Notice of Commission Staff Attendance, 34034 [2012-13879]
Download as PDF
34034
Federal Register / Vol. 77, No. 111 / Friday, June 8, 2012 / Notices
its application. If the licensee of such a
project has not filed an application for
a subsequent license, then it may be
required, pursuant to 18 CFR 16.21(b),
to continue project operations until the
Commission issues someone else a
license for the project or otherwise
orders disposition of the project.
If the project is subject to section 15
of the FPA, notice is hereby given that
an annual license for Project No. 2149
is issued to the Public Utility District
No. 1 of Douglas County for a period
effective June 1, 2012 through May 31,
2013, or until the issuance of a new
license for the project or other
disposition under the FPA, whichever
comes first. If issuance of a new license
(or other disposition) does not take
place on or before May 31, 2013, notice
is hereby given that, pursuant to 18 CFR
16.18(c), an annual license under
section 15(a)(1) of the FPA is renewed
automatically without further order or
notice by the Commission, unless the
Commission orders otherwise.
If the project is not subject to section
15 of the FPA, notice is hereby given
that the Public Utility District No. 1 of
Douglas County is authorized to
continue operation of the Wells
Hydroelectric Project, until such time as
the Commission acts on its application
for a subsequent license.
BILLING CODE 6717–01–P
Comments Due: 5 p.m. ET 6/6/12.
Docket Numbers: RP12–752–000.
Applicants: White River Hub, LLC.
Description: Report of White River
Hub, LLC’s Annual Fuel Gas
Reimbursement Report.
Filed Date: 5/24/12.
Accession Number: 20120524–5204.
Comments Due: 5 p.m. ET 6/5/12.
Docket Numbers: RP12–753–000.
Applicants: Gulf South Pipeline
Company, LP.
Description: Amendments related to
PXS service to be effective 6/1/2012.
Filed Date: 5/29/12.
Accession Number: 20120529–5036.
Comments Due: 5 p.m. ET 6/11/12.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
and service can be found at: https://
www.ferc.gov/docs-filing/efiling/filingreq.pdf. For other information, call (866)
208–3676 (toll free). For TTY, call (202)
502–8659.
DEPARTMENT OF ENERGY
Dated: May 29, 2012.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
Dated: May 31, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012–13880 Filed 6–7–12; 8:45 am]
DEPARTMENT OF ENERGY
mstockstill on DSK4VPTVN1PROD with NOTICES
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Filings Instituting Proceedings
Docket Numbers: RP12–750–000.
Applicants: Questar Southern Trails
Pipeline Company.
Description: Report of Questar
Southern Trails Pipeline Company
Annual Fuel Gas Reimbursement
Report.
Filed Date: 5/24/12.
Accession Number: 20120524–5201.
Comments Due: 5 p.m. ET 6/5/12.
Docket Numbers: RP12–751–000.
Applicants: Big Sandy Pipeline, LLC.
Description: Negotiated Rates May
2012 Cleanup to be effective 6/25/2012.
Filed Date: 5/25/12.
Accession Number: 20120525–5030.
16:23 Jun 07, 2012
BILLING CODE 6717–01–P
BILLING CODE 6717–01–P
Combined Notice of Filings
VerDate Mar<15>2010
Dated: May 31, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012–13879 Filed 6–7–12; 8:45 am]
[FR Doc. 2012–13885 Filed 6–7–12; 8:45 am]
Federal Energy Regulatory
Commission
The above-referenced meetings will
be held at: AEP Offices, 1201 Elm Street,
8th Floor, Dallas, TX 75270.
The above-referenced meetings are
open to stakeholders.
Further information may be found at
www.spp.org.
The discussions at the meetings
described above may address matters at
issue in the following proceedings:
Docket No. ER09–35–001, Tallgrass
Transmission, LLC
Docket No. ER09–36–001, Prairie
Wind Transmission, LLC
Docket No. ER09–548–001, ITC Great
Plains, LLC
Docket No. ER11–4105–000,
Southwest Power Pool, Inc.
Docket No. EL11–34–001, Midwest
Independent Transmission System
Operator, Inc.
Docket No. ER11–3967–002,
Southwest Power Pool, Inc.
Docket No. ER11–3967–003,
Southwest Power Pool, Inc.
Docket No. ER12–1179–000,
Southwest Power Pool, Inc.
Docket No. ER12–1415–000,
Southwest Power Pool, Inc.
Docket No. ER12–1460–000,
Southwest Power Pool, Inc.
Docket No. ER12–1610–000,
Southwest Power Pool, Inc.
For more information, contact
Luciano Lima, Office of Energy Markets
Regulation, Federal Energy Regulatory
Commission at (202) 502–6210 or
luciano.lima@ferc.gov.
Jkt 226001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Federal Energy Regulatory
Commission
[Docket No. PF12–3–000]
Notice of Commission Staff
Attendance
The Federal Energy Regulatory
Commission hereby gives notice that
members of the Commission’s staff may
attend the following meetings related to
the transmission planning activities of
the Southwest Power Pool, Inc. (SPP):
Strategic Planning Committee Task
Force on Order 1000
June 7, 2012
8:30 a.m.–3 p.m. CDT.
June 26, 2012
9:00 a.m.–3 p.m. CDT.
PO 00000
Frm 00032
Fmt 4703
Sfmt 4703
Corpus Christi Liquefaction, LLC;
Cheniere Corpus Christi Pipeline, L.P.;
Notice of Intent To Prepare an
Environmental Assessment for the
Planned Corpus Christi LNG Terminal
and Pipeline Project, Request for
Comments on Environmental Issues,
and Notice of Public Scoping Meeting
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) will prepare an
environmental assessment (EA) that will
discuss the environmental impacts of
the planned Corpus Christi LNG
Terminal and Pipeline Project (Project).
The Project would involve constructing
E:\FR\FM\08JNN1.SGM
08JNN1
Agencies
[Federal Register Volume 77, Number 111 (Friday, June 8, 2012)]
[Notices]
[Page 34034]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-13879]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Notice of Commission Staff Attendance
The Federal Energy Regulatory Commission hereby gives notice that
members of the Commission's staff may attend the following meetings
related to the transmission planning activities of the Southwest Power
Pool, Inc. (SPP):
Strategic Planning Committee Task Force on Order 1000
June 7, 2012
8:30 a.m.-3 p.m. CDT.
June 26, 2012
9:00 a.m.-3 p.m. CDT.
The above-referenced meetings will be held at: AEP Offices, 1201
Elm Street, 8th Floor, Dallas, TX 75270.
The above-referenced meetings are open to stakeholders.
Further information may be found at www.spp.org.
The discussions at the meetings described above may address matters
at issue in the following proceedings:
Docket No. ER09-35-001, Tallgrass Transmission, LLC
Docket No. ER09-36-001, Prairie Wind Transmission, LLC
Docket No. ER09-548-001, ITC Great Plains, LLC
Docket No. ER11-4105-000, Southwest Power Pool, Inc.
Docket No. EL11-34-001, Midwest Independent Transmission System
Operator, Inc.
Docket No. ER11-3967-002, Southwest Power Pool, Inc.
Docket No. ER11-3967-003, Southwest Power Pool, Inc.
Docket No. ER12-1179-000, Southwest Power Pool, Inc.
Docket No. ER12-1415-000, Southwest Power Pool, Inc.
Docket No. ER12-1460-000, Southwest Power Pool, Inc.
Docket No. ER12-1610-000, Southwest Power Pool, Inc.
For more information, contact Luciano Lima, Office of Energy
Markets Regulation, Federal Energy Regulatory Commission at (202) 502-
6210 or luciano.lima@ferc.gov.
Dated: May 31, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012-13879 Filed 6-7-12; 8:45 am]