American River Power VI, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications, 41783 [2012-17251]
Download as PDF
Federal Register / Vol. 77, No. 136 / Monday, July 16, 2012 / Notices
srobinson on DSK4SPTVN1PROD with NOTICES
units for a total capacity of 5 MW; (2)
a new 75-foot-long by 36-foot-wide by
24- to 39-foot-high reinforced concrete
draft tube structure; (3) a new
transformer and switchyard; (4) a new
850-foot-long, 69-kilovolt transmission
line; and (5) appurtenant facilities. The
project would have an estimated annual
generation of 38.5 gigawatt-hours.
Applicant Contact: Mr. Michael
Skelly, 726 Eldridge Avenue,
Collingswood, NJ 08107–1708; (856)
240–0707.
FERC Contact: Tyrone A. Williams,
(202) 502–6331.
Deadline for filing comments, motions
to intervene, and competing
applications (without notices of intent),
or notices of intent to file competing
applications: 60 days from the issuance
of this notice. Competing applications
and notices of intent must meet the
requirements of 18 CFR 4.36.
Comments, motions to intervene,
notices of intent, and competing
applications may be filed electronically
via the Internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov or toll
free at 1–866–208–3676, or for TTY,
(202) 502–8659. Although the
Commission strongly encourages
electronic filing, documents may also be
paper-filed. To paper-file, mail an
original and seven copies to: Kimberly
D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE., Washington, DC 20426.
More information about this project,
including a copy of the application can
be viewed or printed on the ‘‘eLibrary’’
link of Commission’s Web site at https://
www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P–14391) in
the docket number field to access the
document. For assistance, contact FERC
Online Support.
Dated: July 10, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012–17250 Filed 7–13–12; 8:45 am]
BILLING CODE 6717–01–P
VerDate Mar<15>2010
16:32 Jul 13, 2012
Jkt 226001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14392–000]
American River Power VI, LLC; Notice
of Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
On April 23, 2012, the American
River Power VI, LLC filed an application
for a preliminary permit under section
4(f) of the Federal Power Act proposing
to study the feasibility of the proposed
La Grange Hydroelectric Water Power
Project No. 14392, to be located at the
existing La Grange Dam on the Illinois
River, near the city of Beardstown in
Cass County, Illinois. The La Grange
Dam is owned by the United States
government and operated by the United
States Army Corps of Engineers.
The proposed project would consist
of: (1) One new 80-foot-long by 50-footwide by 28-foot-high reinforced
concrete powerhouse, containing two 5megawatt (MW) turbines for a total
capacity of 10 MW; (2) a new 50-footlong by 30-foot-wide by 12-foot-high
reinforced concrete draft tube structure;
(3) a new transformer and switchyard;
(4) a new 12,540-foot-long, 69-kilovolt
transmission line; and (5) appurtenant
facilities. The project would have an
estimated annual generation of 76.2
gigawatt-hours.
Applicant Contact: Mr. Michael
Skelly, 726 Eldridge Avenue,
Collingswood, NJ 08107–1708; (856)
240–0707.
ERC Contact: Tyrone A. Williams,
(202) 502–6331.
Deadline for filing comments, motions
to intervene, and competing
applications (without notices of intent),
or notices of intent to file competing
applications: 60 days from the issuance
of this notice. Competing applications
and notices of intent must meet the
requirements of 18 CFR 4.36.
Comments, motions to intervene,
notices of intent, and competing
applications may be filed electronically
via the Internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov or toll
PO 00000
Frm 00043
Fmt 4703
Sfmt 4703
41783
free at 1–866–208–3676, or for TTY,
(202) 502–8659. Although the
Commission strongly encourages
electronic filing, documents may also be
paper-filed. To paper-file, mail an
original and seven copies to: Kimberly
D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE., Washington, DC 20426.
More information about this project,
including a copy of the application can
be viewed or printed on the ‘‘eLibrary’’
link of Commission’s Web site at https://
www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P–14392) in
the docket number field to access the
document. For assistance, contact FERC
Online Support.
Dated: July 10, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012–17251 Filed 7–13–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14389–000]
American River Power VII, LLC; Notice
of Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
On April 18, 2012, American River
Power VII, LLC filed an application for
a preliminary permit under section 4(f)
of the Federal Power Act proposing to
study the feasibility of the proposed
Lower Appleton Dam Hydroelectric
Water Power Project No. 14389, to be
located at the existing Lower Appleton
Dam on the Fox River, near the city of
Appleton in Outagamie County,
Wisconsin. The Lower Appleton Dam is
owned by the United States government
and operated by the United States Army
Corps of Engineers.
The proposed project would consist
of: (1) One new 80-foot-long by 30-footwide by 20-foot-high reinforced
concrete powerhouse, containing two
2.5-megawatt (MW) turbine/generator
units for a total capacity of 5 MW; (2)
a new 50-foot-long by 18-foot-wide by 9foot-high reinforced concrete draft tube
structure; (3) a new transformer and
switchyard; (4) a new 1,200-foot-long,
36.7-kilovolt transmission line; and (5)
appurtenant facilities. The project
would have an estimated annual
generation of 38.0 gigawatt-hours.
Applicant Contact: Mr. Michael
Skelly, 726 Eldridge Avenue,
E:\FR\FM\16JYN1.SGM
16JYN1
Agencies
[Federal Register Volume 77, Number 136 (Monday, July 16, 2012)]
[Notices]
[Page 41783]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-17251]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 14392-000]
American River Power VI, LLC; Notice of Preliminary Permit
Application Accepted for Filing and Soliciting Comments, Motions To
Intervene, and Competing Applications
On April 23, 2012, the American River Power VI, LLC filed an
application for a preliminary permit under section 4(f) of the Federal
Power Act proposing to study the feasibility of the proposed La Grange
Hydroelectric Water Power Project No. 14392, to be located at the
existing La Grange Dam on the Illinois River, near the city of
Beardstown in Cass County, Illinois. The La Grange Dam is owned by the
United States government and operated by the United States Army Corps
of Engineers.
The proposed project would consist of: (1) One new 80-foot-long by
50-foot-wide by 28-foot-high reinforced concrete powerhouse, containing
two 5-megawatt (MW) turbines for a total capacity of 10 MW; (2) a new
50-foot-long by 30-foot-wide by 12-foot-high reinforced concrete draft
tube structure; (3) a new transformer and switchyard; (4) a new 12,540-
foot-long, 69-kilovolt transmission line; and (5) appurtenant
facilities. The project would have an estimated annual generation of
76.2 gigawatt-hours.
Applicant Contact: Mr. Michael Skelly, 726 Eldridge Avenue,
Collingswood, NJ 08107-1708; (856) 240-0707.
ERC Contact: Tyrone A. Williams, (202) 502-6331.
Deadline for filing comments, motions to intervene, and competing
applications (without notices of intent), or notices of intent to file
competing applications: 60 days from the issuance of this notice.
Competing applications and notices of intent must meet the requirements
of 18 CFR 4.36. Comments, motions to intervene, notices of intent, and
competing applications may be filed electronically via the Internet.
See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's
Web site https://www.ferc.gov/docs-filing/efiling.asp. Commenters can
submit brief comments up to 6,000 characters, without prior
registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information
at the end of your comments. For assistance, please contact FERC Online
Support at FERCOnlineSupport@ferc.gov or toll free at 1-866-208-3676,
or for TTY, (202) 502-8659. Although the Commission strongly encourages
electronic filing, documents may also be paper-filed. To paper-file,
mail an original and seven copies to: Kimberly D. Bose, Secretary,
Federal Energy Regulatory Commission, 888 First Street NE., Washington,
DC 20426.
More information about this project, including a copy of the
application can be viewed or printed on the ``eLibrary'' link of
Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P-14392) in the docket number field to access
the document. For assistance, contact FERC Online Support.
Dated: July 10, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012-17251 Filed 7-13-12; 8:45 am]