000
EG12–58–000
EG12–59–000
EG12–60–000
EG12–61–000
EG12–62–000
FC12–6–000
FC12–7–000
jurisdiction by law or special expertise
with respect to resources potentially
affected by the proposal and participate
in the NEPA analysis.
The proposed Tioga Lateral Project
includes the following facilities:
• Approximately 79.3 miles of 12inch-diameter natural gas pipeline
crossing portions of Williams,
Mountrail, Burke, Ward, and Renville
Counties, North Dakota;
• A 6,000 horsepower compressor
station (Tioga Compressor Station)
containing three natural gas-driven
engines/compressors in Williams
County;
• One meter station within the
proposed compressor station site in
Williams County;
• One pressure regulating station
adjacent to the existing Alliance
mainline in Renville County;
• One pig 1 launcher at the proposed
compressor station site and one pig
receiver at the pressure regulating
station site; and
• Five mainline block valves.
1 A ‘‘pig’’ is a tool that is inserted into and moves
through the pipeline, and is used for cleaning the
pipeline, internal inspections, or other purposes.
E:\FR\FM\20JYN1.SGM
20JYN1
mstockstill on DSK4VPTVN1PROD with NOTICES
42720
Federal Register / Vol. 77, No. 140 / Friday, July 20, 2012 / Notices
The FERC staff mailed copies of the
EA to Federal, State, and local
government representatives and
agencies; elected officials;
environmental and public interest
groups; Native American tribes;
potentially affected landowners and
other interested individuals and groups;
newspapers and libraries in the project
area; and parties to this proceeding. In
addition, the EA is available for public
viewing on the FERC’s Web site
(www.ferc.gov) using the eLibrary link.
A limited number of copies of the EA
are available for distribution and public
inspection at: Federal Energy Regulatory
Commission, Public Reference Room,
888 First Street NE., Room 2A,
Washington, DC 20426, (202) 502–8371.
Any person wishing to comment on
the EA may do so. Your comments
should focus on the potential
environmental effects, reasonable
alternatives, and measures to avoid or
lessen environmental impacts. The more
specific your comments, the more useful
they will be. To ensure that the
Commission has the opportunity to
consider your comments prior to
making its decision on this project, it is
important that we receive your
comments in Washington, DC on or
before August 13, 2012.
For your convenience, there are three
methods you can use to file your
comments to the Commission. In all
instances, please reference the project
docket number (CP12–50–000) with
your submission. The Commission
encourages electronic filing of
comments and has expert staff available
to assist you at (202) 502–8258 or
efiling@ferc.gov.
(1) You can file your comments
electronically using the eComment
feature on the Commission’s Web site
(www.ferc.gov) under the link to
Documents and Filings. This is an easy
method for submitting brief, text-only
comments on a project;
(2) You can also file your comments
electronically using the eFiling feature
on the Commission’s Web site
(www.ferc.gov) under the link to
Documents and Filings. With eFiling,
you can provide comments in a variety
of formats by attaching them as a file
with your submission. New eFiling
users must first create an account by
clicking on ‘‘eRegister.’’ You must select
the type of filing you are making. If you
are filing a comment on a particular
project, please select ‘‘Comment on a
Filing’’; or
(3) You can file a paper copy of your
comments by mailing them to the
following address: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
VerDate Mar<15>2010
18:18 Jul 19, 2012
Jkt 226001
Commission, 888 First Street NE., Room
1A, Washington, DC 20426.
Any person seeking to become a party
to the proceeding must file a motion to
intervene pursuant to Rule 214 of the
Commission’s Rules of Practice and
Procedures (18 CFR 385.214).2 Only
intervenors have the right to seek
rehearing of the Commission’s decision.
The Commission grants affected
landowners and others with
environmental concerns intervenor
status upon showing good cause by
stating that they have a clear and direct
interest in this proceeding which no
other party can adequately represent.
Simply filing environmental comments
will not give you intervenor status, but
you do not need intervenor status to
have your comments considered.
Additional information about the
project is available from the
Commission’s Office of External Affairs,
at (866) 208–FERC, or on the FERC Web
site (www.ferc.gov) using the eLibrary
link. Click on the eLibrary link, click on
‘‘General Search,’’ and enter the docket
number excluding the last three digits in
the Docket Number field (i.e., CP12–50).
Be sure you have selected an
appropriate date range. For assistance,
please contact FERC Online Support at
FercOnlineSupport@ferc.gov or toll free
at (866) 208–3676, or for TTY, contact
(202) 502–8659. The eLibrary link also
provides access to the texts of formal
documents issued by the Commission,
such as orders, notices, and
rulemakings.
In addition, the Commission offers a
free service called eSubscription which
allows you to keep track of all formal
issuances and submittals in specific
dockets. This can reduce the amount of
time you spend researching proceedings
by automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. Go to www.ferc.gov/
esubscribenow.htm.
Dated: July 13, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012–17653 Filed 7–19–12; 8:45 am]
BILLING CODE 6717–01–P
2 See the previous discussion on the methods for
filing comments.
PO 00000
Frm 00029
Fmt 4703
Sfmt 4703
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER12–2231–000]
Shiloh IV Wind Project, LLC;
Supplemental Notice That Initial
Market-Based Rate Filing Includes
Request for Blanket Section 204
Authorization
This is a supplemental notice in the
above-referenced proceeding, of Shiloh
IV Wind Project, LLC’s application for
market-based rate authority, with an
accompanying rate schedule, noting that
such application includes a request for
blanket authorization, under 18 CFR
part 34, of future issuances of securities
and assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability is August 6,
2012.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 14 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First St. NE., Washington, DC
20426.
The filings in the above-referenced
proceeding(s) are accessible in the
Commission’s eLibrary system by
clicking on the appropriate link in the
above list. They are also available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an eSubscription link on the
web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
E:\FR\FM\20JYN1.SGM
20JYN1
Agencies
[Federal Register Volume 77, Number 140 (Friday, July 20, 2012)]
[Notices]
[Pages 42719-42720]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-17653]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP12-50-000]
Alliance Pipeline, L.P.; Notice of Availability of the
Environmental Assessment for the Proposed Tioga Lateral Project
The staff of the Federal Energy Regulatory Commission (FERC or
Commission) has prepared an environmental assessment (EA) for the Tioga
Lateral Project, proposed by Alliance Pipeline L.P. (Alliance) in the
above-referenced docket. Alliance requests authorization to construct
and operate approximately 79.3 miles of new 12-inch-diameter natural
gas pipeline lateral and appurtenant facilities in Williams, Mountrail,
Burke, and Renville Counties, North Dakota. The Tioga Lateral Project
would be designed and constructed to provide about 106.5 million cubic
feet per day of new transportation capacity to the Chicago market area.
The EA assesses the potential environmental effects of the
construction and operation of the Tioga Lateral Project in accordance
with the requirements of the National Environmental Policy Act (NEPA).
The FERC staff concludes that approval of the proposed project, with
appropriate mitigating measures, would not constitute a major federal
action significantly affecting the quality of the human environment.
The U.S. Fish and Wildlife Service (FWS) and the U.S. Army Corps of
Engineers (COE) participated as cooperating agencies in the preparation
of the EA. Cooperating agencies have jurisdiction by law or special
expertise with respect to resources potentially affected by the
proposal and participate in the NEPA analysis.
The proposed Tioga Lateral Project includes the following
facilities:
Approximately 79.3 miles of 12-inch-diameter natural gas
pipeline crossing portions of Williams, Mountrail, Burke, Ward, and
Renville Counties, North Dakota;
A 6,000 horsepower compressor station (Tioga Compressor
Station) containing three natural gas-driven engines/compressors in
Williams County;
One meter station within the proposed compressor station
site in Williams County;
One pressure regulating station adjacent to the existing
Alliance mainline in Renville County;
One pig \1\ launcher at the proposed compressor station
site and one pig receiver at the pressure regulating station site; and
---------------------------------------------------------------------------
\1\ A ``pig'' is a tool that is inserted into and moves through
the pipeline, and is used for cleaning the pipeline, internal
inspections, or other purposes.
---------------------------------------------------------------------------
Five mainline block valves.
[[Page 42720]]
The FERC staff mailed copies of the EA to Federal, State, and local
government representatives and agencies; elected officials;
environmental and public interest groups; Native American tribes;
potentially affected landowners and other interested individuals and
groups; newspapers and libraries in the project area; and parties to
this proceeding. In addition, the EA is available for public viewing on
the FERC's Web site (www.ferc.gov) using the eLibrary link. A limited
number of copies of the EA are available for distribution and public
inspection at: Federal Energy Regulatory Commission, Public Reference
Room, 888 First Street NE., Room 2A, Washington, DC 20426, (202) 502-
8371.
Any person wishing to comment on the EA may do so. Your comments
should focus on the potential environmental effects, reasonable
alternatives, and measures to avoid or lessen environmental impacts.
The more specific your comments, the more useful they will be. To
ensure that the Commission has the opportunity to consider your
comments prior to making its decision on this project, it is important
that we receive your comments in Washington, DC on or before August 13,
2012.
For your convenience, there are three methods you can use to file
your comments to the Commission. In all instances, please reference the
project docket number (CP12-50-000) with your submission. The
Commission encourages electronic filing of comments and has expert
staff available to assist you at (202) 502-8258 or efiling@ferc.gov.
(1) You can file your comments electronically using the eComment
feature on the Commission's Web site (www.ferc.gov) under the link to
Documents and Filings. This is an easy method for submitting brief,
text-only comments on a project;
(2) You can also file your comments electronically using the
eFiling feature on the Commission's Web site (www.ferc.gov) under the
link to Documents and Filings. With eFiling, you can provide comments
in a variety of formats by attaching them as a file with your
submission. New eFiling users must first create an account by clicking
on ``eRegister.'' You must select the type of filing you are making. If
you are filing a comment on a particular project, please select
``Comment on a Filing''; or
(3) You can file a paper copy of your comments by mailing them to
the following address: Kimberly D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street NE., Room 1A, Washington, DC
20426.
Any person seeking to become a party to the proceeding must file a
motion to intervene pursuant to Rule 214 of the Commission's Rules of
Practice and Procedures (18 CFR 385.214).\2\ Only intervenors have the
right to seek rehearing of the Commission's decision. The Commission
grants affected landowners and others with environmental concerns
intervenor status upon showing good cause by stating that they have a
clear and direct interest in this proceeding which no other party can
adequately represent. Simply filing environmental comments will not
give you intervenor status, but you do not need intervenor status to
have your comments considered.
---------------------------------------------------------------------------
\2\ See the previous discussion on the methods for filing
comments.
---------------------------------------------------------------------------
Additional information about the project is available from the
Commission's Office of External Affairs, at (866) 208-FERC, or on the
FERC Web site (www.ferc.gov) using the eLibrary link. Click on the
eLibrary link, click on ``General Search,'' and enter the docket number
excluding the last three digits in the Docket Number field (i.e., CP12-
50). Be sure you have selected an appropriate date range. For
assistance, please contact FERC Online Support at
FercOnlineSupport@ferc.gov or toll free at (866) 208-3676, or for TTY,
contact (202) 502-8659. The eLibrary link also provides access to the
texts of formal documents issued by the Commission, such as orders,
notices, and rulemakings.
In addition, the Commission offers a free service called
eSubscription which allows you to keep track of all formal issuances
and submittals in specific dockets. This can reduce the amount of time
you spend researching proceedings by automatically providing you with
notification of these filings, document summaries, and direct links to
the documents. Go to www.ferc.gov/esubscribenow.htm.
Dated: July 13, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012-17653 Filed 7-19-12; 8:45 am]