American River Power VI, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications, 41783 [2012-17251]

Download as PDF Federal Register / Vol. 77, No. 136 / Monday, July 16, 2012 / Notices srobinson on DSK4SPTVN1PROD with NOTICES units for a total capacity of 5 MW; (2) a new 75-foot-long by 36-foot-wide by 24- to 39-foot-high reinforced concrete draft tube structure; (3) a new transformer and switchyard; (4) a new 850-foot-long, 69-kilovolt transmission line; and (5) appurtenant facilities. The project would have an estimated annual generation of 38.5 gigawatt-hours. Applicant Contact: Mr. Michael Skelly, 726 Eldridge Avenue, Collingswood, NJ 08107–1708; (856) 240–0707. FERC Contact: Tyrone A. Williams, (202) 502–6331. Deadline for filing comments, motions to intervene, and competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Competing applications and notices of intent must meet the requirements of 18 CFR 4.36. Comments, motions to intervene, notices of intent, and competing applications may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site https:// www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov or toll free at 1–866–208–3676, or for TTY, (202) 502–8659. Although the Commission strongly encourages electronic filing, documents may also be paper-filed. To paper-file, mail an original and seven copies to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. More information about this project, including a copy of the application can be viewed or printed on the ‘‘eLibrary’’ link of Commission’s Web site at https:// www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number (P–14391) in the docket number field to access the document. For assistance, contact FERC Online Support. Dated: July 10, 2012. Kimberly D. Bose, Secretary. [FR Doc. 2012–17250 Filed 7–13–12; 8:45 am] BILLING CODE 6717–01–P VerDate Mar<15>2010 16:32 Jul 13, 2012 Jkt 226001 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14392–000] American River Power VI, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On April 23, 2012, the American River Power VI, LLC filed an application for a preliminary permit under section 4(f) of the Federal Power Act proposing to study the feasibility of the proposed La Grange Hydroelectric Water Power Project No. 14392, to be located at the existing La Grange Dam on the Illinois River, near the city of Beardstown in Cass County, Illinois. The La Grange Dam is owned by the United States government and operated by the United States Army Corps of Engineers. The proposed project would consist of: (1) One new 80-foot-long by 50-footwide by 28-foot-high reinforced concrete powerhouse, containing two 5megawatt (MW) turbines for a total capacity of 10 MW; (2) a new 50-footlong by 30-foot-wide by 12-foot-high reinforced concrete draft tube structure; (3) a new transformer and switchyard; (4) a new 12,540-foot-long, 69-kilovolt transmission line; and (5) appurtenant facilities. The project would have an estimated annual generation of 76.2 gigawatt-hours. Applicant Contact: Mr. Michael Skelly, 726 Eldridge Avenue, Collingswood, NJ 08107–1708; (856) 240–0707. ERC Contact: Tyrone A. Williams, (202) 502–6331. Deadline for filing comments, motions to intervene, and competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Competing applications and notices of intent must meet the requirements of 18 CFR 4.36. Comments, motions to intervene, notices of intent, and competing applications may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site https:// www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov or toll PO 00000 Frm 00043 Fmt 4703 Sfmt 4703 41783 free at 1–866–208–3676, or for TTY, (202) 502–8659. Although the Commission strongly encourages electronic filing, documents may also be paper-filed. To paper-file, mail an original and seven copies to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. More information about this project, including a copy of the application can be viewed or printed on the ‘‘eLibrary’’ link of Commission’s Web site at https:// www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number (P–14392) in the docket number field to access the document. For assistance, contact FERC Online Support. Dated: July 10, 2012. Kimberly D. Bose, Secretary. [FR Doc. 2012–17251 Filed 7–13–12; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14389–000] American River Power VII, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On April 18, 2012, American River Power VII, LLC filed an application for a preliminary permit under section 4(f) of the Federal Power Act proposing to study the feasibility of the proposed Lower Appleton Dam Hydroelectric Water Power Project No. 14389, to be located at the existing Lower Appleton Dam on the Fox River, near the city of Appleton in Outagamie County, Wisconsin. The Lower Appleton Dam is owned by the United States government and operated by the United States Army Corps of Engineers. The proposed project would consist of: (1) One new 80-foot-long by 30-footwide by 20-foot-high reinforced concrete powerhouse, containing two 2.5-megawatt (MW) turbine/generator units for a total capacity of 5 MW; (2) a new 50-foot-long by 18-foot-wide by 9foot-high reinforced concrete draft tube structure; (3) a new transformer and switchyard; (4) a new 1,200-foot-long, 36.7-kilovolt transmission line; and (5) appurtenant facilities. The project would have an estimated annual generation of 38.0 gigawatt-hours. Applicant Contact: Mr. Michael Skelly, 726 Eldridge Avenue, E:\FR\FM\16JYN1.SGM 16JYN1

Agencies

[Federal Register Volume 77, Number 136 (Monday, July 16, 2012)]
[Notices]
[Page 41783]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-17251]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 14392-000]


American River Power VI, LLC; Notice of Preliminary Permit 
Application Accepted for Filing and Soliciting Comments, Motions To 
Intervene, and Competing Applications

    On April 23, 2012, the American River Power VI, LLC filed an 
application for a preliminary permit under section 4(f) of the Federal 
Power Act proposing to study the feasibility of the proposed La Grange 
Hydroelectric Water Power Project No. 14392, to be located at the 
existing La Grange Dam on the Illinois River, near the city of 
Beardstown in Cass County, Illinois. The La Grange Dam is owned by the 
United States government and operated by the United States Army Corps 
of Engineers.
    The proposed project would consist of: (1) One new 80-foot-long by 
50-foot-wide by 28-foot-high reinforced concrete powerhouse, containing 
two 5-megawatt (MW) turbines for a total capacity of 10 MW; (2) a new 
50-foot-long by 30-foot-wide by 12-foot-high reinforced concrete draft 
tube structure; (3) a new transformer and switchyard; (4) a new 12,540-
foot-long, 69-kilovolt transmission line; and (5) appurtenant 
facilities. The project would have an estimated annual generation of 
76.2 gigawatt-hours.
    Applicant Contact: Mr. Michael Skelly, 726 Eldridge Avenue, 
Collingswood, NJ 08107-1708; (856) 240-0707.
    ERC Contact: Tyrone A. Williams, (202) 502-6331.
    Deadline for filing comments, motions to intervene, and competing 
applications (without notices of intent), or notices of intent to file 
competing applications: 60 days from the issuance of this notice. 
Competing applications and notices of intent must meet the requirements 
of 18 CFR 4.36. Comments, motions to intervene, notices of intent, and 
competing applications may be filed electronically via the Internet. 
See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's 
Web site https://www.ferc.gov/docs-filing/efiling.asp. Commenters can 
submit brief comments up to 6,000 characters, without prior 
registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information 
at the end of your comments. For assistance, please contact FERC Online 
Support at FERCOnlineSupport@ferc.gov or toll free at 1-866-208-3676, 
or for TTY, (202) 502-8659. Although the Commission strongly encourages 
electronic filing, documents may also be paper-filed. To paper-file, 
mail an original and seven copies to: Kimberly D. Bose, Secretary, 
Federal Energy Regulatory Commission, 888 First Street NE., Washington, 
DC 20426.
    More information about this project, including a copy of the 
application can be viewed or printed on the ``eLibrary'' link of 
Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp. 
Enter the docket number (P-14392) in the docket number field to access 
the document. For assistance, contact FERC Online Support.

    Dated: July 10, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012-17251 Filed 7-13-12; 8:45 am]