Atlas Pipeline Mid-Continent WestTex, LLC; Pioneer Natural Resources USA, Inc.; Notice of Intent To Prepare an Environmental Assessment for the Proposed Driver Residue Pipeline Project and Request for Comments on Environmental Issues, 39696-39698 [2012-16370]
Download as PDF
39696
Federal Register / Vol. 77, No. 129 / Thursday, July 5, 2012 / Notices
of the potential environmental effects of
the proposed change from run-of-river
to load-following operations of the
projects and concludes that authorizing
the amendments, with appropriate
environmental protective measures
would not constitute a major federal
action that would significantly affect the
quality of the human environment.
A copy of the Draft Environmental
Assessment is available for review at the
Commission in the Public Reference
Room or may be viewed on the
Commission’s Web site at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC Online
Support at
FERCOnlineSupport@ferc.gov or tollfree at (866) 208–3676, or for TTY
contact (202) 502–8695.
Any comments should be filed within
30 days from the date of this notice.
Comments may be filed electronically
via the Internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site at
https://www.ferc.gov/docs-filing/
efiling.asp. For assistance, please
contact FERC Online Support. Although
the Commission strongly encourages
electronic filing, documents may also be
paper-filed. To paper-file, mail an
original and seven copies to: Kimberly
D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE., Washington, DC 20426. All
comments must include the docket
numbers P–1975–102 and P–2061–086.
For further information, contact
Rachel Price by telephone at 202–502–
8907 or by email at
Rachel.Price@ferc.gov.
Dated: June 26, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012–16367 Filed 7–3–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
TKELLEY on DSK3SPTVN1PROD with NOTICES
[Docket No. CP12–468–000]
Atlas Pipeline Mid-Continent WestTex,
LLC; Pioneer Natural Resources USA,
Inc.; Notice of Intent To Prepare an
Environmental Assessment for the
Proposed Driver Residue Pipeline
Project and Request for Comments on
Environmental Issues
The staff of the Federal Energy
Regulatory Commission (FERC or
VerDate Mar<15>2010
16:48 Jul 03, 2012
Jkt 226001
Commission) will prepare an
environmental assessment (EA) that will
discuss the environmental impacts of
the Driver Residue Pipeline Project
involving construction and operation of
facilities by Atlas Pipeline MidContinent WestTex, LLC and Pioneer
Natural Resources USA, Inc. (Atlas and
Pioneer), as joint applicants, in Midland
County, Texas. The Commission will
use this EA in its decision-making
process to determine whether the
project is in the public convenience and
necessity.
This notice announces the opening of
the scoping process the Commission
will use to gather input from the public
and interested agencies on the project.
Your input will help the Commission
staff determine what issues they need to
evaluate in the EA. Please note that the
scoping period will close on July 27,
2012.
This notice is being sent to the
Commission’s current environmental
mailing list for this project. State and
local government representatives should
notify their constituents of this
proposed project and encourage them to
comment on their areas of concern.
If you are a landowner receiving this
notice, a pipeline company
representative may contact you about
the acquisition of an easement to
construct, operate, and maintain the
proposed facilities. The company would
seek to negotiate a mutually acceptable
agreement. However, if the Commission
approves the project, that approval
conveys with it the right of eminent
domain. Therefore, if easement
negotiations fail to produce an
agreement, the pipeline company could
initiate condemnation proceedings
where compensation would be
determined in accordance with state
law.
Atlas and Pioneer provided
landowners with a fact sheet prepared
by the FERC entitled ‘‘An Interstate
Natural Gas Facility On My Land? What
Do I Need To Know?’’. This fact sheet
addresses a number of typically-asked
questions, including the use of eminent
domain and how to participate in the
Commission’s proceedings. It is also
available for viewing on the FERC Web
site (www.ferc.gov).
Summary of the Proposed Project
Atlas and Pioneer propose to
construct and operate 10.2 miles of 16inch-diameter pipeline in Midland
County, Texas. According to Atlas and
Pioneer, increased natural gas
production in the Permian Basin has
brought about the need for additional
natural gas processing facilities
including the facilities to deliver
PO 00000
Frm 00022
Fmt 4703
Sfmt 4703
residue gas to downstream markets from
the Driver Plant that is presently under
construction. The Driver Residue
Pipeline Project would provide access to
markets via two intrastate and one
interstate natural gas pipeline systems
for approximately 150 million standard
cubic feet of natural gas per day.
The Driver Residue Pipeline Project
would consist of the following facilities:
• Construction of 10.2 miles of 16inch-diameter pipeline and appurtenant
facilities between the Driver Plant and
interconnections with Atmos Energy
Corporation, Northern Natural Gas
Company, and Enterprise Products
Partners, LP.
• Installation of a pig launcher 1 east
of the Driver Plant at the south end of
the proposed pipeline at milepost (MP)
0.0, and a pig receiver at the north end
at MP 10.2.
• Installation of about 40 feet of 6inch-diameter pipeline to connect the
proposed pipeline to the existing Atlas/
Pioneer Shackleford Station near MP
8.3.
The general location of the project
facilities is shown in appendix 1.2
Land Requirements for Construction
Construction of the proposed facilities
would disturb about 93.4 acres of land.
Following construction, Atlas and
Pioneer would maintain about 39.7
acres for permanent operation of the
project’s facilities; the remaining
acreage would be restored and revert to
former uses. The proposed pipeline
would be installed using a 75-foot-wide
construction right-of-way, of which a
30-foot-wide strip would remain as
permanent right-of-way. The proposed
pipeline route parallels existing
pipeline rights-of-way.
The EA Process
The National Environmental Policy
Act (NEPA) requires the Commission to
take into account the environmental
impacts that could result from an action
whenever it considers the issuance of a
Certificate of Public Convenience and
Necessity. NEPA also requires us 3 to
discover and address concerns the
1 A ‘‘pig’’ is a tool that the pipeline company
inserts into and pushes through the pipeline for
cleaning the pipeline, conducting internal
inspections, or other purposes.
2 The appendices referenced in this notice will
not appear in the Federal Register. Copies of
appendices were sent to all those receiving this
notice in the mail and are available at www.ferc.gov
using the link called ‘‘eLibrary’’ or from the
Commission’s Public Reference Room, 888 First
Street NE., Washington, DC 20426, or call (202)
502–8371. For instructions on connecting to
eLibrary, refer to the last page of this notice.
3 ‘‘We,’’ ‘‘us,’’ and ‘‘our’’ refer to the
environmental staff of the Commission’s Office of
Energy Projects.
E:\FR\FM\05JYN1.SGM
05JYN1
Federal Register / Vol. 77, No. 129 / Thursday, July 5, 2012 / Notices
public may have about proposals. This
process is referred to as ‘‘scoping.’’ The
main goal of the scoping process is to
focus the analysis in the EA on the
important environmental issues. By this
notice, the Commission requests public
comments on the scope of the issues to
address in the EA. We will consider all
filed comments during the preparation
of the EA.
In the EA we will discuss impacts that
could occur as a result of the
construction and operation of the
proposed project under these general
headings:
• Geology and soils;
• Land use;
• Water resources, fisheries, and
wetlands;
• Cultural resources;
• Vegetation and wildlife;
• Air quality and noise;
• Endangered and threatened species;
• Public safety; and
• Cumulative impacts
We will also evaluate reasonable
alternatives to the proposed project or
portions of the project, and make
recommendations on how to lessen or
avoid impacts on the various resource
areas.
The EA will present our independent
analysis of the issues. The EA will be
available in the public record through
eLibrary. Depending on the comments
received during the scoping process, we
may also publish and distribute the EA
to the public for an allotted comment
period. We will consider all comments
on the EA before making our
recommendations to the Commission.
To ensure we have the opportunity to
consider and address your comments,
please carefully follow the instructions
in the Public Participation section
below.
With this notice, we are asking
agencies with jurisdiction by law and/
or special expertise with respect to the
environmental issues of this project to
formally cooperate with us in the
preparation of the EA.4 Agencies that
would like to request cooperating
agency status should follow the
instructions for filing comments
provided under the Public Participation
section of this notice.
TKELLEY on DSK3SPTVN1PROD with NOTICES
Consultations Under Section 106 of the
National Historic Preservation Act
In accordance with the Advisory
Council on Historic Preservation’s
implementing regulations for section
106 of the National Historic
4 The Council on Environmental Quality
regulations addressing cooperating agency
responsibilities are at Title 40, Code of Federal
Regulations, § 1501.6.
VerDate Mar<15>2010
16:48 Jul 03, 2012
Jkt 226001
Preservation Act, we are using this
notice to initiate consultation with
applicable State Historic Preservation
Office (SHPO), and to solicit its views
and those of other government agencies,
interested Indian tribes, and the public
on the project’s potential effects on
historic properties.5 We will define the
project-specific Area of Potential Effects
(APE) in consultation with the SHPO as
the project develops. On natural gas
facility projects, the APE at a minimum
encompasses all areas subject to ground
disturbance (examples include
construction right-of-way, contractor/
pipe storage yards, compressor stations,
and access roads). Our EAS for this
project will document our findings on
the impacts on historic properties and
summarize the status of consultations
under section 106.
Public Participation
You can make a difference by
providing us with your specific
comments or concerns about the project.
Your comments should focus on the
potential environmental effects,
reasonable alternatives, and measures to
avoid or lessen environmental impacts.
The more specific your comments, the
more useful they will be. To ensure that
your comments are timely and properly
recorded, please send your comments so
that the Commission receives them in
Washington, DC on or before July 27,
2012.
For your convenience, there are three
methods which you can use to submit
your comments to the Commission. In
all instances please reference the project
docket number (CP12–468) with your
submission. The Commission
encourages electronic filing of
comments and has expert staff available
to assist you at (202) 502–8258 or
efiling@ferc.gov.
(1) You can file your comments
electronically using the eComment
feature on the Commission’s Web site
(www.ferc.gov) under the link to
Documents and Filings. This is an easy
method for interested persons to submit
brief, text-only comments on a project;
(2) You can file your comments
electronically using the eFiling feature
on the Commission’s Web site
(www.ferc.gov) under the link to
Documents and Filings. With eFiling,
you can provide comments in a variety
of formats by attaching them as a file
with your submission. New eFiling
5 The Advisory Council on Historic Preservation’s
regulations are at Title 36, Code of Federal
Regulations, Part 800. Those regulations define
historic properties as any prehistoric or historic
district, site, building, structure, or object included
in or eligible for inclusion in the National Register
of Historic Places.
PO 00000
Frm 00023
Fmt 4703
Sfmt 4703
39697
users must first create an account by
clicking on ‘‘eRegister.’’ You must select
the type of filing you are making. If you
are filing a comment on a particular
project, please select ‘‘Comment on a
Filing’’; or
(3) You can file a paper copy of your
comments by mailing them to the
following address: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 888 First Street NE., Room
1A, Washington, DC 20426.
Environmental Mailing List
The environmental mailing list
includes federal, state, and local
government representatives and
agencies; elected officials; Native
American Tribes; and local libraries and
newspapers. This list also includes all
affected landowners (as defined in the
Commission’s regulations) who are
potential right-of-way grantors, whose
property may be used temporarily for
project purposes, or who own homes
within certain distances of aboveground
facilities, and anyone who submits
comments on the project. We will
update the environmental mailing list as
the analysis proceeds to ensure that we
send the information related to this
environmental review to all individuals,
organizations, and government entities
interested in and/or potentially affected
by the proposed project.
If we publish and distribute the EA,
copies will be sent to the environmental
mailing list for public review and
comment. If you would prefer to receive
a paper copy of the document instead of
the CD version or would like to remove
your name from the mailing list, please
return the attached Information Request
(appendix 2).
Becoming an Intervenor
In addition to involvement in the EA
scoping process, you may want to
become an ‘‘intervenor’’ which is an
official party to the Commission’s
proceeding. Intervenors play a more
formal role in the process and are able
to file briefs, appear at hearings, and be
heard by the courts if they choose to
appeal the Commission’s final ruling.
An intervenor formally participates in
the proceeding by filing a request to
intervene. Instructions for becoming an
intervenor are in the User’s Guide under
the ‘‘e-filing’’ link on the Commission’s
Web site.
Additional Information
Additional information about the
project is available from the
Commission’s Office of External Affairs,
at (866) 208–FERC, or on the FERC Web
site at www.ferc.gov using the
‘‘eLibrary’’ link. Click on the eLibrary
E:\FR\FM\05JYN1.SGM
05JYN1
39698
Federal Register / Vol. 77, No. 129 / Thursday, July 5, 2012 / Notices
link, click on ‘‘General Search’’ and
enter the docket number, excluding the
last three digits in the Docket Number
field (i.e., CP12–468). Be sure you have
selected an appropriate date range. For
assistance, please contact FERC Online
Support at FercOnlineSupport@ferc.gov
or toll free at (866) 208–3676, or for
TTY, contact (202) 502–8659. The
eLibrary link also provides access to the
texts of formal documents issued by the
Commission, such as orders, notices,
and rulemakings.
In addition, the Commission now
offers a free service called eSubscription
which allows you to keep track of all
formal issuances and submittals in
specific dockets. This can reduce the
amount of time you spend researching
proceedings by automatically providing
you with notification of these filings,
document summaries, and direct links
to the documents. Go to www.ferc.gov/
esubscribenow.htm.
Finally, public meetings or site visits
will be posted on the Commission’s
calendar located at www.ferc.gov/
EventCalendar/EventsList.aspx along
with other related information.
Dated: June 27, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012–16370 Filed 7–3–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. RM98–1–000]
Records Governing Off-the-Record
Communications; Public Notice
This constitutes notice, in accordance
with 18 CFR 385.2201(b), of the receipt
of prohibited and exempt off-the-record
communications.
Order No. 607 (64 FR 51222,
September 22, 1999) requires
Commission decisional employees, who
make or receive a prohibited or exempt
off-the-record communication relevant
to the merits of a contested proceeding,
to deliver to the Secretary of the
Commission, a copy of the
communication, if written, or a
summary of the substance of any oral
communication.
Prohibited communications are
included in a public, non-decisional file
associated with, but not a part of, the
decisional record of the proceeding.
Unless the Commission determines that
the prohibited communication and any
responses thereto should become a part
of the decisional record, the prohibited
off-the-record communication will not
be considered by the Commission in
reaching its decision. Parties to a
proceeding may seek the opportunity to
respond to any facts or contentions
made in a prohibited off-the-record
communication, and may request that
the Commission place the prohibited
communication and responses thereto
in the decisional record. The
Commission will grant such a request
only when it determines that fairness so
requires. Any person identified below as
having made a prohibited off-the-record
communication shall serve the
document on all parties listed on the
official service list for the applicable
proceeding in accordance with Rule
2010, 18 CFR 385.2010.
Exempt off-the-record
communications are included in the
decisional record of the proceeding,
unless the communication was with a
cooperating agency as described by 40
CFR 1501.6, made under 18 CFR
385.2201(e)(1)(v).
The following is a list of off-therecord communications recently
received by the Secretary of the
Commission. The communications
listed are grouped by docket numbers in
ascending order. These filings are
available for review at the Commission
in the Public Reference Room or may be
viewed on the Commission’s Web site at
https://www.ferc.gov using the eLibrary
link. Enter the docket number,
excluding the last three digits, in the
docket number field to access the
document. For assistance, please contact
FERC, Online Support at
FERCOnlineSupport@ferc.gov or toll
free at (866)208–3676, or for TTY,
contact (202)502–8659.
Communication
date
Docket No.
Prohibited:
1. P–2114–000 ......................................................................................................................
2. ER12–1346–000 1 ..............................................................................................................
Exempt:
1. ER12–1699–000 ................................................................................................................
2. P–14241–000 ....................................................................................................................
3. P–12690–005 ....................................................................................................................
4. CP11–72–000 ....................................................................................................................
5. P–12690–005 ....................................................................................................................
6. CP12–72–000 ....................................................................................................................
7. CP12–11–001 ....................................................................................................................
8. CP11–161–000 ..................................................................................................................
9. CP11–56–000 ....................................................................................................................
10. CP11–161–000 ................................................................................................................
Presenter or requester
6–7–12
6–11–12
Tim Culbertson.
Peter Pry.
6–7–12
6–12–12
6–12–12
6–13–12
6–19–12
6–19–12
6–21–12
6–26–12
6–26–12
6–26–12
´
Hon. Ben Ray Lujan.
Hon. Mia Costello.
Craig Trueblood.2
Members of Congress.3
Craig Trueblood.4
Mr. and Mrs. G. Heinsohn
Jason Wallace.
PA House of Representatives.5
Hon. Nita M. Lowey.
Robert M. Ewbank.
1 Pertains
to Docket Nos. ER12–1346–000, ER12–1347–001, ER12–1338–000, ER12–1343–000 and ER12–1345–000.
record.
Rodney Alexander, Steve Scalise, John Fleming, Charles Boustany Jr., MD, Bill Cassidy, MD and Jeff Landry.
4 Email record.
5 Hons. Rosemary Brown, Michael Peifer and Elisabeth Baker.
2 Email
TKELLEY on DSK3SPTVN1PROD with NOTICES
3 Hons.
VerDate Mar<15>2010
16:48 Jul 03, 2012
Jkt 226001
PO 00000
Frm 00024
Fmt 4703
Sfmt 9990
E:\FR\FM\05JYN1.SGM
05JYN1
Agencies
[Federal Register Volume 77, Number 129 (Thursday, July 5, 2012)]
[Notices]
[Pages 39696-39698]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-16370]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP12-468-000]
Atlas Pipeline Mid-Continent WestTex, LLC; Pioneer Natural
Resources USA, Inc.; Notice of Intent To Prepare an Environmental
Assessment for the Proposed Driver Residue Pipeline Project and Request
for Comments on Environmental Issues
The staff of the Federal Energy Regulatory Commission (FERC or
Commission) will prepare an environmental assessment (EA) that will
discuss the environmental impacts of the Driver Residue Pipeline
Project involving construction and operation of facilities by Atlas
Pipeline Mid-Continent WestTex, LLC and Pioneer Natural Resources USA,
Inc. (Atlas and Pioneer), as joint applicants, in Midland County,
Texas. The Commission will use this EA in its decision-making process
to determine whether the project is in the public convenience and
necessity.
This notice announces the opening of the scoping process the
Commission will use to gather input from the public and interested
agencies on the project. Your input will help the Commission staff
determine what issues they need to evaluate in the EA. Please note that
the scoping period will close on July 27, 2012.
This notice is being sent to the Commission's current environmental
mailing list for this project. State and local government
representatives should notify their constituents of this proposed
project and encourage them to comment on their areas of concern.
If you are a landowner receiving this notice, a pipeline company
representative may contact you about the acquisition of an easement to
construct, operate, and maintain the proposed facilities. The company
would seek to negotiate a mutually acceptable agreement. However, if
the Commission approves the project, that approval conveys with it the
right of eminent domain. Therefore, if easement negotiations fail to
produce an agreement, the pipeline company could initiate condemnation
proceedings where compensation would be determined in accordance with
state law.
Atlas and Pioneer provided landowners with a fact sheet prepared by
the FERC entitled ``An Interstate Natural Gas Facility On My Land? What
Do I Need To Know?''. This fact sheet addresses a number of typically-
asked questions, including the use of eminent domain and how to
participate in the Commission's proceedings. It is also available for
viewing on the FERC Web site (www.ferc.gov).
Summary of the Proposed Project
Atlas and Pioneer propose to construct and operate 10.2 miles of
16-inch-diameter pipeline in Midland County, Texas. According to Atlas
and Pioneer, increased natural gas production in the Permian Basin has
brought about the need for additional natural gas processing facilities
including the facilities to deliver residue gas to downstream markets
from the Driver Plant that is presently under construction. The Driver
Residue Pipeline Project would provide access to markets via two
intrastate and one interstate natural gas pipeline systems for
approximately 150 million standard cubic feet of natural gas per day.
The Driver Residue Pipeline Project would consist of the following
facilities:
Construction of 10.2 miles of 16-inch-diameter pipeline
and appurtenant facilities between the Driver Plant and
interconnections with Atmos Energy Corporation, Northern Natural Gas
Company, and Enterprise Products Partners, LP.
Installation of a pig launcher \1\ east of the Driver
Plant at the south end of the proposed pipeline at milepost (MP) 0.0,
and a pig receiver at the north end at MP 10.2.
---------------------------------------------------------------------------
\1\ A ``pig'' is a tool that the pipeline company inserts into
and pushes through the pipeline for cleaning the pipeline,
conducting internal inspections, or other purposes.
---------------------------------------------------------------------------
Installation of about 40 feet of 6-inch-diameter pipeline
to connect the proposed pipeline to the existing Atlas/Pioneer
Shackleford Station near MP 8.3.
The general location of the project facilities is shown in appendix
1.\2\
---------------------------------------------------------------------------
\2\ The appendices referenced in this notice will not appear in
the Federal Register. Copies of appendices were sent to all those
receiving this notice in the mail and are available at www.ferc.gov
using the link called ``eLibrary'' or from the Commission's Public
Reference Room, 888 First Street NE., Washington, DC 20426, or call
(202) 502-8371. For instructions on connecting to eLibrary, refer to
the last page of this notice.
---------------------------------------------------------------------------
Land Requirements for Construction
Construction of the proposed facilities would disturb about 93.4
acres of land. Following construction, Atlas and Pioneer would maintain
about 39.7 acres for permanent operation of the project's facilities;
the remaining acreage would be restored and revert to former uses. The
proposed pipeline would be installed using a 75-foot-wide construction
right-of-way, of which a 30-foot-wide strip would remain as permanent
right-of-way. The proposed pipeline route parallels existing pipeline
rights-of-way.
The EA Process
The National Environmental Policy Act (NEPA) requires the
Commission to take into account the environmental impacts that could
result from an action whenever it considers the issuance of a
Certificate of Public Convenience and Necessity. NEPA also requires us
\3\ to discover and address concerns the
[[Page 39697]]
public may have about proposals. This process is referred to as
``scoping.'' The main goal of the scoping process is to focus the
analysis in the EA on the important environmental issues. By this
notice, the Commission requests public comments on the scope of the
issues to address in the EA. We will consider all filed comments during
the preparation of the EA.
---------------------------------------------------------------------------
\3\ ``We,'' ``us,'' and ``our'' refer to the environmental staff
of the Commission's Office of Energy Projects.
---------------------------------------------------------------------------
In the EA we will discuss impacts that could occur as a result of
the construction and operation of the proposed project under these
general headings:
Geology and soils;
Land use;
Water resources, fisheries, and wetlands;
Cultural resources;
Vegetation and wildlife;
Air quality and noise;
Endangered and threatened species;
Public safety; and
Cumulative impacts
We will also evaluate reasonable alternatives to the proposed
project or portions of the project, and make recommendations on how to
lessen or avoid impacts on the various resource areas.
The EA will present our independent analysis of the issues. The EA
will be available in the public record through eLibrary. Depending on
the comments received during the scoping process, we may also publish
and distribute the EA to the public for an allotted comment period. We
will consider all comments on the EA before making our recommendations
to the Commission. To ensure we have the opportunity to consider and
address your comments, please carefully follow the instructions in the
Public Participation section below.
With this notice, we are asking agencies with jurisdiction by law
and/or special expertise with respect to the environmental issues of
this project to formally cooperate with us in the preparation of the
EA.\4\ Agencies that would like to request cooperating agency status
should follow the instructions for filing comments provided under the
Public Participation section of this notice.
---------------------------------------------------------------------------
\4\ The Council on Environmental Quality regulations addressing
cooperating agency responsibilities are at Title 40, Code of Federal
Regulations, Sec. 1501.6.
---------------------------------------------------------------------------
Consultations Under Section 106 of the National Historic Preservation
Act
In accordance with the Advisory Council on Historic Preservation's
implementing regulations for section 106 of the National Historic
Preservation Act, we are using this notice to initiate consultation
with applicable State Historic Preservation Office (SHPO), and to
solicit its views and those of other government agencies, interested
Indian tribes, and the public on the project's potential effects on
historic properties.\5\ We will define the project-specific Area of
Potential Effects (APE) in consultation with the SHPO as the project
develops. On natural gas facility projects, the APE at a minimum
encompasses all areas subject to ground disturbance (examples include
construction right-of-way, contractor/pipe storage yards, compressor
stations, and access roads). Our EAS for this project will document our
findings on the impacts on historic properties and summarize the status
of consultations under section 106.
---------------------------------------------------------------------------
\5\ The Advisory Council on Historic Preservation's regulations
are at Title 36, Code of Federal Regulations, Part 800. Those
regulations define historic properties as any prehistoric or
historic district, site, building, structure, or object included in
or eligible for inclusion in the National Register of Historic
Places.
---------------------------------------------------------------------------
Public Participation
You can make a difference by providing us with your specific
comments or concerns about the project. Your comments should focus on
the potential environmental effects, reasonable alternatives, and
measures to avoid or lessen environmental impacts. The more specific
your comments, the more useful they will be. To ensure that your
comments are timely and properly recorded, please send your comments so
that the Commission receives them in Washington, DC on or before July
27, 2012.
For your convenience, there are three methods which you can use to
submit your comments to the Commission. In all instances please
reference the project docket number (CP12-468) with your submission.
The Commission encourages electronic filing of comments and has expert
staff available to assist you at (202) 502-8258 or efiling@ferc.gov.
(1) You can file your comments electronically using the eComment
feature on the Commission's Web site (www.ferc.gov) under the link to
Documents and Filings. This is an easy method for interested persons to
submit brief, text-only comments on a project;
(2) You can file your comments electronically using the eFiling
feature on the Commission's Web site (www.ferc.gov) under the link to
Documents and Filings. With eFiling, you can provide comments in a
variety of formats by attaching them as a file with your submission.
New eFiling users must first create an account by clicking on
``eRegister.'' You must select the type of filing you are making. If
you are filing a comment on a particular project, please select
``Comment on a Filing''; or
(3) You can file a paper copy of your comments by mailing them to
the following address: Kimberly D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street NE., Room 1A, Washington, DC
20426.
Environmental Mailing List
The environmental mailing list includes federal, state, and local
government representatives and agencies; elected officials; Native
American Tribes; and local libraries and newspapers. This list also
includes all affected landowners (as defined in the Commission's
regulations) who are potential right-of-way grantors, whose property
may be used temporarily for project purposes, or who own homes within
certain distances of aboveground facilities, and anyone who submits
comments on the project. We will update the environmental mailing list
as the analysis proceeds to ensure that we send the information related
to this environmental review to all individuals, organizations, and
government entities interested in and/or potentially affected by the
proposed project.
If we publish and distribute the EA, copies will be sent to the
environmental mailing list for public review and comment. If you would
prefer to receive a paper copy of the document instead of the CD
version or would like to remove your name from the mailing list, please
return the attached Information Request (appendix 2).
Becoming an Intervenor
In addition to involvement in the EA scoping process, you may want
to become an ``intervenor'' which is an official party to the
Commission's proceeding. Intervenors play a more formal role in the
process and are able to file briefs, appear at hearings, and be heard
by the courts if they choose to appeal the Commission's final ruling.
An intervenor formally participates in the proceeding by filing a
request to intervene. Instructions for becoming an intervenor are in
the User's Guide under the ``e-filing'' link on the Commission's Web
site.
Additional Information
Additional information about the project is available from the
Commission's Office of External Affairs, at (866) 208-FERC, or on the
FERC Web site at www.ferc.gov using the ``eLibrary'' link. Click on the
eLibrary
[[Page 39698]]
link, click on ``General Search'' and enter the docket number,
excluding the last three digits in the Docket Number field (i.e., CP12-
468). Be sure you have selected an appropriate date range. For
assistance, please contact FERC Online Support at
FercOnlineSupport@ferc.gov or toll free at (866) 208-3676, or for TTY,
contact (202) 502-8659. The eLibrary link also provides access to the
texts of formal documents issued by the Commission, such as orders,
notices, and rulemakings.
In addition, the Commission now offers a free service called
eSubscription which allows you to keep track of all formal issuances
and submittals in specific dockets. This can reduce the amount of time
you spend researching proceedings by automatically providing you with
notification of these filings, document summaries, and direct links to
the documents. Go to www.ferc.gov/esubscribenow.htm.
Finally, public meetings or site visits will be posted on the
Commission's calendar located at www.ferc.gov/EventCalendar/EventsList.aspx along with other related information.
Dated: June 27, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012-16370 Filed 7-3-12; 8:45 am]
BILLING CODE 6717-01-P