Download as PDF Federal Register / Vol. 77, No. 111 / Friday, June 8, 2012 / Notices Notice of the June 21, 2012, Millennium Challenge Corporation Board of Directors Meeting. ACTION: 3:00 p.m. to 5:00 p.m., Wednesday, June 21, 2012. PLACE: Department of State, 2201 C Street NW., Washington, DC 20520. FOR FURTHER INFORMATION CONTACT: Information on the meeting may be obtained from Melvin F. Williams, Jr., Vice President, General Counsel and Corporate Secretary via email at corporatesecretary@mcc.gov or by telephone at (202) 521–3600. STATUS: Meeting will be closed to the public. MATTERS TO BE CONSIDERED: The Board of Directors (the ‘‘Board’’) of the Millennium Challenge Corporation (‘‘MCC’’) will hold a meeting to discuss updates on Malawi and Mali, highlights TIME AND DATE: of completed compacts, and an audit committee report. The agenda items are expected to involve the consideration of classified information and the meeting will be closed to the public. Dated: June 5, 2012. Melvin F. Williams, Jr., VP/General Counsel and Corporate Secretary, Millennium Challenge Corporation. [FR Doc. 2012–14025 Filed 6–6–12; 11:15 am] BILLING CODE 9211–03–P MILLENNIUM CHALLENGE CORPORATION [MCC FR 12–06] Notice of Quarterly Report (January 1, 2012–March 31, 2012) 34075 The Millennium Challenge Corporation (MCC) is reporting for the quarter January 1, 2012 through March 31, 2012, on assistance provided under section 605 of the Millennium Challenge Act of 2003 (22 U.S.C. 7701 et seq.), as amended (the Act), and on transfers or allocations of funds to other federal agencies under section 619(b) of the Act. The following report will be made available to the public by publication in the Federal Register and on the Internet Web site of the MCC (www.mcc.gov) in accordance with section 612(b) of the Act. SUMMARY: Dated: June 4, 2012. T. Charles Cooper, Vice President, Congressional and Public Affairs, Millennium Challenge Corporation. Millennium Challenge Corporation. AGENCY: ASSISTANCE PROVIDED UNDER SECTION 605 Projects Obligated Objectives Cumulative expenditures Measures Country: Madagascar Year: 2012 Quarter 2 Total obligation: $85,594.779 Entity to which the assistance is provided: MCA Madagascar Total Quarterly Expenditures 1 : $0 $29,560,718 Increase Land Titling and Security. $29,560,718 Financial Sector Reform Project. mstockstill on DSK4VPTVN1PROD with NOTICES Land Tenure Project ....... $23,704,219 Increase Competition in the Financial Sector. $23,704,220 VerDate Mar<15>2010 16:23 Jun 07, 2012 Jkt 226001 PO 00000 Frm 00073 Fmt 4703 Sfmt 4703 Area secured with land certificates or titles in the Zones. Legal and regulatory reforms adopted. Number of land documents inventoried in the Zones and Antananarivo. Number of land documents restored in the Zones and Antananarivo. Number of land documents digitized in the Zones and Antananarivo. Average time for Land Services Offices to issue a duplicate copy of a title. Average cost to a user to obtain a duplicate copy of a title from the Land Services Offices. Number of land certificates delivered in the Zones during the period. Number of new guichets fonciers operating in the Zones. The 256 Plan Local d’Occupation Foncier-Local Plan of Land Occupation (PLOFs)are completed. Volume of funds processed annually by the national payment system. Number of accountants and financial experts registered to become CPA. Number of Central Bank branches capable of accepting auction tenders. Outstanding value of savings accounts from CEM in the Zones. Number of Micro-Finance Institutions (MFIs) participating in the Refinancing and Guarantee funds. Maximum check clearing delay. Network equipment and integrator. Real time gross settlement system (RTGS). Telecommunication facilities. Retail payment clearing system. Number of CEM branches built in the Zones. Number of savings accounts from CEM in the Zones. Percent of Micro-Finance Institution (MFI) loans recorded in the Central Bank database. E:\FR\FM\08JNN1.SGM 08JNN1 34076 Federal Register / Vol. 77, No. 111 / Friday, June 8, 2012 / Notices ASSISTANCE PROVIDED UNDER SECTION 605—Continued Projects Obligated Objectives Cumulative expenditures Agricultural Business Investment Project. $13,854,448 Improve Agricultural Projection Technologies and Market Capacity in Rural Areas. $13,854,449 Program Administration 2 and Control, Monitoring and Evaluation. Pending subsequent reports 3. $18,475,394 ........................................ $18,475,393 ............................ ........................................ Measures Number of farmers receiving technical assistance. Number of marketing contracts of ABC clients. Number of farmers employing technical assistance. Value of refinancing loans and guarantees issued to participating MFIs (as a measure of value of agricultural and rural loans). ` Number of Mnistere de l’Agriculture,de l’Elevage ˆ et de la Peche- Ministry of Agriculture, Livestock, and Fishing (MAEP) agents trained in marketing and investment promotion. Number of people receiving information from Agricultural Business Center (ABCs) on business opportunities. $0 The compact indicated is closed and therefore will not have any quarterly expenditure amount. Projects Obligated Objective Cumulative expenditures Measures Country: Honduras Year: 2012 Quarter 2 Total obligation: $205,000,000 Entity to which the assistance is provided: MCA Honduras Total Quarterly Expeditures 1 : $0 Rural Development Project. mstockstill on DSK4VPTVN1PROD with NOTICES Transportation Project .... $68,273,380 Increase the productivity and business skills of farmers who operate small and mediumsize farms and their employees. $68,264,510 $120,591,240 Reduce transportation costs between targeted production centers and national, regional and global markets. $120,584,457 Number of program farmers harvesting high-value horticulture crops. Number of hectares harvesting high-value horticulture crops. Number of business plans prepared by program farmers with assistance from the implementing entity. Total value of net sales. Total number of recruited farmers receiving technical assistance. Value of loans disbursed to farmers, agribusiness, and other producers and vendors in the horticulture industry, including Program Farmers, cumulative to date, Trust Fund Resources. Number of loans disbursed (disaggregated by trust fund, leveraged from trust fund, and institutions receiving technical assistance from ACDI–VOCA). Number of hectares under irrigation. Number of farmers connected to the community irrigation system. Freight shipment cost from Tegucigalpa to Puerto Cortes. Average annual daily traffic volume—CA–5. International roughness index (IRI)—CA–5. Kilometers of road upgraded—CA–5. Percent of contracted road works disbursed—CA– 5. Average annual daily traffic volume—secondary roads. International roughness index (IRI)—secondary roads. Kilometers of road upgraded—secondary roads. Average annual daily traffic volume—rural roads. Average speed—Cost per journey (rural roads). Kilometers of road upgraded—rural roads. Percent disbursed for contracted studies. Value of signed contracts for feasibility, design, supervision and program management contracts. Kilometers (km) of roads under design. VerDate Mar<15>2010 16:23 Jun 07, 2012 Jkt 226001 PO 00000 Frm 00074 Fmt 4703 Sfmt 4703 E:\FR\FM\08JNN1.SGM 08JNN1 Federal Register / Vol. 77, No. 111 / Friday, June 8, 2012 / Notices Projects Obligated Objective Cumulative expenditures 34077 Measures Number of Construction works and supervision contracts signed. Kilometers (km) of roads under works contracts. Program Administration 2 and Control, Monitoring and Evaluation. Pending subsequent reports 3. $16,135,380 ........................................ $15,166,048 ............................ ........................................ $0 The compact indicated is closed and therefore will not have any quarterly expenditure amount. Projects Obligated Objective Cumulative expenditures Measures Country: Cape Verde Year: 2012 Quarter 2 Total obligation: $110,078,488 Entity to which the assistance is provided: MCA Cape Verde Total Quarterly Expenditures1: $0 Watershed and Agricultural Support Project. $12,011,603 Increase agricultural production in three targeted watershed areas on three islands. $11,602,406 Infrastructure Improvement Project. $82,630,208 Increase integration of the internal market and reduce transportation costs. $82,542,708 Private Sector Development Project. $1,920,018 Program Administration 2, and Control, Monitoring and Evaluation. Pending subsequent reports 3. $13,516,659 Spur private sector development on all islands through increased investment in the priority sectors and through financial sector reform. ........................................ $1,824,566 $12,542,777 ............................ ........................................ Productivity: Horticulture, Paul watershed. Productivity: Horticulture, Faja watershed. Productivity: Horticulture, Mosteiros watershed. Number of farmers adopting drip irrigation: All intervention watersheds (Paul, Faja and Mosteiros). Hectares under improved or new irrigation (All Watersheds Paul, Faja, and Mosteiros). Irrigation Works: Percent contracted works disbursed. All intervention watersheds (Paul, Faja and Mosteiros). Number of reservoirs constructed in all intervention watersheds (Paul, Faja and Mosteiros) (incremental). Number of farmers trained. Travel time ratio: Percentage of beneficiary population further than 30 minutes from nearest market. Kilometers of roads/bridges completed. Percent of contracted road works disbursed (cumulative). Port of Praia: Percent of contracted port works disbursed (cumulative). Micro-Finance Institutions portfolio at risk, adjusted (level). $0 The compact indicated is closed and therefore will not have any quarterly expenditure amount. Projects Obligated Objective Cumulative expenditures Measures Country: Nicaragua Year: 2012 Quarter 2 Total obligation: $112,009,390 Entity to which the assistance is provided: MCA Nicaragua Total Quarterly Expenditures: $0 mstockstill on DSK4VPTVN1PROD with NOTICES Property Regularization Project. VerDate Mar<15>2010 16:23 Jun 07, 2012 $7,180,454 Jkt 226001 Increase Investment by strengthening property rights. PO 00000 Frm 00075 Fmt 4703 $6,713,553 Sfmt 4703 Automated database of registry and cadastre installed in the 10 municipalities of Leon. Value of land, urban. Value of land, rural. Time to conduct a land transaction. Number of additional parcels with a registered title, urban. Number of additional parcels with a registered title, rural. Area covered by cadastral mapping. Cost to conduct a land transaction. Annual Average daily traffic volume: N1 Section R1. E:\FR\FM\08JNN1.SGM 08JNN1 34078 Federal Register / Vol. 77, No. 111 / Friday, June 8, 2012 / Notices Projects Obligated Objective Cumulative expenditures Rural Development Project. $31,530,722 Increase the value added of farms and enterprises in the region. $31,291,352 Program Administration 2, Due Diligence, Monitoring and Evaluation. Pending subsequent reports 3. $15,562,166 ........................................ ........................................ Annual Average daily traffic volume: N1 Section R2. Annual Average daily traffic volume: Port Sandino (S13). Annual Average daily traffic volume: Villanueva— Guasaule Annual. Average daily traffic volume: Somotillo-Cinco Pinos (S1). ´ Annual average daily traffic volume: Leon˜ Poneloya-Las Penitas. International Roughness Index: N–I Section R1. International Roughness Index: N–I Section R2. International Roughness Index: Port Sandino (S13. International roughness index: Villanueva— Guasaule. International roughness index: Somotillo-Cinco Pinos. ´ International roughness index: Leon-Poneloya-Las ˜ Penitas. Kilometers of NI upgraded: R1 and R2 and S13. Kilometers of NI upgraded: Villanueva—Guasaule. Kilometers of S1 road upgraded. Kilometers of S9 road upgraded. Number of beneficiaries with business plans. Numbers of manzanas (1 manzana = 1.7 hectares), by sector, harvesting higher-value crops. Number of beneficiaries with business plans prepared with assistance of Rural Business Development Project. Number of beneficiaries implementing forestry business plans under Improvement of Water Supplies Activity. Number of Manzanas reforested. Number of Manzanas with trees planted. $15,379,676 ............................ Measures $2,606,245 The compact indicated is closed and therefore will not have any quarterly expenditure amount. Projects Obligated Objective Cumulative expenditures Measures Country: Georgia Year: 2012 Quarter 2 Total obligation: $395,300,000 Entity to which the assistance is provided: MCA Georgia Total Quarterly Expenditures1: $0 mstockstill on DSK4VPTVN1PROD with NOTICES Regional Infrastructure Rehabilitation Project. VerDate Mar<15>2010 16:23 Jun 07, 2012 $314,240,000 Jkt 226001 Key Regional Infrastructure Rehabilitated. PO 00000 Frm 00076 Fmt 4703 $309,899,714 Sfmt 4703 Household savings from Infrastructure Rehabilitation Activities. Savings in vehicle operating costs (VOC). International roughness index (IRI). Annual average daily traffic (AADT). Travel Time. Kilometers of road completed. Signed contracts for feasibility and/or design studies. Percent of contracted studies disbursed. Kilometers of roads under design. Signed contracts for road works. Kilometers of roads under works contracts. Sites rehabilitated (phases I, II, III)—pipeline. Construction works completed (phase II)—pipeline. Savings in household expenditures for all RID subprojects. Population Served by all RID subprojects. RID Subprojects completed. Value of Grant Agreements signed. Value of project works and goods contracts Signed. Subprojects with works initiated. E:\FR\FM\08JNN1.SGM 08JNN1 Federal Register / Vol. 77, No. 111 / Friday, June 8, 2012 / Notices Projects Obligated Objective Cumulative expenditures Regional Enterprise Development Project. $52,040,800 Enterprises in Regions Developed. $52,040,749 Program Administration 2, Due Diligence, Monitoring and Evaluation. Pending subsequent reports 3. $29,019,200 ........................................ ........................................ Measures $25,238,006 ............................ 34079 Jobs Created by Agribusiness Development Activity (ADA) and by Georgia Regional Development Fund (GRDF). Household net income—ADA and GRDF. Jobs created—ADA. Firm income—ADA. Household net income—ADA. Beneficiaries (direct and indirect)—ADA. Grant agreements signed—ADA. Increase in gross revenues of portfolio companies. Increase in portfolio company employees. Increase in wages paid to the portfolio company employees. Portfolio companies. Funds disbursed to the portfolio companies. $51 In November 2008, MCC and the Georgian government signed a Compact amendment making up to $100 million of additional funds available under the Compact to complete works in the Roads, Regional Infrastructure Development, and Energy Rehabilitation Projects contemplated by the original Compact. The amendment was ratified by the Georgian parliament and entered into force on January 30, 2009. The compact indicated is closed and therefore will not have any quarterly expenditure amount. Projects Obligated Objective Cumulative expenditures Measures Country: Vanuatu Year: 2012 Quarter 2 Total obligation: $65,403,519 Entity to which the assistance is provided: MCA Vanuatu Total Quarterly Expenditures: $0 Transportation Infrastructure Project. $60,084,299 Program Administration 2, Due Diligence, Monitoring and Evaluation. Pending subsequent reports 3. $5,319,220 ............................ Facilitate transportation to increase tourism and business development. $60,084,299 Traffic volume (average annual daily traffic)— Efate Ring Road. Traffic Volume (average annual daily traffic)— Santo East Coast Road. Kilometers of road upgraded—Efate Ring Road. Kilometers of roads upgraded—Santo East Coast Road. Percent of MCC contribution disbursed to ‘‘adjusted’’ signed contracts of roads works; including approved variations. $5,319,220 ........................................ $0 The compact indicated is closed and therefore will not have any quarterly expenditure amount. Projects Obligated Objective Cumulative expenditures Country: Armenia Year: 2012 Quarter 2 Entity to which the assistance is provided: MCA Armenia mstockstill on DSK4VPTVN1PROD with NOTICES Irrigated Agriculture Project (Agriculture and Water). VerDate Mar<15>2010 16:23 Jun 07, 2012 $153,892,467 Jkt 226001 Increase agricultural productivity Improve and Quality of Irrigation. PO 00000 Frm 00077 Fmt 4703 Total obligation: $177,650,000 Total Quarterly Expenditures 1: $¥360 $143,685,712 Sfmt 4703 Measures Training/technical assistance provided for OnFarm Water Management. Training/technical assistance provided for PostHarvest Processing. Loans Provided. Value of irrigation feasibility and/or detailed design contracts signed. Value of irrigation feasibility and/or detailed design contracts disbursed. Number of farmers using better on-farm water management. Number of enterprises using improved techniques. Value of irrigation feasibility and/or detailed design contracts signed. Additional Land irrigated under project. E:\FR\FM\08JNN1.SGM 08JNN1 34080 Federal Register / Vol. 77, No. 111 / Friday, June 8, 2012 / Notices Projects Obligated Rural Road Rehabilitation Project. Program Administration 2, Due Diligence, Monitoring and Evaluation. Pending subsequent reports 3. Cumulative expenditures Objective $9,100,000 Better access to economic and social infrastructure. $8,441,028 $14,657,533 ........................................ ........................................ Value of irrigation feasibility and/or detailed design contracts signed. Value of irrigation feasibility and/or detailed design contracts disbursed. Average annual daily traffic on Pilot Roads. International roughness index for Pilot Roads. Road Sections Rehabilitated—Pilot Roads. Pilot Roads: Percent of Contracted Roads Works Disbursed of Works Completed. $13,176,463 ............................ Measures $11,332,414 The negative quarterly expenditure for Armenia is due to a return of funds to the permitted account for compact closure. Projects Obligated Cumulative expenditures Objective Country: Benin Year: 2012 Quarter 2 Entity to which the assistance is provided: MCA Benin Total obligation: $307,298,039 Total Quarterly Expenditures 1: $4,345,977 $17,688,674 Expand Access to Financial Services. $15,495,910 Access to Justice Project $20,075,580 Improved Ability of Justice System to Enforce Contracts and Reconcile Claims. $19,383,915 Access to Land Project .. mstockstill on DSK4VPTVN1PROD with NOTICES Access to Financial Services Project. $32,182,938 Strengthen property rights and increase investment in rural and urban land. $30,978,490 VerDate Mar<15>2010 16:23 Jun 07, 2012 Jkt 226001 PO 00000 Frm 00078 Fmt 4703 Measures Sfmt 4703 Value of credits granted by Micro-Finance Institutions (at the national level). Value of savings collected by MFI institutions (at the national level). Average portfolio at risk >90 days of microfinance institutions at the national level. Operational self-sufficiency of MFIs at the national level. Number of institutions receiving grants through the Facility. Number of MFIs inspected by Cellule Supervision Microfinance. Average time to enforce a contract. Percent of firms reporting confidence in the judicial system. Passage of new legal codes. Average time required for Tribunaux de premiere instance-arbitration centers and courts of first instance (TPI) to reach a final decision on a case. Average time required for Court of Appeals to reach a final decision on a case. Percent of cases resolved in TPI per year. Percent of cases resolved in Court of Appeals per year. Number of Courthouses completed. Average time required to register a business ´ ´ (societe). Average time required to register a business (sole proprietorship). Percentage of households investing in targeted urban land parcels. Percentage of households investing in targeted rural land parcels. Average cost required to convert occupancy permit to land title through systematic process. Share of respondents perceiving land security in the Conversions from Occupancy permit to land title (PH–TF) or Rural Land Plan (PFR) areas. Number of preparatory studies completed. Number of Legal and Regulatory Reforms Adopted. Amount of Equipment Purchased. Number of new land titles obtained by transformation of occupancy permit. Number of land certificates issued within MCABenin implementation. Number of PFRs established with MCA Benin implementation. Number of permanent stations installed. E:\FR\FM\08JNN1.SGM 08JNN1 Federal Register / Vol. 77, No. 111 / Friday, June 8, 2012 / Notices Projects Obligated Access to Markets Project. Objective Cumulative expenditures $188,866,208 $188,683,879 $48,484,639 ........................................ ............................ ........................................ Projects Cumulative expenditures Country: Ghana Year: 2012 Quarter 2 Entity to which the assistance is provided: MCA Ghana Agriculture Project .......... mstockstill on DSK4VPTVN1PROD with NOTICES Rural Development Project. VerDate Mar<15>2010 Number of stakeholders trained. Number of communes with new cadastres. Number of operational land market information systems. Volume of merchandise traffic through the Port Autonome de Cotonou. Bulk ship carriers waiting times at the port. Port design-build contract awarded. Annual number of thefts cases. Average time to clear customs. Port meets—international port security standards (ISPS). $81,588 Objective Measures $47,125,946 Obligated Program Administration 2, Due Diligence, Monitoring and Evaluation. Pending subsequent reports 3. Improve Access to Markets through Improvements to the Port of Cotonou. 34081 16:23 Jun 07, 2012 Total obligation: $547,009,000 Total Quarterly Expenditures 1: $39,208,886 $208,528,167 Enhance Profitability of cultivation, services to agriculture and product handling in support of the expansion of commercial agriculture among groups of smallholder farms. $202,305,873 $78,312,596 Strengthen the rural institutions that provide services complementary to, and supportive of, agricultural and agriculture business development. $75,479,928 Jkt 226001 PO 00000 Frm 00079 Fmt 4703 Measures Sfmt 4703 Number of farmers trained in commercial agriculture. Number of agribusinesses assisted. Number of preparatory land studies completed. Legal and regulatory land reforms adopted. Number of landholders reached by public outreach efforts. Number of hectares under production. Number of personnel trained. Number of buildings rehabilitated/constructed. Value of equipment purchased. Feeder roads international roughness index. Feeder roads annualized average daily traffic. Value of signed contracts for feasibility and/or design studies of feeder roads. Percent of contracted design/feasibility studies completed for feeder roads. Value of signed works contracts for feeder roads. Percent of contracted feeder road works disbursed. Value of loans disbursed to clients from agriculture loan fund. Value of signed contracts for feasibility and/or design studies (irrigation). Percent of contracted (design/feasibility) studies complete (irrigation). Value of signed contracts for irrigation works (irrigation). Rural hectares mapped. Percent of contracted irrigation works disbursed. Percent of people aware of their land rights in Pilot Land Registration Areas. Total number of parcels surveyed in the Pilot Land Registration Areas (PLRAs). Volume of products passing through post-harvest treatment. Number of students enrolled in schools affected by Education Facilities Sub-Activity. Number of schools rehabilitated. Number of school blocks constructed. Distance to collect water. Time to collect water. Incidence of guinea worm. Number of people affected by Water and Sanitation Facilities Sub-Activity. Number of stand-alone boreholes/wells/nonconventional water systems constructed/rehabilitated. E:\FR\FM\08JNN1.SGM 08JNN1 34082 Federal Register / Vol. 77, No. 111 / Friday, June 8, 2012 / Notices Projects Obligated Transportation Project .... Objective $218,367,447 Reduce the transportation costs affecting agriculture commerce at sub-regional levels. Cumulative expenditures $223,556,573 Measures Number of small-town water systems designed and due diligence completed for construction. Number of pipe extension projects designed and due diligence completed for construction. Number of agricultural processing plants in target districts with electricity due to Rural Electrification Sub-Activity. Trunk roads international roughness index. N1 International roughness index. N1 Annualized average daily traffic. N1 Kilometers of road upgraded. Value of signed contracts for feasibility and/or design studies of the N1. Percent of contracted design/feasibility studies completed of the N1. Value of signed contracts for road works N1, Lot 1. Value of signed contracts for road works N1, Lot 2. Trunk roads annualized average daily traffic. Trunk roads kilometers of roads completed. Percent of contracted design/feasibility studies completed of trunk roads. Percent of contracted trunk road works disbursed. Ferry Activity: annualized average daily traffic vehicles. Ferry Activity: annual average daily traffic (passengers). Landing stages rehabilitated. Ferry terminal upgraded. Rehabilitation of Akosombo Floating Dock completed. Rehabilitation of landing stages completed. Percent of contracted road works disbursed: N1, Lot 2. Percent of contracted road works disbursed: N1, Lot 2. Percent of contracted work disbursed: ferry and floating dock. Percent of contracted work disbursed: landings and terminals. Value of signed contracts for feasibility and/or design studies of Trunk Roads. Value of signed contracts for trunk roads. Program Administration 2, Due Diligence, Monitoring and Evaluation. Pending subsequent reports 3. $46,800,791 ........................................ $39,529,223 ............................ ........................................ $3,318,046 Obligated Objective Projects Cumulative expenditures Measures Country: El Salvador Year: 2012 Quarter 2 Total obligation: $460,940,000 Entity to which the assistance is provided: MCA El Salvador Total Quarterly Expenditures 1: $37,021,518 mstockstill on DSK4VPTVN1PROD with NOTICES Human Development Project. VerDate Mar<15>2010 16:23 Jun 07, 2012 $89,146,523 Jkt 226001 Increase human and physical capital of residents of the Northern Zone to take advantage of employment and business opportunities. PO 00000 Frm 00080 Fmt 4703 $73,532,244 Sfmt 4703 Employment rate of graduates of middle technical schools. Graduation rates of middle technical schools. Middle technical schools remodeled and equipped. New Scholarships granted to students of middle technical education. Students of non-formal training. Cost of water. Time collecting water. Number of households with access to improved water supply. Value of contracted water and sanitation works disbursed. Cost of electricity. E:\FR\FM\08JNN1.SGM 08JNN1 Federal Register / Vol. 77, No. 111 / Friday, June 8, 2012 / Notices Projects Obligated Cumulative expenditures Objective Productive Development Project. $71,824,000 Increase production and employment in the Northern Zone. $26,483,228 Connectivity Project ........ $269,212,588 $215,261,446 Productive Development Project. Program Administration 2 and Control, Monitoring and Evaluation. Pending Subsequent Report 3. $68,215,522 Reduce travel cost and time within the Northern Zone, with the rest of the country, and within the region. ........................................ $34,365,368 ........................................ ........................................ Objective Projects $61,035,582 Cumulative expenditures Country: Mali Year: 2012 Quarter 2 Entity to which the assistance is provided: MCA Mali $176,252,117 ........................................ $121,687,704 Alatona Irrigation Project $239,884,675 Increase the agricultural production and productivity in the Alatona zone of the ON. $240,454,297 VerDate Mar<15>2010 16:23 Jun 07, 2012 Jkt 226001 PO 00000 Frm 00081 Fmt 4703 Measures Total obligation: $460,811,163 Total Quarterly Expenditures 1: $48,807,192 Bamako-Senou Airport Improvement Project. mstockstill on DSK4VPTVN1PROD with NOTICES Households benefiting with a connection to the electricity network. Households benefiting with the installation of isolated solar systems. Kilometers of new electrical lines with construction contracts signed. Population benefiting from strategic infrastructure. Number of hectares under production with MCC support. Number of beneficiaries of technical assistance and training—Agriculture. Number of beneficiaries of technical assistance and training—Agribusiness. Value of agricultural loans to farmers/agribusiness. Average annual daily traffic. International roughness index. Kilometers of roads rehabilitated. Kilometers of roads with construction initiated. $0 Obligated Measures $24,112,281 ............................ 34083 Sfmt 4703 Number of full time jobs at the ADM and firms supporting the airport. Average number of weekly flights(arrivals). Passenger traffic (annual average). Percent works complete. Time required for passenger processing at departures and arrivals. Percent works complete. Security and safety deficiencies corrected at the airport. Main season rice yields. International roughness index (IRI) on the NionoGoma Coura Route. Traffic on the Niono-Diabaly road segment. Traffic on the Diabaly-Goma Coura road segment. Percentage works completed on Niono-Goma Coura road. Hectares under improved irrigation. Irrigation system efficiency on Alatona Canal. Percentage of contracted irrigation construction works disbursed. Number market gardens allocated in Alatona zones to PAPs or New Settler women. Net primary school enrollment rate (in Alatona zone). Percent of Alatona population with improved access to drinking water. Number of schools available in Alatona. Number of health centers available in the Alatona. Number of affected people who have been compensated. Number of farmers that have applied improved techniques. Hectares under production (rainy season). Hectares under production (dry season). Number of farmers trained. Value of agricultural and rural loans. Number of active MFI clients. Loan recovery rate among Alatona farmers. E:\FR\FM\08JNN1.SGM 08JNN1 34084 Federal Register / Vol. 77, No. 111 / Friday, June 8, 2012 / Notices Projects Obligated Industrial Park Project .... Program Administration 2 and Control, Monitoring and Evaluation. Pending Subsequent Report 3. Objective Cumulative expenditures $2,637,472 $42,036,899 Terminated ..................... ........................................ $2,637,472 $31,309,488 ............................ ........................................ Measures $2,146,164 On May 4, 2012, the Millennium Challenge Corporation’s (MCC) Board of Directors concurred with the recommendation of MCC to terminate the Mali Compact following the undemocratic change of government in the country. Projects Obligated Objective Cumulative expenditures Country: Mongolia Year: 2012 Quarter 2 Entity to which the assistance is provided: MCA Mongolia Total obligation: $284,911,363 Total Quarterly Expenditures1: $24,286,241 Property Rights Project .. $27,202,619 Increase security and capitalization of land assets held by lowerincome Mongolians, and increased periurban herder productivity and incomes. $13,691,326 Vocational Education Project. $47,355,638 Increase employment and income among unemployed and underemployed Mongolians. $29,600,792 Health Project ................. $38,973,259 $88,440,123 Increase the adoption of behaviors that reduce non-communicable diseases (NCDIs) among target populations and improved medical treatment and control of NCDIs. More efficient transport for trade and access to services. $22,933,730 Roads Project ................. Energy and Environmental Project. mstockstill on DSK4VPTVN1PROD with NOTICES Measures $45,266,205 Increased wealth and productivity through greater fuel use efficiency and decreasing health costs from air. $20,467,556 Rail Project ..................... Program Administration 2 and Control, Monitoring and Evaluation. Pending subsequent reports 3. $369,560 $37,303,959 Terminated ..................... ........................................ $369,560 $19,680,768 ............................ ........................................ $312,277 $16,300,161 Number of legal and regulatory framework or preparatory studies completed (Peri-Urban and Land Plots). Number of Legal and regulatory reforms adopted. Number of stakeholders (Peri-Urban and Land Plots). Stakeholders Trained (Peri-Urban and Land Plots). Number of Buildings Built/Rehabilitated. Equipment purchased. Rural hectares Mapped. Urban Parcels Mapped. Leaseholds Awarded. Rate of employment. Vocational school graduates in MCC-supported educational facilities. Percent of active teachers receiving certification training. Technical and vocational education and training (TVET) legislation passed. Treatment of diabetes. Treatment of hypertension. Early detection of cervical cancer. Recommendations on road safety interventions available. Kilometers of roads completed. Annual average daily traffic. Travel time. International Roughness Index. Kilometers of roads under design. Percent of contracted roads works disbursed. Household savings from decreased fuel costs. Product testing and subsidy setting process adopted. Health costs from air pollution in Ulaanbaatar. Reduced particulate matter concentration. Capacity of wind power generation. Terminated. In late 2009, the MCC’s Board of Directors approved the allocation of a portion of the funds originally designated for the rail project to the expansion of the health, vocational education and property right projects from the rail project, and the remaining portion to the addition of a road project. VerDate Mar<15>2010 16:23 Jun 07, 2012 Jkt 226001 PO 00000 Frm 00082 Fmt 4703 Sfmt 4703 E:\FR\FM\08JNN1.SGM 08JNN1 Federal Register / Vol. 77, No. 111 / Friday, June 8, 2012 / Notices Projects Obligated Objective Cumulative expenditures Country: Mozambique Year: 2012 Quarter 2 Entity to which the assistance is provided: MCA Mozambique Increase access to reliable and quality water and sanitation facilities. $58,227,556 Road Rehabilitation Project. $176,307,480 Increase access to productive resources and markets. $43,865,078 Land Tenure Project ....... $39,068,307 Establish efficient, secure land access for households and investors. $19,883,913 Farmer Income Support Project. mstockstill on DSK4VPTVN1PROD with NOTICES $207,385,393 $18,400,117 Improve coconut productivity and diversification into cash crop. $12,178,148 16:23 Jun 07, 2012 Jkt 226001 PO 00000 Frm 00083 Fmt 4703 Sfmt 4703 Measures Total obligation: $506,924,053 Total Quarterly Expenditures1: $41,806,853 Water Supply and Sanitation Project. VerDate Mar<15>2010 34085 Percent of urban population with improved water sources. Time to get to non-private water source. Percent of urban population with improved sanitation facilities. Percent of rural population with access to improved water sources. Number of private household water connections in urban areas. Number of rural water points constructed. Number of standpipes in urban areas. Five cities: Final detailed design submitted. Three cities: Final detailed design submitted. Kilometers of road rehabilitated. ´ Namialo-Rio Lurio Road-Metoro: Percent of feasibility, design, and supervision contract disbursed. Rio Ligonha-Nampula: Percent of feasibility, design, and supervision contract disbursed. Chimuara-Nicoadala: Percent of feasibility, design, and supervision contract disbursed. ´ Namialo-Rio Lurio: Percent of road construction contract disbursed. ´ Rio Lurio-Metoro: Percent of road construction contract disbursed. Rio Ligonha-Nampula: Percent of road construction contract disbursed. Chimuara-Nicoadala: Percent of road construction contract disbursed. ´ Namialo-Rio Lurio Road: Average annual daily traffic volume. ´ Rio Lurio-Metoro Road: Average annual daily traffic volume. Rio-Ligonha-Nampula Road: Average annual daily traffic volume. Chimuara-Nicoadala Road: Average annual daily traffic volume. ´ Namialo-Rio Lurio Road: Change in International Roughness Index (IRI). ´ Rio Lurio-Metoro Road: Change in International Roughness Index (IRI). Rio-Ligonha-Nampula Road: Change in International Roughness Index (IRI). Chimuara-Nicoadala Road: Change in International Roughness Index (IRI). Time to get land usage rights (DUAT), urban. Time to get land usage rights (DUAT), rural Number of buildings rehabilitated or built. Total value of procured equipment and materials. Number of people trained. Rural hectares mapped in Site Specific Activity. Urban parcels mapped. Rural hectares formalized through Site Specific Activity. Urban parcels formalized. Number of communities delimited and formalized. Number of urban households having land formalized. Number of diseased or dead palm trees cleared. Survival rate of Coconut seedlings. Hectares under production. Number of farmers trained in pest and disease control. Number of farmers trained in crop diversification technologies. Income from coconuts and coconut products (estates). Income from coconuts and coconuts products (households). E:\FR\FM\08JNN1.SGM 08JNN1 34086 Federal Register / Vol. 77, No. 111 / Friday, June 8, 2012 / Notices Projects Obligated Program Administration 2 and Control, Monitoring and Evaluation. Pending Subsequent Report 3. Objective Cumulative expenditures $65,762,756 ........................................ $30,636,826 ............................ ........................................ $1,445,392 Obligated Objective Projects Cumulative expenditures Country: Lesotho Year: 2012 Quarter 2 Entity to which the assistance is provided: MCA Lesotho Measures Total obligation: $362,527,119 Total Quarterly Expenditures1: $28,964,908 Water Project .................. $164,027,999 Improve the water supply for industrial and domestic needs, and enhance rural livelihoods through improved watershed management. $57,068,977 Health Project ................. $121,353,942 Increase access to lifeextending ART and essential health services by providing a sustainable delivery platform. $75,201,886 Private Sector Development Project. $36,470,318 Stimulate investment by improving access to credit, reducing transaction costs and increasing the participation of women in the economy. $12,682,603 Program Administration 2 and Control, Monitoring and Evaluation. Pending Subsequent Report 3. $40,674,860 ........................................ $26,097,107 ............................ ........................................ $1,608,060 Obligated Objective Projects Fruit Tree Productivity Project. $328,453,084 Small Scale Fisheries Project. $125,174,973 VerDate Mar<15>2010 16:23 Jun 07, 2012 Jkt 226001 Reduce volatility of agricultural production and increase volume of fruit agricultural production. Improve quality of fish moving through domestic channels and assure the sustainable use of fishing resources. PO 00000 Frm 00084 Fmt 4703 School days lost due to water borne diseases. Diarrhea notification at health centers. Households with access to improved water supply. Households with access to improved Latrines. Knowledge of good hygiene practices. Households with reliable water services. Enterprises with reliable water services. Households with reliable water services. Volume of treated water. Area re-vegetation. People with HIV still alive 12 months after initiation of treatment. TB notification (per 100,000 pop.). People living with HIV/AIDS (PLWA) receiving Antiretroviral treatment. Deliveries conducted in the health facilities. Immunization coverage rate. Time required to enforce a contract. Value of commercial cases. Cases referred to Alternative Dispute Resolution (ADR) that are successfully completed. Portfolio of loans. Loan application processing time. Performing loans. Electronic payments—salaries. Electronic payments—pensions. Debit/smart cards issued. Mortgage bonds registered. Value of registered mortgage bonds. Clearing time—Country. Clearing time—Maseru. Land transactions recorded. Land parcels regularized and registered. People trained on gender equality and economic rights. Eligible population with ID cards. Monetary cost to process a lease application. Cumulative expenditures Country: Morocco Year: 2012 Quarter 2 Entity to which the assistance is provided: MCA Morocco mstockstill on DSK4VPTVN1PROD with NOTICES Measures Measures Total obligation: $697,500,000 Total Quarterly Expenditures1: $49,148,726 $175,312,594 $24,742,736 Sfmt 4703 Number of farmers trained. Number of agribusinesses assisted. Number of hectares under production. Value of agricultural production. Landing sites and ports rehabilitated. Mobile fish vendors using new equipment. Fishing boats using new landing sites. Average price of fish at auction markets. Average price of fish at wholesale. Average price of fish at ports. E:\FR\FM\08JNN1.SGM 08JNN1 Federal Register / Vol. 77, No. 111 / Friday, June 8, 2012 / Notices Projects Obligated Objective Cumulative expenditures Artisan and Fez Medina Project. $94,283,145 Increase value added to tourism and artisan sectors. $24,165,123 Enterprise Support Project. $26,811,445 $14,175,608 Financial Services Project. $43,700,000 Improved survival rate of new SMEs and INDHfunded income generating activities; increased revenue for new SMEs and INDHfunded income generating activities. To be determined (‘‘TBD’’). Program Administration 2 and Control, Monitoring and Evaluation. Pending Subsequent Report 3. $79,677,353 ........................................ ........................................ $3,801,422 Obligated Objective Projects $27,152,870 $203,465,542 Increase value added to businesses. $118,017,159 Transport Sector Project $368,847,428 Increase cash crop revenue and aggregate visitor spending. $197,196,419 16:23 Jun 07, 2012 Jkt 226001 PO 00000 Frm 00085 Fmt 4703 Portfolio at risk at 30 days. Portfolio rate of return. Number of clients of Microcredit Associations (AMCs) reached through mobile branches. Sfmt 4703 Measures Total obligation: $698,135,999 Total Quarterly Expenditures1: $1,512,225 Energy Sector Project .... VerDate Mar<15>2010 Average revenue of Small and Micro Enterprise (SME) pottery workshops. Construction and rehabilitation of Fez Medina Sites. Tourist receipts in Fez. Training of potters. Value added per enterprise. Survival rate after two years. Cumulative expenditures Country: Tanzania Year: 2012 Quarter 2 Entity to which the assistance is provided: MCA Tanzania mstockstill on DSK4VPTVN1PROD with NOTICES Measures $48,320,641 ............................ 34087 Current power customers: Morogoro D1, Morogoro T1, Morogoro T2 & T3, Tanga D1, Tanga T1, Tanga T2 & T3, Mbeya D1, Mbeya T1, Mbeya T2 & T3, Iringa D1, Iringa T1, Iringa T2 & T3, Dodoma D1, Dodoma T1, Dodoma T2 & T3, Mwanza D1, Mwanza T1 and Mwanza T2 & T3. Transmission and distribution sub-station capacity: Morogoro, Tanga, Mbeya, Iringa, Dodoma and Mwanza. Collection efficiency (Morogoro). Collection efficiency (Tanga). Collection efficiency (Mbeya). Collection efficiency (Iringa). Collection efficiency (Dodoma). Collection efficiency (Mwanza). Technical and nontechnical losses (Morogoro). Technical and nontechnical losses (Tanga). Technical and nontechnical losses (Mbeya). Technical and nontechnical losses (Iringa). Technical and nontechnical losses (Dodoma). Technical and nontechnical losses (Mwanza). International roughness index: Tunduma Sumbawanga. International roughness index: Tanga Horohoro. International roughness index: Namtumbo Songea. International roughness index: Peramiho Mbinga. Annual average daily traffic: Tunduma Sumbawanga. Annual average daily traffic: Tanga Horohoro. Annual average daily traffic: Namtumbo Songea. Annual average daily traffic: Peramiho Mbinga. Kilometers upgraded/completed: Tunduma Sumbawanga. Kilometers upgraded/completed: Tanga Horohoro. Kilometers upgraded/completed: Namtumbo Songea. Kilometers upgraded/completed: Peramiho Mbinga. Percent disbursed on construction works: Tunduma Sumbawanga. E:\FR\FM\08JNN1.SGM 08JNN1 34088 Federal Register / Vol. 77, No. 111 / Friday, June 8, 2012 / Notices Projects Obligated Objective Cumulative expenditures Water Sector Project ...... $65,692,145 Increase investment in human and physical capital and to reduce the prevalence of water-related disease. $28,130,025 Program Administration 2 and Control, Monitoring and Evaluation. Pending Subsequent Report 3. $56,130,884 ........................................ ........................................ $99,857 Obligated Objective Percent disbursed on construction works: Tanga Horohoro. Percent disbursed on construction works: Namtumbo Songea. Percent disbursed on construction works: Peramiho Mbinga. Percent disbursed for feasibility and/or design studies: Tunduma Sumbawanga. Percent disbursed for feasibility and/or design studies: Tanga Horohoro. Percent disbursed for feasibility and/or design studies: Namtumbo Songea. Percent disbursed for feasibility and/or design studies: Peramiho Mbinga. International roughness index: Pemba. Average annual daily traffic: Pemba. Kilometers upgraded/completed: Pemba. Percent disbursed on construction works: Pemba. Signed contracts for construction works (Zanzibar Rural Roads). Percent disbursed on signed contracts for feasibility and/or design studies: Pemba. Passenger arrivals: Mafia Island. Percentage of upgrade complete: Mafia Island. Percent disbursed on construction works: Mafia Island. Number of domestic customers (Dar es Salaam). Number of domestic customers (Morogoro). Number of non-domestic (commercial and institutional) customers (Dar es Salaam). Number of non-domestic (commercial and institutional) customers (Morogoro). Volume of water produced (Lower Ruvu). Volume of water produced (Morogoro). Percent disbursed on feasibility design update contract Lower Ruvu Plant Expansion. $23,385,406 ............................ Measures Projects Cumulative expenditures Measures Country: Burkina Faso Year: 2012 Quarter 2 Total obligation: $480,085,358 Entity to which the assistance is provided: MCA Burkina Faso Total Quarterly Expenditures1: $20,475,679 mstockstill on DSK4VPTVN1PROD with NOTICES Roads Project ................. Rural Land Governance Project. VerDate Mar<15>2010 16:23 Jun 07, 2012 $194,130,681 Enhance access to markets through investments in the road network. $14,639,792 $59,934,615 Increase investment in land and rural productivity through improved land tenure security and land management. $15,204,582 Jkt 226001 PO 00000 Frm 00086 Fmt 4703 Sfmt 4703 Annual average daily traffic: Dedougou-Nouna. Annual average daily traffic: Nouna-Bomborukuy. Annual average daily traffic: Bomborukuy-Mali border. Kilometers of road under works contract. Kilometers of road under design/feasibility contract. Access time to the closest market via paved roads in the Sourou and Comoe (minutes). Kilometers of road under works contract. Kilometers of road under design/feasibility contract. Personnel trained in procurement, contract management and financial systems. Periodic road maintenance coverage rate (for all funds) (percentage). Trend in incidence of conflict over land rights reported in the 17 pilot communes (Annual percentage rate of change in the occurrence of conflicts over land rights). Number of legal and regulatory reforms adopted. Number of stakeholders reached by public outreach efforts. Personnel trained. E:\FR\FM\08JNN1.SGM 08JNN1 Federal Register / Vol. 77, No. 111 / Friday, June 8, 2012 / Notices Projects Obligated Objective Cumulative expenditures Agriculture Development Project. $141,910,059 Expand the productive use of land in order to increase the volume and value of agricultural production in project zones. $30,542,691 Bright II Schools Project $27,971,458 Increase primary school completion rates. $26,582,359 Program Administration 2 and Control, Monitoring and Evaluation. Pending Subsequent Report 3. $56,138,545 ........................................ ........................................ Objective Projects Cumulative expenditures Country: Namibia Year: 2012 Quarter 2 Entity to which the assistance is provided: MCA Namibia Education Project ........... mstockstill on DSK4VPTVN1PROD with NOTICES Number of Services Fonciers Ruraux (rural land service offices) installed and functioning. Rural hectares formalized. Number of parcels registered in Ganzourou project area. New irrigated perimeters developed in Di (Hectares). Technical water management core teams (noyaux techniques) installed and operational in the two basins (Sourou and Comoe). Number of farmers trained. Number of agro-sylvo-pastoral groups which receive technical assistance. Number of loans provided by the rural finance facility. Volume of loans intended for agro-sylvo-pastoral borrowers (million CFA). Number of girls/boys graduating from BRIGHT II primary schools. Percent of girls regularly attending (90% attendance) BRIGHT schools. Number of girls enrolled in the MCC/USAID-supported BRIGHT schools. Number of additional classrooms constructed. Number of teachers trained through 10 provincial workshops. $0 Obligated Measures $27,441,397 ............................ 34089 VerDate Mar<15>2010 16:23 Jun 07, 2012 $144,976,558 Jkt 226001 Improve the quality of the workforce in Namibia by enhancing the equity and effectiveness of basic. PO 00000 Frm 00087 Fmt 4703 Measures Total obligation: $304,477,815 Total Quarterly Expenditures1: $8,590,528 $34,906,402 Sfmt 4703 Percentage of students who are new entrants in grade 5 for 47 schools. Percent of contracted construction works disbursed for 47 schools. Percent disbursed against design/supervisory contracts for 47 schools. Percentage of schools with a learner-textbook ration of 1 to 1 in science, math, and English. Number of textbooks delivered. Number of teachers and managers trained in textbook management, utilization, and storage. Percent disbursed against works contracts for Regional Study Resource Centers Activity (RSRCS). Percent disbursed against design/supervisory contracts for RSRCs. Number of vocational trainees enrolled through the MCA–N grant facility. Value of vocational training grants awarded through the MCA–N grant facility. Percent disbursed against construction, rehabilitation, and equipment contracts for Community Skills and Development Centres (COSDECS). Percent disbursed against design/supervisory contracts for COSDECS. E:\FR\FM\08JNN1.SGM 08JNN1 34090 Federal Register / Vol. 77, No. 111 / Friday, June 8, 2012 / Notices Projects Obligated Objective Cumulative expenditures Tourism Project .............. $66,994,941 Grow the Namibian tourism industry with a focus on increasing income to households in communal. $10,974,515 Agriculture Project .......... $47,835,474 Enhance the health and marketing efficiency of livestock in the NCAs of Namibia and to increase income. $15,536,855 Program Administration 2 and Control, Monitoring and Evaluation. Pending Subsequent Report 3. $44,670,841 ........................................ $16,809,968 ............................ ........................................ $6,305,828 Obligated Objective Projects Road Rehabilitation Project. $132,840,000 $101,773,402 Increase incomes in the agricultural sector; Create models for transition to HVA in CIS areas and an enabling environment (legal, financial and market) for replication. VerDate Mar<15>2010 16:23 Jun 07, 2012 Jkt 226001 PO 00000 Frm 00088 Fmt 4703 Measures Total obligation: $262,000,000 Total Quarterly Expenditures1: $3,695,071 Enhance transportation conditions. Transition to High Value Agriculture Project. Percent of condition precedents and performance targets met for Etosha National Park (ENP) activity. Number of game translocated with MCA–N support. Number of unique visits on Namibia Tourism Board (NTB) web site. Number of North American tourism businesses (travel agencies and tour operators) that offer Namibian tours or tour packages. Value of grants issued by the conservancy grant fund (Namibian dollars). Amount of private sector investment secured by MCA–N assisted conservancies (Namibian dollars). Number of annual general meetings with financial reports submitted and benefit distribution plans discussed. Number of participating households registered in the Community-based Rangeland and Livestock Management (CBRLM) sub-activity. Number of grazing area management implementation agreements established under CBRLM sub-activity Number of community land board members and traditional authority members trained. Number of cattle tagged with radio frequency identification (RFID) tags. Percent disbursed against works contracts for State Veterinary Offices. Percent disbursed against design/supervisory contracts for State Veterinary Offices. Value of grant agreements signed under Livestock Market Efficiency Fund. Number of Indigenous Natural Product (INP) producers selected and mobilized. Value of grant agreements signed under INP Innovation Fund. Cumulative expenditures Country: Moldova Year: 2012 Quarter 2 Entity to which the assistance is provided: MCA Moldova mstockstill on DSK4VPTVN1PROD with NOTICES Measures $525,929 $8,944,959 Sfmt 4703 Reduced cost for road users. Average annual daily traffic. Road maintenance expenditure. Kilometers of roads completed. Percent of contracted roads works disbursed. Kilometers of roads under works contracts. Resettlement Action Plan (RAP) implemented. Final design. Kilometers of roads under design. Hectares under improved or new irrigation. Centralized irrigation systems rehabilitated. Percent of contracted irrigation feasibility and/or design studies disbursed. Value of irrigation feasibility and/or detailed design contracts signed. Water user associations (WUA) achieving financial sustainability. WUA established under new law. Revised water management policy framework— with long-term water rights defined—established. Contracts of association signed. E:\FR\FM\08JNN1.SGM 08JNN1 Federal Register / Vol. 77, No. 111 / Friday, June 8, 2012 / Notices Projects Obligated Objective Cumulative expenditures 34091 Measures Irrigation Sector Reform (ISRA) Contractor mobilized. Additionally factor of Access to Agricultural Finance (AAF) investments. Value of agricultural and rural loans. Number of all loans. Number of all loans (female). High value agriculture (HVA) Post-Harvest Credit Facility launched. HVA Post-Harvest Credit Facility Policies and Procedures Manual (PPM) Finalized. Number of farmers that have applied improved techniques (Growing High Value Agriculture Sales [GSH]). Number of farmers that have applied improved techniques (GHS) (female). Number of farmers trained. Number of farmers trained (female). Number of enterprises assisted. Number of enterprises assisted (female). GHS activity launched. Program Administration 2 and Monitoring and Evaluation. Pending Subsequent Report 3. $27,386,598 ........................................ $3,260,089 ............................ ........................................ $251,108 Obligated Objective Projects Cumulative expenditures Country: Philippines Year: 2012 Quarter 2 Entity to which the assistance is provided: MCA Philippines Total obligation: $432,829,526 Total Quarterly Expenditures 1: $11,379,502 Kalahi-CIDSS Project ..... $120,000,000 Improve the responsiveness of local governments to community needs, encourage communities to engage in development activities. $12,016,874 Secondary National Roads Development Project. $213,412,526 Reduce transportation costs and improve access to markets and social services. $5,393,202 Revenue Administration Reform Project. $54,300,000 $45,117,000 Increase tax revenues over time and support the Department of Finance’s initiatives to detect and deter corruption within its revenue agencies. ........................................ $4,010,877 Program Administration 2 and Control, Monitoring and Evaluation. Pending Subsequent Reports 3. ............................ ........................................ $1,859,797 Obligated Objective Projects mstockstill on DSK4VPTVN1PROD with NOTICES Measures $2,491,252 Cumulative expenditures Country: Senegal Year: 2012 Quarter 2 Entity to which the assistance is provided: MCA Senegal Road Rehabilitation Project. VerDate Mar<15>2010 16:23 Jun 07, 2012 $324,712,499 Jkt 226001 Expand Access to Markets and Services. PO 00000 Frm 00089 Fmt 4703 Percentage of Municipal Local Government Units (MLGUs) that provide funding support for KC subproject operations and maintenance. Number of completed KC sub-projects implemented in compliance with technical plans and within schedule and budget. Percentage of communities with KC sub-projects that have sustainability evaluation rating of satisfactory or better. Motorized traffic time cost. Kilometers of road sections completed. Value of road construction contracts disbursed. Value of signed road feasibility and design contracts. Value of road feasibility and design contracts disbursed. Number of audits performed. Number of Revenue District Offices using the electronic tax information system (eTIS). Number of successful case resolutions. Measures Total obligation: $540,000,000 Total Quarterly Expenditures1: $1,590,061 $2,366,527 Sfmt 4703 Tons of irrigated rice production. Kilometers of roads rehabilitated on the RN#2. Annual average daily traffic Richard-Toll— Ndioum. Percentage change in travel time on the RN#2. E:\FR\FM\08JNN1.SGM 08JNN1 34092 Federal Register / Vol. 77, No. 111 / Friday, June 8, 2012 / Notices Projects Obligated Objective Cumulative expenditures Irrigation and Water Resources Management Project. $170,008,860 Improve productivity of the agricultural sector. $437,433 Program Administration 2 and Monitoring and Evaluation. Pending Subsequent Report 3. $45,278,641 ........................................ ........................................ $82,456 Obligated Objective International Roughness Index on the RN#2 (Lower number = smoother road). Kilometers (km) of roads covered by the contract for the studies, the supervision and management of the RN#2. Kilometers of roads rehabilitated on the RN#6. Annual average daily traffic Ziguinchor—Tanaff. Annual average daily traffic Tanaff—Kolda. ´ Annual average daily traffic Kolda—Kounkane. Percentage change in travel time on the RN#6. International Roughness Index on the RN#6 (Lower number = smoother road). Kilometers (km) of roads covered by the contract for the studies, the supervision and management of the RN#6. Tons of irrigated rice production. Potentially irrigable lands area (Delta and Ngallenka). Hectares under production. Total value of feasibility, design and environmental study contracts signed for the Delta and the Ngallenka (including RAPs). Cropping intensity (hectares under production per year/cultivable hectares). Number of hectares mapped to clarify boundaries and land use types. Percent of new conflicts resolved. Number of people trained on land security tools. $7,006,105 ............................ Measures Projects Cumulative expenditures Country: Jordan Year: 2012 Quarter 2 Entity to which the assistance is provided: MCA Jordan Water Network Restructuring and Rehabilitation. Wastewater Collection .... Expansion of Wastewater Treatment Capacity. Program Administration 2 and Monitoring and Evaluation. Pending Subsequent Report 3. Measures Total obligation: $275,100,000 Total Quarterly Expenditures: $¥32,288 $102,570,034 TBD ................................ ............................ TBD. $58,224,386 $93,025,488 TBD ................................ TBD ................................ ............................ ............................ TBD. TBD. $21,280,092 ........................................ $10,828 The negative expense relates to expense accruals and disbursements for the quarter. 1 Expenditures are the sum of cash outlays and quarterly accruals for work in process and invoices received but not yet paid. administration funds are used to pay items such as salaries, rent, and the cost of office equipment. amounts represent disbursements made that will be allocated to individual projects in the subsequent quarter(s) and reported as such in subsequent quarterly report(s). 2 Program 3 These 619(b) TRANSFER OR ALLOCATION OF FUNDS Amount Description of program or project None mstockstill on DSK4VPTVN1PROD with NOTICES U.S. Agency to which Funds were Transferred or Allocated None None [FR Doc. 2012–13948 Filed 6–7–12; 8:45 am] BILLING CODE 9211–03–P VerDate Mar<15>2010 16:23 Jun 07, 2012 Jkt 226001 PO 00000 Frm 00090 Fmt 4703 Sfmt 9990 E:\FR\FM\08JNN1.SGM 08JNN1

Agencies

[Federal Register Volume 77, Number 111 (Friday, June 8, 2012)]
[Notices]
[Pages 34075-34092]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-13948]


-----------------------------------------------------------------------

MILLENNIUM CHALLENGE CORPORATION

[MCC FR 12-06]


Notice of Quarterly Report (January 1, 2012-March 31, 2012)

AGENCY: Millennium Challenge Corporation.

SUMMARY: The Millennium Challenge Corporation (MCC) is reporting for 
the quarter January 1, 2012 through March 31, 2012, on assistance 
provided under section 605 of the Millennium Challenge Act of 2003 (22 
U.S.C. 7701 et seq.), as amended (the Act), and on transfers or 
allocations of funds to other federal agencies under section 619(b) of 
the Act. The following report will be made available to the public by 
publication in the Federal Register and on the Internet Web site of the 
MCC (www.mcc.gov) in accordance with section 612(b) of the Act.

    Dated: June 4, 2012.
T. Charles Cooper,
Vice President, Congressional and Public Affairs, Millennium Challenge 
Corporation.

                                      Assistance Provided Under Section 605
----------------------------------------------------------------------------------------------------------------
                                                                          Cumulative
            Projects                 Obligated         Objectives        expenditures            Measures
----------------------------------------------------------------------------------------------------------------
                     Country: Madagascar Year: 2012 Quarter 2 Total obligation: $85,594.779
        Entity to which the assistance is provided: MCA Madagascar Total Quarterly Expenditures \1\ : $0
----------------------------------------------------------------------------------------------------------------
Land Tenure Project............       $29,560,718  Increase Land            $29,560,718  Area secured with land
                                                    Titling and                           certificates or titles
                                                    Security.                             in the Zones.
                                                                                         Legal and regulatory
                                                                                          reforms adopted.
                                                                                         Number of land
                                                                                          documents inventoried
                                                                                          in the Zones and
                                                                                          Antananarivo.
                                                                                         Number of land
                                                                                          documents restored in
                                                                                          the Zones and
                                                                                          Antananarivo.
                                                                                         Number of land
                                                                                          documents digitized in
                                                                                          the Zones and
                                                                                          Antananarivo.
                                                                                         Average time for Land
                                                                                          Services Offices to
                                                                                          issue a duplicate copy
                                                                                          of a title.
                                 ................                      ................  Average cost to a user
                                                                                          to obtain a duplicate
                                                                                          copy of a title from
                                                                                          the Land Services
                                                                                          Offices.
                                 ................                      ................  Number of land
                                                                                          certificates delivered
                                                                                          in the Zones during
                                                                                          the period.
                                 ................                      ................  Number of new guichets
                                                                                          fonciers operating in
                                                                                          the Zones.
                                 ................                      ................  The 256 Plan Local
                                                                                          d'Occupation Foncier-
                                                                                          Local Plan of Land
                                                                                          Occupation (PLOFs)are
                                                                                          completed.
Financial Sector Reform Project       $23,704,219  Increase                 $23,704,220  Volume of funds
                                                    Competition in                        processed annually by
                                                    the Financial                         the national payment
                                                    Sector.                               system.
                                                                                         Number of accountants
                                                                                          and financial experts
                                                                                          registered to become
                                                                                          CPA.
                                                                                         Number of Central Bank
                                                                                          branches capable of
                                                                                          accepting auction
                                                                                          tenders.
                                                                                         Outstanding value of
                                                                                          savings accounts from
                                                                                          CEM in the Zones.
                                                                                         Number of Micro-Finance
                                                                                          Institutions (MFIs)
                                                                                          participating in the
                                                                                          Refinancing and
                                                                                          Guarantee funds.
                                                                                         Maximum check clearing
                                                                                          delay.
                                 ................                      ................  Network equipment and
                                                                                          integrator.
                                 ................                      ................  Real time gross
                                                                                          settlement system
                                                                                          (RTGS).
                                 ................                      ................  Telecommunication
                                                                                          facilities.
                                 ................                      ................  Retail payment clearing
                                                                                          system.
                                 ................                      ................  Number of CEM branches
                                                                                          built in the Zones.
                                 ................                      ................  Number of savings
                                                                                          accounts from CEM in
                                                                                          the Zones.
                                 ................                      ................  Percent of Micro-
                                                                                          Finance Institution
                                                                                          (MFI) loans recorded
                                                                                          in the Central Bank
                                                                                          database.

[[Page 34076]]

 
Agricultural Business                 $13,854,448  Improve                  $13,854,449  Number of farmers
 Investment Project.                                Agricultural                          receiving technical
                                                    Projection                            assistance.
                                                    Technologies and                     Number of marketing
                                                    Market Capacity                       contracts of ABC
                                                    in Rural Areas.                       clients.
                                                                                         Number of farmers
                                                                                          employing technical
                                                                                          assistance.
                                                                                         Value of refinancing
                                                                                          loans and guarantees
                                                                                          issued to
                                                                                          participating MFIs (as
                                                                                          a measure of value of
                                                                                          agricultural and rural
                                                                                          loans).
                                                                                         Number of
                                                                                          Mnist[egrave]re de
                                                                                          l'Agriculture,de
                                                                                          l'Elevage et de la
                                                                                          P[ecirc]che- Ministry
                                                                                          of Agriculture,
                                                                                          Livestock, and Fishing
                                                                                          (MAEP) agents trained
                                                                                          in marketing and
                                                                                          investment promotion.
                                 ................                      ................  Number of people
                                                                                          receiving information
                                                                                          from Agricultural
                                                                                          Business Center (ABCs)
                                                                                          on business
                                                                                          opportunities.
Program Administration \2\ and        $18,475,394  ..................       $18,475,393
 Control, Monitoring and
 Evaluation.
Pending subsequent reports \3\.  ................  ..................                $0
----------------------------------------------------------------------------------------------------------------
The compact indicated is closed and therefore will not have any quarterly expenditure amount.
----------------------------------------------------------------------------------------------------------------


 
                                                                          Cumulative
            Projects                 Obligated          Objective        expenditures            Measures
----------------------------------------------------------------------------------------------------------------
                      Country: Honduras Year: 2012 Quarter 2 Total obligation: $205,000,000
          Entity to which the assistance is provided: MCA Honduras Total Quarterly Expeditures \1\ : $0
----------------------------------------------------------------------------------------------------------------
Rural Development Project......       $68,273,380  Increase the             $68,264,510  Number of program
                                                    productivity and                      farmers harvesting
                                                    business skills                       high-value
                                                    of farmers who                        horticulture crops.
                                                    operate small and                    Number of hectares
                                                    medium-size farms                     harvesting high-value
                                                    and their                             horticulture crops.
                                                    employees.                           Number of business
                                                                                          plans prepared by
                                                                                          program farmers with
                                                                                          assistance from the
                                                                                          implementing entity.
                                                                                         Total value of net
                                                                                          sales.
                                                                                         Total number of
                                                                                          recruited farmers
                                                                                          receiving technical
                                                                                          assistance.
                                                                                         Value of loans
                                                                                          disbursed to farmers,
                                                                                          agribusiness, and
                                                                                          other producers and
                                                                                          vendors in the
                                                                                          horticulture industry,
                                                                                          including Program
                                                                                          Farmers, cumulative to
                                                                                          date, Trust Fund
                                                                                          Resources.
                                 ................                      ................  Number of loans
                                                                                          disbursed
                                                                                          (disaggregated by
                                                                                          trust fund, leveraged
                                                                                          from trust fund, and
                                                                                          institutions receiving
                                                                                          technical assistance
                                                                                          from ACDI-VOCA).
                                 ................                      ................  Number of hectares
                                                                                          under irrigation.
                                 ................                      ................  Number of farmers
                                                                                          connected to the
                                                                                          community irrigation
                                                                                          system.
Transportation Project.........      $120,591,240  Reduce                  $120,584,457  Freight shipment cost
                                                    transportation                        from Tegucigalpa to
                                                    costs between                         Puerto Cortes.
                                                    targeted                             Average annual daily
                                                    production                            traffic volume--CA-5.
                                                    centers and                          International roughness
                                                    national,                             index (IRI)--CA-5.
                                                    regional and                         Kilometers of road
                                                    global markets.                       upgraded--CA-5.
                                 ................                      ................  Percent of contracted
                                                                                          road works disbursed--
                                                                                          CA-5.
                                 ................                      ................  Average annual daily
                                                                                          traffic volume--
                                                                                          secondary roads.
                                 ................                      ................  International roughness
                                                                                          index (IRI)--secondary
                                                                                          roads.
                                 ................                      ................  Kilometers of road
                                                                                          upgraded--secondary
                                                                                          roads.
                                 ................                      ................  Average annual daily
                                                                                          traffic volume--rural
                                                                                          roads.
                                 ................                      ................  Average speed--Cost per
                                                                                          journey (rural roads).
                                 ................                      ................  Kilometers of road
                                                                                          upgraded--rural roads.
                                 ................                      ................  Percent disbursed for
                                                                                          contracted studies.
                                 ................                      ................  Value of signed
                                                                                          contracts for
                                                                                          feasibility, design,
                                                                                          supervision and
                                                                                          program management
                                                                                          contracts.
                                 ................                      ................  Kilometers (km) of
                                                                                          roads under design.

[[Page 34077]]

 
                                 ................                      ................  Number of Construction
                                                                                          works and supervision
                                                                                          contracts signed.
                                 ................                      ................  Kilometers (km) of
                                                                                          roads under works
                                                                                          contracts.
Program Administration \2\ and        $16,135,380  ..................       $15,166,048
 Control, Monitoring and
 Evaluation.
Pending subsequent reports \3\.  ................  ..................                $0
----------------------------------------------------------------------------------------------------------------
The compact indicated is closed and therefore will not have any quarterly expenditure amount.
----------------------------------------------------------------------------------------------------------------


 
                                                                          Cumulative
            Projects                 Obligated          Objective        expenditures            Measures
----------------------------------------------------------------------------------------------------------------
                     Country: Cape Verde Year: 2012 Quarter 2 Total obligation: $110,078,488
         Entity to which the assistance is provided: MCA Cape Verde Total Quarterly Expenditures\1\: $0
----------------------------------------------------------------------------------------------------------------
Watershed and Agricultural            $12,011,603  Increase                 $11,602,406  Productivity:
 Support Project.                                   agricultural                          Horticulture, Paul
                                                    production in                         watershed.
                                                    three targeted                       Productivity:
                                                    watershed areas                       Horticulture, Faja
                                                    on three islands.                     watershed.
                                                                                         Productivity:
                                                                                          Horticulture,
                                                                                          Mosteiros watershed.
                                                                                         Number of farmers
                                                                                          adopting drip
                                                                                          irrigation: All
                                                                                          intervention
                                                                                          watersheds (Paul, Faja
                                                                                          and Mosteiros).
                                                                                         Hectares under improved
                                                                                          or new irrigation (All
                                                                                          Watersheds Paul, Faja,
                                                                                          and Mosteiros).
                                 ................                      ................  Irrigation Works:
                                                                                          Percent contracted
                                                                                          works disbursed. All
                                                                                          intervention
                                                                                          watersheds (Paul, Faja
                                                                                          and Mosteiros).
                                 ................                      ................  Number of reservoirs
                                                                                          constructed in all
                                                                                          intervention
                                                                                          watersheds (Paul, Faja
                                                                                          and Mosteiros)
                                                                                          (incremental).
                                 ................                      ................  Number of farmers
                                                                                          trained.
Infrastructure Improvement            $82,630,208  Increase                 $82,542,708  Travel time ratio:
 Project.                                           integration of                        Percentage of
                                                    the internal                          beneficiary population
                                                    market and reduce                     further than 30
                                                    transportation                        minutes from nearest
                                                    costs.                                market.
                                                                                         Kilometers of roads/
                                                                                          bridges completed.
                                                                                         Percent of contracted
                                                                                          road works disbursed
                                                                                          (cumulative).
                                                                                         Port of Praia: Percent
                                                                                          of contracted port
                                                                                          works disbursed
                                                                                          (cumulative).
Private Sector Development             $1,920,018  Spur private              $1,824,566  Micro-Finance
 Project.                                           sector                                Institutions portfolio
                                                    development on                        at risk, adjusted
                                                    all islands                           (level).
                                                    through increased
                                                    investment in the
                                                    priority sectors
                                                    and through
                                                    financial sector
                                                    reform.
Program Administration \2\, and       $13,516,659  ..................       $12,542,777
 Control, Monitoring and
 Evaluation.
Pending subsequent reports \3\.  ................  ..................                $0
----------------------------------------------------------------------------------------------------------------
The compact indicated is closed and therefore will not have any quarterly expenditure amount.
----------------------------------------------------------------------------------------------------------------


 
                                                                          Cumulative
            Projects                 Obligated          Objective        expenditures            Measures
----------------------------------------------------------------------------------------------------------------
                     Country: Nicaragua Year: 2012 Quarter 2 Total obligation: $112,009,390
           Entity to which the assistance is provided: MCA Nicaragua Total Quarterly Expenditures: $0
----------------------------------------------------------------------------------------------------------------
Property Regularization Project        $7,180,454  Increase                  $6,713,553  Automated database of
                                                    Investment by                         registry and cadastre
                                                    strengthening                         installed in the 10
                                                    property rights.                      municipalities of
                                                                                          Leon.
                                                                                         Value of land, urban.
                                                                                         Value of land, rural.
                                                                                         Time to conduct a land
                                                                                          transaction.
                                                                                         Number of additional
                                                                                          parcels with a
                                                                                          registered title,
                                                                                          urban.
                                 ................                      ................  Number of additional
                                                                                          parcels with a
                                                                                          registered title,
                                                                                          rural.
                                                                                         Area covered by
                                                                                          cadastral mapping.
                                                                                         Cost to conduct a land
                                                                                          transaction.
                                 ................                      ................  Annual Average daily
                                                                                          traffic volume: N1
                                                                                          Section R1.

[[Page 34078]]

 
                                 ................                      ................  Annual Average daily
                                                                                          traffic volume: N1
                                                                                          Section R2.
                                 ................                      ................  Annual Average daily
                                                                                          traffic volume: Port
                                                                                          Sandino (S13).
                                 ................                      ................  Annual Average daily
                                                                                          traffic volume:
                                                                                          Villanueva--Guasaule
                                                                                          Annual.
                                 ................                      ................  Average daily traffic
                                                                                          volume: Somotillo-
                                                                                          Cinco Pinos (S1).
                                 ................                      ................  Annual average daily
                                                                                          traffic volume:
                                                                                          Le[oacute]n-Poneloya-
                                                                                          Las Pe[ntilde]itas.
                                 ................                      ................  International Roughness
                                                                                          Index: N-I Section R1.
                                 ................                      ................  International Roughness
                                                                                          Index: N-I Section R2.
                                 ................                      ................  International Roughness
                                                                                          Index: Port Sandino
                                                                                          (S13.
                                 ................                      ................  International roughness
                                                                                          index: Villanueva--
                                                                                          Guasaule.
                                 ................                      ................  International roughness
                                                                                          index: Somotillo-Cinco
                                                                                          Pinos.
                                 ................                      ................  International roughness
                                                                                          index: Le[oacute]n-
                                                                                          Poneloya-Las
                                                                                          Pe[ntilde]itas.
                                 ................                      ................  Kilometers of NI
                                                                                          upgraded: R1 and R2
                                                                                          and S13.
                                 ................                      ................  Kilometers of NI
                                                                                          upgraded: Villanueva--
                                                                                          Guasaule.
                                 ................                      ................  Kilometers of S1 road
                                                                                          upgraded.
                                 ................                      ................  Kilometers of S9 road
                                                                                          upgraded.
Rural Development Project......       $31,530,722  Increase the value       $31,291,352  Number of beneficiaries
                                                    added of farms                        with business plans.
                                                    and enterprises                      Numbers of manzanas (1
                                                    in the region.                        manzana = 1.7
                                                                                          hectares), by sector,
                                                                                          harvesting higher-
                                                                                          value crops.
                                                                                         Number of beneficiaries
                                                                                          with business plans
                                                                                          prepared with
                                                                                          assistance of Rural
                                                                                          Business Development
                                                                                          Project.
                                 ................                      ................  Number of beneficiaries
                                                                                          implementing forestry
                                                                                          business plans under
                                                                                          Improvement of Water
                                                                                          Supplies Activity.
                                 ................                      ................  Number of Manzanas
                                                                                          reforested.
                                 ................                      ................  Number of Manzanas with
                                                                                          trees planted.
Program Administration \2\, Due       $15,562,166  ..................       $15,379,676
 Diligence, Monitoring and
 Evaluation.
Pending subsequent reports \3\.  ................  ..................        $2,606,245
----------------------------------------------------------------------------------------------------------------
The compact indicated is closed and therefore will not have any quarterly expenditure amount.
----------------------------------------------------------------------------------------------------------------


 
                                                                          Cumulative
            Projects                 Obligated          Objective        expenditures            Measures
----------------------------------------------------------------------------------------------------------------
                      Country: Georgia Year: 2012 Quarter 2 Total obligation: $395,300,000
           Entity to which the assistance is provided: MCA Georgia Total Quarterly Expenditures\1\: $0
----------------------------------------------------------------------------------------------------------------
Regional Infrastructure              $314,240,000  Key Regional            $309,899,714  Household savings from
 Rehabilitation Project.                            Infrastructure                        Infrastructure
                                                    Rehabilitated.                        Rehabilitation
                                                                                          Activities.
                                                                                         Savings in vehicle
                                                                                          operating costs (VOC).
                                                                                         International roughness
                                                                                          index (IRI).
                                                                                         Annual average daily
                                                                                          traffic (AADT).
                                                                                         Travel Time.
                                                                                         Kilometers of road
                                                                                          completed.
                                                                                         Signed contracts for
                                                                                          feasibility and/or
                                                                                          design studies.
                                                                                         Percent of contracted
                                                                                          studies disbursed.
                                                                                         Kilometers of roads
                                                                                          under design.
                                                                                         Signed contracts for
                                                                                          road works.
                                 ................                      ................  Kilometers of roads
                                                                                          under works contracts.
                                 ................                      ................  Sites rehabilitated
                                                                                          (phases I, II, III)--
                                                                                          pipeline.
                                 ................                      ................  Construction works
                                                                                          completed (phase II)--
                                                                                          pipeline.
                                 ................                      ................  Savings in household
                                                                                          expenditures for all
                                                                                          RID subprojects.
                                 ................                      ................  Population Served by
                                                                                          all RID subprojects.
                                 ................                      ................  RID Subprojects
                                                                                          completed.
                                 ................                      ................  Value of Grant
                                                                                          Agreements signed.
                                 ................                      ................  Value of project works
                                                                                          and goods contracts
                                                                                          Signed.
                                 ................                      ................  Subprojects with works
                                                                                          initiated.

[[Page 34079]]

 
Regional Enterprise Development       $52,040,800  Enterprises in           $52,040,749  Jobs Created by
 Project.                                           Regions Developed.                    Agribusiness
                                                                                          Development Activity
                                                                                          (ADA) and by Georgia
                                                                                          Regional Development
                                                                                          Fund (GRDF).
                                                                                         Household net income--
                                                                                          ADA and GRDF.
                                                                                         Jobs created--ADA.
                                                                                         Firm income--ADA.
                                 ................                      ................  Household net income--
                                                                                          ADA.
                                 ................                      ................  Beneficiaries (direct
                                                                                          and indirect)--ADA.
                                 ................                      ................  Grant agreements
                                                                                          signed--ADA.
                                 ................                      ................  Increase in gross
                                                                                          revenues of portfolio
                                                                                          companies.
                                 ................                      ................  Increase in portfolio
                                                                                          company employees.
                                 ................                      ................  Increase in wages paid
                                                                                          to the portfolio
                                                                                          company employees.
                                 ................                      ................  Portfolio companies.
                                 ................                      ................  Funds disbursed to the
                                                                                          portfolio companies.
Program Administration \2\, Due       $29,019,200  ..................       $25,238,006
 Diligence, Monitoring and
 Evaluation.
Pending subsequent reports \3\.  ................  ..................               $51
----------------------------------------------------------------------------------------------------------------
In November 2008, MCC and the Georgian government signed a Compact amendment making up to $100 million of
 additional funds available under the Compact to complete works in the Roads, Regional Infrastructure
 Development, and Energy Rehabilitation Projects contemplated by the original Compact. The amendment was
 ratified by the Georgian parliament and entered into force on January 30, 2009.
----------------------------------------------------------------------------------------------------------------
The compact indicated is closed and therefore will not have any quarterly expenditure amount.
----------------------------------------------------------------------------------------------------------------


 
                                                                          Cumulative
            Projects                 Obligated          Objective        expenditures            Measures
----------------------------------------------------------------------------------------------------------------
                       Country: Vanuatu Year: 2012 Quarter 2 Total obligation: $65,403,519
            Entity to which the assistance is provided: MCA Vanuatu Total Quarterly Expenditures: $0
----------------------------------------------------------------------------------------------------------------
Transportation Infrastructure         $60,084,299  Facilitate               $60,084,299  Traffic volume (average
 Project.                                           transportation to                     annual daily traffic)--
                                                    increase tourism                      Efate Ring Road.
                                                    and business                         Traffic Volume (average
                                                    development.                          annual daily traffic)--
                                                                                          Santo East Coast Road.
                                                                                         Kilometers of road
                                                                                          upgraded--Efate Ring
                                                                                          Road.
                                 ................                      ................  Kilometers of roads
                                                                                          upgraded--Santo East
                                                                                          Coast Road.
                                 ................                      ................  Percent of MCC
                                                                                          contribution disbursed
                                                                                          to ``adjusted'' signed
                                                                                          contracts of roads
                                                                                          works; including
                                                                                          approved variations.
Program Administration \2\, Due        $5,319,220                            $5,319,220
 Diligence, Monitoring and
 Evaluation.
Pending subsequent reports \3\.  ................  ..................                $0
----------------------------------------------------------------------------------------------------------------
The compact indicated is closed and therefore will not have any quarterly expenditure amount.
----------------------------------------------------------------------------------------------------------------


 
                                                                          Cumulative
            Projects                 Obligated          Objective        expenditures            Measures
----------------------------------------------------------------------------------------------------------------
                      Country: Armenia Year: 2012 Quarter 2 Total obligation: $177,650,000
         Entity to which the assistance is provided: MCA Armenia Total Quarterly Expenditures \1\: $-360
----------------------------------------------------------------------------------------------------------------
Irrigated Agriculture Project        $153,892,467  Increase                $143,685,712  Training/technical
 (Agriculture and Water).                           agricultural                          assistance provided
                                                    productivity                          for On-Farm Water
                                                    Improve and                           Management.
                                                    Quality of                           Training/technical
                                                    Irrigation.                           assistance provided
                                                                                          for Post-Harvest
                                                                                          Processing.
                                                                                         Loans Provided.
                                                                                         Value of irrigation
                                                                                          feasibility and/or
                                                                                          detailed design
                                                                                          contracts signed.
                                                                                         Value of irrigation
                                                                                          feasibility and/or
                                                                                          detailed design
                                                                                          contracts disbursed.
                                                                                         Number of farmers using
                                                                                          better on-farm water
                                                                                          management.
                                 ................                      ................  Number of enterprises
                                                                                          using improved
                                                                                          techniques.
                                 ................                      ................  Value of irrigation
                                                                                          feasibility and/or
                                                                                          detailed design
                                                                                          contracts signed.
                                 ................                      ................  Additional Land
                                                                                          irrigated under
                                                                                          project.

[[Page 34080]]

 
                                 ................                      ................  Value of irrigation
                                                                                          feasibility and/or
                                                                                          detailed design
                                                                                          contracts signed.
                                 ................                      ................  Value of irrigation
                                                                                          feasibility and/or
                                                                                          detailed design
                                                                                          contracts disbursed.
Rural Road Rehabilitation              $9,100,000  Better access to          $8,441,028  Average annual daily
 Project.                                           economic and                          traffic on Pilot
                                                    social                                Roads.
                                                    infrastructure.                      International roughness
                                                                                          index for Pilot Roads.
                                                                                         Road Sections
                                                                                          Rehabilitated--Pilot
                                                                                          Roads.
                                 ................                      ................  Pilot Roads: Percent of
                                                                                          Contracted Roads Works
                                                                                          Disbursed of Works
                                                                                          Completed.
Program Administration \2\, Due       $14,657,533  ..................       $13,176,463
 Diligence, Monitoring and
 Evaluation.
Pending subsequent reports \3\.  ................  ..................       $11,332,414
----------------------------------------------------------------------------------------------------------------
The negative quarterly expenditure for Armenia is due to a return of funds to the permitted account for compact
 closure.
----------------------------------------------------------------------------------------------------------------


 
                                                                          Cumulative
            Projects                 Obligated          Objective        expenditures            Measures
----------------------------------------------------------------------------------------------------------------
                       Country: Benin Year: 2012 Quarter 2 Total obligation: $307,298,039
       Entity to which the assistance is provided: MCA Benin Total Quarterly Expenditures \1\: $4,345,977
----------------------------------------------------------------------------------------------------------------
Access to Financial Services          $17,688,674  Expand Access to         $15,495,910  Value of credits
 Project.                                           Financial                             granted by Micro-
                                                    Services.                             Finance Institutions
                                                                                          (at the national
                                                                                          level).
                                                                                         Value of savings
                                                                                          collected by MFI
                                                                                          institutions (at the
                                                                                          national level).
                                                                                         Average portfolio at
                                                                                          risk >90 days of
                                                                                          microfinance
                                                                                          institutions at the
                                                                                          national level.
                                 ................                      ................  Operational self-
                                                                                          sufficiency of MFIs at
                                                                                          the national level.
                                 ................                      ................  Number of institutions
                                                                                          receiving grants
                                                                                          through the Facility.
                                 ................                      ................  Number of MFIs
                                                                                          inspected by Cellule
                                                                                          Supervision
                                                                                          Microfinance.
Access to Justice Project......       $20,075,580  Improved Ability         $19,383,915  Average time to enforce
                                                    of Justice System                     a contract.
                                                    to Enforce                           Percent of firms
                                                    Contracts and                         reporting confidence
                                                    Reconcile Claims.                     in the judicial
                                                                                          system.
                                                                                         Passage of new legal
                                                                                          codes.
                                                                                         Average time required
                                                                                          for Tribunaux de
                                                                                          premiere instance-
                                                                                          arbitration centers
                                                                                          and courts of first
                                                                                          instance (TPI) to
                                                                                          reach a final decision
                                                                                          on a case.
                                                                                         Average time required
                                                                                          for Court of Appeals
                                                                                          to reach a final
                                                                                          decision on a case.
                                 ................                      ................  Percent of cases
                                                                                          resolved in TPI per
                                                                                          year.
                                 ................                      ................  Percent of cases
                                                                                          resolved in Court of
                                                                                          Appeals per year.
                                 ................                      ................  Number of Courthouses
                                                                                          completed.
                                 ................                      ................  Average time required
                                                                                          to register a business
                                                                                          (soci[eacute]t[eacute]
                                                                                          ).
                                 ................                      ................  Average time required
                                                                                          to register a business
                                                                                          (sole proprietorship).
Access to Land Project.........       $32,182,938  Strengthen               $30,978,490  Percentage of
                                                    property rights                       households investing
                                                    and increase                          in targeted urban land
                                                    investment in                         parcels.
                                                    rural and urban                      Percentage of
                                                    land.                                 households investing
                                                                                          in targeted rural land
                                                                                          parcels.
                                                                                         Average cost required
                                                                                          to convert occupancy
                                                                                          permit to land title
                                                                                          through systematic
                                                                                          process.
                                 ................                      ................  Share of respondents
                                                                                          perceiving land
                                                                                          security in the
                                                                                          Conversions from
                                                                                          Occupancy permit to
                                                                                          land title (PH-TF) or
                                                                                          Rural Land Plan (PFR)
                                                                                          areas.
                                 ................                      ................  Number of preparatory
                                                                                          studies completed.
                                 ................                      ................  Number of Legal and
                                                                                          Regulatory Reforms
                                                                                          Adopted.
                                 ................                      ................  Amount of Equipment
                                                                                          Purchased.
                                 ................                      ................  Number of new land
                                                                                          titles obtained by
                                                                                          transformation of
                                                                                          occupancy permit.
                                 ................                      ................  Number of land
                                                                                          certificates issued
                                                                                          within MCA-Benin
                                                                                          implementation.
                                 ................                      ................  Number of PFRs
                                                                                          established with MCA
                                                                                          Benin implementation.
                                 ................                      ................  Number of permanent
                                                                                          stations installed.

[[Page 34081]]

 
                                 ................                      ................  Number of stakeholders
                                                                                          trained.
                                 ................                      ................  Number of communes with
                                                                                          new cadastres.
                                 ................                      ................  Number of operational
                                                                                          land market
                                                                                          information systems.
Access to Markets Project......      $188,866,208  Improve Access to       $188,683,879  Volume of merchandise
                                                    Markets through                       traffic through the
                                                    Improvements to                       Port Autonome de
                                                    the Port of                           Cotonou.
                                                    Cotonou.                             Bulk ship carriers
                                                                                          waiting times at the
                                                                                          port.
                                                                                         Port design-build
                                                                                          contract awarded.
                                                                                         Annual number of thefts
                                                                                          cases.
                                 ................                      ................  Average time to clear
                                                                                          customs.
                                 ................                      ................  Port meets--
                                                                                          international port
                                                                                          security standards
                                                                                          (ISPS).
Program Administration \2\, Due       $48,484,639  ..................       $47,125,946
 Diligence, Monitoring and
 Evaluation.
Pending subsequent reports \3\.  ................  ..................           $81,588
----------------------------------------------------------------------------------------------------------------


 
                                                                          Cumulative
            Projects                 Obligated          Objective        expenditures            Measures
----------------------------------------------------------------------------------------------------------------
                       Country: Ghana Year: 2012 Quarter 2 Total obligation: $547,009,000
       Entity to which the assistance is provided: MCA Ghana Total Quarterly Expenditures \1\: $39,208,886
----------------------------------------------------------------------------------------------------------------
Agriculture Project............      $208,528,167  Enhance                 $202,305,873  Number of farmers
                                                    Profitability of                      trained in commercial
                                                    cultivation,                          agriculture.
                                                    services to                          Number of
                                                    agriculture and                       agribusinesses
                                                    product handling                      assisted.
                                                    in support of the                    Number of preparatory
                                                    expansion of                          land studies
                                                    commercial                            completed.
                                                    agriculture among                    Legal and regulatory
                                                    groups of                             land reforms adopted.
                                                    smallholder farms.                   Number of landholders
                                                                                          reached by public
                                                                                          outreach efforts.
                                                                                         Number of hectares
                                                                                          under production.
                                                                                         Number of personnel
                                                                                          trained.
                                                                                         Number of buildings
                                                                                          rehabilitated/
                                                                                          constructed.
                                                                                         Value of equipment
                                                                                          purchased.
                                                                                         Feeder roads
                                                                                          international
                                                                                          roughness index.
                                                                                         Feeder roads annualized
                                                                                          average daily traffic.
                                                                                         Value of signed
                                                                                          contracts for
                                                                                          feasibility and/or
                                                                                          design studies of
                                                                                          feeder roads.
                                 ................                      ................  Percent of contracted
                                                                                          design/feasibility
                                                                                          studies completed for
                                                                                          feeder roads.
                                 ................                      ................  Value of signed works
                                                                                          contracts for feeder
                                                                                          roads.
                                 ................                      ................  Percent of contracted
                                                                                          feeder road works
                                                                                          disbursed.
                                 ................                      ................  Value of loans
                                                                                          disbursed to clients
                                                                                          from agriculture loan
                                                                                          fund.
                                 ................                      ................  Value of signed
                                                                                          contracts for
                                                                                          feasibility and/or
                                                                                          design studies
                                                                                          (irrigation).
                                 ................                      ................  Percent of contracted
                                                                                          (design/feasibility)
                                                                                          studies complete
                                                                                          (irrigation).
                                 ................                      ................  Value of signed
                                                                                          contracts for
                                                                                          irrigation works
                                                                                          (irrigation).
                                 ................                      ................  Rural hectares mapped.
                                 ................                      ................  Percent of contracted
                                                                                          irrigation works
                                                                                          disbursed.
                                 ................                      ................  Percent of people aware
                                                                                          of their land rights
                                                                                          in Pilot Land
                                                                                          Registration Areas.
                                 ................                      ................  Total number of parcels
                                                                                          surveyed in the Pilot
                                                                                          Land Registration
                                                                                          Areas (PLRAs).
                                 ................                      ................  Volume of products
                                                                                          passing through post-
                                                                                          harvest treatment.
Rural Development Project......       $78,312,596  Strengthen the           $75,479,928  Number of students
                                                    rural                                 enrolled in schools
                                                    institutions that                     affected by Education
                                                    provide services                      Facilities Sub-
                                                    complementary to,                     Activity.
                                                    and supportive                       Number of schools
                                                    of, agricultural                      rehabilitated.
                                                    and agriculture                      Number of school blocks
                                                    business                              constructed.
                                                    development.                         Distance to collect
                                                                                          water.
                                                                                         Time to collect water.
                                                                                         Incidence of guinea
                                                                                          worm.
                                                                                         Number of people
                                                                                          affected by Water and
                                                                                          Sanitation Facilities
                                                                                          Sub-Activity.
                                 ................                      ................  Number of stand-alone
                                                                                          boreholes/wells/
                                                                                          nonconventional water
                                                                                          systems constructed/
                                                                                          rehabilitated.

[[Page 34082]]

 
                                 ................                      ................  Number of small-town
                                                                                          water systems designed
                                                                                          and due diligence
                                                                                          completed for
                                                                                          construction.
                                 ................                      ................  Number of pipe
                                                                                          extension projects
                                                                                          designed and due
                                                                                          diligence completed
                                                                                          for construction.
                                 ................                      ................  Number of agricultural
                                                                                          processing plants in
                                                                                          target districts with
                                                                                          electricity due to
                                                                                          Rural Electrification
                                                                                          Sub-Activity.
Transportation Project.........      $218,367,447  Reduce the              $223,556,573  Trunk roads
                                                    transportation                        international
                                                    costs affecting                       roughness index.
                                                    agriculture                          N1 International
                                                    commerce at sub-                      roughness index.
                                                    regional levels.                     N1 Annualized average
                                                                                          daily traffic.
                                 ................                      ................  N1 Kilometers of road
                                                                                          upgraded.
                                 ................                      ................  Value of signed
                                                                                          contracts for
                                                                                          feasibility and/or
                                                                                          design studies of the
                                                                                          N1.
                                 ................                      ................  Percent of contracted
                                                                                          design/feasibility
                                                                                          studies completed of
                                                                                          the N1.
                                 ................                      ................  Value of signed
                                                                                          contracts for road
                                                                                          works N1, Lot 1.
                                 ................                      ................  Value of signed
                                                                                          contracts for road
                                                                                          works N1, Lot 2.
                                 ................                      ................  Trunk roads annualized
                                                                                          average daily traffic.
                                 ................                      ................  Trunk roads kilometers
                                                                                          of roads completed.
                                 ................                      ................  Percent of contracted
                                                                                          design/feasibility
                                                                                          studies completed of
                                                                                          trunk roads.
                                 ................                      ................  Percent of contracted
                                                                                          trunk road works
                                                                                          disbursed.
                                 ................                      ................  Ferry Activity:
                                                                                          annualized average
                                                                                          daily traffic
                                                                                          vehicles.
                                 ................                      ................  Ferry Activity: annual
                                                                                          average daily traffic
                                                                                          (passengers).
                                 ................                      ................  Landing stages
                                                                                          rehabilitated.
                                 ................                      ................  Ferry terminal
                                                                                          upgraded.
                                 ................                      ................  Rehabilitation of
                                                                                          Akosombo Floating Dock
                                                                                          completed.
                                 ................                      ................  Rehabilitation of
                                                                                          landing stages
                                                                                          completed.
                                 ................                      ................  Percent of contracted
                                                                                          road works disbursed:
                                                                                          N1, Lot 2.
                                 ................                      ................  Percent of contracted
                                                                                          road works disbursed:
                                                                                          N1, Lot 2.
                                 ................                      ................  Percent of contracted
                                                                                          work disbursed: ferry
                                                                                          and floating dock.
                                 ................                      ................  Percent of contracted
                                                                                          work disbursed:
                                                                                          landings and
                                                                                          terminals.
                                 ................                      ................  Value of signed
                                                                                          contracts for
                                                                                          feasibility and/or
                                                                                          design studies of
                                                                                          Trunk Roads.
                                 ................                      ................  Value of signed
                                                                                          contracts for trunk
                                                                                          roads.
Program Administration \2\, Due       $46,800,791  ..................       $39,529,223
 Diligence, Monitoring and
 Evaluation.
Pending subsequent reports \3\.  ................  ..................        $3,318,046
----------------------------------------------------------------------------------------------------------------


 
                                                                          Cumulative
            Projects                 Obligated          Objective        expenditures            Measures
----------------------------------------------------------------------------------------------------------------
                    Country: El Salvador Year: 2012 Quarter 2 Total obligation: $460,940,000
Entity to which the assistance is provided: MCA El Salvador Total Quarterly Expenditures \1\: $37,021,518.......
----------------------------------------------------------------------------------------------------------------
Human Development Project......       $89,146,523  Increase human and       $73,532,244  Employment rate of
                                                    physical capital                      graduates of middle
                                                    of residents of                       technical schools.
                                                    the Northern Zone                    Graduation rates of
                                                    to take advantage                     middle technical
                                                    of employment and                     schools.
                                                    business                             Middle technical
                                                    opportunities.                        schools remodeled and
                                                                                          equipped.
                                                                                         New Scholarships
                                                                                          granted to students of
                                                                                          middle technical
                                                                                          education.
                                                                                         Students of non-formal
                                                                                          training.
                                                                                         Cost of water.
                                                                                         Time collecting water.
                                 ................                      ................  Number of households
                                                                                          with access to
                                                                                          improved water supply.
                                 ................                      ................  Value of contracted
                                                                                          water and sanitation
                                                                                          works disbursed.
                                 ................                      ................  Cost of electricity.

[[Page 34083]]

 
                                 ................                      ................  Households benefiting
                                                                                          with a connection to
                                                                                          the electricity
                                                                                          network.
                                 ................                      ................  Households benefiting
                                                                                          with the installation
                                                                                          of isolated solar
                                                                                          systems.
                                 ................                      ................  Kilometers of new
                                                                                          electrical lines with
                                                                                          construction contracts
                                                                                          signed.
                                 ................                      ................  Population benefiting
                                                                                          from strategic
                                                                                          infrastructure.
Productive Development Project.       $71,824,000  Increase                 $26,483,228  Number of hectares
                                                    production and                        under production with
                                                    employment in the                     MCC support.
                                                    Northern Zone.                       Number of beneficiaries
                                                                                          of technical
                                                                                          assistance and
                                                                                          training--Agriculture.
                                 ................                      ................  Number of beneficiaries
                                                                                          of technical
                                                                                          assistance and
                                                                                          training--Agribusiness
                                                                                          .
                                 ................                      ................  Value of agricultural
                                                                                          loans to farmers/
                                                                                          agribusiness.
Connectivity Project...........      $269,212,588  Reduce travel cost      $215,261,446  Average annual daily
                                                    and time within                       traffic.
                                                    the Northern                         International roughness
                                                    Zone, with the                        index.
                                                    rest of the                          Kilometers of roads
                                                    country, and                          rehabilitated.
                                                    within the region.                   Kilometers of roads
                                                                                          with construction
                                                                                          initiated.
Productive Development Project.       $68,215,522  ..................       $61,035,582  .......................
Program Administration \2\ and        $34,365,368  ..................       $24,112,281
 Control, Monitoring and
 Evaluation.
Pending Subsequent Report \3\..  ................  ..................                $0
----------------------------------------------------------------------------------------------------------------


 
                                                                          Cumulative
            Projects                 Obligated          Objective        expenditures            Measures
----------------------------------------------------------------------------------------------------------------
                        Country: Mali Year: 2012 Quarter 2 Total obligation: $460,811,163
       Entity to which the assistance is provided: MCA Mali Total Quarterly Expenditures \1\: $48,807,192
----------------------------------------------------------------------------------------------------------------
Bamako-Senou Airport                 $176,252,117  ..................      $121,687,704  Number of full time
 Improvement Project.                                                                     jobs at the ADM and
                                                                                          firms supporting the
                                                                                          airport.
                                                                                         Average number of
                                                                                          weekly
                                                                                          flights(arrivals).
                                                                                         Passenger traffic
                                                                                          (annual average).
                                                                                         Percent works complete.
                                 ................                      ................  Time required for
                                                                                          passenger processing
                                                                                          at departures and
                                                                                          arrivals.
                                 ................                      ................  Percent works complete.
                                 ................                      ................  Security and safety
                                                                                          deficiencies corrected
                                                                                          at the airport.
Alatona Irrigation Project.....      $239,884,675  Increase the            $240,454,297  Main season rice
                                                    agricultural                          yields.
                                                    production and                       International roughness
                                                    productivity in                       index (IRI) on the
                                                    the Alatona zone                      Niono-Goma Coura
                                                    of the ON.                            Route.
                                                                                         Traffic on the Niono-
                                                                                          Diabaly road segment.
                                 ................                      ................  Traffic on the Diabaly-
                                                                                          Goma Coura road
                                                                                          segment.
                                 ................                      ................  Percentage works
                                                                                          completed on Niono-
                                                                                          Goma Coura road.
                                 ................                      ................  Hectares under improved
                                                                                          irrigation.
                                 ................                      ................  Irrigation system
                                                                                          efficiency on Alatona
                                                                                          Canal.
                                 ................                      ................  Percentage of
                                                                                          contracted irrigation
                                                                                          construction works
                                                                                          disbursed.
                                 ................                      ................  Number market gardens
                                                                                          allocated in Alatona
                                                                                          zones to PAPs or New
                                                                                          Settler women.
                                 ................                      ................  Net primary school
                                                                                          enrollment rate (in
                                                                                          Alatona zone).
                                 ................                      ................  Percent of Alatona
                                                                                          population with
                                                                                          improved access to
                                                                                          drinking water.
                                 ................                      ................  Number of schools
                                                                                          available in Alatona.
                                 ................                      ................  Number of health
                                                                                          centers available in
                                                                                          the Alatona.
                                 ................                      ................  Number of affected
                                                                                          people who have been
                                                                                          compensated.
                                 ................                      ................  Number of farmers that
                                                                                          have applied improved
                                                                                          techniques.
                                 ................                      ................  Hectares under
                                                                                          production (rainy
                                                                                          season).
                                 ................                      ................  Hectares under
                                                                                          production (dry
                                                                                          season).
                                 ................                      ................  Number of farmers
                                                                                          trained.
                                 ................                      ................  Value of agricultural
                                                                                          and rural loans.
                                 ................                      ................  Number of active MFI
                                                                                          clients.
                                 ................                      ................  Loan recovery rate
                                                                                          among Alatona farmers.

[[Page 34084]]

 
Industrial Park Project........        $2,637,472  Terminated........        $2,637,472  .......................
Program Administration \2\ and        $42,036,899  ..................       $31,309,488
 Control, Monitoring and
 Evaluation.
Pending Subsequent Report \3\..  ................  ..................        $2,146,164
----------------------------------------------------------------------------------------------------------------
On May 4, 2012, the Millennium Challenge Corporation's (MCC) Board of Directors concurred with the
 recommendation of MCC to terminate the Mali Compact following the undemocratic change of government in the
 country.
----------------------------------------------------------------------------------------------------------------


 
                                                                          Cumulative
            Projects                 Obligated          Objective        expenditures            Measures
----------------------------------------------------------------------------------------------------------------
                      Country: Mongolia Year: 2012 Quarter 2 Total obligation: $284,911,363
      Entity to which the assistance is provided: MCA Mongolia Total Quarterly Expenditures\1\: $24,286,241
----------------------------------------------------------------------------------------------------------------
Property Rights Project........       $27,202,619  Increase security        $13,691,326  Number of legal and
                                                    and                                   regulatory framework
                                                    capitalization of                     or preparatory studies
                                                    land assets held                      completed (Peri-Urban
                                                    by lower-income                       and Land Plots).
                                                    Mongolians, and                      Number of Legal and
                                                    increased peri-                       regulatory reforms
                                                    urban herder                          adopted.
                                                    productivity and                     Number of stakeholders
                                                    incomes.                              (Peri-Urban and Land
                                                                                          Plots).
                                                                                         Stakeholders Trained
                                                                                          (Peri-Urban and Land
                                                                                          Plots).
                                                                                         Number of Buildings
                                                                                         Built/Rehabilitated.
                                 ................                      ................  Equipment purchased.
                                 ................                      ................  Rural hectares Mapped.
                                 ................                      ................  Urban Parcels Mapped.
                                 ................                      ................  Leaseholds Awarded.
Vocational Education Project...       $47,355,638  Increase                 $29,600,792  Rate of employment.
                                                    employment and                       Vocational school
                                                    income among                          graduates in MCC-
                                                    unemployed and                        supported educational
                                                    underemployed                         facilities.
                                                    Mongolians.                          Percent of active
                                                                                          teachers receiving
                                                                                          certification
                                                                                          training.
                                 ................                      ................  Technical and
                                                                                          vocational education
                                                                                          and training (TVET)
                                                                                          legislation passed.
Health Project.................       $38,973,259  Increase the             $22,933,730  Treatment of diabetes.
                                                    adoption of                          Treatment of
                                                    behaviors that                        hypertension.
                                                    reduce non-                          Early detection of
                                                    communicable                          cervical cancer.
                                                    diseases (NCDIs)                     Recommendations on road
                                                    among target                          safety interventions
                                                    populations and                       available.
                                                    improved medical
                                                    treatment and
                                                    control of NCDIs.
Roads Project..................       $88,440,123  More efficient           $16,300,161  Kilometers of roads
                                                    transport for                         completed.
                                                    trade and access                     Annual average daily
                                                    to services.                          traffic.
                                                                                         Travel time.
                                 ................                      ................  International Roughness
                                                                                          Index.
                                 ................                      ................  Kilometers of roads
                                                                                          under design.
                                 ................                      ................  Percent of contracted
                                                                                          roads works disbursed.
Energy and Environmental              $45,266,205  Increased wealth         $20,467,556  Household savings from
 Project.                                           and productivity                      decreased fuel costs.
                                                    through greater                      Product testing and
                                                    fuel use                              subsidy setting
                                                    efficiency and                        process adopted.
                                                    decreasing health                    Health costs from air
                                                    costs from air.                       pollution in
                                                                                          Ulaanbaatar.
                                                                                         Reduced particulate
                                                                                          matter concentration.
                                 ................                      ................  Capacity of wind power
                                                                                          generation.
Rail Project...................          $369,560  Terminated........          $369,560  Terminated.
Program Administration \2\ and        $37,303,959  ..................       $19,680,768
 Control, Monitoring and
 Evaluation.
Pending subsequent reports \3\.  ................  ..................          $312,277
----------------------------------------------------------------------------------------------------------------
In late 2009, the MCC's Board of Directors approved the allocation of a portion of the funds originally
 designated for the rail project to the expansion of the health, vocational education and property right
 projects from the rail project, and the remaining portion to the addition of a road project.
----------------------------------------------------------------------------------------------------------------


[[Page 34085]]


 
                                                                          Cumulative
            Projects                 Obligated          Objective        expenditures            Measures
----------------------------------------------------------------------------------------------------------------
                     Country: Mozambique Year: 2012 Quarter 2 Total obligation: $506,924,053
     Entity to which the assistance is provided: MCA Mozambique Total Quarterly Expenditures\1\: $41,806,853
----------------------------------------------------------------------------------------------------------------
Water Supply and Sanitation          $207,385,393  Increase access to       $58,227,556  Percent of urban
 Project.                                           reliable and                          population with
                                                    quality water and                     improved water
                                                    sanitation                            sources.
                                                    facilities.                          Time to get to non-
                                                                                          private water source.
                                                                                         Percent of urban
                                                                                          population with
                                                                                          improved sanitation
                                                                                          facilities.
                                                                                         Percent of rural
                                                                                          population with access
                                                                                          to improved water
                                                                                          sources.
                                 ................                      ................  Number of private
                                                                                          household water
                                                                                          connections in urban
                                                                                          areas.
                                 ................                      ................  Number of rural water
                                                                                          points constructed.
                                 ................                      ................  Number of standpipes in
                                                                                          urban areas.
                                 ................                      ................  Five cities: Final
                                                                                          detailed design
                                                                                          submitted.
                                 ................                      ................  Three cities: Final
                                                                                          detailed design
                                                                                          submitted.
Road Rehabilitation Project....      $176,307,480  Increase access to       $43,865,078  Kilometers of road
                                                    productive                            rehabilitated.
                                                    resources and                        Namialo-Rio
                                                    markets.                              L[uacute]rio Road-
                                                                                          Metoro: Percent of
                                                                                          feasibility, design,
                                                                                          and supervision
                                                                                          contract disbursed.
                                                                                         Rio Ligonha-Nampula:
                                                                                          Percent of
                                                                                          feasibility, design,
                                                                                          and supervision
                                                                                          contract disbursed.
                                 ................                      ................  Chimuara-Nicoadala:
                                                                                          Percent of
                                                                                          feasibility, design,
                                                                                          and supervision
                                                                                          contract disbursed.
                                 ................                      ................  Namialo-Rio
                                                                                          L[uacute]rio: Percent
                                                                                          of road construction
                                                                                          contract disbursed.
                                 ................                      ................  Rio L[uacute]rio-
                                                                                          Metoro: Percent of
                                                                                          road construction
                                                                                          contract disbursed.
                                 ................                      ................  Rio Ligonha-Nampula:
                                                                                          Percent of road
                                                                                          construction contract
                                                                                          disbursed.
                                 ................                      ................  Chimuara-Nicoadala:
                                                                                          Percent of road
                                                                                          construction contract
                                                                                          disbursed.
                                 ................                      ................  Namialo-Rio
                                                                                          L[uacute]rio Road:
                                                                                          Average annual daily
                                                                                          traffic volume.
                                 ................                      ................  Rio L[uacute]rio-Metoro
                                                                                          Road: Average annual
                                                                                          daily traffic volume.
                                 ................                      ................  Rio-Ligonha-Nampula
                                                                                          Road: Average annual
                                                                                          daily traffic volume.
                                 ................                      ................  Chimuara-Nicoadala
                                                                                          Road: Average annual
                                                                                          daily traffic volume.
                                 ................                      ................  Namialo-Rio
                                                                                          L[uacute]rio Road:
                                                                                          Change in
                                                                                          International
                                                                                          Roughness Index (IRI).
                                 ................                      ................  Rio L[uacute]rio-Metoro
                                                                                          Road: Change in
                                                                                          International
                                                                                          Roughness Index (IRI).
                                 ................                      ................  Rio-Ligonha-Nampula
                                                                                          Road: Change in
                                                                                          International
                                                                                          Roughness Index (IRI).
                                 ................                      ................  Chimuara-Nicoadala
                                                                                          Road: Change in
                                                                                          International
                                                                                          Roughness Index (IRI).
Land Tenure Project............       $39,068,307  Establish                $19,883,913  Time to get land usage
                                                    efficient, secure                     rights (DUAT), urban.
                                                    land access for                      Time to get land usage
                                                    households and                        rights (DUAT), rural
                                                    investors.                           Number of buildings
                                                                                          rehabilitated or
                                                                                          built.
                                                                                         Total value of procured
                                                                                          equipment and
                                                                                          materials.
                                                                                         Number of people
                                                                                          trained.
                                                                                         Rural hectares mapped
                                                                                          in Site Specific
                                                                                          Activity.
                                 ................                      ................  Urban parcels mapped.
                                 ................                      ................  Rural hectares
                                                                                          formalized through
                                                                                          Site Specific
                                                                                          Activity.
                                 ................                      ................  Urban parcels
                                                                                          formalized.
                                 ................                      ................  Number of communities
                                                                                          delimited and
                                                                                          formalized.
                                 ................                      ................  Number of urban
                                                                                          households having land
                                                                                          formalized.
Farmer Income Support Project..       $18,400,117  Improve coconut          $12,178,148  Number of diseased or
                                                    productivity and                      dead palm trees
                                                    diversification                       cleared.
                                                    into cash crop.                      Survival rate of
                                                                                          Coconut seedlings.
                                                                                         Hectares under
                                                                                          production.
                                 ................                      ................  Number of farmers
                                                                                          trained in pest and
                                                                                          disease control.
                                 ................                      ................  Number of farmers
                                                                                          trained in crop
                                                                                          diversification
                                                                                          technologies.
                                 ................                      ................  Income from coconuts
                                                                                          and coconut products
                                                                                          (estates).
                                 ................                      ................  Income from coconuts
                                                                                          and coconuts products
                                                                                          (households).

[[Page 34086]]

 
Program Administration \2\ and        $65,762,756  ..................       $30,636,826
 Control, Monitoring and
 Evaluation.
Pending Subsequent Report \3\..  ................  ..................        $1,445,392
----------------------------------------------------------------------------------------------------------------


 
                                                                          Cumulative
            Projects                 Obligated          Objective        expenditures            Measures
----------------------------------------------------------------------------------------------------------------
                      Country: Lesotho Year: 2012 Quarter 2 Total obligation: $362,527,119
      Entity to which the assistance is provided: MCA Lesotho Total Quarterly Expenditures\1\: $28,964,908
----------------------------------------------------------------------------------------------------------------
Water Project..................      $164,027,999  Improve the water        $57,068,977  School days lost due to
                                                    supply for                            water borne diseases.
                                                    industrial and                       Diarrhea notification
                                                    domestic needs,                       at health centers.
                                                    and enhance rural                    Households with access
                                                    livelihoods                           to improved water
                                                    through improved                      supply.
                                                    watershed                            Households with access
                                                    management.                           to improved Latrines.
                                                                                         Knowledge of good
                                                                                          hygiene practices.
                                                                                         Households with
                                                                                          reliable water
                                                                                          services.
                                                                                         Enterprises with
                                                                                          reliable water
                                                                                          services.
                                                                                         Households with
                                                                                          reliable water
                                                                                          services.
                                 ................                      ................  Volume of treated
                                                                                          water.
                                 ................                      ................  Area re-vegetation.
Health Project.................      $121,353,942  Increase access to       $75,201,886  People with HIV still
                                                    life-extending                        alive 12 months after
                                                    ART and essential                     initiation of
                                                    health services                       treatment.
                                                    by providing a                       TB notification (per
                                                    sustainable                           100,000 pop.).
                                                    delivery platform.                   People living with HIV/
                                                                                          AIDS (PLWA) receiving
                                                                                          Antiretroviral
                                                                                          treatment.
                                                                                         Deliveries conducted in
                                                                                          the health facilities.
                                                                                         Immunization coverage
                                                                                          rate.
Private Sector Development            $36,470,318  Stimulate                $12,682,603  Time required to
 Project.                                           investment by                         enforce a contract.
                                                    improving access                     Value of commercial
                                                    to credit,                            cases.
                                                    reducing                             Cases referred to
                                                    transaction costs                     Alternative Dispute
                                                    and increasing                        Resolution (ADR) that
                                                    the participation                     are successfully
                                                    of women in the                       completed.
                                                    economy.                             Portfolio of loans.
                                                                                         Loan application
                                                                                          processing time.
                                                                                         Performing loans.
                                 ................                      ................  Electronic payments--
                                                                                          salaries.
                                 ................                      ................  Electronic payments--
                                                                                          pensions.
                                 ................                      ................  Debit/smart cards
                                                                                          issued.
                                 ................                      ................  Mortgage bonds
                                                                                          registered.
                                 ................                      ................  Value of registered
                                                                                          mortgage bonds.
                                 ................                      ................  Clearing time--Country.
                                 ................                      ................  Clearing time--Maseru.
                                 ................                      ................  Land transactions
                                                                                          recorded.
                                 ................                      ................  Land parcels
                                                                                          regularized and
                                                                                          registered.
                                 ................                      ................  People trained on
                                                                                          gender equality and
                                                                                          economic rights.
                                 ................                      ................  Eligible population
                                                                                          with ID cards.
                                 ................                      ................  Monetary cost to
                                                                                          process a lease
                                                                                          application.
Program Administration \2\ and        $40,674,860  ..................       $26,097,107
 Control, Monitoring and
 Evaluation.
Pending Subsequent Report \3\..  ................  ..................        $1,608,060
----------------------------------------------------------------------------------------------------------------


 
                                                                          Cumulative
            Projects                 Obligated          Objective        expenditures            Measures
----------------------------------------------------------------------------------------------------------------
                      Country: Morocco Year: 2012 Quarter 2 Total obligation: $697,500,000
      Entity to which the assistance is provided: MCA Morocco Total Quarterly Expenditures\1\: $49,148,726
----------------------------------------------------------------------------------------------------------------
Fruit Tree Productivity Project      $328,453,084  Reduce volatility       $175,312,594  Number of farmers
                                                    of agricultural                       trained.
                                                    production and                       Number of
                                                    increase volume                       agribusinesses
                                                    of fruit                              assisted.
                                                    agricultural                         Number of hectares
                                                    production.                           under production.
                                                                                         Value of agricultural
                                                                                          production.
Small Scale Fisheries Project..      $125,174,973  Improve quality of       $24,742,736  Landing sites and ports
                                                    fish moving                           rehabilitated.
                                                    through domestic                     Mobile fish vendors
                                                    channels and                          using new equipment.
                                                    assure the                           Fishing boats using new
                                                    sustainable use                       landing sites.
                                                    of fishing                           Average price of fish
                                                    resources.                            at auction markets.
                                                                                         Average price of fish
                                                                                          at wholesale.
                                                                                         Average price of fish
                                                                                          at ports.

[[Page 34087]]

 
Artisan and Fez Medina Project.       $94,283,145  Increase value           $24,165,123  Average revenue of
                                                    added to tourism                      Small and Micro
                                                    and artisan                           Enterprise (SME)
                                                    sectors.                              pottery workshops.
                                                                                         Construction and
                                                                                          rehabilitation of Fez
                                                                                          Medina Sites.
                                                                                         Tourist receipts in
                                                                                          Fez.
                                                                                         Training of potters.
Enterprise Support Project.....       $26,811,445  Improved survival        $14,175,608  Value added per
                                                    rate of new SMEs                      enterprise.
                                                    and INDH-funded                      Survival rate after two
                                                    income generating                     years.
                                                    activities;
                                                    increased revenue
                                                    for new SMEs and
                                                    INDH-funded
                                                    income generating
                                                    activities.
Financial Services Project.....       $43,700,000  To be determined         $27,152,870  Portfolio at risk at 30
                                                    (``TBD'').                            days.
                                                                                         Portfolio rate of
                                                                                          return.
                                                                                         Number of clients of
                                                                                          Microcredit
                                                                                          Associations (AMCs)
                                                                                          reached through mobile
                                                                                          branches.
Program Administration \2\ and        $79,677,353  ..................       $48,320,641
 Control, Monitoring and
 Evaluation.
Pending Subsequent Report \3\..  ................  ..................        $3,801,422
----------------------------------------------------------------------------------------------------------------


 
                                                                          Cumulative
            Projects                 Obligated          Objective        expenditures            Measures
----------------------------------------------------------------------------------------------------------------
                      Country: Tanzania Year: 2012 Quarter 2 Total obligation: $698,135,999
      Entity to which the assistance is provided: MCA Tanzania Total Quarterly Expenditures\1\: $1,512,225
----------------------------------------------------------------------------------------------------------------
Energy Sector Project..........      $203,465,542  Increase value          $118,017,159  Current power
                                                    added to                              customers: Morogoro
                                                    businesses.                           D1, Morogoro T1,
                                                                                          Morogoro T2 & T3,
                                                                                          Tanga D1, Tanga T1,
                                                                                          Tanga T2 & T3, Mbeya
                                                                                          D1, Mbeya T1, Mbeya T2
                                                                                          & T3, Iringa D1,
                                                                                          Iringa T1, Iringa T2 &
                                                                                          T3, Dodoma D1, Dodoma
                                                                                          T1, Dodoma T2 & T3,
                                                                                          Mwanza D1, Mwanza T1
                                                                                          and Mwanza T2 & T3.
                                                                                         Transmission and
                                                                                          distribution sub-
                                                                                          station capacity:
                                                                                          Morogoro, Tanga,
                                                                                          Mbeya, Iringa, Dodoma
                                                                                          and Mwanza.
                                                                                         Collection efficiency
                                                                                          (Morogoro).
                                                                                         Collection efficiency
                                                                                          (Tanga).
                                 ................                      ................  Collection efficiency
                                                                                          (Mbeya).
                                 ................                      ................  Collection efficiency
                                                                                          (Iringa).
                                 ................                      ................  Collection efficiency
                                                                                          (Dodoma).
                                 ................                      ................  Collection efficiency
                                                                                          (Mwanza).
                                 ................                      ................  Technical and
                                                                                          nontechnical losses
                                                                                          (Morogoro).
                                 ................                      ................  Technical and
                                                                                          nontechnical losses
                                                                                          (Tanga).
                                 ................                      ................  Technical and
                                                                                          nontechnical losses
                                                                                          (Mbeya).
                                 ................                      ................  Technical and
                                                                                          nontechnical losses
                                                                                          (Iringa).
                                 ................                      ................  Technical and
                                                                                          nontechnical losses
                                                                                          (Dodoma).
                                 ................                      ................  Technical and
                                                                                          nontechnical losses
                                                                                          (Mwanza).
Transport Sector Project.......      $368,847,428  Increase cash crop      $197,196,419  International roughness
                                                    revenue and                           index: Tunduma
                                                    aggregate visitor                     Sumbawanga.
                                                    spending.                            International roughness
                                                                                          index: Tanga Horohoro.
                                                                                         International roughness
                                                                                          index: Namtumbo
                                                                                          Songea.
                                                                                         International roughness
                                                                                          index: Peramiho
                                                                                          Mbinga.
                                                                                         Annual average daily
                                                                                          traffic: Tunduma
                                                                                          Sumbawanga.
                                 ................                      ................  Annual average daily
                                                                                          traffic: Tanga
                                                                                          Horohoro.
                                 ................                      ................  Annual average daily
                                                                                          traffic: Namtumbo
                                                                                          Songea.
                                 ................                      ................  Annual average daily
                                                                                          traffic: Peramiho
                                                                                          Mbinga.
                                 ................                      ................  Kilometers upgraded/
                                                                                          completed: Tunduma
                                                                                          Sumbawanga.
                                 ................                      ................  Kilometers upgraded/
                                                                                          completed: Tanga
                                                                                          Horohoro.
                                 ................                      ................  Kilometers upgraded/
                                                                                          completed: Namtumbo
                                                                                          Songea.
                                 ................                      ................  Kilometers upgraded/
                                                                                          completed: Peramiho
                                                                                          Mbinga.
                                 ................                      ................  Percent disbursed on
                                                                                          construction works:
                                                                                          Tunduma Sumbawanga.

[[Page 34088]]

 
                                 ................                      ................  Percent disbursed on
                                                                                          construction works:
                                                                                          Tanga Horohoro.
                                 ................                      ................  Percent disbursed on
                                                                                          construction works:
                                                                                          Namtumbo Songea.
                                 ................                      ................  Percent disbursed on
                                                                                          construction works:
                                                                                          Peramiho Mbinga.
                                 ................                      ................  Percent disbursed for
                                                                                          feasibility and/or
                                                                                          design studies:
                                                                                          Tunduma Sumbawanga.
                                 ................                      ................  Percent disbursed for
                                                                                          feasibility and/or
                                                                                          design studies: Tanga
                                                                                          Horohoro.
                                 ................                      ................  Percent disbursed for
                                                                                          feasibility and/or
                                                                                          design studies:
                                                                                          Namtumbo Songea.
                                 ................                      ................  Percent disbursed for
                                                                                          feasibility and/or
                                                                                          design studies:
                                                                                          Peramiho Mbinga.
                                 ................                      ................  International roughness
                                                                                          index: Pemba.
                                 ................                      ................  Average annual daily
                                                                                          traffic: Pemba.
                                 ................                      ................  Kilometers upgraded/
                                                                                          completed: Pemba.
                                 ................                      ................  Percent disbursed on
                                                                                          construction works:
                                                                                          Pemba.
                                 ................                      ................  Signed contracts for
                                                                                          construction works
                                                                                          (Zanzibar Rural
                                                                                          Roads).
                                 ................                      ................  Percent disbursed on
                                                                                          signed contracts for
                                                                                          feasibility and/or
                                                                                          design studies: Pemba.
                                 ................                      ................  Passenger arrivals:
                                                                                          Mafia Island.
                                 ................                      ................  Percentage of upgrade
                                                                                          complete: Mafia
                                                                                          Island.
                                 ................                      ................  Percent disbursed on
                                                                                          construction works:
                                                                                          Mafia Island.
Water Sector Project...........       $65,692,145  Increase                 $28,130,025  Number of domestic
                                                    investment in                         customers (Dar es
                                                    human and                             Salaam).
                                                    physical capital                     Number of domestic
                                                    and to reduce the                     customers (Morogoro).
                                                    prevalence of                        Number of non-domestic
                                                    water-related                         (commercial and
                                                    disease.                              institutional)
                                                                                          customers (Dar es
                                                                                          Salaam).
                                                                                         Number of non-domestic
                                                                                          (commercial and
                                                                                          institutional)
                                                                                          customers (Morogoro).
                                                                                         Volume of water
                                                                                          produced (Lower Ruvu).
                                                                                         Volume of water
                                                                                          produced (Morogoro).
                                 ................                      ................  Percent disbursed on
                                                                                          feasibility design
                                                                                          update contract Lower
                                                                                          Ruvu Plant Expansion.
Program Administration \2\ and        $56,130,884  ..................       $23,385,406
 Control, Monitoring and
 Evaluation.
Pending Subsequent Report \3\..  ................  ..................           $99,857
----------------------------------------------------------------------------------------------------------------


 
                                                                          Cumulative
            Projects                 Obligated          Objective        expenditures            Measures
----------------------------------------------------------------------------------------------------------------
                    Country: Burkina Faso Year: 2012 Quarter 2 Total obligation: $480,085,358
Entity to which the assistance is provided: MCA Burkina Faso Total Quarterly Expenditures\1\: $20,475,679.......
----------------------------------------------------------------------------------------------------------------
Roads Project..................      $194,130,681  Enhance access to        $14,639,792  Annual average daily
                                                    markets through                       traffic: Dedougou-
                                                    investments in                        Nouna.
                                                    the road network.                    Annual average daily
                                                                                          traffic: Nouna-
                                                                                          Bomborukuy.
                                                                                         Annual average daily
                                                                                          traffic: Bomborukuy-
                                                                                          Mali border.
                                                                                         Kilometers of road
                                                                                          under works contract.
                                                                                         Kilometers of road
                                                                                          under design/
                                                                                          feasibility contract.
                                                                                         Access time to the
                                                                                          closest market via
                                                                                          paved roads in the
                                                                                          Sourou and Comoe
                                                                                          (minutes).
                                 ................                      ................  Kilometers of road
                                                                                          under works contract.
                                 ................                      ................  Kilometers of road
                                                                                          under design/
                                                                                          feasibility contract.
                                 ................                      ................  Personnel trained in
                                                                                          procurement, contract
                                                                                          management and
                                                                                          financial systems.
                                 ................                      ................  Periodic road
                                                                                          maintenance coverage
                                                                                          rate (for all funds)
                                                                                          (percentage).
Rural Land Governance Project..       $59,934,615  Increase                 $15,204,582  Trend in incidence of
                                                    investment in                         conflict over land
                                                    land and rural                        rights reported in the
                                                    productivity                          17 pilot communes
                                                    through improved                      (Annual percentage
                                                    land tenure                           rate of change in the
                                                    security and land                     occurrence of
                                                    management.                           conflicts over land
                                                                                          rights).
                                                                                         Number of legal and
                                                                                          regulatory reforms
                                                                                          adopted.
                                                                                         Number of stakeholders
                                                                                          reached by public
                                                                                          outreach efforts.
                                 ................                      ................  Personnel trained.

[[Page 34089]]

 
                                 ................                      ................  Number of Services
                                                                                          Fonciers Ruraux (rural
                                                                                          land service offices)
                                                                                          installed and
                                                                                          functioning.
                                 ................                      ................  Rural hectares
                                                                                          formalized.
                                 ................                      ................  Number of parcels
                                                                                          registered in
                                                                                          Ganzourou project
                                                                                          area.
Agriculture Development Project      $141,910,059  Expand the               $30,542,691  New irrigated
                                                    productive use of                     perimeters developed
                                                    land in order to                      in Di (Hectares).
                                                    increase the                         Technical water
                                                    volume and value                      management core teams
                                                    of agricultural                       (noyaux techniques)
                                                    production in                         installed and
                                                    project zones.                        operational in the two
                                                                                          basins (Sourou and
                                                                                          Comoe).
                                                                                         Number of farmers
                                                                                          trained.
                                                                                         Number of agro-sylvo-
                                                                                          pastoral groups which
                                                                                          receive technical
                                                                                          assistance.
                                                                                         Number of loans
                                                                                          provided by the rural
                                                                                          finance facility.
                                                                                         Volume of loans
                                                                                          intended for agro-
                                                                                          sylvo-pastoral
                                                                                          borrowers (million
                                                                                          CFA).
Bright II Schools Project......       $27,971,458  Increase primary         $26,582,359  Number of girls/boys
                                                    school completion                     graduating from BRIGHT
                                                    rates.                                II primary schools.
                                                                                         Percent of girls
                                                                                          regularly attending
                                                                                          (90% attendance)
                                                                                          BRIGHT schools.
                                 ................                      ................  Number of girls
                                                                                          enrolled in the MCC/
                                                                                          USAID-supported BRIGHT
                                                                                          schools.
                                 ................                      ................  Number of additional
                                                                                          classrooms
                                                                                          constructed.
                                 ................                      ................  Number of teachers
                                                                                          trained through 10
                                                                                          provincial workshops.
Program Administration \2\ and        $56,138,545  ..................       $27,441,397
 Control, Monitoring and
 Evaluation.
Pending Subsequent Report \3\..  ................  ..................                $0
----------------------------------------------------------------------------------------------------------------


 
                                                                          Cumulative
            Projects                 Obligated          Objective        expenditures            Measures
----------------------------------------------------------------------------------------------------------------
                      Country: Namibia Year: 2012 Quarter 2 Total obligation: $304,477,815
       Entity to which the assistance is provided: MCA Namibia Total Quarterly Expenditures\1\: $8,590,528
----------------------------------------------------------------------------------------------------------------
Education Project..............      $144,976,558  Improve the              $34,906,402  Percentage of students
                                                    quality of the                        who are new entrants
                                                    workforce in                          in grade 5 for 47
                                                    Namibia by                            schools.
                                                    enhancing the                        Percent of contracted
                                                    equity and                            construction works
                                                    effectiveness of                      disbursed for 47
                                                    basic.                                schools.
                                                                                         Percent disbursed
                                                                                          against design/
                                                                                          supervisory contracts
                                                                                          for 47 schools.
                                                                                         Percentage of schools
                                                                                          with a learner-
                                                                                          textbook ration of 1
                                                                                          to 1 in science, math,
                                                                                          and English.
                                                                                         Number of textbooks
                                                                                          delivered.
                                                                                         Number of teachers and
                                                                                          managers trained in
                                                                                          textbook management,
                                                                                          utilization, and
                                                                                          storage.
                                 ................                      ................  Percent disbursed
                                                                                          against works
                                                                                          contracts for Regional
                                                                                          Study Resource Centers
                                                                                          Activity (RSRCS).
                                 ................                      ................  Percent disbursed
                                                                                          against design/
                                                                                          supervisory contracts
                                                                                          for RSRCs.
                                 ................                      ................  Number of vocational
                                                                                          trainees enrolled
                                                                                          through the MCA-N
                                                                                          grant facility.
                                 ................                      ................  Value of vocational
                                                                                          training grants
                                                                                          awarded through the
                                                                                          MCA-N grant facility.
                                 ................                      ................  Percent disbursed
                                                                                          against construction,
                                                                                          rehabilitation, and
                                                                                          equipment contracts
                                                                                          for Community Skills
                                                                                          and Development
                                                                                          Centres (COSDECS).
                                 ................                      ................  Percent disbursed
                                                                                          against design/
                                                                                          supervisory contracts
                                                                                          for COSDECS.

[[Page 34090]]

 
Tourism Project................       $66,994,941  Grow the Namibian        $10,974,515  Percent of condition
                                                    tourism industry                      precedents and
                                                    with a focus on                       performance targets
                                                    increasing income                     met for Etosha
                                                    to households in                      National Park (ENP)
                                                    communal.                             activity.
                                                                                         Number of game
                                                                                          translocated with MCA-
                                                                                          N support.
                                                                                         Number of unique visits
                                                                                          on Namibia Tourism
                                                                                          Board (NTB) web site.
                                                                                         Number of North
                                                                                          American tourism
                                                                                          businesses (travel
                                                                                          agencies and tour
                                                                                          operators) that offer
                                                                                          Namibian tours or tour
                                                                                          packages.
                                                                                         Value of grants issued
                                                                                          by the conservancy
                                                                                          grant fund (Namibian
                                                                                          dollars).
                                 ................                      ................  Amount of private
                                                                                          sector investment
                                                                                          secured by MCA-N
                                                                                          assisted conservancies
                                                                                          (Namibian dollars).
                                 ................                      ................  Number of annual
                                                                                          general meetings with
                                                                                          financial reports
                                                                                          submitted and benefit
                                                                                          distribution plans
                                                                                          discussed.
Agriculture Project............       $47,835,474  Enhance the health       $15,536,855  Number of participating
                                                    and marketing                         households registered
                                                    efficiency of                         in the Community-based
                                                    livestock in the                      Rangeland and
                                                    NCAs of Namibia                       Livestock Management
                                                    and to increase                       (CBRLM) sub-activity.
                                                    income.                              Number of grazing area
                                                                                          management
                                                                                          implementation
                                                                                          agreements established
                                                                                          under CBRLM sub-
                                                                                          activity
                                 ................                      ................  Number of community
                                                                                          land board members and
                                                                                          traditional authority
                                                                                          members trained.
                                 ................                      ................  Number of cattle tagged
                                                                                          with radio frequency
                                                                                          identification (RFID)
                                                                                          tags.
                                 ................                      ................  Percent disbursed
                                                                                          against works
                                                                                          contracts for State
                                                                                          Veterinary Offices.
                                 ................                      ................  Percent disbursed
                                                                                          against design/
                                                                                          supervisory contracts
                                                                                          for State Veterinary
                                                                                          Offices.
                                 ................                      ................  Value of grant
                                                                                          agreements signed
                                                                                          under Livestock Market
                                                                                          Efficiency Fund.
                                 ................                      ................  Number of Indigenous
                                                                                          Natural Product (INP)
                                                                                          producers selected and
                                                                                          mobilized.
                                 ................                      ................  Value of grant
                                                                                          agreements signed
                                                                                          under INP Innovation
                                                                                          Fund.
Program Administration \2\ and        $44,670,841  ..................       $16,809,968
 Control, Monitoring and
 Evaluation.
Pending Subsequent Report \3\..  ................  ..................        $6,305,828
----------------------------------------------------------------------------------------------------------------


 
                                                                          Cumulative
            Projects                 Obligated          Objective        expenditures            Measures
----------------------------------------------------------------------------------------------------------------
                      Country: Moldova Year: 2012 Quarter 2 Total obligation: $262,000,000
       Entity to which the assistance is provided: MCA Moldova Total Quarterly Expenditures\1\: $3,695,071
----------------------------------------------------------------------------------------------------------------
Road Rehabilitation Project....      $132,840,000  Enhance                     $525,929  Reduced cost for road
                                                    transportation                        users.
                                                    conditions.                          Average annual daily
                                                                                          traffic.
                                                                                         Road maintenance
                                                                                          expenditure.
                                                                                         Kilometers of roads
                                                                                          completed.
                                                                                         Percent of contracted
                                                                                          roads works disbursed.
                                                                                         Kilometers of roads
                                                                                          under works contracts.
                                 ................                      ................  Resettlement Action
                                                                                          Plan (RAP)
                                                                                          implemented.
                                 ................                      ................  Final design.
                                 ................                      ................  Kilometers of roads
                                                                                          under design.
Transition to High Value             $101,773,402  Increase incomes          $8,944,959  Hectares under improved
 Agriculture Project.                               in the                                or new irrigation.
                                                    agricultural                         Centralized irrigation
                                                    sector; Create                        systems rehabilitated.
                                                    models for                           Percent of contracted
                                                    transition to HVA                     irrigation feasibility
                                                    in CIS areas and                      and/or design studies
                                                    an enabling                           disbursed.
                                                    environment                          Value of irrigation
                                                    (legal, financial                     feasibility and/or
                                                    and market) for                       detailed design
                                                    replication.                          contracts signed.
                                                                                         Water user associations
                                                                                          (WUA) achieving
                                                                                          financial
                                                                                          sustainability.
                                                                                         WUA established under
                                                                                          new law.
                                 ................                      ................  Revised water
                                                                                          management policy
                                                                                          framework--with long-
                                                                                          term water rights
                                                                                          defined--established.
                                 ................                      ................  Contracts of
                                                                                          association signed.

[[Page 34091]]

 
                                 ................                      ................  Irrigation Sector
                                                                                          Reform (ISRA)
                                                                                          Contractor mobilized.
                                 ................                      ................  Additionally factor of
                                                                                          Access to Agricultural
                                                                                          Finance (AAF)
                                                                                          investments.
                                 ................                      ................  Value of agricultural
                                                                                          and rural loans.
                                 ................                      ................  Number of all loans.
                                 ................                      ................  Number of all loans
                                                                                          (female).
                                 ................                      ................  High value agriculture
                                                                                          (HVA) Post-Harvest
                                                                                          Credit Facility
                                                                                          launched.
                                 ................                      ................  HVA Post-Harvest Credit
                                                                                          Facility Policies and
                                                                                          Procedures Manual
                                                                                          (PPM) Finalized.
                                 ................                      ................  Number of farmers that
                                                                                          have applied improved
                                                                                          techniques (Growing
                                                                                          High Value Agriculture
                                                                                          Sales [GSH]).
                                 ................                      ................  Number of farmers that
                                                                                          have applied improved
                                                                                          techniques (GHS)
                                                                                          (female).
                                 ................                      ................  Number of farmers
                                                                                          trained.
                                 ................                      ................  Number of farmers
                                                                                          trained (female).
                                 ................                      ................  Number of enterprises
                                                                                          assisted.
                                 ................                      ................  Number of enterprises
                                                                                          assisted (female).
                                 ................                      ................  GHS activity launched.
Program Administration \2\ and        $27,386,598  ..................        $3,260,089
 Monitoring and Evaluation.
Pending Subsequent Report \3\..  ................  ..................          $251,108
----------------------------------------------------------------------------------------------------------------


 
                                                                          Cumulative
            Projects                 Obligated          Objective        expenditures            Measures
----------------------------------------------------------------------------------------------------------------
                    Country: Philippines Year: 2012 Quarter 2 Total obligation: $432,829,526
    Entity to which the assistance is provided: MCA Philippines Total Quarterly Expenditures \1\: $11,379,502
----------------------------------------------------------------------------------------------------------------
Kalahi-CIDSS Project...........      $120,000,000  Improve the              $12,016,874  Percentage of Municipal
                                                    responsiveness of                     Local Government Units
                                                    local governments                     (MLGUs) that provide
                                                    to community                          funding support for KC
                                                    needs, encourage                      subproject operations
                                                    communities to                        and maintenance.
                                                    engage in                            Number of completed KC
                                                    development                           sub-projects
                                                    activities.                           implemented in
                                                                                          compliance with
                                                                                          technical plans and
                                                                                          within schedule and
                                                                                          budget.
                                                                                         Percentage of
                                                                                          communities with KC
                                                                                          sub-projects that have
                                                                                          sustainability
                                                                                          evaluation rating of
                                                                                          satisfactory or
                                                                                          better.
Secondary National Roads             $213,412,526  Reduce                    $5,393,202  Motorized traffic time
 Development Project.                               transportation                        cost.
                                                    costs and improve                    Kilometers of road
                                                    access to markets                     sections completed.
                                                    and social                           Value of road
                                                    services.                             construction contracts
                                                                                          disbursed.
                                                                                         Value of signed road
                                                                                          feasibility and design
                                                                                          contracts.
                                 ................                      ................  Value of road
                                                                                          feasibility and design
                                                                                          contracts disbursed.
Revenue Administration Reform         $54,300,000  Increase tax              $4,010,877  Number of audits
 Project.                                           revenues over                         performed.
                                                    time and support                     Number of Revenue
                                                    the Department of                     District Offices using
                                                    Finance's                             the electronic tax
                                                    initiatives to                        information system
                                                    detect and deter                      (eTIS).
                                                    corruption within                    Number of successful
                                                    its revenue                           case resolutions.
                                                    agencies.
Program Administration \2\ and        $45,117,000  ..................        $2,491,252
 Control, Monitoring and
 Evaluation.
Pending Subsequent Reports \3\.  ................  ..................        $1,859,797
----------------------------------------------------------------------------------------------------------------


 
                                                                          Cumulative
            Projects                 Obligated          Objective        expenditures            Measures
----------------------------------------------------------------------------------------------------------------
                      Country: Senegal Year: 2012 Quarter 2 Total obligation: $540,000,000
       Entity to which the assistance is provided: MCA Senegal Total Quarterly Expenditures\1\: $1,590,061
----------------------------------------------------------------------------------------------------------------
Road Rehabilitation Project....      $324,712,499  Expand Access to          $2,366,527  Tons of irrigated rice
                                                    Markets and                           production.
                                                    Services.                            Kilometers of roads
                                                                                          rehabilitated on the
                                                                                          RN2.
                                                                                         Annual average daily
                                                                                          traffic Richard-Toll--
                                                                                          Ndioum.
                                                                                         Percentage change in
                                                                                          travel time on the
                                                                                          RN2.

[[Page 34092]]

 
                                 ................                      ................  International Roughness
                                                                                          Index on the RN2 (Lower number =
                                                                                          smoother road).
                                 ................                      ................  Kilometers (km) of
                                                                                          roads covered by the
                                                                                          contract for the
                                                                                          studies, the
                                                                                          supervision and
                                                                                          management of the
                                                                                          RN2.
                                 ................                      ................  Kilometers of roads
                                                                                          rehabilitated on the
                                                                                          RN6.
                                 ................                      ................  Annual average daily
                                                                                          traffic Ziguinchor--
                                                                                          Tanaff.
                                 ................                      ................  Annual average daily
                                                                                          traffic Tanaff--Kolda.
                                 ................                      ................  Annual average daily
                                                                                          traffic Kolda--
                                                                                          Kounkan[eacute].
                                 ................                      ................  Percentage change in
                                                                                          travel time on the
                                                                                          RN6.
                                 ................                      ................  International Roughness
                                                                                          Index on the RN6 (Lower number =
                                                                                          smoother road).
                                 ................                      ................  Kilometers (km) of
                                                                                          roads covered by the
                                                                                          contract for the
                                                                                          studies, the
                                                                                          supervision and
                                                                                          management of the
                                                                                          RN6.
Irrigation and Water Resources       $170,008,860  Improve                     $437,433  Tons of irrigated rice
 Management Project.                                productivity of                       production.
                                                    the agricultural                     Potentially irrigable
                                                    sector.                               lands area (Delta and
                                                                                          Ngallenka).
                                                                                         Hectares under
                                                                                          production.
                                                                                         Total value of
                                                                                          feasibility, design
                                                                                          and environmental
                                                                                          study contracts signed
                                                                                          for the Delta and the
                                                                                          Ngallenka (including
                                                                                          RAPs).
                                                                                         Cropping intensity
                                                                                          (hectares under
                                                                                          production per year/
                                                                                          cultivable hectares).
                                 ................                      ................  Number of hectares
                                                                                          mapped to clarify
                                                                                          boundaries and land
                                                                                          use types.
                                 ................                      ................  Percent of new
                                                                                          conflicts resolved.
                                 ................                      ................  Number of people
                                                                                          trained on land
                                                                                          security tools.
Program Administration \2\ and        $45,278,641  ..................        $7,006,105
 Monitoring and Evaluation.
Pending Subsequent Report \3\..  ................  ..................           $82,456
----------------------------------------------------------------------------------------------------------------


 
                                                                          Cumulative
            Projects                 Obligated          Objective        expenditures            Measures
----------------------------------------------------------------------------------------------------------------
                       Country: Jordan Year: 2012 Quarter 2 Total obligation: $275,100,000
          Entity to which the assistance is provided: MCA Jordan Total Quarterly Expenditures: $-32,288
----------------------------------------------------------------------------------------------------------------
Water Network Restructuring and      $102,570,034  TBD...............  ................  TBD.
 Rehabilitation.
Wastewater Collection..........       $58,224,386  TBD...............  ................  TBD.
Expansion of Wastewater               $93,025,488  TBD...............  ................  TBD.
 Treatment Capacity.
Program Administration \2\ and        $21,280,092  ..................           $10,828
 Monitoring and Evaluation.
Pending Subsequent Report \3\..
----------------------------------------------------------------------------------------------------------------
The negative expense relates to expense accruals and disbursements for the quarter.
----------------------------------------------------------------------------------------------------------------
\1\ Expenditures are the sum of cash outlays and quarterly accruals for work in process and invoices received
  but not yet paid.
\2\ Program administration funds are used to pay items such as salaries, rent, and the cost of office equipment.
\3\ These amounts represent disbursements made that will be allocated to individual projects in the subsequent
  quarter(s) and reported as such in subsequent quarterly report(s).


                                     619(b) Transfer or Allocation of Funds
----------------------------------------------------------------------------------------------------------------
   U.S. Agency to which Funds were Transferred or                                     Description of program or
                     Allocated                                   Amount                        project
----------------------------------------------------------------------------------------------------------------
                                            None                           None                          None
----------------------------------------------------------------------------------------------------------------

[FR Doc. 2012-13948 Filed 6-7-12; 8:45 am]