Download as PDF 34034 Federal Register / Vol. 77, No. 111 / Friday, June 8, 2012 / Notices its application. If the licensee of such a project has not filed an application for a subsequent license, then it may be required, pursuant to 18 CFR 16.21(b), to continue project operations until the Commission issues someone else a license for the project or otherwise orders disposition of the project. If the project is subject to section 15 of the FPA, notice is hereby given that an annual license for Project No. 2149 is issued to the Public Utility District No. 1 of Douglas County for a period effective June 1, 2012 through May 31, 2013, or until the issuance of a new license for the project or other disposition under the FPA, whichever comes first. If issuance of a new license (or other disposition) does not take place on or before May 31, 2013, notice is hereby given that, pursuant to 18 CFR 16.18(c), an annual license under section 15(a)(1) of the FPA is renewed automatically without further order or notice by the Commission, unless the Commission orders otherwise. If the project is not subject to section 15 of the FPA, notice is hereby given that the Public Utility District No. 1 of Douglas County is authorized to continue operation of the Wells Hydroelectric Project, until such time as the Commission acts on its application for a subsequent license. BILLING CODE 6717–01–P Comments Due: 5 p.m. ET 6/6/12. Docket Numbers: RP12–752–000. Applicants: White River Hub, LLC. Description: Report of White River Hub, LLC’s Annual Fuel Gas Reimbursement Report. Filed Date: 5/24/12. Accession Number: 20120524–5204. Comments Due: 5 p.m. ET 6/5/12. Docket Numbers: RP12–753–000. Applicants: Gulf South Pipeline Company, LP. Description: Amendments related to PXS service to be effective 6/1/2012. Filed Date: 5/29/12. Accession Number: 20120529–5036. Comments Due: 5 p.m. ET 6/11/12. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, and service can be found at: https:// www.ferc.gov/docs-filing/efiling/filingreq.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. DEPARTMENT OF ENERGY Dated: May 29, 2012. Nathaniel J. Davis, Sr., Deputy Secretary. Dated: May 31, 2012. Kimberly D. Bose, Secretary. [FR Doc. 2012–13880 Filed 6–7–12; 8:45 am] DEPARTMENT OF ENERGY mstockstill on DSK4VPTVN1PROD with NOTICES Take notice that the Commission has received the following Natural Gas Pipeline Rate and Refund Report filings: Filings Instituting Proceedings Docket Numbers: RP12–750–000. Applicants: Questar Southern Trails Pipeline Company. Description: Report of Questar Southern Trails Pipeline Company Annual Fuel Gas Reimbursement Report. Filed Date: 5/24/12. Accession Number: 20120524–5201. Comments Due: 5 p.m. ET 6/5/12. Docket Numbers: RP12–751–000. Applicants: Big Sandy Pipeline, LLC. Description: Negotiated Rates May 2012 Cleanup to be effective 6/25/2012. Filed Date: 5/25/12. Accession Number: 20120525–5030. 16:23 Jun 07, 2012 BILLING CODE 6717–01–P BILLING CODE 6717–01–P Combined Notice of Filings VerDate Mar<15>2010 Dated: May 31, 2012. Kimberly D. Bose, Secretary. [FR Doc. 2012–13879 Filed 6–7–12; 8:45 am] [FR Doc. 2012–13885 Filed 6–7–12; 8:45 am] Federal Energy Regulatory Commission The above-referenced meetings will be held at: AEP Offices, 1201 Elm Street, 8th Floor, Dallas, TX 75270. The above-referenced meetings are open to stakeholders. Further information may be found at www.spp.org. The discussions at the meetings described above may address matters at issue in the following proceedings: Docket No. ER09–35–001, Tallgrass Transmission, LLC Docket No. ER09–36–001, Prairie Wind Transmission, LLC Docket No. ER09–548–001, ITC Great Plains, LLC Docket No. ER11–4105–000, Southwest Power Pool, Inc. Docket No. EL11–34–001, Midwest Independent Transmission System Operator, Inc. Docket No. ER11–3967–002, Southwest Power Pool, Inc. Docket No. ER11–3967–003, Southwest Power Pool, Inc. Docket No. ER12–1179–000, Southwest Power Pool, Inc. Docket No. ER12–1415–000, Southwest Power Pool, Inc. Docket No. ER12–1460–000, Southwest Power Pool, Inc. Docket No. ER12–1610–000, Southwest Power Pool, Inc. For more information, contact Luciano Lima, Office of Energy Markets Regulation, Federal Energy Regulatory Commission at (202) 502–6210 or luciano.lima@ferc.gov. Jkt 226001 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Federal Energy Regulatory Commission [Docket No. PF12–3–000] Notice of Commission Staff Attendance The Federal Energy Regulatory Commission hereby gives notice that members of the Commission’s staff may attend the following meetings related to the transmission planning activities of the Southwest Power Pool, Inc. (SPP): Strategic Planning Committee Task Force on Order 1000 June 7, 2012 8:30 a.m.–3 p.m. CDT. June 26, 2012 9:00 a.m.–3 p.m. CDT. PO 00000 Frm 00032 Fmt 4703 Sfmt 4703 Corpus Christi Liquefaction, LLC; Cheniere Corpus Christi Pipeline, L.P.; Notice of Intent To Prepare an Environmental Assessment for the Planned Corpus Christi LNG Terminal and Pipeline Project, Request for Comments on Environmental Issues, and Notice of Public Scoping Meeting The staff of the Federal Energy Regulatory Commission (FERC or Commission) will prepare an environmental assessment (EA) that will discuss the environmental impacts of the planned Corpus Christi LNG Terminal and Pipeline Project (Project). The Project would involve constructing E:\FR\FM\08JNN1.SGM 08JNN1

Agencies

[Federal Register Volume 77, Number 111 (Friday, June 8, 2012)]
[Notices]
[Page 34034]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-13879]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Notice of Commission Staff Attendance

    The Federal Energy Regulatory Commission hereby gives notice that 
members of the Commission's staff may attend the following meetings 
related to the transmission planning activities of the Southwest Power 
Pool, Inc. (SPP):

Strategic Planning Committee Task Force on Order 1000

June 7, 2012

8:30 a.m.-3 p.m. CDT.

June 26, 2012

9:00 a.m.-3 p.m. CDT.

    The above-referenced meetings will be held at: AEP Offices, 1201 
Elm Street, 8th Floor, Dallas, TX 75270.
    The above-referenced meetings are open to stakeholders.
    Further information may be found at www.spp.org.
    The discussions at the meetings described above may address matters 
at issue in the following proceedings:
    Docket No. ER09-35-001, Tallgrass Transmission, LLC
    Docket No. ER09-36-001, Prairie Wind Transmission, LLC
    Docket No. ER09-548-001, ITC Great Plains, LLC
    Docket No. ER11-4105-000, Southwest Power Pool, Inc.
    Docket No. EL11-34-001, Midwest Independent Transmission System 
Operator, Inc.
    Docket No. ER11-3967-002, Southwest Power Pool, Inc.
    Docket No. ER11-3967-003, Southwest Power Pool, Inc.
    Docket No. ER12-1179-000, Southwest Power Pool, Inc.
    Docket No. ER12-1415-000, Southwest Power Pool, Inc.
    Docket No. ER12-1460-000, Southwest Power Pool, Inc.
    Docket No. ER12-1610-000, Southwest Power Pool, Inc.

    For more information, contact Luciano Lima, Office of Energy 
Markets Regulation, Federal Energy Regulatory Commission at (202) 502-
6210 or luciano.lima@ferc.gov.

    Dated: May 31, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012-13879 Filed 6-7-12; 8:45 am]
BILLING CODE 6717-01-P