Enogex LLC; Notice of Filing, 41978-41979 [2012-17318]

Download as PDF 41978 Federal Register / Vol. 77, No. 137 / Tuesday, July 17, 2012 / Notices Commission staff has reviewed the application for amendment of license for the Skagit River Project (FERC No. 553) and has prepared an Environmental Assessment (EA). The project is located on the Skagit River in Skagit, Snohomish, and Whatcom Counties, Washington. The EA contains the Commission staff’s analysis of the potential environmental effects of construction and operation of a proposed second power tunnel and fish flow measures and concludes that authorizing the amendment, with appropriate environmental protective measures would not constitute a major federal action that would significantly affect the quality of the human environment. Copies of the EA are available for review in the Public Reference Room 2– A of the Commission’s offices at 888 First Street NE., Washington, DC 20426. The EA may also be viewed on the Commission’s Internet Web site (www.ferc.gov) using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. Additional information about the project is available from the Commission’s Web site using the eLibrary link. For assistance with eLibrary, contact FERCOnlineSupport@ferc.gov or tollfree at (866) 208–3676; for TTY contact (202) 502–8659. Dated: July 9, 2012. Kimberly D. Bose, Secretary. [FR Doc. 2012–17324 Filed 7–16–12; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 2712–074; 2710–057] tkelley on DSK3SPTVN1PROD with NOTICES Black Bear Hydro Partners, LLC, Maine; Notice of Availability of Environmental Assessment In accordance with the National Environmental Policy Act of 1969 and the Federal Energy Regulatory Commission’s (Commission or FERC’s) regulations, 18 Code of Federal Regulations (CFR) part 380 (Order No. 486, 52 Federal Register [FR] 47897), Commission staff has reviewed the application for the amendment of licenses for the Stillwater Hydroelectric Project (FERC Project No. 2712–074) and Orono Hydroelectric Project (FERC Project No. 2710–057), located on the Stillwater Branch of the Penobscot River VerDate Mar<15>2010 16:53 Jul 16, 2012 Jkt 226001 in Penobscot County, near the communities of Old Town and Orono, respectively. The projects do not occupy any federal lands. Staff prepared an Environmental Assessment (EA), which analyzes the potential environmental effects of the proposed modifications to the projects and the addition of new generating capacity, and concludes that authorizing amendments to the projects, with appropriate environmental protective measures, would not constitute a major federal action that would significantly affect the quality of the human environment. A copy of the EA is available for review at the Commission in the Public Reference Room 2–A of the Commission’s offices at 888 First Street NE., Washington, DC 20426. The EA also may be viewed on the Commission’s Internet Web site at (www.ferc.gov) using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. Additional information about the project is available from the Commission’s Office of External Affairs, at (202) 502–6088, or on the Commission’s Web site using the eLibrary link. For assistance with eLibrary, contact FERCOnlineSupport@ferc.gov or tollfree at (866) 208–3676; for TTY contact (202) 502–8659. You may also register online at www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support. Any comments should be filed within 30 days from the date of this notice. Comments may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site at https://www.ferc.gov/docs-filing/ efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support. Although the Commission strongly encourages electronic filing, documents may also be paper-filed. To paper-file, mail an original and seven copies to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. For further information, contact Rachel Price by telephone at 202–502– PO 00000 Frm 00012 Fmt 4703 Sfmt 4703 8907 or by email at Rachel.Price@ferc.gov. Dated: July 9, 2012. Kimberly D. Bose, Secretary. [FR Doc. 2012–17322 Filed 7–16–12; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. PR11–83–003] Enogex LLC; Notice of Filing Take notice that on July 6, 2012, Enogex LLC filed to revise its Statement of Operating Conditions (SOC) to synchronize its fuel tracker filings with its transportation SOC as more fully described in the filing. Any person desiring to participate in this rate filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the date as indicated below. Anyone filing an intervention or protest must serve a copy of that document on the Applicant. Anyone filing an intervention or protest on or before the intervention or protest date need not serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 7 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov, or call E:\FR\FM\17JYN1.SGM 17JYN1 Federal Register / Vol. 77, No. 137 / Tuesday, July 17, 2012 / Notices (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5:00 p.m. Eastern Time on Monday, July 16, 2012. Dated: July 9, 2012. Kimberly D. Bose, Secretary. [FR Doc. 2012–17318 Filed 7–16–12; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Sunshine Act Meeting The following notice of meeting is published pursuant to section 3(a) of the Item No. government in the Sunshine Act (Pub. L. 94–409), 5 U.S.C. 552b: AGENCY HOLDING MEETING: Federal Energy Regulatory Commission. DATE AND TIME: July 19, 2012, 10:00 a.m. PLACE: Room 2C, 888 First Street NE., Washington, DC 20426. STATUS: Open. MATTERS TO BE CONSIDERED: Agenda. * NOTE—Items listed on the agenda may be deleted without further notice. CONTACT PERSON FOR MORE INFORMATION: Kimberly D. Bose, Secretary, Telephone (202) 502–8400. For a recorded message listing items struck from or added to the meeting, call (202) 502–8627. This is a list of matters to be considered by the Commission. It does Docket No. 41979 not include a listing of all documents relevant to the items on the agenda. All public documents, however, may be viewed on line at the Commission’s Web site at https://www.ferc.gov using the eLibrary link, or may be examined in the Commission’s Public Reference Room. 983RD—MEETING REGULAR MEETING July 19, 2012, 10:00 a.m. Company ADMINISTRATIVE A–1 .................... A–2 .................... AD02–1–000 ............................................ AD02–7–000 ............................................ Agency Business Matters. Customer Matters, Reliability, Security and Market Operations. ELECTRIC E–1 .................... E–3 .................... E–4 .................... ER12–1265–000, ER12–1265–001, ER09–1049–005. ER12–1266–000, ER12–1266–001, ER11–4337–001. OMITTED ................................................ AD12–9–000, AD11–11–000 .................. E–5 .................... E–6 .................... NP11–238–000 ........................................ RM12–9–000 ........................................... E–7 .................... EL12–19–001 .......................................... E–8 .................... EL12–56–000 .......................................... E–9 .................... E–10 .................. E–11 .................. E–12 .................. E–13 .................. E–14 .................. AC11–46–000 .......................................... NJ08–2–001 ............................................ ER10–253–001, EL10–14–001 ............... EL10–52–001 .......................................... EL12–69–000 .......................................... EL12–24–000 .......................................... E–15 .................. EL12–28–000 .......................................... E–16 .................. E–17 .................. E–18 .................. EL12–49–000 .......................................... EL12–55–000 .......................................... ER10–2061–000, ER10–2061–001, ER10–2061–002, ER10–2061–003, ER10–2061–004. ER11–4244–001 ...................................... E–2 .................... E–19 .................. Midwest Independent Transmission System Operator, Inc. Midwest Independent Transmission System Operator, Inc. Allocation of Capacity on New Merchant Transmission Projects and New CostBased, Participant-Funded Transmission Projects, Priority Rights to New Participant-Funded Transmission. North American Electric Reliability Corporation. Regional Reliability Standard PRC–006–SERC–01—Automatic Underfrequency Load Shedding Requirements. FirstEnergy Solutions Corp. and Allegheny Energy Supply Company, LLC v. PJM Interconnection, L.L.C. Energy Spectrum, Inc. and Riverbay Corporation v. New York Independent System Operator, Inc. Ameren Corporation. United States Department of Energy—Bonneville Power Administration. Primary Power, LLC. Central Transmission, LLC v. PJM Interconnection L.L.C. Primary Power, LLC v. PJM Interconnection, L.L.C. Pioneer Transmission, LLC v. Northern Indiana Public Service Company and Midwest Independent Transmission System Operator, Inc. Xcel Energy Services Inc. and Northern States Power Company, a Wisconsin Corporation v. American Transmission Company, LLC. Northern Indiana Public Service Company. SIG Energy, LLLP v. California Independent System Operator Corporation. Tampa Electric Company. Midwest Independent Transmission System Operator, Inc. MISCELLANEOUS M–1 .................... RM12–13–000 ......................................... Continuity of Operations Plan. tkelley on DSK3SPTVN1PROD with NOTICES GAS G–1 .................... RM96–1–037 ........................................... Standards for Business Practices for Interstate Natural Gas Pipelines. HYDRO H–1 .................... H–2 .................... H–3 .................... VerDate Mar<15>2010 P–13226–004 .......................................... P–2146–137 ............................................ P–1881–076 ............................................ 16:53 Jul 16, 2012 Jkt 226001 PO 00000 Frm 00013 Blue Heron Hydro LLC. Alabama Power Company. PPL Holtwood, LLC. Fmt 4703 Sfmt 4703 E:\FR\FM\17JYN1.SGM 17JYN1

Agencies

[Federal Register Volume 77, Number 137 (Tuesday, July 17, 2012)]
[Notices]
[Pages 41978-41979]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-17318]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. PR11-83-003]


Enogex LLC; Notice of Filing

    Take notice that on July 6, 2012, Enogex LLC filed to revise its 
Statement of Operating Conditions (SOC) to synchronize its fuel tracker 
filings with its transportation SOC as more fully described in the 
filing.
    Any person desiring to participate in this rate filing must file in 
accordance with Rules 211 and 214 of the Commission's Rules of Practice 
and Procedure (18 CFR 385.211 and 385.214). Protests will be considered 
by the Commission in determining the appropriate action to be taken, 
but will not serve to make protestants parties to the proceeding. Any 
person wishing to become a party must file a notice of intervention or 
motion to intervene, as appropriate. Such notices, motions, or protests 
must be filed on or before the date as indicated below. Anyone filing 
an intervention or protest must serve a copy of that document on the 
Applicant. Anyone filing an intervention or protest on or before the 
intervention or protest date need not serve motions to intervene or 
protests on persons other than the Applicant.
    The Commission encourages electronic submission of protests and 
interventions in lieu of paper using the ``eFiling'' link at https://www.ferc.gov. Persons unable to file electronically should submit an 
original and 7 copies of the protest or intervention to the Federal 
Energy Regulatory Commission, 888 First Street NE., Washington, DC 
20426.
    This filing is accessible on-line at https://www.ferc.gov, using the 
``eLibrary'' link and is available for review in the Commission's 
Public Reference Room in Washington, DC. There is an ``eSubscription'' 
link on the Web site that enables subscribers to receive email 
notification when a document is added to a subscribed docket(s). For 
assistance with any FERC Online service, please email 
FERCOnlineSupport@ferc.gov, or call

[[Page 41979]]

(866) 208-3676 (toll free). For TTY, call (202) 502-8659.
    Comment Date: 5:00 p.m. Eastern Time on Monday, July 16, 2012.

    Dated: July 9, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012-17318 Filed 7-16-12; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.