Discussion
Notice is hereby given that the NRC
has issued renewed facility operating
license No. DPR–35 to Entergy
Operations Inc., the operator of the
PNPS. Renewed facility operating
license No. DPR–35 authorizes
operation of PNPS by the licensee at
reactor core power levels not in excess
of 2,028 megawatts thermal in
accordance with the provisions of the
PNPS renewed license and its technical
specifications.
The notice also serves as the record of
decision for the renewal of facility
operating license No. DPR–35,
consistent with Title 10 of the Code of
Federal Regulations (10 CFR) 51.103. As
discussed in the final supplemental
environmental impact statement (FSEIS)
for PNPS, Supplement 47 to NUREG–
1437, ‘‘Generic Environmental Impact
Statement for License Renewal of
Nuclear Plants Regarding Pilgrim
Nuclear Power Station,’’ dated July 2007
(ADAMS Accession Nos. ML071990020
and ML071990027), the Commission
has considered a range of reasonable
alternatives that included fossil fuel
generation, renewable energy sources,
demand-side measures such as energy
conservation, and the no-action
alternative. The factors considered in
the record of decision can be found in
the FSEIS for PNPS.
PNPS is a boiling water reactor
located 4 miles southeast of Plymouth,
Massachusetts. The application for the
renewed license, ‘‘Pilgrim Nuclear
Power Station License Renewal
Application,’’ dated January 25, 2006
(ADAMS Accession No. ML060300028),
complied with the standards and
requirements of the Atomic Energy Act
of 1954, as amended (the Act), and the
Commission’s regulations. As required
by the Act and the Commission’s
regulations in 10 CFR Chapter 1, the
Commission has made appropriate
findings, which are set forth in the
license. Prior public notice of the action
involving the proposed issuance of the
renewed license and of an opportunity
for a hearing regarding the proposed
issuance of the renewed license was
published in the Federal Register on
March 27, 2006 (71 FR 15222).
For further details with respect to this
action, see: (1) Entergy Nuclear
Operation, Inc., license renewal
application for Pilgrim Nuclear Power
Station dated January 25, 2006, as
supplemented by letters dated through
April 24, 2012; (2) the Commission’s
safety evaluation report (NUREG–1891),
published in November 2007, as
supplemented (ADAMS Accession Nos.
VerDate Mar<15>2010
22:42 Jun 11, 2012
Jkt 226001
ML073241016, ML072210478, and
ML11147A036); (3) the licensee’s Final
Safety Analysis Report; and (4) the
Commission’s FSEIS (NUREG–1437,
Supplement 29), for the Pilgrim Nuclear
Power Station, published in July 2007.
Dated at Rockville, Maryland, this 29th day
of May, 2012.
For the Nuclear Regulatory Commission.
Dennis Morey,
Chief, Projects Branch 1, Division of License
Renewal, Office of Nuclear Reactor
Regulation.
[FR Doc. 2012–14262 Filed 6–11–12; 8:45 am]
BILLING CODE 7590–01–P
NUCLEAR REGULATORY
COMMISSION
Advisory Committee on Reactor
Safeguards (ACRS); Meeting of the
ACRS Subcommittee on Power
Uprates; Notice of Meeting
The ACRS Subcommittee on Power
Uprates will hold a meeting on June 22,
2012, Room T–2B1, 11545 Rockville
Pike, Rockville, Maryland.
The meeting will be open to public
attendance, with the exception of
portions that may be closed to protect
information that is proprietary pursuant
to 5 U.S.C. 552b(c)(4).
The agenda for the subject meeting
shall be as follows:
Friday, June 22, 2012—8:30 a.m. Until
5:00 p.m.
The Subcommittee will review the
Safety Evaluation (SER) associated with
the St. Lucie 2 extended power uprate
application. The Subcommittee will
hear presentations by and hold
discussions with the NRC staff, Florida
Power and Light Company, and other
interested persons regarding this matter.
The Subcommittee will gather
information, analyze relevant issues and
facts, and formulate proposed positions
and actions, as appropriate, for
deliberation by the Full Committee.
Members of the public desiring to
provide oral statements and/or written
comments should notify the Designated
Federal Official (DFO), Weidong Wang
(Telephone 301–415–6279 or Email:
Weidong.Wang@nrc.gov) five days prior
to the meeting, if possible, so that
appropriate arrangements can be made.
Thirty-five hard copies of each
presentation or handout should be
provided to the DFO thirty minutes
before the meeting. In addition, one
electronic copy of each presentation
should be emailed to the DFO one day
before the meeting. If an electronic copy
cannot be provided within this
timeframe, presenters should provide
PO 00000
Frm 00149
Fmt 4703
Sfmt 4703
35081
the DFO with a CD containing each
presentation at least thirty minutes
before the meeting. Electronic
recordings will be permitted only
during those portions of the meeting
that are open to the public. Detailed
procedures for the conduct of and
participation in ACRS meetings were
published in the Federal Register on
October 17, 2011, (76 FR 64126–64127).
Detailed meeting agendas and meeting
transcripts are available on the NRC
Web site at https://www.nrc.gov/readingrm/doc-collections/acrs. Information
regarding topics to be discussed,
changes to the agenda, whether the
meeting has been canceled or
rescheduled, and the time allotted to
present oral statements can be obtained
from the Web site cited above or by
contacting the identified DFO.
Moreover, in view of the possibility that
the schedule for ACRS meetings may be
adjusted by the Chairman as necessary
to facilitate the conduct of the meeting,
persons planning to attend should check
with these references if such
rescheduling would result in a major
inconvenience.
If attending this meeting, please enter
through the One White Flint North
Building, 11555 Rockville Pike,
Rockville, MD. After registering with
security, please contact Mr. Theron
Brown (Telephone 240–888–9835) to be
escorted to the meeting room.
Dated: June 4, 2012.
Antonio Dias,
Technical Advisor, Advisory Committee on
Reactor Safeguards.
[FR Doc. 2012–14224 Filed 6–11–12; 8:45 am]
BILLING CODE 7590–01–P
NUCLEAR REGULATORY
COMMISSION
[NRC–2012–0002]
Sunshine Act Meeting
AGENCY HOLDING THE MEETINGS: Nuclear
Regulatory Commission.
DATE: Weeks of June 11, 18, 25; July 2,
9, 16, 2012.
PLACE: Commissioners’ Conference
Room, 11555 Rockville Pike, Rockville,
Maryland.
STATUS: Public and Closed.
Week of June 11, 2012
Friday, June 15, 2012
9:30 a.m. Joint Meeting of the Federal
Energy Regulatory Commission
(FERC) and the Nuclear Regulatory
Commission (NRC) on Grid
Reliability (Public Meeting). To be
held at FERC Headquarters, 888
E:\FR\FM\12JNN1.SGM
12JNN1
Agencies
[Federal Register Volume 77, Number 113 (Tuesday, June 12, 2012)]
[Notices]
[Page 35081]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-14224]
-----------------------------------------------------------------------
NUCLEAR REGULATORY COMMISSION
Advisory Committee on Reactor Safeguards (ACRS); Meeting of the
ACRS Subcommittee on Power Uprates; Notice of Meeting
The ACRS Subcommittee on Power Uprates will hold a meeting on June
22, 2012, Room T-2B1, 11545 Rockville Pike, Rockville, Maryland.
The meeting will be open to public attendance, with the exception
of portions that may be closed to protect information that is
proprietary pursuant to 5 U.S.C. 552b(c)(4).
The agenda for the subject meeting shall be as follows:
Friday, June 22, 2012--8:30 a.m. Until 5:00 p.m.
The Subcommittee will review the Safety Evaluation (SER) associated
with the St. Lucie 2 extended power uprate application. The
Subcommittee will hear presentations by and hold discussions with the
NRC staff, Florida Power and Light Company, and other interested
persons regarding this matter. The Subcommittee will gather
information, analyze relevant issues and facts, and formulate proposed
positions and actions, as appropriate, for deliberation by the Full
Committee.
Members of the public desiring to provide oral statements and/or
written comments should notify the Designated Federal Official (DFO),
Weidong Wang (Telephone 301-415-6279 or Email: Weidong.Wang@nrc.gov)
five days prior to the meeting, if possible, so that appropriate
arrangements can be made. Thirty-five hard copies of each presentation
or handout should be provided to the DFO thirty minutes before the
meeting. In addition, one electronic copy of each presentation should
be emailed to the DFO one day before the meeting. If an electronic copy
cannot be provided within this timeframe, presenters should provide the
DFO with a CD containing each presentation at least thirty minutes
before the meeting. Electronic recordings will be permitted only during
those portions of the meeting that are open to the public. Detailed
procedures for the conduct of and participation in ACRS meetings were
published in the Federal Register on October 17, 2011, (76 FR 64126-
64127).
Detailed meeting agendas and meeting transcripts are available on
the NRC Web site at https://www.nrc.gov/reading-rm/doc-collections/acrs.
Information regarding topics to be discussed, changes to the agenda,
whether the meeting has been canceled or rescheduled, and the time
allotted to present oral statements can be obtained from the Web site
cited above or by contacting the identified DFO. Moreover, in view of
the possibility that the schedule for ACRS meetings may be adjusted by
the Chairman as necessary to facilitate the conduct of the meeting,
persons planning to attend should check with these references if such
rescheduling would result in a major inconvenience.
If attending this meeting, please enter through the One White Flint
North Building, 11555 Rockville Pike, Rockville, MD. After registering
with security, please contact Mr. Theron Brown (Telephone 240-888-9835)
to be escorted to the meeting room.
Dated: June 4, 2012.
Antonio Dias,
Technical Advisor, Advisory Committee on Reactor Safeguards.
[FR Doc. 2012-14224 Filed 6-11-12; 8:45 am]