Sunshine Act Meeting, 36530-36531 [2012-15040]
Download as PDF
36530
Federal Register / Vol. 77, No. 118 / Tuesday, June 19, 2012 / Notices
above list. They are also available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an eSubscription link on the
Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov. or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Dated: June 13, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012–14881 Filed 6–18–12; 8:45 am]
BILLING CODE 6717–01–P
Item No.
CONTACT PERSON FOR MORE INFORMATION:
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Sunshine Act Meeting
The following notice of meeting is
published pursuant to section 3(a) of the
government in the Sunshine Act (Pub.
L. 94–409), 5 U.S.C. 552b:
AGENCY HOLDING MEETING: Federal
Energy Regulatory Commission.
DATE AND TIME: June 21, 2012, 10:00 a.m.
PLACE: Room 2C, 888 First Street NE.,
Washington, DC 20426.
STATUS: OPEN.
MATTERS TO BE CONSIDERED: Agenda.
* NOTE—Items listed on the agenda
may be deleted without further notice.
Kimberly D. Bose, Secretary, Telephone
(202) 502–8400.
For a recorded message listing items
struck from or added to the meeting, call
(202) 502–8627.
This is a list of matters to be
considered by the Commission. It does
not include a listing of all documents
relevant to the items on the agenda. All
public documents, however, may be
viewed on line at the Commission’s
Web site at https://www.ferc.gov using
the eLibrary link, or may be examined
in the Commission’s Public Reference
Room.
982ND—MEETING
REGULAR MEETING
June 21, 2012, 10:00 a.m.
Docket No.
Company
Administrative
A–1 ........................
A–2 ........................
AD02–1–000 ..................................................................................
AD02–7–000 ..................................................................................
A–3 ........................
IN12–16–000 ..................................................................................
Agency Business Matters.
Customer Matters, Reliability, Security and Market Operations.
Unidentified Entity.
Electric
E–1 ........................
E–2 ........................
RM12–3–000 ..................................................................................
RM11–24–000, AD10–13–000 ......................................................
E–3 ........................
E–4 ........................
RM10–11–000 ................................................................................
RM12–6–000, RM12–7–000 ..........................................................
E–5 ........................
E–7 ........................
E–8 ........................
E–9 ........................
ER06–456–021, ER06–954–017, ER6–1271–016, ER07–424–
012, EL07–57–007.
ER06–456–022, ER06–456–023, ER06–954–018, ER06–954–
019, ER06–1271–017, ER06–1271–018, ER07–424–013,
ER07–424–014, EL07–57–008, EL07–57–009, ER07–1186–
002, ER07–1186–003, ER08–229–002, ER08–229–003,
ER08–1065–002, ER08–1065–003, ER09–497–003, ER09–
497–004, ER10–268–002, ER10–268–003.
ER06–880–017, ER06–880–018 ...................................................
OMITTED.
NP10–18–002 ................................................................................
EL12–21–001 .................................................................................
E–10 ......................
EL11–42–000 .................................................................................
E–11
E–12
E–13
E–14
......................
......................
......................
......................
OMITTE.
OMITTED.
ER12–1600–000 ............................................................................
EL09–61–001 .................................................................................
E–15
E–16
E–17
E–18
......................
......................
......................
......................
OMITTED.
OMITTED.
OMITTED.
EL12–39–000 .................................................................................
srobinson on DSK4SPTVN1PROD with NOTICES
E–6 ........................
E–19 ......................
VerDate Mar<15>2010
Revisions to Electric Quarterly Report Filing Process.
Third-Party Provision of Ancillary Services; Accounting
and Financial Reporting for New Electric Storage
Technologies.
Integration of Variable Energy Resources.
Revisions to Electric Reliability Organization Definition
of Bulk Electric System and Rules of Procedure.
PJM Interconnection, L.L.C.
PJM Interconnection, L.L.C.
PJM Transmission Owners.
North American Electric Reliability Corporation.
Powerex Corp. v. United States Department of Energy,
Western Area Power Administration—Sierra Nevada
Region.
Astoria Generating Company L.P.; NRG Power Marketing LLC; Arthur Kill Power, LLC; Astoria Gas Turbine Power LLC; Dunkirk Power LLC; Huntley Power
LLC, Oswego Harbor Power LLC and TC
Ravenswood, LLC v. New York Independent System
Operator, Inc.
Southwest Power Pool, Inc.
Louisiana Public Service Commission v. Entergy Corporation, Entergy Services, Inc, Entergy Louisiana,
L.L.C., Entergy Arkansas, Inc., Entergy Mississippi,
Inc., Entergy New Orleans, Inc., Entergy Gulf States
Louisiana, LLC and Entergy Texas, Inc.
Seminole Electric Cooperative, Inc. and Florida Municipal Power Agency v. Florida Power Corporation.
OMITTED.
16:39 Jun 18, 2012
Jkt 226001
PO 00000
Frm 00054
Fmt 4703
Sfmt 4703
E:\FR\FM\19JNN1.SGM
19JNN1
Federal Register / Vol. 77, No. 118 / Tuesday, June 19, 2012 / Notices
Item No.
E–20
E–21
E–22
E–23
E–24
E–25
E–26
E–27
36531
Docket No.
......................
......................
......................
......................
......................
......................
......................
......................
Company
RM10–5–001 ..................................................................................
OMITTED.
OMITTED.
OMITTED .......................................................................................
OMITTED.
OMITTED.
OMITTED.
EL10–72–001 .................................................................................
Interpretation of Protection System Reliability Standard.
Puget Sound Energy, Inc.
Gas
G–1 .......................
G–2 .......................
G–3 .......................
RP12–465–000 ..............................................................................
OR12–11–000 ................................................................................
RP12–245–000 ..............................................................................
Equitrans, L.P.
Shell Pipeline Company LP.
TransColorado Gas Transmission Company LLC.
Hydro
H–1 ........................
H–2 ........................
H–3 ........................
OMITTED.
P–14208–001 .................................................................................
P–2188–201 ...................................................................................
Percheron Power, LLC.
PPL Montana, LLC.
Certificates
C–1 ........................
C–2 ........................
C–3 ........................
C–4 ........................
C–5 ........................
srobinson on DSK4SPTVN1PROD with NOTICES
C–6 ........................
C–7 ........................
CP12–33–000 ................................................................................
CP12–4–000 ..................................................................................
CP12–9–000 ..................................................................................
CP11–543–000 ..............................................................................
CP11–544–000 ..............................................................................
CP12–5–000 ..................................................................................
CP11–13–000 ................................................................................
CP11–103–000 ..............................................................................
CP12–51–000 ................................................................................
CP11–50–000, CP11–50–001 .......................................................
A free Web cast of this event is
available through www.ferc.gov. Anyone
with Internet access who desires to view
this event can do so by navigating to
www.ferc.gov’s Calendar of Events and
locating this event in the Calendar. The
event will contain a link to its Web cast.
The Capitol Connection provides
technical support for the free Web casts.
It also offers access to this event via
television in the DC area and via phone
bridge for a fee. If you have any
questions, visit
www.CapitolConnection.org or contact
Danelle Springer or David Reininger at
703–993–3100.
Immediately following the conclusion
of the Commission Meeting, a press
briefing will be held in the Commission
Meeting Room. Members of the public
may view this briefing in the designated
overflow room. This statement is
intended to notify the public that the
press briefings that follow Commission
meetings may now be viewed remotely
at Commission headquarters, but will
not be telecast through the Capitol
Connection service.
Dated: June 14, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012–15040 Filed 6–15–12; 4:15 pm]
BILLING CODE 6717–01–P
VerDate Mar<15>2010
16:39 Jun 18, 2012
Jkt 226001
Caledonia Energy Partners, L.L.C.
Southern Natural Gas Company, L.L.C.
High Point Gas Transmission, LLC.
ANR Pipeline Company.
TC Offshore LLC.
Trunkline Gas Company, LLC.
Sea Robin Pipeline Company, LLC.
Columbia Gulf Transmission Company.
Texas Eastern Transmission, LP.
Bluewater Gas Storage, LLC.
PetroLogistics Natural Gas Storage, LLC.
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13315–001]
Yegua Mesa Hydro, LLC; Notice of
Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
On May 2, 2012, Yegua Mesa Hydro,
LLC, filed an application for a
successive preliminary permit, pursuant
to section 4(f) of the Federal Power Act
(FPA), proposing to continue studying
the feasibility of the Yegua Mesa
Pumped Storage Hydroelectric Project
(Yegua Mesa Project or project) to be
located near the city of Las Vegas, in
San Miguel County, New Mexico. The
proposed project would affect lands
administered by the Bureau of Land
Management. The sole purpose of a
preliminary permit, if issued, is to grant
the permit holder priority to file a
license application during the permit
term. A preliminary permit does not
authorize the permit holder to perform
any land-disturbing activities or
otherwise enter upon lands or waters
owned by others without the owners’
express permission.
PO 00000
Frm 00055
Fmt 4703
Sfmt 4703
The proposed project would be closed
loop and would not be built on an
existing body of water. The proposed
project would consist of: (1) An upper
earthen dam with a height of 94 feet and
a length of 11,088 feet; (2) an upper
reservoir with a surface area of 380
acres, a capacity of 9,868 acre-feet, and
a maximum pool elevation of 6,800 feet
mean sea level (msl); (3) a lower earthen
dam with a height of 99 feet and a
length of 5,597 feet; (4) a lower reservoir
with a surface area of 380 acres, a
capacity of 9,365 acre-feet, and a
maximum pool elevation of 5,380 feet
msl; (5) a 27-foot-diameter, 9,690-footlong steel penstock; (6) a powerhouse
containing 4 pump/turbine units with a
total installed capacity of 1,100
megawatts; (7) a 14-mile-long, 500kilovolt transmission line; and (8)
appurtenant facilities. The proposed
project would have an annual
production of 3,993 gigawatthours that
would be sold to a local utility.
Applicant Contact: Mr. Brent L.
Smith, COO, Symbiotics LLC, 811 SW
Naito Parkway Ste. 120, Portland,
Oregon 97204; phone: (503) 235–3424.
FERC Contact: Carolyn Templeton;
carolyn.templeton@ferc.gov; phone:
(202) 502–8785.
Deadline for filing comments, motions
to intervene, competing applications
E:\FR\FM\19JNN1.SGM
19JNN1
Agencies
[Federal Register Volume 77, Number 118 (Tuesday, June 19, 2012)]
[Notices]
[Pages 36530-36531]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-15040]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Sunshine Act Meeting
The following notice of meeting is published pursuant to section
3(a) of the government in the Sunshine Act (Pub. L. 94-409), 5 U.S.C.
552b:
Agency Holding Meeting: Federal Energy Regulatory Commission.
Date and Time: June 21, 2012, 10:00 a.m.
Place: Room 2C, 888 First Street NE., Washington, DC 20426.
Status: OPEN.
Matters To Be Considered: Agenda.
* NOTE--Items listed on the agenda may be deleted without further
notice.
Contact Person for More Information: Kimberly D. Bose, Secretary,
Telephone (202) 502-8400.
For a recorded message listing items struck from or added to the
meeting, call (202) 502-8627.
This is a list of matters to be considered by the Commission. It
does not include a listing of all documents relevant to the items on
the agenda. All public documents, however, may be viewed on line at the
Commission's Web site at https://www.ferc.gov using the eLibrary link,
or may be examined in the Commission's Public Reference Room.
982ND--MEETING
REGULAR MEETING
June 21, 2012, 10:00 a.m.
--------------------------------------------------------------------------------------------------------------------------------------------------------
Item No. Docket No. Company
--------------------------------------------------------------------------------------------------------------------------------------------------------
Administrative
--------------------------------------------------------------------------------------------------------------------------------------------------------
A-1...................................... AD02-1-000.................. Agency Business Matters.
A-2...................................... AD02-7-000.................. Customer Matters, Reliability, Security and Market Operations.
A-3...................................... IN12-16-000................. Unidentified Entity.
--------------------------------------------------------------------------------------------------------------------------------------------------------
Electric
--------------------------------------------------------------------------------------------------------------------------------------------------------
E-1...................................... RM12-3-000.................. Revisions to Electric Quarterly Report Filing Process.
E-2...................................... RM11-24-000, AD10-13-000.... Third-Party Provision of Ancillary Services; Accounting and Financial Reporting
for New Electric Storage Technologies.
E-3...................................... RM10-11-000................. Integration of Variable Energy Resources.
E-4...................................... RM12-6-000, RM12-7-000...... Revisions to Electric Reliability Organization Definition of Bulk Electric
System and Rules of Procedure.
E-5...................................... ER06-456-021, ER06-954-017, PJM Interconnection, L.L.C.
ER6-1271-016, ER07-424-012,
EL07-57-007.
E-6...................................... ER06-456-022, ER06-456-023, PJM Interconnection, L.L.C.
ER06-954-018, ER06-954-019,
ER06-1271-017, ER06-1271-
018, ER07-424-013, ER07-424-
014, EL07-57-008, EL07-57-
009, ER07-1186-002, ER07-
1186-003, ER08-229-002,
ER08-229-003, ER08-1065-
002, ER08-1065-003, ER09-
497-003, ER09-497-004, ER10-
268-002, ER10-268-003.
ER06-880-017, ER06-880-018.. PJM Transmission Owners.
E-7...................................... OMITTED.
E-8...................................... NP10-18-002................. North American Electric Reliability Corporation.
E-9...................................... EL12-21-001................. Powerex Corp. v. United States Department of Energy, Western Area Power
Administration--Sierra Nevada Region.
E-10..................................... EL11-42-000................. Astoria Generating Company L.P.; NRG Power Marketing LLC; Arthur Kill Power,
LLC; Astoria Gas Turbine Power LLC; Dunkirk Power LLC; Huntley Power LLC,
Oswego Harbor Power LLC and TC Ravenswood, LLC v. New York Independent System
Operator, Inc.
E-11..................................... OMITTE.
E-12..................................... OMITTED.
E-13..................................... ER12-1600-000............... Southwest Power Pool, Inc.
E-14..................................... EL09-61-001................. Louisiana Public Service Commission v. Entergy Corporation, Entergy Services,
Inc, Entergy Louisiana, L.L.C., Entergy Arkansas, Inc., Entergy Mississippi,
Inc., Entergy New Orleans, Inc., Entergy Gulf States Louisiana, LLC and
Entergy Texas, Inc.
E-15..................................... OMITTED.
E-16..................................... OMITTED.
E-17..................................... OMITTED.
E-18..................................... EL12-39-000................. Seminole Electric Cooperative, Inc. and Florida Municipal Power Agency v.
Florida Power Corporation.
E-19..................................... OMITTED.
[[Page 36531]]
E-20..................................... RM10-5-001.................. Interpretation of Protection System Reliability Standard.
E-21..................................... OMITTED.
E-22..................................... OMITTED.
E-23..................................... OMITTED.....................
E-24..................................... OMITTED.
E-25..................................... OMITTED.
E-26..................................... OMITTED.
E-27..................................... EL10-72-001................. Puget Sound Energy, Inc.
--------------------------------------------------------------------------------------------------------------------------------------------------------
Gas
--------------------------------------------------------------------------------------------------------------------------------------------------------
G-1...................................... RP12-465-000................ Equitrans, L.P.
G-2...................................... OR12-11-000................. Shell Pipeline Company LP.
G-3...................................... RP12-245-000................ TransColorado Gas Transmission Company LLC.
--------------------------------------------------------------------------------------------------------------------------------------------------------
Hydro
--------------------------------------------------------------------------------------------------------------------------------------------------------
H-1...................................... OMITTED.
H-2...................................... P-14208-001................. Percheron Power, LLC.
H-3...................................... P-2188-201.................. PPL Montana, LLC.
--------------------------------------------------------------------------------------------------------------------------------------------------------
Certificates
--------------------------------------------------------------------------------------------------------------------------------------------------------
C-1...................................... CP12-33-000................. Caledonia Energy Partners, L.L.C.
C-2...................................... CP12-4-000.................. Southern Natural Gas Company, L.L.C.
CP12-9-000.................. High Point Gas Transmission, LLC.
C-3...................................... CP11-543-000................ ANR Pipeline Company.
CP11-544-000................ TC Offshore LLC.
C-4...................................... CP12-5-000.................. Trunkline Gas Company, LLC.
Sea Robin Pipeline Company, LLC.
C-5...................................... CP11-13-000................. Columbia Gulf Transmission Company.
CP11-103-000................ Texas Eastern Transmission, LP.
C-6...................................... CP12-51-000................. Bluewater Gas Storage, LLC.
C-7...................................... CP11-50-000, CP11-50-001.... PetroLogistics Natural Gas Storage, LLC.
--------------------------------------------------------------------------------------------------------------------------------------------------------
A free Web cast of this event is available through www.ferc.gov.
Anyone with Internet access who desires to view this event can do so by
navigating to www.ferc.gov's Calendar of Events and locating this event
in the Calendar. The event will contain a link to its Web cast. The
Capitol Connection provides technical support for the free Web casts.
It also offers access to this event via television in the DC area and
via phone bridge for a fee. If you have any questions, visit
www.CapitolConnection.org or contact Danelle Springer or David
Reininger at 703-993-3100.
Immediately following the conclusion of the Commission Meeting, a
press briefing will be held in the Commission Meeting Room. Members of
the public may view this briefing in the designated overflow room. This
statement is intended to notify the public that the press briefings
that follow Commission meetings may now be viewed remotely at
Commission headquarters, but will not be telecast through the Capitol
Connection service.
Dated: June 14, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012-15040 Filed 6-15-12; 4:15 pm]
BILLING CODE 6717-01-P