Yegua Mesa Hydro, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications, 36531-36532 [2012-14876]
Download as PDF
Federal Register / Vol. 77, No. 118 / Tuesday, June 19, 2012 / Notices
Item No.
E–20
E–21
E–22
E–23
E–24
E–25
E–26
E–27
36531
Docket No.
......................
......................
......................
......................
......................
......................
......................
......................
Company
RM10–5–001 ..................................................................................
OMITTED.
OMITTED.
OMITTED .......................................................................................
OMITTED.
OMITTED.
OMITTED.
EL10–72–001 .................................................................................
Interpretation of Protection System Reliability Standard.
Puget Sound Energy, Inc.
Gas
G–1 .......................
G–2 .......................
G–3 .......................
RP12–465–000 ..............................................................................
OR12–11–000 ................................................................................
RP12–245–000 ..............................................................................
Equitrans, L.P.
Shell Pipeline Company LP.
TransColorado Gas Transmission Company LLC.
Hydro
H–1 ........................
H–2 ........................
H–3 ........................
OMITTED.
P–14208–001 .................................................................................
P–2188–201 ...................................................................................
Percheron Power, LLC.
PPL Montana, LLC.
Certificates
C–1 ........................
C–2 ........................
C–3 ........................
C–4 ........................
C–5 ........................
srobinson on DSK4SPTVN1PROD with NOTICES
C–6 ........................
C–7 ........................
CP12–33–000 ................................................................................
CP12–4–000 ..................................................................................
CP12–9–000 ..................................................................................
CP11–543–000 ..............................................................................
CP11–544–000 ..............................................................................
CP12–5–000 ..................................................................................
CP11–13–000 ................................................................................
CP11–103–000 ..............................................................................
CP12–51–000 ................................................................................
CP11–50–000, CP11–50–001 .......................................................
A free Web cast of this event is
available through www.ferc.gov. Anyone
with Internet access who desires to view
this event can do so by navigating to
www.ferc.gov’s Calendar of Events and
locating this event in the Calendar. The
event will contain a link to its Web cast.
The Capitol Connection provides
technical support for the free Web casts.
It also offers access to this event via
television in the DC area and via phone
bridge for a fee. If you have any
questions, visit
www.CapitolConnection.org or contact
Danelle Springer or David Reininger at
703–993–3100.
Immediately following the conclusion
of the Commission Meeting, a press
briefing will be held in the Commission
Meeting Room. Members of the public
may view this briefing in the designated
overflow room. This statement is
intended to notify the public that the
press briefings that follow Commission
meetings may now be viewed remotely
at Commission headquarters, but will
not be telecast through the Capitol
Connection service.
Dated: June 14, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012–15040 Filed 6–15–12; 4:15 pm]
BILLING CODE 6717–01–P
VerDate Mar<15>2010
16:39 Jun 18, 2012
Jkt 226001
Caledonia Energy Partners, L.L.C.
Southern Natural Gas Company, L.L.C.
High Point Gas Transmission, LLC.
ANR Pipeline Company.
TC Offshore LLC.
Trunkline Gas Company, LLC.
Sea Robin Pipeline Company, LLC.
Columbia Gulf Transmission Company.
Texas Eastern Transmission, LP.
Bluewater Gas Storage, LLC.
PetroLogistics Natural Gas Storage, LLC.
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13315–001]
Yegua Mesa Hydro, LLC; Notice of
Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
On May 2, 2012, Yegua Mesa Hydro,
LLC, filed an application for a
successive preliminary permit, pursuant
to section 4(f) of the Federal Power Act
(FPA), proposing to continue studying
the feasibility of the Yegua Mesa
Pumped Storage Hydroelectric Project
(Yegua Mesa Project or project) to be
located near the city of Las Vegas, in
San Miguel County, New Mexico. The
proposed project would affect lands
administered by the Bureau of Land
Management. The sole purpose of a
preliminary permit, if issued, is to grant
the permit holder priority to file a
license application during the permit
term. A preliminary permit does not
authorize the permit holder to perform
any land-disturbing activities or
otherwise enter upon lands or waters
owned by others without the owners’
express permission.
PO 00000
Frm 00055
Fmt 4703
Sfmt 4703
The proposed project would be closed
loop and would not be built on an
existing body of water. The proposed
project would consist of: (1) An upper
earthen dam with a height of 94 feet and
a length of 11,088 feet; (2) an upper
reservoir with a surface area of 380
acres, a capacity of 9,868 acre-feet, and
a maximum pool elevation of 6,800 feet
mean sea level (msl); (3) a lower earthen
dam with a height of 99 feet and a
length of 5,597 feet; (4) a lower reservoir
with a surface area of 380 acres, a
capacity of 9,365 acre-feet, and a
maximum pool elevation of 5,380 feet
msl; (5) a 27-foot-diameter, 9,690-footlong steel penstock; (6) a powerhouse
containing 4 pump/turbine units with a
total installed capacity of 1,100
megawatts; (7) a 14-mile-long, 500kilovolt transmission line; and (8)
appurtenant facilities. The proposed
project would have an annual
production of 3,993 gigawatthours that
would be sold to a local utility.
Applicant Contact: Mr. Brent L.
Smith, COO, Symbiotics LLC, 811 SW
Naito Parkway Ste. 120, Portland,
Oregon 97204; phone: (503) 235–3424.
FERC Contact: Carolyn Templeton;
carolyn.templeton@ferc.gov; phone:
(202) 502–8785.
Deadline for filing comments, motions
to intervene, competing applications
E:\FR\FM\19JNN1.SGM
19JNN1
36532
Federal Register / Vol. 77, No. 118 / Tuesday, June 19, 2012 / Notices
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36. Comments, motions to
intervene, notices of intent, and
competing applications may be filed
electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov or toll
free at 1–866–208–3676, or for TTY,
(202) 502–8659. Although the
Commission strongly encourages
electronic filing, documents may also be
paper-filed. To paper-file, mail an
original and seven copies to: Kimberly
D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE., Washington, DC 20426.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of Commission’s Web site at http:
//www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P–13315) in
the docket number field to access the
document. For assistance, contact FERC
Online Support.
Dated: June 13, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012–14876 Filed 6–18–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP12–470–000]
place Well No. 2519 and approximately
0.12 miles of Line 29079 and related
appurtenances located in Marshall
County, West Virginia, all as more fully
set forth in the application, which is on
file with the Commission.
Any questions concerning this
application may be directed to Fredric
J. George, Senior Counsel Columbia Gas
Transmission, LLC, P.O. Box 1273,
Charleston, West Virginia 25325–1273,
phone (304) 357–2359, or fax (304) 357–
3206 or email at fgeorge@nisource.com.
This filing is available for review at
the Commission or may be viewed on
the Commission’s Web site at https://
www.ferc.gov, using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
filed to access the document. For
assistance, please contact FERC Online
Support at FERC OnlineSupport@ferc.
gov or call toll-free at (866) 206–3676,
or, for TTY, contact (202) 502–8659.
Comments, protests and interventions
may be filed electronically via the
Internet in lieu of paper. See, 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under the
‘‘e-Filing’’ link. The Commission
strongly encourages intervenors to file
electronically.
Any person or the Commission’s staff
may, within 60 days after issuance of
the instant notice by the Commission,
file pursuant to Rule 214 of the
Commission’s Procedural Rules (18 CFR
385.214) a motion to intervene or notice
of intervention and pursuant to Section
157.205 of the regulations under the
NGA (18 CFR 157.205), a protest to the
request. If no protest is filed within the
time allowed therefore, the proposed
activity shall be deemed to be
authorized effective the day after the
time allowed for filing a protest. If a
protest is filed and not withdrawn
within 30 days after the allowed time
for filing a protest, the instant request
shall be treated as an application for
authorization pursuant to Section 7 of
the NGA.
srobinson on DSK4SPTVN1PROD with NOTICES
Dated: June 13, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012–14875 Filed 6–18–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[FR Doc. 2012–14880 Filed 6–18–12; 8:45 am]
Take notice that on June 1, 2012,
Columbia Gas Transmission, LLC
(Columbia), 5151 San Felipe, Suite
2500, Houston, Texas 77056, pursuant
to its blanket certificate issued in Docket
No. CP83–76–000, filed an application
in accordance to sections 157.205 and
157.216(b) of the Commission’s
Regulations under the Natural Gas Act
(NGA) as amended, (1) to relocate a
consumer tap and (2) to abandon in
Jkt 226001
June 18, 2012, 10:00 a.m.–12:00 p.m.,
Local Time (teleconference only)
June 26, 2012, 10:00 a.m.–4:00 p.m.,
Local Time
July 10, 2012, 10:00 a.m.–4:00 p.m.,
Local Time
July 24, 2012, 10:00 a.m.–4:00 p.m.,
Local Time
August 6, 2012, 10:00 a.m.–4:00 p.m.,
Local Time
August 28, 2012, 10:00 a.m.–4:00 p.m.,
Local Time
September 24, 2012, 10:00 a.m.–4:00
p.m., Local Time
The above-referenced meetings will
be held at: NYISO’s offices, Rensselaer,
NY.
The above-referenced meetings are
open to stakeholders.
Further information may be found at
www.nyiso.com.
The discussions at the meetings
described above may address matters at
issue in the following proceeding:
Docket No. ER08–1281, New York
Independent System Operator, Inc.
For more information, contact James
Eason, Office of Energy Market
Regulation, Federal Energy Regulatory
Commission at (202) 502–8622 or
James.Eason@ferc.gov.
[Docket No. AD12–17–000; RM12–10–000;
ER12–502–001; ER12–502–002; ER12–1177–
001; ER12–1855–000]
Review of Small Generator
Interconnection Agreements and
Procedures; Solar Energy Industries
Association; California Independent
System Operator Corporation; PJM
Interconnection, LLC; California
Independent System Operator
Corporation; Notice of Technical
Conference
BILLING CODE 6717–01–P
16:39 Jun 18, 2012
Joint Inter-Regional Planning Task
Force/Electric System Planning
Working Group
Dated: June 13, 2012.
Kimberly D. Bose,
Secretary.
Columbia Gas Transmission, LLC;
Notice of Request Under Blanket
Authorization
VerDate Mar<15>2010
members of the Commission’s staff may
attend the following meetings related to
the transmission planning activities of
the New York Independent System
Operator, Inc. (NYISO):
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Commission Staff
Attendance
The Federal Energy Regulatory
Commission hereby gives notice that
PO 00000
Frm 00056
Fmt 4703
Sfmt 4703
Take notice that Federal Energy
Regulatory Commission (Commission)
staff will convene a technical
E:\FR\FM\19JNN1.SGM
19JNN1
Agencies
[Federal Register Volume 77, Number 118 (Tuesday, June 19, 2012)]
[Notices]
[Pages 36531-36532]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-14876]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 13315-001]
Yegua Mesa Hydro, LLC; Notice of Preliminary Permit Application
Accepted for Filing and Soliciting Comments, Motions To Intervene, and
Competing Applications
On May 2, 2012, Yegua Mesa Hydro, LLC, filed an application for a
successive preliminary permit, pursuant to section 4(f) of the Federal
Power Act (FPA), proposing to continue studying the feasibility of the
Yegua Mesa Pumped Storage Hydroelectric Project (Yegua Mesa Project or
project) to be located near the city of Las Vegas, in San Miguel
County, New Mexico. The proposed project would affect lands
administered by the Bureau of Land Management. The sole purpose of a
preliminary permit, if issued, is to grant the permit holder priority
to file a license application during the permit term. A preliminary
permit does not authorize the permit holder to perform any land-
disturbing activities or otherwise enter upon lands or waters owned by
others without the owners' express permission.
The proposed project would be closed loop and would not be built on
an existing body of water. The proposed project would consist of: (1)
An upper earthen dam with a height of 94 feet and a length of 11,088
feet; (2) an upper reservoir with a surface area of 380 acres, a
capacity of 9,868 acre-feet, and a maximum pool elevation of 6,800 feet
mean sea level (msl); (3) a lower earthen dam with a height of 99 feet
and a length of 5,597 feet; (4) a lower reservoir with a surface area
of 380 acres, a capacity of 9,365 acre-feet, and a maximum pool
elevation of 5,380 feet msl; (5) a 27-foot-diameter, 9,690-foot-long
steel penstock; (6) a powerhouse containing 4 pump/turbine units with a
total installed capacity of 1,100 megawatts; (7) a 14-mile-long, 500-
kilovolt transmission line; and (8) appurtenant facilities. The
proposed project would have an annual production of 3,993 gigawatthours
that would be sold to a local utility.
Applicant Contact: Mr. Brent L. Smith, COO, Symbiotics LLC, 811 SW
Naito Parkway Ste. 120, Portland, Oregon 97204; phone: (503) 235-3424.
FERC Contact: Carolyn Templeton; carolyn.templeton@ferc.gov; phone:
(202) 502-8785.
Deadline for filing comments, motions to intervene, competing
applications
[[Page 36532]]
(without notices of intent), or notices of intent to file competing
applications: 60 days from the issuance of this notice. Competing
applications and notices of intent must meet the requirements of 18 CFR
4.36. Comments, motions to intervene, notices of intent, and competing
applications may be filed electronically via the Internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions on the Commission's Web site
https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit
brief comments up to 6,000 characters, without prior registration,
using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information at the
end of your comments. For assistance, please contact FERC Online
Support at FERCOnlineSupport@ferc.gov or toll free at 1-866-208-3676,
or for TTY, (202) 502-8659. Although the Commission strongly encourages
electronic filing, documents may also be paper-filed. To paper-file,
mail an original and seven copies to: Kimberly D. Bose, Secretary,
Federal Energy Regulatory Commission, 888 First Street NE., Washington,
DC 20426.
More information about this project, including a copy of the
application, can be viewed or printed on the ``eLibrary'' link of
Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P-13315) in the docket number field to access
the document. For assistance, contact FERC Online Support.
Dated: June 13, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012-14876 Filed 6-18-12; 8:45 am]
BILLING CODE 6717-01-P