United Water; Notice of Declaration of Intention and Petition for Relief, and Soliciting Comments, Protests, and/or Motions To Intervene, 40606-40607 [2012-16752]
Download as PDF
40606
Federal Register / Vol. 77, No. 132 / Tuesday, July 10, 2012 / Notices
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14405–000]
mstockstill on DSK4VPTVN1PROD with NOTICES
Town of Waterville; Notice of Intent To
File License Application, Filing of PreApplication Document, and Approving
Use of the Traditional Licensing
Process
a. Type of Filing: Notice of Intent to
File License Application and Request to
Use the Traditional Licensing Process.
b. Project No.: 14405–000.
c. Date filed: May 7, 2012.
d. Submitted By: Town of Waterville.
e. Name of Project: Waterville
Hydroelectric Project.
f. Location: On Kelley River, in the
Town of Waterville, Lamoille County,
Vermont. The project would not occupy
lands of the United States.
g. Filed Pursuant to: 18 CFR 5.3 of the
Commission’s regulations.
h. Potential Applicant Contact: Scott
Johnson, Town of Waterville Planning
Commission, PO Box 31, 850 VT
Route 109, Waterville, VT 05492, (802)
888-5229 Ext. 124;
sjohnson@lamoillefamilycenter.org.
i. FERC Contact: Samantha Davidson,
(202) 502–6839 or
samantha.davidson@ferc.gov.
j. Town of Waterville filed its request
to use the Traditional Licensing Process
on May 7, 2012. Town of Waterville
provided public notice of its request on
June 6, 2012. In a letter dated July 2,
2012, the Director of the Division of
Hydropower Licensing approved Town
of Waterville’s request to use the
Traditional Licensing Process.
k. With this notice, we are initiating
informal consultation with: (a) The U.S.
Fish and Wildlife Service and NOAA
Fisheries under section 7 of the
Endangered Species Act and the joint
agency regulations thereunder at 50
CFR, Part 402; (b) NOAA Fisheries
under section 305(b) of the MagnusonStevens Fishery Conservation and
Management Act and implementing
regulations at 50 CFR 600.920; and (c)
the Vermont State Historic Preservation
Officer, as required by section 106,
National Historical Preservation Act,
and the implementing regulations of the
Advisory Council on Historic
Preservation at 36 CFR 800.2.
l. Town of Waterville filed a PreApplication Document (PAD; including
a proposed process plan and schedule)
with the Commission, pursuant to 18
CFR 5.6 of the Commission’s
regulations.
m. A copy of the PAD is available for
review at the Commission in the Public
VerDate Mar<15>2010
16:28 Jul 09, 2012
Jkt 226001
Reference Room or may be viewed on
the Commission’s Web site (https://
www.ferc.gov), using the ‘‘eLibrary’’
link. Enter the docket number,
excluding the last three digits in the
docket number field to access the
document. For assistance, contact FERC
Online Support at
FERCONlineSupport@ferc.gov or toll
free at 1–866–208–3676, or for TTY,
(202) 502–8659. A copy is also available
for inspection and reproduction at the
address in paragraph h.
n. Register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filing and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
Dated: July 2, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012–16750 Filed 7–9–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Commission Staff
Attendance
The Federal Energy Regulatory
Commission hereby gives notice that
members of the Commission’s staff may
attend the following meetings related to
the transmission planning activities of
the Midwest Independent Transmission
System Operator, Inc. and Southwest
Power Pool:
Order No. 1000–MISO–SPP Workshop—
July 9–10
The above-referenced meeting will be
held at:
Hilton St. Louis at the Ballpark, One
South Broadway, St. Louis, MO 63102
The above-referenced meeting is open
to the public.
Further information may be found at
https://spp.org/.
The discussions at the meeting
described above may address matters at
issue in the following proceedings:
Docket No. ER12–1772–000, Southwest
Power Pool, Inc.
Docket No. ER12–1610–000, Southwest
Power Pool, Inc.
Docket No. ER12–1577–000, Midwest
Independent Transmission System
Operator, Inc.
Docket No. ER12–1460–000, Southwest
Power Pool, Inc.
Docket No. ER12–1415–000, Southwest
Power Pool, Inc.
Docket No. ER12–1179–000, Southwest
Power Pool, Inc.
PO 00000
Frm 00043
Fmt 4703
Sfmt 4703
Docket No. ER12–715, Midwest
Independent Transmission System
Operator, Inc.
Docket No. ER12–480, Midwest
Independent Transmission System
Operator, Inc.
Docket No. ER12–309, Midwest
Independent Transmission System
Operator, Inc.
Docket No. ER11–4105–000, Southwest
Power Pool, Inc.
Docket No. ER11–1844, Midwest
Independent Transmission System
Operator, Inc.
Docket No. ER09–548–001, ITC Great
Plains, LLC
Docket No. ER09–36–001, Prairie Wind
Transmission, LLC
Docket No. ER09–35–001, Tallgrass
Transmission, LLC
Docket No. EL11–56, FirstEnergy
Service Company
Docket No. EL11–30, E.ON Climate &
Renewables North America, LLC v.
Midwest Independent Transmission
System Operator, Inc.
Docket No. EL12–24–000, Pioneer
Transmission LLC v. Midwest
Independent Transmission System
Operator, Inc.
Docket No. EL12–28–000, Xcel Energy
Services Inc. v. American
Transmission Company, LLC
Docket No. OA08–53, Midwest
Independent Transmission System
Operator, Inc.
For more information, contact
Christopher Miller, Office of Energy
Markets Regulation, Federal Energy
Regulatory Commission at (317) 249–
5936 or christopher.miller@ferc.gov, or
contact Robert Sacknoff, Office of
Energy Markets Regulation, Federal
Energy Regulatory Commission at (202)
502–6758 or robert.sacknoff@ferc.gov.
Dated: July 2, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012–16756 Filed 7–9–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. DI12–8–000]
United Water; Notice of Declaration of
Intention and Petition for Relief, and
Soliciting Comments, Protests, and/or
Motions To Intervene
Take notice that the following
application has been filed with the
Commission and is available for public
inspection:
a. Application Type: Declaration of
Intention.
E:\FR\FM\10JYN1.SGM
10JYN1
mstockstill on DSK4VPTVN1PROD with NOTICES
Federal Register / Vol. 77, No. 132 / Tuesday, July 10, 2012 / Notices
b. Docket No: DI12–8–000.
c. Date Filed: June 11, 2012.
d. Applicant: United Water.
e. Name of Project: Arlington
Wastewater Plant Demonstration
Project.
f. Location: The proposed Arlington
Wastewater Plant Demonstration Project
will be located in the effluent outfall
pipe of the Arlington Wastewater Plant,
in the Town of Poughkeepsie, Dutchess
County, New York.
g. Filed Pursuant to: 18 CFR part 24,
section 24.1.
h. Applicant Contact: Jeffrey
McDonald, PE, Project Director, Fuss &
O’Neill, 146 Hartford Road, Manchester,
CT 06040; telephone: (860) 646–2469,
Ext. 5339; Fax: (860) 533–5143; email:
www.jmcdonald@fando.com.
i. FERC Contact: Any questions on
this notice should be addressed to
Henry Ecton, (202) 502–8768, or Email
address: henry.ecton@ferc.gov.
j. Deadline for filing comments,
protests, and/or motions: July 27, 2012.
Comments, Motions to Intervene, and
Protests may be filed electronically via
the Internet. See 18 CFR
385.2001(a)(l)(iii) and the instructions
on the Commission’s Web site under the
‘‘eFiling’’ link. If unable to be filed
electronically, documents may be paperfiled. To paper-file, an original and eight
copies should be mailed to: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE., Washington, DC 20426. For more
information on how to submit these
types of filings, please go to the
Commission’s Web site located at
https://www.ferc.gov/filingcomments.asp.
Please include the docket number
(DI12–8–000) on any comments,
protests, and/or motions filed.
k. Description of Project: The
proposed Arlington Wastewater Plant
Demonstration Project would consist of
an experimental 15-kW hydrokinetic
turbine generator, designed for use in
the pipelines of municipal wastewater
treatment facilities, which will be
dropped into a 8-foot-long, 6-foot-wide,
and 6-foot-deep concrete diversion
chamber that is located along the 24inch-diameter, 421-foot-long outfall
pipe from the treatment plant. An
outflow pipe from the diversion
chamber deposits the treated water into
the Hudson River. A 100-foot-long
transmission line will connect the
proposed project to the sewage
treatment plant.
l. Petition for Declaration of Intention:
United Water asks that it be allowed,
without a license under part I of the
Federal Power Act, to deploy, test, and
study the type of facilities listed above,
VerDate Mar<15>2010
16:28 Jul 09, 2012
Jkt 226001
and use the power from the test devices
to operate miscellaneous ventilation and
lighting equipment at the treatment
facility. The experimental hydrokinetic
turbine generator will be tested for a
limited time to determine its durability.
m. Locations of the Application:
Copies of this filing are on file with the
Commission and are available for public
inspection. This filing may be viewed
on the Web at https://www.ferc.gov using
the ‘‘eLibrary’’ link. Enter the Docket
number excluding the last three digits in
the docket number field to access the
document. You may also register online
at https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, call 1–866–208–3676 or
email FERCOlineSupport@ferc.gov for
TTY, call (202) 502–8659. A copy is also
available for inspection and
reproduction at the address in item (h)
above.
n. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
o. Comments, Protests, or Motions to
Intervene—Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
In determining the appropriate action to
take, the Commission will consider all
protests or other comments filed, but
only those who file a motion to
intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
p. Filing and Service of Responsive
Documents—All filings must bear in all
capital letters the title ‘‘COMMENTS’’,
‘‘PROTESTS’’, AND/OR ‘‘MOTIONS TO
INTERVENE’’, as applicable, and the
Docket Number of the particular
application to which the filing refers. A
copy of any Motion to Intervene must
also be served upon each representative
of the Applicant specified in the
particular application.
q. Agency Comments—Federal, state,
and local agencies are invited to file
comments on the described application.
A copy of the application may be
obtained by agencies directly from the
Applicant. If an agency does not file
comments within the time specified for
filing comments, it will be presumed to
have no comments. One copy of an
agency’s comments must also be sent to
the Applicant’s representatives.
PO 00000
Frm 00044
Fmt 4703
Sfmt 4703
40607
Dated: July 2, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012–16752 Filed 7–9–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13237–003–MA]
Whitman River Dam, Inc.; Notice of
Availability of Environmental
Assessment
In accordance with the National
Environmental Policy Act of 1969 and
the Federal Energy Regulatory
Commission’s (Commission’s)
regulations, 18 CFR part 380 (Order No.
486, 52 FR 47897), the Office of Energy
Projects has reviewed the application
for an original license for the Crocker
Dam Hydroelectric Project, to be located
on the Whitman River, within the
Township of Westminster, Worcester
County, Massachusetts, and has
prepared an Environmental Assessment
(EA).
The EA contains the staff’s analysis of
the potential environmental impacts of
the project and concludes that licensing
the project, with appropriate
environmental protective measures,
would not constitute a major federal
action that would significantly affect the
quality of the human environment.
A copy of the EA is on file with the
Commission and is available for public
inspection. The EA may also be viewed
on the Commission’s Web site at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access
documents. For assistance, contact
FERC Online Support at FERCOnline
Support@ferc.gov or toll-free at 1–866–
208–3676, or for TTY, (202) 502–8659.
You may also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
Any comments on the EA should be
filed within 30 days from the date of
this notice. Comments may be filed
electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
E:\FR\FM\10JYN1.SGM
10JYN1
Agencies
[Federal Register Volume 77, Number 132 (Tuesday, July 10, 2012)]
[Notices]
[Pages 40606-40607]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-16752]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. DI12-8-000]
United Water; Notice of Declaration of Intention and Petition for
Relief, and Soliciting Comments, Protests, and/or Motions To Intervene
Take notice that the following application has been filed with the
Commission and is available for public inspection:
a. Application Type: Declaration of Intention.
[[Page 40607]]
b. Docket No: DI12-8-000.
c. Date Filed: June 11, 2012.
d. Applicant: United Water.
e. Name of Project: Arlington Wastewater Plant Demonstration
Project.
f. Location: The proposed Arlington Wastewater Plant Demonstration
Project will be located in the effluent outfall pipe of the Arlington
Wastewater Plant, in the Town of Poughkeepsie, Dutchess County, New
York.
g. Filed Pursuant to: 18 CFR part 24, section 24.1.
h. Applicant Contact: Jeffrey McDonald, PE, Project Director, Fuss
& O'Neill, 146 Hartford Road, Manchester, CT 06040; telephone: (860)
646-2469, Ext. 5339; Fax: (860) 533-5143; email:
www.jmcdonald@fando.com.
i. FERC Contact: Any questions on this notice should be addressed
to Henry Ecton, (202) 502-8768, or Email address: henry.ecton@ferc.gov.
j. Deadline for filing comments, protests, and/or motions: July 27,
2012.
Comments, Motions to Intervene, and Protests may be filed
electronically via the Internet. See 18 CFR 385.2001(a)(l)(iii) and the
instructions on the Commission's Web site under the ``eFiling'' link.
If unable to be filed electronically, documents may be paper-filed. To
paper-file, an original and eight copies should be mailed to: Kimberly
D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First
Street NE., Washington, DC 20426. For more information on how to submit
these types of filings, please go to the Commission's Web site located
at https://www.ferc.gov/filing-comments.asp.
Please include the docket number (DI12-8-000) on any comments,
protests, and/or motions filed.
k. Description of Project: The proposed Arlington Wastewater Plant
Demonstration Project would consist of an experimental 15-kW
hydrokinetic turbine generator, designed for use in the pipelines of
municipal wastewater treatment facilities, which will be dropped into a
8-foot-long, 6-foot-wide, and 6-foot-deep concrete diversion chamber
that is located along the 24-inch-diameter, 421-foot-long outfall pipe
from the treatment plant. An outflow pipe from the diversion chamber
deposits the treated water into the Hudson River. A 100-foot-long
transmission line will connect the proposed project to the sewage
treatment plant.
l. Petition for Declaration of Intention: United Water asks that it
be allowed, without a license under part I of the Federal Power Act, to
deploy, test, and study the type of facilities listed above, and use
the power from the test devices to operate miscellaneous ventilation
and lighting equipment at the treatment facility. The experimental
hydrokinetic turbine generator will be tested for a limited time to
determine its durability.
m. Locations of the Application: Copies of this filing are on file
with the Commission and are available for public inspection. This
filing may be viewed on the Web at https://www.ferc.gov using the
``eLibrary'' link. Enter the Docket number excluding the last three
digits in the docket number field to access the document. You may also
register online at https://www.ferc.gov/docs-filing/esubscription.asp to
be notified via email of new filings and issuances related to this or
other pending projects. For assistance, call 1-866-208-3676 or email
FERCOlineSupport@ferc.gov for TTY, call (202) 502-8659. A copy is also
available for inspection and reproduction at the address in item (h)
above.
n. Individuals desiring to be included on the Commission's mailing
list should so indicate by writing to the Secretary of the Commission.
o. Comments, Protests, or Motions to Intervene--Anyone may submit
comments, a protest, or a motion to intervene in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211,
.214. In determining the appropriate action to take, the Commission
will consider all protests or other comments filed, but only those who
file a motion to intervene in accordance with the Commission's Rules
may become a party to the proceeding. Any comments, protests, or
motions to intervene must be received on or before the specified
comment date for the particular application.
p. Filing and Service of Responsive Documents--All filings must
bear in all capital letters the title ``COMMENTS'', ``PROTESTS'', AND/
OR ``MOTIONS TO INTERVENE'', as applicable, and the Docket Number of
the particular application to which the filing refers. A copy of any
Motion to Intervene must also be served upon each representative of the
Applicant specified in the particular application.
q. Agency Comments--Federal, state, and local agencies are invited
to file comments on the described application. A copy of the
application may be obtained by agencies directly from the Applicant. If
an agency does not file comments within the time specified for filing
comments, it will be presumed to have no comments. One copy of an
agency's comments must also be sent to the Applicant's representatives.
Dated: July 2, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012-16752 Filed 7-9-12; 8:45 am]