Whitman River Dam, Inc.; Notice of Availability of Environmental Assessment, 40607-40608 [2012-16749]

Download as PDF mstockstill on DSK4VPTVN1PROD with NOTICES Federal Register / Vol. 77, No. 132 / Tuesday, July 10, 2012 / Notices b. Docket No: DI12–8–000. c. Date Filed: June 11, 2012. d. Applicant: United Water. e. Name of Project: Arlington Wastewater Plant Demonstration Project. f. Location: The proposed Arlington Wastewater Plant Demonstration Project will be located in the effluent outfall pipe of the Arlington Wastewater Plant, in the Town of Poughkeepsie, Dutchess County, New York. g. Filed Pursuant to: 18 CFR part 24, section 24.1. h. Applicant Contact: Jeffrey McDonald, PE, Project Director, Fuss & O’Neill, 146 Hartford Road, Manchester, CT 06040; telephone: (860) 646–2469, Ext. 5339; Fax: (860) 533–5143; email: www.jmcdonald@fando.com. i. FERC Contact: Any questions on this notice should be addressed to Henry Ecton, (202) 502–8768, or Email address: henry.ecton@ferc.gov. j. Deadline for filing comments, protests, and/or motions: July 27, 2012. Comments, Motions to Intervene, and Protests may be filed electronically via the Internet. See 18 CFR 385.2001(a)(l)(iii) and the instructions on the Commission’s Web site under the ‘‘eFiling’’ link. If unable to be filed electronically, documents may be paperfiled. To paper-file, an original and eight copies should be mailed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. For more information on how to submit these types of filings, please go to the Commission’s Web site located at https://www.ferc.gov/filingcomments.asp. Please include the docket number (DI12–8–000) on any comments, protests, and/or motions filed. k. Description of Project: The proposed Arlington Wastewater Plant Demonstration Project would consist of an experimental 15-kW hydrokinetic turbine generator, designed for use in the pipelines of municipal wastewater treatment facilities, which will be dropped into a 8-foot-long, 6-foot-wide, and 6-foot-deep concrete diversion chamber that is located along the 24inch-diameter, 421-foot-long outfall pipe from the treatment plant. An outflow pipe from the diversion chamber deposits the treated water into the Hudson River. A 100-foot-long transmission line will connect the proposed project to the sewage treatment plant. l. Petition for Declaration of Intention: United Water asks that it be allowed, without a license under part I of the Federal Power Act, to deploy, test, and study the type of facilities listed above, VerDate Mar<15>2010 16:28 Jul 09, 2012 Jkt 226001 and use the power from the test devices to operate miscellaneous ventilation and lighting equipment at the treatment facility. The experimental hydrokinetic turbine generator will be tested for a limited time to determine its durability. m. Locations of the Application: Copies of this filing are on file with the Commission and are available for public inspection. This filing may be viewed on the Web at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the Docket number excluding the last three digits in the docket number field to access the document. You may also register online at https://www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, call 1–866–208–3676 or email FERCOlineSupport@ferc.gov for TTY, call (202) 502–8659. A copy is also available for inspection and reproduction at the address in item (h) above. n. Individuals desiring to be included on the Commission’s mailing list should so indicate by writing to the Secretary of the Commission. o. Comments, Protests, or Motions to Intervene—Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application. p. Filing and Service of Responsive Documents—All filings must bear in all capital letters the title ‘‘COMMENTS’’, ‘‘PROTESTS’’, AND/OR ‘‘MOTIONS TO INTERVENE’’, as applicable, and the Docket Number of the particular application to which the filing refers. A copy of any Motion to Intervene must also be served upon each representative of the Applicant specified in the particular application. q. Agency Comments—Federal, state, and local agencies are invited to file comments on the described application. A copy of the application may be obtained by agencies directly from the Applicant. If an agency does not file comments within the time specified for filing comments, it will be presumed to have no comments. One copy of an agency’s comments must also be sent to the Applicant’s representatives. PO 00000 Frm 00044 Fmt 4703 Sfmt 4703 40607 Dated: July 2, 2012. Kimberly D. Bose, Secretary. [FR Doc. 2012–16752 Filed 7–9–12; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13237–003–MA] Whitman River Dam, Inc.; Notice of Availability of Environmental Assessment In accordance with the National Environmental Policy Act of 1969 and the Federal Energy Regulatory Commission’s (Commission’s) regulations, 18 CFR part 380 (Order No. 486, 52 FR 47897), the Office of Energy Projects has reviewed the application for an original license for the Crocker Dam Hydroelectric Project, to be located on the Whitman River, within the Township of Westminster, Worcester County, Massachusetts, and has prepared an Environmental Assessment (EA). The EA contains the staff’s analysis of the potential environmental impacts of the project and concludes that licensing the project, with appropriate environmental protective measures, would not constitute a major federal action that would significantly affect the quality of the human environment. A copy of the EA is on file with the Commission and is available for public inspection. The EA may also be viewed on the Commission’s Web site at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access documents. For assistance, contact FERC Online Support at FERCOnline Support@ferc.gov or toll-free at 1–866– 208–3676, or for TTY, (202) 502–8659. You may also register online at https:// www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support. Any comments on the EA should be filed within 30 days from the date of this notice. Comments may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site https://www.ferc.gov/docs-filing/ efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// E:\FR\FM\10JYN1.SGM 10JYN1 40608 Federal Register / Vol. 77, No. 132 / Tuesday, July 10, 2012 / Notices www.ferc.gov/docs-filing/ eComment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support. Although the Commission strongly encourages electronic filing, documents may also be paper-filed. To paper-file, mail an original and seven copies to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, Washington, DC 20426. Please affix ‘‘Crocker Dam Hydroelectric Project No. 13237–003’’ to all comments. For further information, contact Jeff Browning at (202) 502–8677. 888 First Street NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5 p.m. Eastern Time on July 20, 2012. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5 p.m. Eastern Time on July 30, 2012 Dated: July 2, 2012. Kimberly D. Bose, Secretary. Dated: July 2, 2012. Kimberly D. Bose, Secretary. [FR Doc. 2012–16749 Filed 7–9–12; 8:45 am] [FR Doc. 2012–16755 Filed 7–9–12; 8:45 am] BILLING CODE 6717–01–P BILLING CODE 6717–01–P DEPARTMENT OF ENERGY DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Federal Energy Regulatory Commission Dated: July 2, 2012. Kimberly D. Bose, Secretary. [Docket No. ID–6931–000] [Docket No. EL12–81–000] [FR Doc. 2012–16754 Filed 7–9–12; 8:45 am] Nunn, Samuel A; Notice of Filing Take notice that on June 29, 2012, Samuel A. Nunn submitted for filing, an application for authority to hold interlocking positions, pursuant to section 305(b) of the Federal Power Act, and 18 CFR part 45 and 18 CFR 385.204 (2012) of Federal Energy Regulatory Commission’s (Commission) Regulations. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. On or before the comment date, it is not necessary to serve motions to intervene or protest on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, Wisconsin Electric Power Company; Notice of Petition for Declaratory Order Take notice that on June 29, 2012, pursuant to the Federal Energy Regulatory Commission’s (Commission) Rules of Practice and Procedure, 18 CFR 381.302 and 385.207, Wisconsin Electric Power Company (Wisconsin Electric) submitted a petition requesting the Commission to issue a declaratory order approving: (1) Wisconsin Electric’s proposed accounting treatment of a coal contract buydown; and (2) waiver of the Commission’s fuel clause regulation to allow Wisconsin Electric to recoup the cost of the coal contract buydown through Wisconsin Electric’s cost-based, Formula Rate Wholesale Sales Tariff. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. On or before the comment date, it is not necessary to serve motions to intervene or protests on persons other than the Applicant. mstockstill on DSK4VPTVN1PROD with NOTICES BILLING CODE 6717–01–P VerDate Mar<15>2010 16:28 Jul 09, 2012 Jkt 226001 PO 00000 Frm 00045 Fmt 4703 Sfmt 4703 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL12–80–000] Notice of Petition for Enforcement and Declaratory Order; Exelon Wind 1, LLC; Exelon Wind 2, LLC; Exelon Wind 3, LLC; Exelon Wind 4, LLC; Exelon Wind 5, LLC; Exelon Wind 6, LLC; Exelon Wind 7, LLC; Exelon Wind 8, LLC; Exelon Wind 9, LLC; Exelon Wind 10, LLC; Exelon Wind 11, LLC; High Plains Wind Power, LLC Take notice that on June 29, 2012, pursuant to section 210(h)(2) of the Public Utility Regulatory Policies Act of 1978 (PURPA) and Rule 207 (a)(2) of the Rules of Practice and Procedure of the Federal Energy Regulatory Commission (Commission), Exelon Wind 1, LLC, Exelon Wind 2, LLC, Exelon Wind 3, LLC, Exelon Wind 4, LLC, Exelon Wind 5, LLC, Exelon Wind 6, LLC, Exelon Wind 7, LLC, Exelon Wind 8, LLC, Exelon Wind 9, LLC, Exelon Wind 10, LLC, Exelon Wind 11, LLC, and High Plains Wind Power, LLC (the Exelon Wind Companies) filed a petition requesting the Commission take enforcement action under section 210(h) of PURPA, or in the alternative, issue a declaratory order finding that an order E:\FR\FM\10JYN1.SGM 10JYN1

Agencies

[Federal Register Volume 77, Number 132 (Tuesday, July 10, 2012)]
[Notices]
[Pages 40607-40608]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-16749]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 13237-003-MA]


Whitman River Dam, Inc.; Notice of Availability of Environmental 
Assessment

    In accordance with the National Environmental Policy Act of 1969 
and the Federal Energy Regulatory Commission's (Commission's) 
regulations, 18 CFR part 380 (Order No. 486, 52 FR 47897), the Office 
of Energy Projects has reviewed the application for an original license 
for the Crocker Dam Hydroelectric Project, to be located on the Whitman 
River, within the Township of Westminster, Worcester County, 
Massachusetts, and has prepared an Environmental Assessment (EA).
    The EA contains the staff's analysis of the potential environmental 
impacts of the project and concludes that licensing the project, with 
appropriate environmental protective measures, would not constitute a 
major federal action that would significantly affect the quality of the 
human environment.
    A copy of the EA is on file with the Commission and is available 
for public inspection. The EA may also be viewed on the Commission's 
Web site at https://www.ferc.gov using the ``eLibrary'' link. Enter the 
docket number excluding the last three digits in the docket number 
field to access documents. For assistance, contact FERC Online Support 
at FERCOnlineSupport@ferc.gov or toll-free at 1-866-208-3676, or for 
TTY, (202) 502-8659. You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of 
new filings and issuances related to this or other pending projects. 
For assistance, contact FERC Online Support.
    Any comments on the EA should be filed within 30 days from the date 
of this notice. Comments may be filed electronically via the Internet. 
See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's 
Web site https://www.ferc.gov/docs-filing/efiling.asp. Commenters can 
submit brief comments up to 6,000 characters, without prior 
registration, using the eComment system at https://

[[Page 40608]]

www.ferc.gov/docs-filing/eComment.asp. You must include your name and 
contact information at the end of your comments.
    For assistance, please contact FERC Online Support. Although the 
Commission strongly encourages electronic filing, documents may also be 
paper-filed. To paper-file, mail an original and seven copies to: 
Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 
First Street, Washington, DC 20426. Please affix ``Crocker Dam 
Hydroelectric Project No. 13237-003'' to all comments.
    For further information, contact Jeff Browning at (202) 502-8677.

    Dated: July 2, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012-16749 Filed 7-9-12; 8:45 am]