Onyx Specialty Papers, Inc; Notice of Availability of Environmental Assessment, 40353-40354 [2012-16628]

Download as PDF sroberts on DSK5SPTVN1PROD with NOTICES Federal Register / Vol. 77, No. 131 / Monday, July 9, 2012 / Notices Description: Updated Market Power Analysis of Consolidated Water Power Company, et al. Filed Date: 6/27/12. Accession Number: 20120627–5176. Comments Due: 5 p.m. ET 8/27/12. Docket Numbers: ER10–2609–001. Applicants: Escanaba Paper Company. Description: Escanaba Paper Company Market-Based Rate Tariff to be effective 6/28/2012. Filed Date: 6/27/12. Accession Number: 20120627–5146. Comments Due: 5 p.m. ET 7/18/12. Docket Numbers: ER11–4386–002. Applicants: AmericaWide Energy, LLC. Description: AmericaWide Energy, LLC submits letter to FERC informing them that AmericaWide Energy Holdings, LLC is now the sole member of the company. Filed Date: 6/25/12. Accession Number: 20120627–0201. Comments Due: 5 p.m. ET 7/16/12. Docket Numbers: ER12–1875–001. Applicants: AltaGas Renewable Energy Colorado LLC. Description: Supplement to be effective 12/31/9998. Filed Date: 6/27/12. Accession Number: 20120627–5145. Comments Due: 5 p.m. ET 7/18/12. Docket Numbers: ER12–2065–001. Applicants: Aequitas Energy, Inc. Description: Amendment to Filing 1 to be effective 6/20/2012. Filed Date: 6/27/12. Accession Number: 20120627–5167. Comments Due: 5 p.m. ET 7/18/12. Docket Numbers: ER12–2115–000. Applicants: PJM Interconnection, L.L.C. Description: Notice of Cancellation of Service Agreement 2856 in Docket No. ER11–3527–000 to be effective 5/9/ 2012. Filed Date: 6/27/12. Accession Number: 20120627–5083. Comments Due: 5 p.m. ET 7/18/12. Docket Numbers: ER12–2116–000. Applicants: Northeast Utilities Service Company. Description: NUSCO on Behalf of Western Massachusetts Electric Company Notice of Cancellation of Service Agreement. Filed Date: 6/27/12. Accession Number: 20120627–5112. Comments Due: 5 p.m. ET 7/18/12. Docket Numbers: ER12–2117–000. Applicants: Midwest Independent Transmission System Operator, Inc. Description: G645–G788 Amended GIA (6–27–12) to be effective 6/28/2012. Filed Date: 6/27/12. Accession Number: 20120627–5116. VerDate Mar<15>2010 16:20 Jul 06, 2012 Jkt 226001 Comments Due: 5 p.m. ET 7/18/12. Docket Numbers: ER12–2118–000. Applicants: Pacific Gas and Electric Company. Description: Shelter Cove IA Amendment and WDT SA to be effective 8/27/2012. Filed Date: 6/27/12. Accession Number: 20120627–5154. Comments Due: 5 p.m. ET 7/18/12. Docket Numbers: ER12–2119–000. Applicants: Avista Corporation. Description: Avista KEC Unexecuted SA T–1119 to be effective 9/1/2012. Filed Date: 6/27/12. Accession Number: 20120627–5165. Comments Due: 5 p.m. ET 7/18/12. Take notice that the Commission received the following electric securities filings: Docket Numbers: ES12–45–000. Applicants: Golden Spread Electric Cooperative, Inc. Description: Amendment to Application of Golden Spread Electric Cooperative, Inc. Filed Date: 6/27/12. Accession Number: 20120627–5178. Comments Due: 5 p.m. ET 7/9/12. Take notice that the Commission received the following public utility holding company filings: Docket Numbers: PH12–17–000. Applicants: SteelRiver Infrastructure Partners LP. Description: FERC–65A: Revised Exemption Notification of SteelRiver Infrastructure Partners LP. Filed Date: 6/27/12. Accession Number: 20120627–5103. Comments Due: 5 p.m. ET 7/18/12. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: June 28, 2012. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2012–16689 Filed 7–6–12; 8:45 am] BILLING CODE 6717–01–P PO 00000 Frm 00034 Fmt 4703 Sfmt 4703 40353 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2985–008 Massachusetts] Onyx Specialty Papers, Inc; Notice of Availability of Environmental Assessment In accordance with the National Environmental Policy Act of 1969 and the Federal Energy Regulatory Commission’s (Commission or FERC’s) regulations, 18 Code of Federal Regulations (CFR) Part 380 (Order No. 486, 52 FR 47897), Commission staff has reviewed the Onyx Specialty Papers, Inc.’s application for surrender of project license for the Willow Mill Hydroelectric Project (FERC Project No. 2985) and has prepared an environmental assessment (EA). The project is located on the Housatonic River, in the Town of Lee, Berkshire County, Massachusetts. The EA contains the Commission staff’s analysis of the potential environmental effects of the proposed surrender of license and concludes that the proposal would not constitute a major federal action that would significantly affect the quality of the human environment. A copy of the EA is available for review at the Commission in the Public Reference Room 2–A of the Commission’s offices at 888 First Street NE., Washington, DC 20426. The EA also may be viewed on the Commission’s Internet Web site at (www.ferc.gov) using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. Additional information about the project is available from the Commission’s Web site using the eLibrary link. For assistance with eLibrary, contact FERCOnlineSupport@ferc.gov or tollfree at (866) 208–3676; for TTY contact (202) 502–8659. You may also register online at www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support. For further information, contact Carlisa Linton by telephone at 202–502– 8416 or by email at Carlisa.lintonpeters@ferc.gov. E:\FR\FM\09JYN1.SGM 09JYN1 40354 Federal Register / Vol. 77, No. 131 / Monday, July 9, 2012 / Notices Dated: June 29, 2012. Kimberly D. Bose, Secretary. [FR Doc. 2012–16628 Filed 7–6–12; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13316–001] sroberts on DSK5SPTVN1PROD with NOTICES Mesa de Los Carros Hydro, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On April 3, 2012, Mesa De Los Carros Hydro, LLC filed an application, pursuant to section 4(f) of the Federal Power Act (FPA), proposing to study the feasibility of the Mesa De Los Carros Pumped Storage Project to be located in San Miguel County, New Mexico. The proposed project would be closed loop and would not be built on an existing body of water. The proposed project would consist of: (1) An upper earthen dam with a height of 88 feet and a length of 11,880 feet; (2) an upper reservoir with a surface area of 276 acres, a capacity of 10,394 acre-feet, and a maximum pool elevation of 6,900 feet msl; (3) a lower earthen dam with a height of 110 feet and a length of 9,662 feet; (4) a lower reservoir with a surface area of 396 acres, a capacity of 11,652 acre-feet, and a maximum pool elevation of 5,560 feet msl; (5) a 29-foot-diameter, 9,000-footlong steel penstock; (6) a powerhouse containing 4 generating units with a total installed capacity of 1,154 MW; (7) a 19.5-mile-long, 500 kV transmission line and; (8) appurtenant facilities. The proposed project would have an annual production of 4,214 GWh which would be sold to a local utility. Applicant Contact: Brent L. Smith, Symbiotics, LLC, 811 SW Naito Parkway Ste. 120, Portland, OR 97204 (503) 235– 3424. FERC Contact: Shana Murray (202) 502–8333. Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Competing applications and notices of intent must meet the requirements of 18 CFR 4.36. Comments, motions to intervene, notices of intent, and competing applications may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web VerDate Mar<15>2010 16:20 Jul 06, 2012 Jkt 226001 site https://www.ferc.gov/docs-filing/ efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov or toll free at 1–866–208–3676, or for TTY, (202) 502–8659. Although the Commission strongly encourages electronic filing, documents may also be paper-filed. To paper-file, mail an original and seven copies to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. More information about this project, including a copy of the application, can be viewed or printed on the ‘‘eLibrary’’ link of Commission’s Web site at https://www.ferc.gov/docs-filing/ elibrary.asp. Enter the docket number (P–13316) in the docket number field to access the document. For assistance, contact FERC Online Support. Dated: June 29, 2012. Kimberly D. Bose, Secretary. [FR Doc. 2012–16629 Filed 7–6–12; 8:45 am] BILLING CODE 6717–01–P ENVIRONMENTAL PROTECTION AGENCY [EPA–HQ–OW–2011–1013; FRL 9697–6] Permitting Guidance for Oil and Gas Hydraulic Fracturing Activities Using Diesel Fuels—Draft Environmental Protection Agency (EPA). ACTION: Extension of Comment Period. AGENCY: EPA published on May 10, 2012, Permitting Guidance for Oil and Gas Hydraulic Fracturing Activities Using Diesel Fuels—Draft. The initial public comment period for this proposal was 60 days, ending on July 9, 2012. In response to requests from several stakeholders, this action extends the public comment period for an additional 45 days. DATES: The deadline for submitting comments is August 23, 2012. ADDRESSES: Submit your comments, identified by Docket ID No. EPA–HQ– OW–2011–1013 by one of the following methods: • www.regulations.gov: Follow the on-line instructions for submitting comments. SUMMARY: PO 00000 Frm 00035 Fmt 4703 Sfmt 4703 • Email: OWDocket@epa.gov@epa.gov. • Mail: Permitting Guidance for Oil and Gas Hydraulic Fracturing Activities Using Diesel Fuels—Draft, Environmental Protection Agency, Mailcode: 4606M, 1200 Pennsylvania Ave. NW., Washington, DC. • Hand Delivery: Office of Water (OW) Docket, EPA/DC, EPA West, Room 3334, 1301 Constitution Ave. NW., Washington, DC. Such deliveries are only accepted during the Docket’s normal hours of operation, and special arrangements should be made for deliveries of boxed information. Instructions: Direct your comments to Docket ID No. EPA–HQ–OW–2011– 1013. EPA’s policy is that all comments received will be included in the public docket without change and may be made available online at www.regulations.gov, including any personal information provided, unless the comment includes information claimed to be Confidential Business Information (CBI) or other information whose disclosure is restricted by statute. Do not submit information that you consider to be CBI or otherwise protected through www.regulations.gov. The www.regulations.gov Web site is an ‘‘anonymous access’’ system, which means EPA will not know your identity or contact information unless you provide it in the body of your comment. If you send an email comment directly to EPA without going through www.regulations.gov your email address will be automatically captured and included as part of the comment that is placed in the public docket and made available on the Internet. If you submit an electronic comment, EPA recommends that you include your name and other contact information in the body of your comment and with any disk or CD–ROM you submit. If EPA cannot read your comment due to technical difficulties and cannot contact you for clarification, EPA may not be able to consider your comment. Electronic files should avoid the use of special characters, any form of encryption, and be free of any defects or viruses. For additional information about EPA’s public docket visit the EPA Docket Center homepage at https:// www.epa.gov/epahome/dockets.htm. Docket: All documents in the docket are listed in the www.regulations.gov index. Although listed in the index, some information is not publicly available, e.g., CBI or other information whose disclosure is restricted by statute. Certain other material, such as copyrighted material, will be publicly available only in hard copy. Publicly available docket materials are available E:\FR\FM\09JYN1.SGM 09JYN1

Agencies

[Federal Register Volume 77, Number 131 (Monday, July 9, 2012)]
[Notices]
[Pages 40353-40354]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-16628]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 2985-008 Massachusetts]


Onyx Specialty Papers, Inc; Notice of Availability of 
Environmental Assessment

    In accordance with the National Environmental Policy Act of 1969 
and the Federal Energy Regulatory Commission's (Commission or FERC's) 
regulations, 18 Code of Federal Regulations (CFR) Part 380 (Order No. 
486, 52 FR 47897), Commission staff has reviewed the Onyx Specialty 
Papers, Inc.'s application for surrender of project license for the 
Willow Mill Hydroelectric Project (FERC Project No. 2985) and has 
prepared an environmental assessment (EA). The project is located on 
the Housatonic River, in the Town of Lee, Berkshire County, 
Massachusetts.
    The EA contains the Commission staff's analysis of the potential 
environmental effects of the proposed surrender of license and 
concludes that the proposal would not constitute a major federal action 
that would significantly affect the quality of the human environment.
    A copy of the EA is available for review at the Commission in the 
Public Reference Room 2-A of the Commission's offices at 888 First 
Street NE., Washington, DC 20426. The EA also may be viewed on the 
Commission's Internet Web site at (www.ferc.gov) using the ``eLibrary'' 
link. Enter the docket number excluding the last three digits in the 
docket number field to access the document. Additional information 
about the project is available from the Commission's Web site using the 
eLibrary link. For assistance with eLibrary, contact 
FERCOnlineSupport@ferc.gov or toll-free at (866) 208-3676; for TTY 
contact (202) 502-8659.
    You may also register online at www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances 
related to this or other pending projects. For assistance, contact FERC 
Online Support.
    For further information, contact Carlisa Linton by telephone at 
202-502-8416 or by email at Carlisa.linton-peters@ferc.gov.


[[Page 40354]]


    Dated: June 29, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012-16628 Filed 7-6-12; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.