Idaho Power Company; Notice of Application for Amendment of License and Soliciting Comments, Motions To Intervene, and Protests, 38619-38620 [2012-15832]
Download as PDF
srobinson on DSK4SPTVN1PROD with NOTICES
Federal Register / Vol. 77, No. 125 / Thursday, June 28, 2012 / Notices
Idaho Power, PO Box 70, 1221 W Idaho
Street, Boise, ID 83702, (208) 388–2964,
lwardle@idahopower.com.
i. FERC Contact: Dr. Mark Ivy, (202)
502–6156, mark.ivy@ferc.gov.
j. Deadline for filing comments,
motions to intervene, and protests: July
23, 2012.
All documents may be filed
electronically via the Internet. See,
18 CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site at https://www.ferc.gov/docs-filing/
efiling.asp. For assistance, please
contact FERC Online Support at
FERCOnlineSupport@ferc.gov or toll
free at 1–866–208–3676, or for TTY,
(202) 502–8659. If unable to be filed
electronically, documents may be paperfiled. To paper-file, an original and
seven copies should be mailed to:
Secretary, Federal Energy Regulatory
Commission, 888 First Street NE.,
Washington, DC 20426. Commenters
can submit brief comments up to 6,000
characters, without prior registration,
using the eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. Please include the
project number (P–2061–088) on any
comments, motions, or
recommendations filed.
The Commission’s Rules of Practice
and Procedure require all intervenors
filing documents with the Commission
to serve a copy of that document on
each person whose name appears on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
k. Description of the Application:
Idaho Power Company, licensee of the
Lower Salmon Falls Hydroelectric
Project, has filed a Land Management
Plan (LMP) update for the project. The
LMP is a comprehensive plan to manage
project lands including control of
noxious weeds, and protection and
enhancement of riparian and shoreline
habitats in a manner that is consistent
with license requirements and project
purposes, and to address the needs and
interests of stakeholders.
l. Locations of the Application: A
copy of the application is available for
inspection and reproduction at the
Commission’s Public Reference Room,
located at 888 First Street NE., Room
2A, Washington, DC 20426, or by calling
(202) 502–8371. This filing may also be
viewed on the Commission’s Web site at
https://www.ferc.gov using the
VerDate Mar<15>2010
16:35 Jun 27, 2012
Jkt 226001
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits
(P–2061) in the docket number field to
access the document. You may also
register online at https://www.ferc.gov/
docs-filing/esubscription.asp to be
notified via email of new filings and
issuances related to this or other
pending projects. For assistance, call 1–
866–208–3676 or email
FERCOnlineSupport@ferc.gov, for TTY,
call (202) 502–8659. A copy is also
available for inspection and
reproduction at the address in item (h)
above.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
In determining the appropriate action to
take, the Commission will consider all
protests or other comments filed, but
only those who file a motion to
intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
o. Filing and Service of Responsive
Documents: Any filing must (1) bear in
all capital letters the title
‘‘COMMENTS’’, ‘‘PROTEST’’, or
‘‘MOTION TO INTERVENE’’ as
applicable; (2) set forth in the heading
the name of the applicant and the
project number of the application to
which the filing responds; (3) furnish
the name, address, and telephone
number of the person protesting or
intervening; and (4) otherwise comply
with the requirements of 18 CFR
385.2001 through 385.2005. All
comments, motions to intervene, or
protests must set forth their evidentiary
basis. All comments, motions to
intervene, or protests should relate to
project works which are the subject of
the amendment application. Agencies
may obtain copies of the application
directly from the applicant. Any filing
made by an intervenor must be
accompanied by proof of service on all
persons listed in the service list
prepared by the Commission in this
proceeding, in accordance with 18 CFR
385.2010.
PO 00000
Frm 00051
Fmt 4703
Sfmt 4703
38619
Dated: June 21, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012–15830 Filed 6–27–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 1975–109]
Idaho Power Company; Notice of
Application for Amendment of License
and Soliciting Comments, Motions To
Intervene, and Protests
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Application Type: Land
Management Plan Update.
b. Project No.: 1975–109.
c. Date Filed: March 29, 2012.
d. Applicant: Idaho Power Company.
e. Name of Project: Bliss
Hydroelectric Project.
f. Location: The project is located in
south-central Idaho on the Snake River
in Gooding, Twin Falls, and Elmore
Counties.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791a–825r.
h. Applicant Contact: L. Lewis
Wardle, Licensing Program Coordinator,
Idaho Power, P.O. Box 70, 1221 W.
Idaho Street, Boise, ID 83702, (208) 388–
2964, lwardle@idahopower.com.
i. FERC Contact: Dr. Mark Ivy, (202)
502–6156, mark.ivy@ferc.gov.
j. Deadline for filing comments,
motions to intervene, and protests: July
23, 2012.
All documents may be filed
electronically via the Internet. See,
18 CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site at https://www.ferc.gov/docs-filing/
efiling.asp. For assistance, please
contact FERC Online Support at
FERCOnlineSupport@ferc.gov or toll
free at 1–866–208–3676, or for TTY,
(202) 502–8659. If unable to be filed
electronically, documents may be paperfiled. To paper-file, an original and
seven copies should be mailed to:
Secretary, Federal Energy Regulatory
Commission, 888 First Street NE.,
Washington, DC 20426. Commenters
can submit brief comments up to 6,000
characters, without prior registration,
using the eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. Please include the
project number (P–1975–109) on any
E:\FR\FM\28JNN1.SGM
28JNN1
srobinson on DSK4SPTVN1PROD with NOTICES
38620
Federal Register / Vol. 77, No. 125 / Thursday, June 28, 2012 / Notices
comments, motions, or
recommendations filed.
The Commission’s Rules of Practice
and Procedure require all intervenors
filing documents with the Commission
to serve a copy of that document on
each person whose name appears on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
k. Description of the Application:
Idaho Power Company, licensee of the
Bliss Hydroelectric Project, has filed a
Land Management Plan (LMP) update
for the project. The LMP is a
comprehensive plan to manage project
lands including control of noxious
weeds, and protection and enhancement
of riparian and shoreline habitats in a
manner that is consistent with license
requirements and project purposes, and
to address the needs and interests of
stakeholders.
l. Locations of the Application: A
copy of the application is available for
inspection and reproduction at the
Commission’s Public Reference Room,
located at 888 First Street NE., Room
2A, Washington, DC 20426, or by calling
(202) 502–8371. This filing may also be
viewed on the Commission’s Web site at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits
(P–1975) in the docket number field to
access the document. You may also
register online at https://www.ferc.gov/
docs-filing/esubscription.asp to be
notified via email of new filings and
issuances related to this or other
pending projects. For assistance, call
1–866–208–3676 or email
FERCOnlineSupport@ferc.gov, for TTY,
call (202) 502–8659. A copy is also
available for inspection and
reproduction at the address in item (h)
above.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions To
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
In determining the appropriate action to
take, the Commission will consider all
protests or other comments filed, but
only those who file a motion to
intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
VerDate Mar<15>2010
16:35 Jun 27, 2012
Jkt 226001
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
o. Filing and Service of Responsive
Documents: Any filing must (1) bear in
all capital letters the title
‘‘COMMENTS,’’ ‘‘PROTEST,’’ or
‘‘MOTION TO INTERVENE’’ as
applicable; (2) set forth in the heading
the name of the applicant and the
project number of the application to
which the filing responds; (3) furnish
the name, address, and telephone
number of the person protesting or
intervening; and (4) otherwise comply
with the requirements of 18 CFR
385.2001 through 385.2005. All
comments, motions to intervene, or
protests must set forth their evidentiary
basis. All comments, motions to
intervene, or protests should relate to
project works which are the subject of
the amendment application. Agencies
may obtain copies of the application
directly from the applicant. Any filing
made by an intervenor must be
accompanied by proof of service on all
persons listed in the service list
prepared by the Commission in this
proceeding, in accordance with 18 CFR
385.2010.
Dated: June 21, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012–15832 Filed 6–27–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2777–115]
Idaho Power Company; Notice of
Application for Amendment of License
And Soliciting Comments, Motions To
Intervene, and Protests
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Application Type: Land
Management Plan Update.
b. Project No.: 2777–115.
c. Date Filed: March 29, 2012.
d. Applicant: Idaho Power Company.
e. Name of Project: Upper Salmon
Falls Hydroelectric Project.
f. Location: The project is located in
south-central Idaho on the Snake River
in Gooding and Twin Falls Counties.
g. Filed Pursuant to: Federal Power
Act, 16 USC 791a–825r.
h. Applicant Contact: L. Lewis
Wardle, Licensing Program Coordinator,
PO 00000
Frm 00052
Fmt 4703
Sfmt 4703
Idaho Power, PO Box 70, 1221 W Idaho
Street, Boise, ID 83702, (208) 388–2964,
lwardle@idahopower.com.
i. FERC Contact: Dr. Mark Ivy, (202)
502–6156, mark.ivy@ferc.gov.
j. Deadline for filing comments,
motions to intervene, and protests: July
23, 2012.
All documents may be filed
electronically via the Internet. See,
18 CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site at https://www.ferc.gov/docs-filing/
efiling.asp. For assistance, please
contact FERC Online Support at
FERCOnlineSupport@ferc.gov or toll
free at 1–866–208–3676, or for TTY,
(202) 502–8659. If unable to be filed
electronically, documents may be paperfiled. To paper-file, an original and
seven copies should be mailed to:
Secretary, Federal Energy Regulatory
Commission, 888 First Street NE.,
Washington, DC 20426. Commenters
can submit brief comments up to 6,000
characters, without prior registration,
using the eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. Please include the
project number (P–2777–115) on any
comments, motions, or
recommendations filed.
The Commission’s Rules of Practice
and Procedure require all intervenors
filing documents with the Commission
to serve a copy of that document on
each person whose name appears on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
k. Description of the Application:
Idaho Power Company, licensee of the
Upper Salmon Falls Hydroelectric
Project, has filed a Land Management
Plan (LMP) update for the project. The
LMP is a comprehensive plan to manage
project lands including control of
noxious weeds, and protection and
enhancement of riparian and shoreline
habitats in a manner that is consistent
with license requirements and project
purposes, and to address the needs and
interests of stakeholders.
l. Locations of the Application: A
copy of the application is available for
inspection and reproduction at the
Commission’s Public Reference Room,
located at 888 First Street NE., Room
2A, Washington, DC 20426, or by calling
(202) 502–8371. This filing may also be
viewed on the Commission’s Web site at
https://www.ferc.gov using the
E:\FR\FM\28JNN1.SGM
28JNN1
Agencies
[Federal Register Volume 77, Number 125 (Thursday, June 28, 2012)]
[Notices]
[Pages 38619-38620]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-15832]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 1975-109]
Idaho Power Company; Notice of Application for Amendment of
License and Soliciting Comments, Motions To Intervene, and Protests
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Application Type: Land Management Plan Update.
b. Project No.: 1975-109.
c. Date Filed: March 29, 2012.
d. Applicant: Idaho Power Company.
e. Name of Project: Bliss Hydroelectric Project.
f. Location: The project is located in south-central Idaho on the
Snake River in Gooding, Twin Falls, and Elmore Counties.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a-825r.
h. Applicant Contact: L. Lewis Wardle, Licensing Program
Coordinator, Idaho Power, P.O. Box 70, 1221 W. Idaho Street, Boise, ID
83702, (208) 388-2964, lwardle@idahopower.com.
i. FERC Contact: Dr. Mark Ivy, (202) 502-6156, mark.ivy@ferc.gov.
j. Deadline for filing comments, motions to intervene, and
protests: July 23, 2012.
All documents may be filed electronically via the Internet. See, 18
CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web
site at https://www.ferc.gov/docs-filing/efiling.asp. For assistance,
please contact FERC Online Support at FERCOnlineSupport@ferc.gov or
toll free at 1-866-208-3676, or for TTY, (202) 502-8659. If unable to
be filed electronically, documents may be paper-filed. To paper-file,
an original and seven copies should be mailed to: Secretary, Federal
Energy Regulatory Commission, 888 First Street NE., Washington, DC
20426. Commenters can submit brief comments up to 6,000 characters,
without prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and
contact information at the end of your comments. Please include the
project number (P-1975-109) on any
[[Page 38620]]
comments, motions, or recommendations filed.
The Commission's Rules of Practice and Procedure require all
intervenors filing documents with the Commission to serve a copy of
that document on each person whose name appears on the official service
list for the project. Further, if an intervenor files comments or
documents with the Commission relating to the merits of an issue that
may affect the responsibilities of a particular resource agency, they
must also serve a copy of the document on that resource agency.
k. Description of the Application: Idaho Power Company, licensee of
the Bliss Hydroelectric Project, has filed a Land Management Plan (LMP)
update for the project. The LMP is a comprehensive plan to manage
project lands including control of noxious weeds, and protection and
enhancement of riparian and shoreline habitats in a manner that is
consistent with license requirements and project purposes, and to
address the needs and interests of stakeholders.
l. Locations of the Application: A copy of the application is
available for inspection and reproduction at the Commission's Public
Reference Room, located at 888 First Street NE., Room 2A, Washington,
DC 20426, or by calling (202) 502-8371. This filing may also be viewed
on the Commission's Web site at https://www.ferc.gov using the
``eLibrary'' link. Enter the docket number excluding the last three
digits (P-1975) in the docket number field to access the document. You
may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects. For assistance, call 1-866-
208-3676 or email FERCOnlineSupport@ferc.gov, for TTY, call (202) 502-
8659. A copy is also available for inspection and reproduction at the
address in item (h) above.
m. Individuals desiring to be included on the Commission's mailing
list should so indicate by writing to the Secretary of the Commission.
n. Comments, Protests, or Motions To Intervene: Anyone may submit
comments, a protest, or a motion to intervene in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211,
.214. In determining the appropriate action to take, the Commission
will consider all protests or other comments filed, but only those who
file a motion to intervene in accordance with the Commission's Rules
may become a party to the proceeding. Any comments, protests, or
motions to intervene must be received on or before the specified
comment date for the particular application.
o. Filing and Service of Responsive Documents: Any filing must (1)
bear in all capital letters the title ``COMMENTS,'' ``PROTEST,'' or
``MOTION TO INTERVENE'' as applicable; (2) set forth in the heading the
name of the applicant and the project number of the application to
which the filing responds; (3) furnish the name, address, and telephone
number of the person protesting or intervening; and (4) otherwise
comply with the requirements of 18 CFR 385.2001 through 385.2005. All
comments, motions to intervene, or protests must set forth their
evidentiary basis. All comments, motions to intervene, or protests
should relate to project works which are the subject of the amendment
application. Agencies may obtain copies of the application directly
from the applicant. Any filing made by an intervenor must be
accompanied by proof of service on all persons listed in the service
list prepared by the Commission in this proceeding, in accordance with
18 CFR 385.2010.
Dated: June 21, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012-15832 Filed 6-27-12; 8:45 am]
BILLING CODE 6717-01-P