City of Quincy; FFP Project 109, LLC; Notice of Competing Preliminary Permit Applications Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications, 41781-41782 [2012-17248]
Download as PDF
Federal Register / Vol. 77, No. 136 / Monday, July 16, 2012 / Notices
and newspapers. This list also includes
all affected landowners (as defined in
the Commission’s regulations) who are
potential right-of-way grantors, whose
property may be used temporarily for
project purposes, or who own homes
within certain distances of aboveground
facilities, and anyone who submits
comments on the project. We will
update the environmental mailing list as
the analysis proceeds to ensure that we
send the information related to this
environmental review to all individuals,
organizations, and government entities
interested in and/or potentially affected
by the planned project.
If we publish and distribute the EA,
copies will be sent to the environmental
mailing list for public review and
comment. If you would prefer to receive
a paper copy of the document instead of
the CD version or would like to remove
your name from the mailing list, please
return the attached Information Request
(appendix 2).
srobinson on DSK4SPTVN1PROD with NOTICES
Becoming an Intervenor
Once Millennium files its application
with the Commission, you may want to
become an ‘‘intervenor’’ which is an
official party to the Commission’s
proceeding. Intervenors play a more
formal role in the process and are able
to file briefs, appear at hearings, and be
heard by the courts if they choose to
appeal the Commission’s final ruling.
An intervenor formally participates in
the proceeding by filing a request to
intervene. Instructions for becoming an
intervenor are in the User’s Guide under
the ‘‘e-filing’’ link on the Commission’s
Web site. Please note that the
Commission will not accept requests for
intervenor status at this time. You must
wait until the Commission receives a
formal application for the project.
Additional Information
Additional information about the
project is available from the
Commission’s Office of External Affairs,
at (866) 208–FERC, or on the FERC Web
site (www.ferc.gov) using the eLibrary
link. Click on the eLibrary link, click on
‘‘General Search’’ and enter the docket
number, excluding the last three digits
in the Docket Number field (i.e., PF12–
10). Be sure you have selected an
appropriate date range. For assistance,
please contact FERC Online Support at
FercOnlineSupport@ferc.gov or toll free
at (866) 208–3676, or for TTY, contact
(202) 502–8659. The eLibrary link also
provides access to the texts of formal
documents issued by the Commission,
such as orders, notices, and
rulemakings.
In addition, the Commission offers a
free service called eSubscription which
VerDate Mar<15>2010
16:32 Jul 13, 2012
Jkt 226001
allows you to keep track of all formal
issuances and submittals in specific
dockets. This can reduce the amount of
time you spend researching proceedings
by automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. Go to www.ferc.gov/
esubscribenow.htm.
Finally, public meetings or site visits
will be posted on the Commission’s
calendar located at www.ferc.gov/
EventCalendar/EventsList.aspx along
with other related information.
Dated: July 10, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012–17246 Filed 7–13–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13331–002; Project No. 14402–
000]
City of Quincy; FFP Project 109, LLC;
Notice of Competing Preliminary
Permit Applications Accepted for
Filing and Soliciting Comments,
Motions To Intervene, and Competing
Applications
On May 1, 2012, City of Quincy and
FFP Project 109, LLC filed preliminary
permit applications pursuant to section
4(f) of the Federal Power Act proposing
to study the feasibility of a hydropower
project, to be located at the existing
Mississippi River Lock and Dam No. 24
on the Mississippi River, near the city
of Clarksville in Pike County, Missouri
and Calhoun County, Illinois. City of
Quincy’s application is for a successive
preliminary permit. Mississippi River
Lock and Dam No. 24 is owned by the
United States government and operated
by the United States Army Corps of
Engineers. The sole purpose of a
preliminary permit, if issued, is to grant
the permit holder priority to file a
license application during the permit
term. A preliminary permit does not
authorize the permit holder to perform
any land-disturbing activities or
otherwise enter upon lands or waters
owned by others without the owner’s
express permission.
City of Quincy’s proposed project
would consist of: (1) Sixty new 500kilowatt submersible low-head turbinegenerator units, having a total combined
generating capacity of 30 megawatts; (2)
one of three transmission line
alternatives: a 2.7-mile-long section of
an existing, 34.5-kilovolt transmission
PO 00000
Frm 00041
Fmt 4703
Sfmt 4703
41781
line that is part of the Missouri electric
power grid, or a 4.2-mile-long portion of
an existing 12.5-kilovolt transmission
line that is part of the Illinois electric
power grid that would be upgraded to
34.5-kilovolt, or a 6.7-mile-long portion
of an existing 12.5-kilovolt transmission
line that is part of the Illinois electric
power grid that would be upgraded to
34.5-kilovolts; (3) new switchyard; and
(4) appurtenant facilities. The project
would have an estimated annual
generation of 154 gigawatt-hours.
Applicant Contact: Mr. Charles
Bevelheimer, 730 Maine Street, Quincy,
IL 62301; (217) 228–4500.
FFP Project 109, LLC’s proposed
project would consist of: (1) Fifteen new
60-foot by 80-foot reinforced concrete
powerhouses, each containing two 500kilowatt bulb turbine-generators, having
a total combined generating capacity of
15 megawatts; (2) fifteen existing
submersible tainter gates; (3) a new 40foot by 35-foot substation; (4) a new 10foot by 80-foot intake structure; (5) a
new 2.8-mile-long, 34.5-kilovolt
transmission line; and (6) appurtenant
facilities. The project would have an
estimated annual generation of 60
gigawatt-hours.
Applicant Contact: Ms. Ramya
Swaminathan, 239 Causeway Street,
Suite 300, Boston, MA 02114; (978)
283–2822.
FERC Contact: Tyrone A. Williams,
(202) 502–6331.
Deadline for filing comments, motions
to intervene, and competing
applications (without notices of intent)
or notices of intent to file competing
applications for Project No. 13331: 60
days from the issuance of this notice.
We previously issued an acceptance
notice for Project No. 14402 on May 24,
2012. That notice established a deadline
of July 23, 2012 for filing comments,
motions to intervene, and competing
applications. The deadline for filing
comments, motions to intervene, and
competing applications, or notices of
intent to file competing applications for
Project No. 14402 is herewith extended
to 60 days from the issuance of this
notice to coincide with the deadline for
Project No. 13331. Competing
applications and notices of intent must
meet the requirements of 18 CFR 4.36.
Comments, motions to intervene,
notices of intent, and competing
applications may be filed electronically
via the Internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
E:\FR\FM\16JYN1.SGM
16JYN1
41782
Federal Register / Vol. 77, No. 136 / Monday, July 16, 2012 / Notices
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov or toll
free at 1–866–208–3676, or for TTY,
(202) 502–8659. Although the
Commission strongly encourages
electronic filing, documents may also be
paper-filed. To paper-file, mail an
original and seven copies to: Kimberly
D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE., Washington, DC 20426.
More information about this project,
including a copy of either application
can be viewed or printed on the
‘‘eLibrary’’ link of Commission’s Web
site at https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–13331or P–14402) in the docket
number field to access the document.
For assistance, contact FERC Online
Support.
Dated: July 10, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012–17248 Filed 7–13–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13330–001; Project No. 14403–
000]
srobinson on DSK4SPTVN1PROD with NOTICES
City of Quincy; FFP Project 110, LLC;
Notice of Competing Preliminary
Permit Applications Accepted for
Filing and Soliciting Comments,
Motions To Intervene, and Competing
Applications
On May 1, 2012, City of Quincy and
FFP Project 110, LLC filed preliminary
permit applications pursuant to section
4(f) of the Federal Power Act proposing
to study the feasibility of a hydropower
project, to be located at the existing
Mississippi River Lock and Dam No. 25
on the Mississippi River, near the city
of Winfield in Lincoln County, Missouri
and Calhoun County, Illinois. The City
of Quincy’s application is for a
successive preliminary permit.
Mississippi River Lock and Dam No. 25
is owned by the United States
government and operated by the United
States Army Corps of Engineers. The
sole purpose of a preliminary permit, if
issued, is to grant the permit holder
priority to file a license application
during the permit term. A preliminary
permit does not authorize the permit
holder to perform any land-disturbing
activities or otherwise enter upon lands
VerDate Mar<15>2010
16:32 Jul 13, 2012
Jkt 226001
or waters owned by others without the
owner’s express permission.
City of Quincy’s proposed project
would consist of: (1) Forty new 500kilowatt submersible low-head turbinegenerator units, having a total combined
generating capacity of 30 megawatts; (2)
a new 878-foot-long concrete and steel
control building structure immediately
downstream of an existing dyke; (3) a
new 3.1-mile-long, 34.5-kilovolt
transmission line that would connect to
the Missouri electric power grid, or a
new 6.8-mile-long, 34.5-kilovolt
transmission line that would connect to
the Illinois electric power grid; and (4)
appurtenant facilities. The project
would have an estimated annual
generation of 98.3 gigawatt-hours.
Applicant Contact: Mr. Charles
Bevelheimer, 730 Maine Street, Quincy,
IL 62301; (217) 228–4500.
FFP Project 110, LLC’s proposed
project would consist of: (1) Fourteen
new 60-foot by 60-foot reinforced
concrete powerhouses, each containing
two 500-kilowatt bulb turbinegenerators, having a total combined
generating capacity of 14 megawatts; (2)
fourteen existing submersible tainter
gates; (3) a new 40-foot by 35-foot
substation; (4) a new 10-foot by 60-foot
intake structure; (5) a new 3-mile-long,
34.5-kilovolt transmission line; and (6)
appurtenant facilities. The project
would have an estimated annual
generation of 56 gigawatt-hours.
Applicant Contact: Ms. Ramya
Swaminathan, 239 Causeway Street,
Suite 300, Boston, MA 02114; (978)
283–2822.
FERC Contact: Tyrone A. Williams,
(202) 502–6331.
Deadline for filing comments, motions
to intervene, and competing
applications (without notices of intent)
or notices of intent to file competing
applications for Project No. 13330: 60
days from the issuance of this notice.
We previously issued an acceptance
notice for Project No. 14403 on May 21,
2012. That notice established a deadline
of July 20, 2012 for filing comments,
motions to intervene, and competing
applications. The deadline for filing
comments, motions to intervene, and
competing applications, or notices of
intent to file competing applications for
Project No. 14403 is herewith extended
to 60 days from the issuance of this
notice to coincide with the deadline for
Project No. 13330. Competing
applications and notices of intent must
meet the requirements of 18 CFR 4.36.
Comments, motions to intervene,
notices of intent, and competing
applications may be filed electronically
via the Internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions
PO 00000
Frm 00042
Fmt 4703
Sfmt 4703
on the Commission’s Web site https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov or toll
free at 1–866–208–3676, or for TTY,
(202) 502–8659. Although the
Commission strongly encourages
electronic filing, documents may also be
paper-filed. To paper-file, mail an
original and seven copies to: Kimberly
D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE., Washington, DC 20426.
More information about this project,
including a copy of either application
can be viewed or printed on the
‘‘eLibrary’’ link of Commission’s Web
site at https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–13330 or P–14403) in the docket
number field to access the document.
For assistance, contact FERC Online
Support.
Dated: July 10, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012–17247 Filed 7–13–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14391–000]
American River Power VIII, LLC; Notice
of Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
On April 20, 2012, American River
Power VIII, LLC filed an application for
a preliminary permit under section 4(f)
of the Federal Power Act proposing to
study the feasibility of the proposed
Upper Appleton Dam Hydroelectric
Water Power Project No. 14391, to be
located at the existing Upper Appleton
Dam on the Fox River, near the city of
Appleton in Outagamie County,
Wisconsin. The Upper Appleton Dam is
owned by the United States government
and operated by the United States Army
Corps of Engineers.
The proposed project would consist
of: (1) One new 80-foot-long by 50-footwide by 20-foot-high reinforced
concrete powerhouse, containing two
2.5-megawatt (MW) turbine/generator
E:\FR\FM\16JYN1.SGM
16JYN1
Agencies
[Federal Register Volume 77, Number 136 (Monday, July 16, 2012)]
[Notices]
[Pages 41781-41782]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-17248]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 13331-002; Project No. 14402-000]
City of Quincy; FFP Project 109, LLC; Notice of Competing
Preliminary Permit Applications Accepted for Filing and Soliciting
Comments, Motions To Intervene, and Competing Applications
On May 1, 2012, City of Quincy and FFP Project 109, LLC filed
preliminary permit applications pursuant to section 4(f) of the Federal
Power Act proposing to study the feasibility of a hydropower project,
to be located at the existing Mississippi River Lock and Dam No. 24 on
the Mississippi River, near the city of Clarksville in Pike County,
Missouri and Calhoun County, Illinois. City of Quincy's application is
for a successive preliminary permit. Mississippi River Lock and Dam No.
24 is owned by the United States government and operated by the United
States Army Corps of Engineers. The sole purpose of a preliminary
permit, if issued, is to grant the permit holder priority to file a
license application during the permit term. A preliminary permit does
not authorize the permit holder to perform any land-disturbing
activities or otherwise enter upon lands or waters owned by others
without the owner's express permission.
City of Quincy's proposed project would consist of: (1) Sixty new
500-kilowatt submersible low-head turbine-generator units, having a
total combined generating capacity of 30 megawatts; (2) one of three
transmission line alternatives: a 2.7-mile-long section of an existing,
34.5-kilovolt transmission line that is part of the Missouri electric
power grid, or a 4.2-mile-long portion of an existing 12.5-kilovolt
transmission line that is part of the Illinois electric power grid that
would be upgraded to 34.5-kilovolt, or a 6.7-mile-long portion of an
existing 12.5-kilovolt transmission line that is part of the Illinois
electric power grid that would be upgraded to 34.5-kilovolts; (3) new
switchyard; and (4) appurtenant facilities. The project would have an
estimated annual generation of 154 gigawatt-hours.
Applicant Contact: Mr. Charles Bevelheimer, 730 Maine Street,
Quincy, IL 62301; (217) 228-4500.
FFP Project 109, LLC's proposed project would consist of: (1)
Fifteen new 60-foot by 80-foot reinforced concrete powerhouses, each
containing two 500-kilowatt bulb turbine-generators, having a total
combined generating capacity of 15 megawatts; (2) fifteen existing
submersible tainter gates; (3) a new 40-foot by 35-foot substation; (4)
a new 10-foot by 80-foot intake structure; (5) a new 2.8-mile-long,
34.5-kilovolt transmission line; and (6) appurtenant facilities. The
project would have an estimated annual generation of 60 gigawatt-hours.
Applicant Contact: Ms. Ramya Swaminathan, 239 Causeway Street,
Suite 300, Boston, MA 02114; (978) 283-2822.
FERC Contact: Tyrone A. Williams, (202) 502-6331.
Deadline for filing comments, motions to intervene, and competing
applications (without notices of intent) or notices of intent to file
competing applications for Project No. 13331: 60 days from the issuance
of this notice. We previously issued an acceptance notice for Project
No. 14402 on May 24, 2012. That notice established a deadline of July
23, 2012 for filing comments, motions to intervene, and competing
applications. The deadline for filing comments, motions to intervene,
and competing applications, or notices of intent to file competing
applications for Project No. 14402 is herewith extended to 60 days from
the issuance of this notice to coincide with the deadline for Project
No. 13331. Competing applications and notices of intent must meet the
requirements of 18 CFR 4.36. Comments, motions to intervene, notices of
intent, and competing applications may be filed electronically via the
Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the
Commission's Web site https://www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments up to 6,000 characters, without
prior registration, using the eComment system at https://www.ferc.gov/
docs-filing/
[[Page 41782]]
ecomment.asp. You must include your name and contact information at the
end of your comments. For assistance, please contact FERC Online
Support at FERCOnlineSupport@ferc.gov or toll free at 1-866-208-3676,
or for TTY, (202) 502-8659. Although the Commission strongly encourages
electronic filing, documents may also be paper-filed. To paper-file,
mail an original and seven copies to: Kimberly D. Bose, Secretary,
Federal Energy Regulatory Commission, 888 First Street NE., Washington,
DC 20426.
More information about this project, including a copy of either
application can be viewed or printed on the ``eLibrary'' link of
Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P-13331or P-14402) in the docket number field
to access the document. For assistance, contact FERC Online Support.
Dated: July 10, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012-17248 Filed 7-13-12; 8:45 am]
BILLING CODE 6717-01-P