HollyFrontier Refining and Marketing LLC v. Osage Pipe Line Company, LLC; Notice of Complaint, 39695 [2012-16366]
Download as PDF
TKELLEY on DSK3SPTVN1PROD with NOTICES
Federal Register / Vol. 77, No. 129 / Thursday, July 5, 2012 / Notices
Description: The Integrys Energy
Group submits Updated Market
Analysis for their market based rate
authority in the Central Region.
Filed Date: 6/26/12.
Accession Number: 20120626–5146.
Comments Due: 5 p.m. ET 8/27/12.
Docket Numbers: ER10–2839–001.
Applicants: Midland Cogeneration
Venture Limited Partnership.
Description: Updated Market Power
Analysis of Midland Cogeneration
Venture Limited Partnership.
Filed Date: 6/27/12.
Accession Number: 20120627–5061.
Comments Due: 5 p.m. ET 8/27/12.
Docket Numbers: ER12–1803–001.
Applicants: Cleco Power LLC.
Description: Compliance Filing to be
effective 5/14/2012.
Filed Date: 6/27/12.
Accession Number: 20120627–5034.
Comments Due: 5 p.m. ET 7/18/12.
Docket Numbers: ER12–2071–002.
Applicants: Verde Energy USA New
York, LLC.
Description: Revised Amended MBR
Filing to be effective 8/20/2012.
Filed Date: 6/27/12.
Accession Number: 20120627–5029.
Comments Due: 5 p.m. ET 7/18/12.
Docket Numbers: ER12–2112–000.
Applicants: ISO New England Inc.
Description: ISO New England Inc.
Informational Filing Related to the Peak
Energy Rent Feature of the Forward
Capacity Market.
Filed Date: 6/26/12.
Accession Number: 20120626–5161.
Comments Due: 5 p.m. ET 7/17/12.
Docket Numbers: ER12–2113–000.
Applicants: Hess Small Business
Services LLC.
Description: Market-Based Rate Tariff
Revisions to be effective 6/28/2012.
Filed Date: 6/27/12.
Accession Number: 20120627–5066.
Comments Due: 5 p.m. ET 7/18/12.
Docket Numbers: ER12–2114–000.
Applicants: Carolina Power & Light
Company.
Description: Rate Schedule No. 184 of
Carolina Power and Light Company to
be effective 7/1/2012.
Filed Date: 6/27/12.
Accession Number: 20120627–5072.
Comments Due: 5 p.m. ET 7/18/12.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5 p.m. Eastern
VerDate Mar<15>2010
16:48 Jul 03, 2012
Jkt 226001
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: June 27, 2012.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2012–16386 Filed 7–3–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. OR12–21–000]
HollyFrontier Refining and Marketing
LLC v. Osage Pipe Line Company,
LLC; Notice of Complaint
Take notice that on June 25, 2012,
pursuant to section 13(1) of the
Interstate Commerce Act (ICA); 49
U.S.C. App. § 13(1), Rule 206 of the
Rules of Practice and Procedure of the
Federal Energy Regulatory Commission
(Commission); 18 CFR 385.206 (2011),
and the Commission’s Procedural Rules
Applicable to Oil Pipeline Proceedings;
18 CFR 343.1(a) and 343.2(c),
HollyFrontier Refining and Marketing
LLC (Complainant) filed a formal
complaint against Osage Pipe Line
Company, LLC (Respondent) alleging
that the Respondent has violated the
ICA by charging unjust and
unreasonable rates for Respondent’s
interstate transportation service, as set
forth more fully in the Complaint.
The Complainant states that a copy of
the Complaint has been served on the
contact for the Respondent as listed on
the Commission list of Corporate
Officials.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. The Respondent’s answer
and all interventions, or protests must
be filed on or before the comment date.
PO 00000
Frm 00021
Fmt 4703
Sfmt 4703
39695
The Respondent’s answer, motions to
intervene, and protests must be served
on the Complainants.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5 p.m. Eastern Time
on July 16, 2012.
Dated: June 26, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012–16366 Filed 7–3–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project Nos. 1975–102 and 2061–086]
Idaho Power Company; Notice of
Availability of Draft Environmental
Assessment
In accordance with the National
Environmental Policy Act of 1969 and
the Federal Energy Regulatory
Commission’s (Commission or FERC)
regulations, 18 CFR part 380,
Commission staff has reviewed the
applications for amendment of the
licenses for the Bliss Project
(FERC No. 1975) and Lower Salmon
Falls Project (FERC No. 2061) and has
prepared a Draft Environmental
Assessment. The projects are located on
the Snake River in Gooding, Twin Falls,
and Elmore Counties, Idaho. Both
projects occupy lands managed by the
Bureau of Land Management. The
Lower Salmon Falls Project also
occupies lands within the Hagerman
Fossil Beds National Monument
managed by the National Park Service.
The Draft Environmental Assessment
contains the Commission staff’s analysis
E:\FR\FM\05JYN1.SGM
05JYN1
Agencies
[Federal Register Volume 77, Number 129 (Thursday, July 5, 2012)]
[Notices]
[Page 39695]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-16366]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. OR12-21-000]
HollyFrontier Refining and Marketing LLC v. Osage Pipe Line
Company, LLC; Notice of Complaint
Take notice that on June 25, 2012, pursuant to section 13(1) of the
Interstate Commerce Act (ICA); 49 U.S.C. App. Sec. 13(1), Rule 206 of
the Rules of Practice and Procedure of the Federal Energy Regulatory
Commission (Commission); 18 CFR 385.206 (2011), and the Commission's
Procedural Rules Applicable to Oil Pipeline Proceedings; 18 CFR
343.1(a) and 343.2(c), HollyFrontier Refining and Marketing LLC
(Complainant) filed a formal complaint against Osage Pipe Line Company,
LLC (Respondent) alleging that the Respondent has violated the ICA by
charging unjust and unreasonable rates for Respondent's interstate
transportation service, as set forth more fully in the Complaint.
The Complainant states that a copy of the Complaint has been served
on the contact for the Respondent as listed on the Commission list of
Corporate Officials.
Any person desiring to intervene or to protest this filing must
file in accordance with Rules 211 and 214 of the Commission's Rules of
Practice and Procedure (18 CFR 385.211, 385.214). Protests will be
considered by the Commission in determining the appropriate action to
be taken, but will not serve to make protestants parties to the
proceeding. Any person wishing to become a party must file a notice of
intervention or motion to intervene, as appropriate. The Respondent's
answer and all interventions, or protests must be filed on or before
the comment date. The Respondent's answer, motions to intervene, and
protests must be served on the Complainants.
The Commission encourages electronic submission of protests and
interventions in lieu of paper using the ``eFiling'' link at https://www.ferc.gov. Persons unable to file electronically should submit an
original and 14 copies of the protest or intervention to the Federal
Energy Regulatory Commission, 888 First Street NE., Washington, DC
20426.
This filing is accessible on-line at https://www.ferc.gov, using the
``eLibrary'' link and is available for review in the Commission's
Public Reference Room in Washington, DC. There is an ``eSubscription''
link on the Web site that enables subscribers to receive email
notification when a document is added to a subscribed docket(s). For
assistance with any FERC Online service, please email
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For
TTY, call (202) 502-8659.
Comment Date: 5 p.m. Eastern Time on July 16, 2012.
Dated: June 26, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012-16366 Filed 7-3-12; 8:45 am]
BILLING CODE 6717-01-P