Download as PDF rmajette on DSK2TPTVN1PROD with NOTICES 38044 Federal Register / Vol. 77, No. 123 / Tuesday, June 26, 2012 / Notices Great Lakes Hydro America, LLC, 1024 Central Street, Millinocket, ME 04462, (207) 723–4341, Ext. 118. i. FERC Contact: John K. Novak, (202) 502–6076, john.novak@ferc.gov. j. Deadline for filing comments, motions to intervene, and protests, is July 23, 2012. All documents may be filed electronically via the Internet. See, 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site at https://www.ferc.gov/docs-filing/ efiling.asp. If unable to be filed electronically, documents may be paperfiled. To paper-file, an original and seven copies should be mailed to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. Please include the project number (P– 2458–198) on any comments, motions, or recommendations filed. k. Description of Request: Great Lakes Hydro America, LLC requests Commission approval of amendment of Article 408 to eliminate the water level management requirements in the North Twin impoundment for lake trout spawning/incubation. The propagation of wild lake trout has not been successful after several years of controlling the reservoir levels in compliance with Article 408. Removal of reservoir level requirements for lake trout would provide more flexibility in providing power and non-power benefits at the development including the maintenance of higher flows to benefit the tailwater fishery. Great Lakes Hydro America, LLC proposes to request a modification to its Water Quality Certificate from the Maine Department of Environment Protection. l. Locations of the Application: A copy of the application is available for inspection and reproduction at the Commission’s Public Reference Room, located at 888 First Street NE., Room 2A, Washington, DC 20426, or by calling (202) 502–8371. This filing may also be viewed on the Commission’s Web site at https://www.ferc.gov/docs-filing/ efiling.asp. Enter the docket number excluding the last three digits in the docket number field to access the document. You may also register online at https://www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, call 1–866–208–3676 or VerDate Mar<15>2010 15:33 Jun 25, 2012 Jkt 226001 email FERCOnlineSupport@ferc.gov, for TTY, call (202) 502–8659. A copy is also available for inspection and reproduction at the address in item (h) above. m. Individuals desiring to be included on the Commission’s mailing list should so indicate by writing to the Secretary of the Commission. n. Comments, Protests, or Motions to Intervene: Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application. o. Filing and Service of Responsive Documents: All filings must (1) bear in all capital letters the title ‘‘COMMENTS’’, ‘‘PROTEST’’, or ‘‘MOTION TO INTERVENE’’ as applicable; (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person protesting or intervening; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. All comments, motions to intervene, or protests must set forth their evidentiary basis and otherwise comply with the requirements of 18 CFR 4.34(b). All comments, motions to intervene, or protests should relate to project works which are the subject of the amendment. Agencies may obtain copies of the application directly from the applicant. A copy of any protest or motion to intervene must be served upon each representative of the applicant specified in the particular application. If an intervener files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. A copy of all other filings in reference to this application must be accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010. PO 00000 Frm 00012 Fmt 4703 Sfmt 4703 Dated: June 20, 2012. Kimberly D. Bose, Secretary. [FR Doc. 2012–15521 Filed 6–25–12; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #1 Take notice that the Commission received the following exempt wholesale generator filings: Docket Numbers: EG12–78–000. Applicants: NaturEner Rim Rock Wind Energy, LLC. Description: Notice of Self Certification of Exempt Wholesale Generator Status of NaturEner Rim Rock Wind Energy, LLC. Filed Date: 6/18/12. Accession Number: 20120618–5059. Comments Due: 5 p.m. ET 7/9/12. Docket Numbers: EG12–79–000. Applicants: NaturEner Glacier Wind Energy 1, LLC. Description: Notice of SelfCertification of Exempt Wholesale Generator Status of NaturEner Glacier Wind Energy 1, LLC. Filed Date: 6/18/12. Accession Number: 20120618–5073. Comments Due: 5 p.m. ET 7/9/12. Take notice that the Commission received the following electric rate filings: Docket Numbers: ER12–2041–001. Applicants: ISO New England Inc., New England Power Pool Participants Committee. Description: Errata to Defined Term Revisions to be effective 8/14/2012. Filed Date: 6/18/12. Accession Number: 20120618–5024. Comments Due: 5 p.m. ET 7/9/12. Docket Numbers: ER12–2057–000. Applicants: NaturEner Glacier Wind Energy 1, LLC. Description: Filing of Temporary Use Agreement and Request for Waivers and Expedited Action to be effective 6/19/2012. Filed Date: 6/18/12. Accession Number: 20120618–5045. Comments Due: 5 p.m. ET 7/9/12. Docket Numbers: ER12–2058–000. Applicants: Southwestern Electric Power Company. Description: NTEC Sabine DPA to be effective 6/1/2012. Filed Date: 6/18/12. Accession Number: 20120618–5061. Comments Due: 5 p.m. ET 7/9/12. Docket Numbers: ER12–2059–000. E:\FR\FM\26JNN1.SGM 26JNN1 rmajette on DSK2TPTVN1PROD with NOTICES Federal Register / Vol. 77, No. 123 / Tuesday, June 26, 2012 / Notices Applicants: Southwestern Electric Power Company. Description: NTEC Scroggins 138 DPA to be effective 6/1/2012. Filed Date: 6/18/12. Accession Number: 20120618–5062. Comments Due: 5 p.m. ET 7/9/12. Docket Numbers: ER12–2060–000. Applicants: Public Service Company of Oklahoma. Description: WFEC Wardville Delivery Point Agreement to be effective 6/1/2012. Filed Date: 6/18/12. Accession Number: 20120618–5063. Comments Due: 5 p.m. ET 7/9/12. Docket Numbers: ER12–2061–000. Applicants: AEP Texas Central Company. Description: Los Vientos 1B IA to be effective 5/24/2012. Filed Date: 6/18/12. Accession Number: 20120618–5066. Comments Due: 5 p.m. ET 7/9/12. Docket Numbers: ER12–2062–000. Applicants: Southwest Power Pool, Inc. Description: Southwest Power Pool, Inc.’s Notice of Cancellation of Generator Interconnection Agreement. Filed Date: 6/15/12. Accession Number: 20120615–5188. Comments Due: 5 p.m. ET 7/6/12. Docket Numbers: ER12–2063–000. Applicants: AEP Texas Central Company. Description: Los Vientos 1A Amended & Restated IA to be effective 5/24/2012. Filed Date: 6/18/12. Accession Number: 20120618–5074. Comments Due: 5 p.m. ET 7/9/12. Docket Numbers: ER12–2064–000. Applicants: Southwest Power Pool, Inc. Description: 2439 Kansas Municipal Energy Agency NITSA NOA to be effective 6/1/2012. Filed Date: 6/18/12. Accession Number: 20120618–5097. Comments Due: 5 p.m. ET 7/9/12. Docket Numbers: ER12–275–004. Applicants: Dynegy Oakland, LLC. Description: Compliance Filing to be effective 1/1/2012. Filed Date: 6/18/12. Accession Number: 20120618–5092. Comments Due: 5 p.m. ET 7/9/12. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5 p.m. Eastern VerDate Mar<15>2010 15:33 Jun 25, 2012 Jkt 226001 time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: June 19, 2012. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2012–15499 Filed 6–25–12; 8:45 am] BILLING CODE 6717–01–P 38045 Midwest Independent Transmission System Operator, Inc. Docket No. EL12–24–000, Pioneer Transmission LLC v. Midwest Independent Transmission System Operator, Inc. Docket No. EL12–28–000, Xcel Energy Services Inc. v. American Transmission Company, LLC. Docket No. OA08–53, Midwest Independent Transmission System Operator, Inc. For more information, contact Christopher Miller, Office of Energy Markets Regulation, Federal Energy Regulatory Commission at (317) 249– 5936 or christopher.miller@ferc.gov. Dated: June 19, 2012. Kimberly D. Bose, Secretary. DEPARTMENT OF ENERGY [FR Doc. 2012–15487 Filed 6–25–12; 8:45 am] Federal Energy Regulatory Commission BILLING CODE 6717–01–P Notice of Commission Staff Attendance DEPARTMENT OF ENERGY The Federal Energy Regulatory Commission hereby gives notice that members of the Commission’s staff may attend the following meetings related to the transmission planning activities of the Midwest Independent Transmission System Operator, Inc. (MISO): RECB Task Force & Planning Advisory Committee—June 28, 2012; Order 1000 Right of First Refusal Task Team—June 28, 2012; Order 1000 Right of First Refusal Task Team—June 29, 2012. The above-referenced meeting will be held at: MISO Headquarters, 720 City Center Drive, Carmel, IN 46032. The above-referenced meeting is open to the public. Further information may be found at www.misoenergy.org. The discussions at the meeting described above may address matters at issue in the following proceedings: Docket No. ER12–1577–000, Midwest Independent Transmission System Operator, Inc. Docket No. ER12–715, Midwest Independent Transmission System Operator, Inc. Docket No. ER12–480, Midwest Independent Transmission System Operator, Inc. Docket No. ER12–309, Midwest Independent Transmission System Operator, Inc. Docket No. ER11–1844, Midwest Independent Transmission System Operator, Inc. Docket No. EL11–56, FirstEnergy Service Company. Docket No. EL11–30, E.ON Climate & Renewables North America, LLC v. Federal Energy Regulatory Commission PO 00000 Frm 00013 Fmt 4703 Sfmt 4703 Notice of Commission Staff Attendance The Federal Energy Regulatory Commission hereby gives notice that members of the Commission’s staff may attend the following meeting related to the transmission planning activities of ISO New England Inc., New York Independent System Operator, Inc., and PJM Interconnection, L.L.C.: Inter-Regional Planning Stakeholder Advisory Committee June 22, 2012, 9 a.m. to 12 p.m., Local Time The above-referenced meeting will be held via teleconference. The above-referenced meeting is open to stakeholders. Further information may be found at www.pjm.com. The discussions at the meetings described above may address matters at issue in the following proceedings: Docket No. ER08–1281, New York Independent System Operator, Inc. Docket Nos. ER10–787, EL10–50, and EL10–57, ISO New England Inc. and the New England Power Pool Participants Committee Docket No. ER11–2216, ISO New England Inc. and the Participating Transmission Owners Administrative Committee Docket No. ER11–2580, ISO New England Inc. Docket No. ER11–3953, ISO New England Inc. and the New England Power Pool Participants Committee E:\FR\FM\26JNN1.SGM 26JNN1

Agencies

[Federal Register Volume 77, Number 123 (Tuesday, June 26, 2012)]
[Notices]
[Pages 38044-38045]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-15499]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Combined Notice of Filings 1

    Take notice that the Commission received the following exempt 
wholesale generator filings:

    Docket Numbers: EG12-78-000.
    Applicants: NaturEner Rim Rock Wind Energy, LLC.
    Description: Notice of Self Certification of Exempt Wholesale 
Generator Status of NaturEner Rim Rock Wind Energy, LLC.
    Filed Date: 6/18/12.
    Accession Number: 20120618-5059.
    Comments Due: 5 p.m. ET 7/9/12.

    Docket Numbers: EG12-79-000.
    Applicants: NaturEner Glacier Wind Energy 1, LLC.
    Description: Notice of Self-Certification of Exempt Wholesale 
Generator Status of NaturEner Glacier Wind Energy 1, LLC.
    Filed Date: 6/18/12.
    Accession Number: 20120618-5073.
    Comments Due: 5 p.m. ET 7/9/12.

    Take notice that the Commission received the following electric 
rate filings:

    Docket Numbers: ER12-2041-001.
    Applicants: ISO New England Inc., New England Power Pool 
Participants Committee.
    Description: Errata to Defined Term Revisions to be effective 8/14/
2012.
    Filed Date: 6/18/12.
    Accession Number: 20120618-5024.
    Comments Due: 5 p.m. ET 7/9/12.

    Docket Numbers: ER12-2057-000.
    Applicants: NaturEner Glacier Wind Energy 1, LLC.
    Description: Filing of Temporary Use Agreement and Request for 
Waivers and Expedited Action to be effective 6/19/2012.
    Filed Date: 6/18/12.
    Accession Number: 20120618-5045.
    Comments Due: 5 p.m. ET 7/9/12.

    Docket Numbers: ER12-2058-000.
    Applicants: Southwestern Electric Power Company.
    Description: NTEC Sabine DPA to be effective 6/1/2012.
    Filed Date: 6/18/12.
    Accession Number: 20120618-5061.
    Comments Due: 5 p.m. ET 7/9/12.

    Docket Numbers: ER12-2059-000.

[[Page 38045]]

    Applicants: Southwestern Electric Power Company.
    Description: NTEC Scroggins 138 DPA to be effective 6/1/2012.
    Filed Date: 6/18/12.
    Accession Number: 20120618-5062.
    Comments Due: 5 p.m. ET 7/9/12.

    Docket Numbers: ER12-2060-000.
    Applicants: Public Service Company of Oklahoma.
    Description: WFEC Wardville Delivery Point Agreement to be 
effective 6/1/2012.
    Filed Date: 6/18/12.
    Accession Number: 20120618-5063.
    Comments Due: 5 p.m. ET 7/9/12.

    Docket Numbers: ER12-2061-000.
    Applicants: AEP Texas Central Company.
    Description: Los Vientos 1B IA to be effective 5/24/2012.
    Filed Date: 6/18/12.
    Accession Number: 20120618-5066.
    Comments Due: 5 p.m. ET 7/9/12.

    Docket Numbers: ER12-2062-000.
    Applicants: Southwest Power Pool, Inc.
    Description: Southwest Power Pool, Inc.'s Notice of Cancellation of 
Generator Interconnection Agreement.
    Filed Date: 6/15/12.
    Accession Number: 20120615-5188.
    Comments Due: 5 p.m. ET 7/6/12.

    Docket Numbers: ER12-2063-000.
    Applicants: AEP Texas Central Company.
    Description: Los Vientos 1A Amended & Restated IA to be effective 
5/24/2012.
    Filed Date: 6/18/12.
    Accession Number: 20120618-5074.
    Comments Due: 5 p.m. ET 7/9/12.

    Docket Numbers: ER12-2064-000.
    Applicants: Southwest Power Pool, Inc.
    Description: 2439 Kansas Municipal Energy Agency NITSA NOA to be 
effective 6/1/2012.
    Filed Date: 6/18/12.
    Accession Number: 20120618-5097.
    Comments Due: 5 p.m. ET 7/9/12.

    Docket Numbers: ER12-275-004.
    Applicants: Dynegy Oakland, LLC.
    Description: Compliance Filing to be effective 1/1/2012.
    Filed Date: 6/18/12.
    Accession Number: 20120618-5092.
    Comments Due: 5 p.m. ET 7/9/12.

    The filings are accessible in the Commission's eLibrary system by 
clicking on the links or querying the docket number.
    Any person desiring to intervene or protest in any of the above 
proceedings must file in accordance with Rules 211 and 214 of the 
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5 
p.m. Eastern time on the specified comment date. Protests may be 
considered, but intervention is necessary to become a party to the 
proceeding.
    eFiling is encouraged. More detailed information relating to filing 
requirements, interventions, protests, service, and qualifying 
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676 
(toll free). For TTY, call (202) 502-8659.

    Dated: June 19, 2012.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2012-15499 Filed 6-25-12; 8:45 am]
BILLING CODE 6717-01-P