Approval, Disapproval and Promulgation of Implementation Plans; State of Wyoming; Regional Haze State Implementation Plan; Federal Implementation Plan for Regional Haze, 33022-33062 [2012-12923]

Download as PDF 33022 Federal Register / Vol. 77, No. 107 / Monday, June 4, 2012 / Proposed Rules ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA–R08–OAR–2012–0026, FRL–9678–9] Approval, Disapproval and Promulgation of Implementation Plans; State of Wyoming; Regional Haze State Implementation Plan; Federal Implementation Plan for Regional Haze Environmental Protection Agency. ACTION: Proposed rule. AGENCY: EPA is proposing to partially approve and partially disapprove approve a State Implementation Plan (SIP) revision submitted by the State of Wyoming on January 12, 2011, that addresses regional haze. This SIP revision was submitted to address the requirements of the Clean Air Act (CAA or ‘‘the Act’’) and our rules that require states to prevent any future and remedy any existing anthropogenic impairment of visibility in mandatory Class I areas caused by emissions of air pollutants from numerous sources located over a wide geographic area (also referred to as the ‘‘regional haze program’’). States are required to assure reasonable progress toward the national goal of achieving natural visibility conditions in Class I areas. EPA is taking this action pursuant to section 110 of the CAA. EPA is proposing a Federal Implementation Plan (FIP) to address the deficiencies identified in our proposed partial disapproval of Wyoming’s regional haze SIP. In lieu of this proposed FIP, or a portion thereof, we propose approval of a SIP revision if the State submits such a revision and the revision matches the terms of our proposed FIP. DATES: Comments: Written comments must be received at the address below on or before August 3, 2012. Public Hearings: A public hearing for this proposal is scheduled to be held on Tuesday, June 26, 2012, at the Hershchler Building, Room B–63, 122 W. 25th St., Cheyenne, Wyoming 82002. Another public hearing is scheduled to be held on Thursday, June 28, 2012, at Western Wyoming Community College, Room 1005, 2500 College Drive, Rock Springs, Wyoming 82901. The public hearings will be held from 1 p.m. until 5 p.m., and again from 6 p.m. until 8 p.m. ADDRESSES: Submit your comments, identified by Docket ID No. EPA–R08– OAR–2012–0026, by one of the following methods: mstockstill on DSK4VPTVN1PROD with PROPOSALS2 SUMMARY: VerDate Mar<15>2010 17:21 Jun 01, 2012 Jkt 226001 • https://www.regulations.gov. Follow the on-line instructions for submitting comments. • Email: r8airrulemakings@epa.gov. • Fax: (303) 312–6064 (please alert the individual listed in the FOR FURTHER INFORMATION CONTACT if you are faxing comments). • Mail: Carl Daly, Director, Air Program, Environmental Protection Agency (EPA), Region 8, Mailcode 8P– AR, 1595 Wynkoop Street, Denver, Colorado 80202–1129. • Hand Delivery: Carl Daly, Director, Air Program, Environmental Protection Agency (EPA), Region 8, Mailcode 8P– AR, 1595 Wynkoop, Denver, Colorado 80202–1129. Such deliveries are only accepted Monday through Friday, 8 a.m. to 4:30 p.m., excluding Federal holidays. Special arrangements should be made for deliveries of boxed information. Instructions: Direct your comments to Docket ID No. EPA–R08–OAR–2012– 0026. EPA’s policy is that all comments received will be included in the public docket without change and may be made available online at https:// www.regulations.gov, including any personal information provided, unless the comment includes information claimed to be Confidential Business Information (CBI) or other information whose disclosure is restricted by statute. Do not submit information that you consider to be CBI or otherwise protected through https:// www.regulations.gov or email. The https://www.regulations.gov Web site is an ‘‘anonymous access’’ system, which means EPA will not know your identity or contact information unless you provide it in the body of your comment. If you send an email comment directly to EPA, without going through https:// www.regulations.gov, your email address will be automatically captured and included as part of the comment that is placed in the public docket and made available on the Internet. If you submit an electronic comment, EPA recommends that you include your name and other contact information in the body of your comment and with any disk or CD–ROM you submit. If EPA cannot read your comment due to technical difficulties and cannot contact you for clarification, EPA may not be able to consider your comment. Electronic files should avoid the use of special characters, any form of encryption, and be free of any defects or viruses. For additional instructions on submitting comments, go to Section I. General Information of the SUPPLEMENTARY INFORMATION section of this document. PO 00000 Frm 00002 Fmt 4701 Sfmt 4702 Docket: All documents in the docket are listed in the https:// www.regulations.gov index. Although listed in the index, some information is not publicly available, e.g., CBI or other information whose disclosure is restricted by statute. Certain other material, such as copyrighted material, will be publicly available only in hard copy. Publicly-available docket materials are available either electronically in https:// www.regulations.gov or in hard copy at the Air Program, Environmental Protection Agency (EPA), Region 8, Mailcode 8P–AR, 1595 Wynkoop, Denver, Colorado 80202–1129. EPA requests that if at all possible, you contact the individual listed in the FOR FURTHER INFORMATION CONTACT section to view the hard copy of the docket. You may view the hard copy of the docket Monday through Friday, 8 a.m. to 4 p.m., excluding Federal holidays. FOR FURTHER INFORMATION CONTACT: Laurel Dygowski, Air Program, U.S. Environmental Protection Agency, Region 8, Mailcode 8P–AR, 1595 Wynkoop, Denver, Colorado 80202– 1129, (303) 312–6144, dygowski.laurel@epa.gov. SUPPLEMENTARY INFORMATION: Definitions For the purpose of this document, we are giving meaning to certain words or initials as follows: i. The words or initials Act or CAA mean or refer to the Clean Air Act, unless the context indicates otherwise. ii. The initials AFRC mean or refer to airfuel ratio controls. iii. The initials BART mean or refer to Best Available Retrofit Technology. iv. The initials CAMx mean or refer to Comprehensive Air Quality Model. v. The initials CMAQ mean or refer to Community Multi-Scale Air Quality modeling system. vi. The initials CEMS mean or refer to continuous emission monitoring systems. vii. The initials EC mean or refer to elemental carbon. viii. The initials EGUs mean or refer to Electric Generating Units. ix. The initials EGR mean or refer to exhaust gas recirculation. x. The words EPA, we, us or our mean or refer to the United States Environmental Protection Agency. xi. The initials ESP mean or refer to electrostatic precipitator. xii. The initials FGC mean or refer to flue gas conditioning. xiii. The initials FGD mean or refer to flue gas desulfurization. xiv. The initials FGR mean or refer to external flue gas recirculation. xv. The initials FIP mean or refer to Federal Implementation Plan. xvi. The initials FLMs mean or refer to Federal Land Managers. E:\FR\FM\04JNP2.SGM 04JNP2 mstockstill on DSK4VPTVN1PROD with PROPOSALS2 Federal Register / Vol. 77, No. 107 / Monday, June 4, 2012 / Proposed Rules xvii. The initials FS mean or refer to the U.S. Forest Service. xviii. The initials IMPROVE mean or refer to Interagency Monitoring of Protected Visual Environments monitoring network. xix. The initials IWAQM mean or refer to Interagency Workgroup on Air Quality Modeling. xx. The initials LEC mean or refer to lowemission combustion. xxi. The initials LNB mean or refer to low NOX burner. xxii. The initials LTS mean or refer to the long-term strategy. xxiii. The initials MW mean or refer to megawatts. xxiv. The initials NH3 mean or refer to ammonia. xxv. The initials NOX mean or refer to nitrogen oxides. xxvi. The initials NPS mean or refer to National Park Service. xxvii. The initials OC mean or refer to organic carbon. xxviii. The initials OFA mean or refer to overfire air. xxix. The initials PM2.5 mean or refer to particulate matter with an aerodynamic diameter of less than 2.5 micrometers. xxx. The initials PM10 mean or refer to particulate matter with an aerodynamic diameter of less than 10 micrometers. xxxi. The initials PSAT mean or refer to Particle Source Apportionment Technology. xxxii. The initials PSD mean or refer to Prevention of Signification Deterioration. xxxiii. The initials RAVI mean or refer to Reasonably Attributable Visibility Impairment. xxxiv. The initials RHR mean or refer to the Regional Haze Rule. xxxv. The initials RMC mean or refer to the Regional Modeling Center at the University of California Riverside. xxxvi. The initials RPGs mean or refer to Reasonable Progress Goals. xxxvii. The initials RPOs mean or refer to regional planning organizations. xxxviii. The initials SCR mean or refer to selective catalytic reduction. xxxix. The initials SIP mean or refer to State Implementation Plan. xl. The initials SNCR mean or refer to selective non-catalytic reduction. xli. The initials SO2 mean or refer to sulfur dioxide. xlii. The initials SOFA mean or refer to separated overfire air. xliii. The initials TSD mean or refer to Technical Support Document. xliv. The initials ULNB mean or refer to ultra-low NOX burners. xlv. The initials URP mean or refer to Uniform Rate of Progress. xlvi. The initials VOC mean or refer to volatile organic compounds. xlvii. The initials WAQSR mean or refer to Wyoming Air Quality Standards and Regulations. xlviii. The initials WEP mean or refer to Weighted Emissions Potential. xlix. The initials WRAP mean or refer to the Western Regional Air Partnership. l. The words Wyoming and State mean the State of Wyoming. VerDate Mar<15>2010 17:21 Jun 01, 2012 Jkt 226001 Table of Contents I. General Information A. What should I consider as I prepare my comments for EPA? II. Overview of Proposed Actions III. SIP and FIP Background IV. Background A. Regional Haze B. Requirements of the CAA and EPA’s Regional Haze Rule (RHR) C. Roles of Agencies in Addressing Regional Haze V. Requirements for the Regional Haze SIPs A. The CAA and the Regional Haze Rule B. Determination of Baseline, Natural, and Current Visibility Conditions C. Determination of Reasonable Progress Goals D. Best Available Retrofit Technology E. Long-Term Strategy F. Coordinating Regional Haze and Reasonably Attributable Visibility Impairment G. Monitoring Strategy and Other Implementation Plan Requirements H. Consultation With States and Federal Land Managers (FLMs) VI. EPA’s Evaluation of Wyoming’s Regional Haze SIP A. Affected Class I Areas B. Baseline Visibility, Natural Visibility, and Uniform Rate of Progress C. BART Determinations 1. BART-Eligible Sources 2. Sources Subject-to-BART a. Modeling Methodology b. Contribution Threshold c. Sources Identified by Wyoming as Subject-to-BART 3. BART Determinations and Federally Enforceable Limits a. Visibility Improvement Modeling b. Summary of BART Determinations and Federally Enforceable Limits i. FMC Westvaco—Units NS–1A and NS– 1B ii. General Chemical Green River—Boilers C and D iii. Basin Electric Laramie River Station— Units 1–3 iv. PacifiCorp Dave Johnston—Units 3 and 4 v. PacifiCorp Jim Bridger Units 1–4 vi. PacifiCorp Naughton Units 1–3 vii. PacifiCorp Wyodak—Unit 1 D. Reasonable Progress Requirements 1. Visibility Impairing Pollutants and Sources 2. Four-Factor Analyses a. Stationary Sources b. Summary of Reasonable Progress Determinations and Limits i. Oil and Gas Area Sources ii. Mountain Cement Company Laramie Plant—Kiln 3. Reasonable Progress Goals E. Long Term Strategy 1. Emission Inventories 2. Consultation and Emissions Reductions for Other States’ Class I Areas 3. Mandatory Long-Term Strategy Requirements a. Reductions Due to Ongoing Air Pollution Programs b. Measures to Mitigate the Impacts of Construction Activities PO 00000 Frm 00003 Fmt 4701 Sfmt 4702 33023 c. Smoke Management d. Emission Limitations and Schedules for Compliance e. Source Retirement and Replacement Schedules f. Enforceability of Wyoming’s Measures g. Anticipated Net Effect on Visibility Due to Projected Changes 4. Our Conclusions on Wyoming’s LongTerm Strategy F. Coordination of RAVI and Regional Haze Rule Requirements G. Monitoring Strategy and Other Implementation Plan Requirements H. Consultation With FLMs I. Periodic SIP Revisions and 5-Year Progress Reports VII. Federal Implementation Plan A. Disapproval of the State’s NOX BART Determinations and Federal Implementation Plan for NOX BART Determinations and Limits 1. Disapproval of the State’s Basin Electric Laramie River Units 1–3 NOX BART Determination and FIP to Address NOX BART 2. Disapproval of the State’s PacifiCorp Dave Johnston Unit 3 NOX BART Determination and FIP to Address NOX BART 3. Disapproval of the State’s PacifiCorp Jim Bridger Unit 1 and 2 NOX BART Determination and FIP to Address NOX BART 4. Proposals in the Alternative for PacifiCorp Jim Bridger Units 1, 2, 3, and 4 NOX BART 5. Disapproval of the State’s PacifiCorp Wyodak Unit 1 NOX BART Determination and FIP to Address NOX BART B. Disapproval of the State’s NOX Reasonable Progress Determinations and Federal Implementation Plan for NOX Reasonable Progress Determinations and Limits 1. PacifiCorp Dave Johnston—Units 1 and 2 C. Reasonable Progress Goals D. Federal Monitoring, Recordkeeping, and Reporting Requirements E. Federal Implementation Plan for the Long-Term Strategy F. Federal Implementation Plan for Coordination of RAVI and Regional Haze Long-Term Strategy VIII. EPA’s Proposed Action IX. Statutory and Executive Order Reviews I. General Information A. What should I consider as I prepare my comments for EPA? 1. Submitting CBI. Do not submit CBI to EPA through https:// www.regulations.gov or email. Clearly mark the part or all of the information that you claim to be CBI. For CBI information in a disk or CD–ROM that you mail to EPA, mark the outside of the disk or CD–ROM as CBI and then identify electronically within the disk or CD–ROM the specific information that is claimed as CBI. In addition to one complete version of the comment that E:\FR\FM\04JNP2.SGM 04JNP2 33024 Federal Register / Vol. 77, No. 107 / Monday, June 4, 2012 / Proposed Rules includes information claimed as CBI, a copy of the comment that does not contain the information claimed as CBI must be submitted for inclusion in the public docket. Information so marked will not be disclosed except in accordance with procedures set forth in 40 CFR part 2. 2. Tips for Preparing Your Comments. When submitting comments, remember to: a. Identify the rulemaking by docket number and other identifying information (subject heading, Federal Register date and page number). b. Follow directions—The agency may ask you to respond to specific questions or organize comments by referencing a Code of Federal Regulations (CFR) part or section number. c. Explain why you agree or disagree; suggest alternatives and substitute language for your requested changes. d. Describe any assumptions and provide any technical information and/ or data that you used. e. If you estimate potential costs or burdens, explain how you arrived at your estimate in sufficient detail to allow for it to be reproduced. f. Provide specific examples to illustrate your concerns, and suggest alternatives. g. Explain your views as clearly as possible, avoiding the use of profanity or personal threats. h. Make sure to submit your comments by the comment period deadline identified. mstockstill on DSK4VPTVN1PROD with PROPOSALS2 II. Overview of Proposed Actions EPA is proposing to partially approve and partially disapprove a regional haze SIP revision submitted by the State of Wyoming on January 12, 2011. Specifically, we are proposing to disapprove the following: • The State’s nitrogen oxides (NOX) best available retrofit technology (BART) determinations for PacifiCorp Dave Johnston Unit 3, PacifiCorp Jim Bridger Units 1 and 2, PacifiCorp Wyodak Unit 1, and Basin Electric Laramie River Units 1, 2, and 3. • The State’s NOX reasonable progress determination for PacifiCorp Dave Johnston Units 1 and 2. • Wyoming’s Reasonable Progress Goals (RPGs). • The State’s monitoring, recordkeeping, and reporting requirements in Chapter 6.4 of the SIP. • Portions of the State’s long-term strategy (LTS) that rely on or reflect other aspects of the regional haze SIP. • The State’s SIP because it does not contain the necessary provisions to meet the requirements for the coordination of the review of the reasonably attributable VerDate Mar<15>2010 17:21 Jun 01, 2012 Jkt 226001 visibility impairment (RAVI) and the regional haze LTS. We are proposing to approve the remaining aspects of the State’s January 12, 2011, SIP submittal. We are also seeking comment on two alternative proposals related to the State’s NOX BART determination for PacifiCorp Jim Bridger Units 1 and 2. We are proposing the promulgation of a FIP to address the deficiencies in the Wyoming regional haze SIP that we have identified in this proposal. The proposed FIP includes the following elements: • NOX BART determinations and limits for PacifiCorp Dave Johnston Unit 3, PacifiCorp Jim Bridger Units 1 and 2, PacifiCorp Wyodak Unit 1, and Basin Electric Laramie River Units 1, 2, and 3. • NOX reasonable progress determination and limits for PacifiCorp Dave Johnston Units 1 and 2. • RPGs consistent with the SIP limits proposed for approval and the proposed FIP limits. • Monitoring, recordkeeping, and reporting requirements applicable to all BART and reasonable progress sources for which there is a SIP or FIP emissions limit. • LTS elements pertaining to emission limits and compliance schedules for the proposed BART and reasonable progress FIP emission limits. • Provisions to ensure the coordination of the RAVI and regional haze LTS. In lieu of our proposed FIP, or a portion thereof, we would propose approval of a SIP revision if the State submits such a revision and the revision matches the terms of our proposed FIP. We encourage the State to submit a SIP revision to replace the FIP, either before or after our final action. III. SIP and FIP Background The CAA requires each state to develop plans to meet various air quality requirements, including protection of visibility. CAA sections 110(a), 169A, and 169B. The plans developed by a state are referred to as SIPs. A state must submit its SIPs and SIP revisions to us for approval. Once approved, a SIP is enforceable by EPA and citizens under the CAA, also known as being federally enforceable. If a state fails to make a required SIP submittal or if we find that a state’s required submittal is incomplete or unapprovable, then we must promulgate a FIP to fill this regulatory gap. CAA section 110(c)(1). As discussed elsewhere in this notice, we are proposing to disapprove aspects of Wyoming’s regional haze SIP. We are proposing FIPs to address the PO 00000 Frm 00004 Fmt 4701 Sfmt 4702 deficiencies in Wyoming’s regional haze SIP. IV. Background A. Regional Haze Regional haze is visibility impairment that is produced by a multitude of sources and activities which are located across a broad geographic area and emit fine particles (PM2.5) (e.g., sulfates, nitrates, organic carbon (OC), elemental carbon (EC), and soil dust), and their precursors (e.g., sulfur dioxide (SO2), NOX, and in some cases, ammonia (NH3) and volatile organic compounds (VOC)). Fine particle precursors react in the atmosphere to form PM2.5, which impairs visibility by scattering and absorbing light. Visibility impairment reduces the clarity, color, and visible distance that one can see. PM2.5 can also cause serious health effects and mortality in humans and contributes to environmental effects such as acid deposition and eutrophication. Data from the existing visibility monitoring network, the ‘‘Interagency Monitoring of Protected Visual Environments’’ (IMPROVE) monitoring network, show that visibility impairment caused by air pollution occurs virtually all the time at most national park and wilderness areas. The average visual range 1 in many Class I areas (i.e., national parks and memorial parks, wilderness areas, and international parks meeting certain size criteria) in the western United States is 100–150 kilometers, or about one-half to two-thirds of the visual range that would exist without anthropogenic air pollution. In most of the eastern Class I areas of the United States, the average visual range is less than 30 kilometers, or about one-fifth of the visual range that would exist under estimated natural conditions. 64 FR 35715 (July 1, 1999). B. Requirements of the CAA and EPA’s Regional Haze Rule (RHR) In section 169A of the 1977 Amendments to the CAA, Congress created a program for protecting visibility in the nation’s national parks and wilderness areas. This section of the CAA establishes as a national goal the ‘‘prevention of any future, and the remedying of any existing, impairment of visibility in mandatory Class I Federal areas 2 which impairment 1 Visual range is the greatest distance, in kilometers or miles, at which a dark object can be viewed against the sky. 2 Areas designated as mandatory Class I Federal areas consist of national parks exceeding 6000 acres, wilderness areas and national memorial parks exceeding 5000 acres, and all international parks that were in existence on August 7, 1977. 42 U.S.C. E:\FR\FM\04JNP2.SGM 04JNP2 Federal Register / Vol. 77, No. 107 / Monday, June 4, 2012 / Proposed Rules mstockstill on DSK4VPTVN1PROD with PROPOSALS2 results from manmade air pollution.’’ On December 2, 1980, EPA promulgated regulations to address visibility impairment in Class I areas that is ‘‘reasonably attributable’’ to a single source or small group of sources, i.e., ‘‘reasonably attributable visibility impairment.’’ 45 FR 80084. These regulations represented the first phase in addressing visibility impairment. EPA deferred action on regional haze that emanates from a variety of sources until monitoring, modeling and scientific knowledge about the relationships between pollutants and visibility impairment were improved. Congress added section 169B to the CAA in 1990 to address regional haze issues. EPA promulgated a rule to address regional haze on July 1, 1999. 64 FR 35714 (July 1, 1999), codified at 40 CFR part 51, subpart P. The RHR revised the existing visibility regulations to integrate into the regulation provisions addressing regional haze impairment and established a comprehensive visibility protection program for Class I areas. The requirements for regional haze, found at 40 CFR 51.308 and 51.309, are included in EPA’s visibility protection regulations at 40 CFR 51.300–309. Some of the main elements of the regional haze requirements are summarized in section III of this preamble. The requirement to submit a regional haze SIP applies to all 50 states, the District of Columbia and the Virgin Islands. 40 CFR 51.308(b) requires states to submit the first implementation plan addressing regional haze visibility impairment no later than December 17, 2007.3 Few states submitted a regional haze SIP prior to the December 17, 2007 deadline, and on January 15, 2009, EPA found that 37 states (including Colorado), the District of Columbia, and the Virgin Islands, had failed to submit SIPs addressing the regional haze requirements. 74 FR 2392. Once EPA 7472(a). In accordance with section 169A of the CAA, EPA, in consultation with the Department of Interior, promulgated a list of 156 areas where visibility is identified as an important value. 44 FR 69122 (November 30, 1979). The extent of a mandatory Class I area includes subsequent changes in boundaries, such as park expansions. 42 U.S.C. 7472(a). Although states and tribes may designate as Class I additional areas which they consider to have visibility as an important value, the requirements of the visibility program set forth in section 169A of the CAA apply only to ‘‘mandatory Class I Federal areas.’’ Each mandatory Class I Federal area is the responsibility of a ‘‘Federal Land Manager.’’ 42 U.S.C. 7602(i). When we use the term ‘‘Class I area’’ in this action, we mean a ‘‘mandatory Class I Federal area.’’ 3 EPA’s regional haze regulations require subsequent updates to the regional haze SIPs. 40 CFR 51.308(g)–(i). VerDate Mar<15>2010 17:21 Jun 01, 2012 Jkt 226001 has found that a state has failed to make a required submission, EPA is required to promulgate a FIP within two years unless the state submits a SIP and the Agency approves it within the two-year period. CAA § 110(c)(1). C. Roles of Agencies in Addressing Regional Haze Successful implementation of the regional haze program will require longterm regional coordination among states, tribal governments and various federal agencies. As noted above, pollution affecting the air quality in Class I areas can be transported over long distances, even hundreds of kilometers. Therefore, to effectively address the problem of visibility impairment in Class I areas, states need to develop strategies in coordination with one another, taking into account the effect of emissions from one jurisdiction on the air quality in another. Because the pollutants that lead to regional haze can originate from sources located across broad geographic areas, EPA has encouraged the states and tribes across the United States to address visibility impairment from a regional perspective. Five regional planning organizations (RPOs) were developed to address regional haze and related issues. The RPOs first evaluated technical information to better understand how their states and tribes impact Class I areas across the country, and then pursued the development of regional strategies to reduce emissions of particulate matter (PM) and other pollutants leading to regional haze. The Western Regional Air Partnership (WRAP) RPO is a collaborative effort of state governments, tribal governments, and various federal agencies established to initiate and coordinate activities associated with the management of regional haze, visibility and other air quality issues in the western United States. WRAP member state governments include: Alaska, Arizona, California, Colorado, Idaho, Montana, New Mexico, North Dakota, Oregon, South Dakota, Utah, Washington, and Wyoming. Tribal members include Campo Band of Kumeyaay Indians, Confederated Salish and Kootenai Tribes, Cortina Indian Rancheria, Hopi Tribe, Hualapai Nation of the Grand Canyon, Native Village of Shungnak, Nez Perce Tribe, Northern Cheyenne Tribe, Pueblo of Acoma, Pueblo of San Felipe, and Shoshone-Bannock Tribes of Fort Hall. V. Requirements for Regional Haze SIPs The following is a summary of the requirements of the RHR. See 40 CFR PO 00000 Frm 00005 Fmt 4701 Sfmt 4702 33025 51.308 for further detail regarding the requirements of the rule. A. The CAA and the Regional Haze Rule Regional haze SIPs must assure reasonable progress towards the national goal of achieving natural visibility conditions in Class I areas. Section 169A of the CAA and EPA’s implementing regulations require states to establish long-term strategies for making reasonable progress toward meeting this goal. Implementation plans must also give specific attention to certain stationary sources that were in existence on August 7, 1977, but were not in operation before August 7, 1962, and require these sources, where appropriate, to install BART controls for the purpose of eliminating or reducing visibility impairment. The specific regional haze SIP requirements are discussed in further detail below. B. Determination of Baseline, Natural, and Current Visibility Conditions The RHR establishes the deciview as the principal metric or unit for expressing visibility. See 70 FR 39104, 39118. This visibility metric expresses uniform changes in the degree of haze in terms of common increments across the entire range of visibility conditions, from pristine to extremely hazy conditions. Visibility expressed in deciviews is determined by using air quality measurements to estimate light extinction and then transforming the value of light extinction using a logarithm function. The deciview is a more useful measure for tracking progress in improving visibility than light extinction itself because each deciview change is an equal incremental change in visibility perceived by the human eye. Most people can detect a change in visibility at one deciview.4 The deciview is used in expressing RPGs (which are interim visibility goals towards meeting the national visibility goal), defining baseline, current, and natural conditions, and tracking changes in visibility. The regional haze SIPs must contain measures that ensure ‘‘reasonable progress’’ toward the national goal of preventing and remedying visibility impairment in Class I areas caused by anthropogenic air pollution by reducing anthropogenic emissions that cause regional haze. The national goal is a return to natural conditions, i.e., anthropogenic sources of air pollution would no longer impair visibility in Class I areas. 4 The preamble to the RHR provides additional details about the dv. 64 FR 35714, 35725 (July 1, 1999). E:\FR\FM\04JNP2.SGM 04JNP2 33026 Federal Register / Vol. 77, No. 107 / Monday, June 4, 2012 / Proposed Rules mstockstill on DSK4VPTVN1PROD with PROPOSALS2 To track changes in visibility over time at each of the 156 Class I areas covered by the visibility program (40 CFR 81.401–437), and as part of the process for determining reasonable progress, states must calculate the degree of existing visibility impairment at each Class I area at the time of each regional haze SIP submittal and periodically review progress every five years midway through each 10-year implementation period. To do this, the RHR requires states to determine the degree of impairment (in deciviews) for the average of the 20 percent least impaired (‘‘best’’) and 20 percent most impaired (‘‘worst’’) visibility days over a specified time period at each of their Class I areas. In addition, states must also develop an estimate of natural visibility conditions for the purpose of comparing progress toward the national goal. Natural visibility is determined by estimating the natural concentrations of pollutants that cause visibility impairment and then calculating total light extinction based on those estimates. We have provided guidance to states regarding how to calculate baseline, natural and current visibility conditions.5 For the first regional haze SIPs that were due by December 17, 2007, ‘‘baseline visibility conditions’’ were the starting points for assessing ‘‘current’’ visibility impairment. Baseline visibility conditions represent the degree of visibility impairment for the 20 percent least impaired days and 20 percent most impaired days for each calendar year from 2000 to 2004. Using monitoring data for 2000 through 2004, states are required to calculate the average degree of visibility impairment for each Class I area, based on the average of annual values over the five-year period. The comparison of initial baseline visibility conditions to natural visibility conditions indicates the amount of improvement necessary to attain natural visibility, while the future comparison of baseline conditions to the then current conditions will indicate the amount of progress made. In general, the 2000–2004 baseline period is considered the time from which improvement in visibility is measured. 5 Guidance for Estimating Natural Visibility Conditions Under the Regional Haze Rule, September 2003, EPA–454/B–03–005, available at https://www.epa.gov/ttncaaa1/t1/memoranda/ RegionalHaze_envcurhr_gd.pdf, (hereinafter referred to as ‘‘our 2003 Natural Visibility Guidance’’); and Guidance for Tracking Progress Under the Regional Haze Rule, September 2003, EPA–454/B–03–004, available at https://www.epa. gov/ttncaaa1/t1/memoranda/rh_tpurhr_gd.pdf, (hereinafter referred to as our ‘‘2003 Tracking Progress Guidance’’). VerDate Mar<15>2010 17:21 Jun 01, 2012 Jkt 226001 C. Determination of Reasonable Progress Goals The vehicle for ensuring continuing progress towards achieving the natural visibility goal is the submission of a series of regional haze SIPs from the states that establish two RPGs (i.e., two distinct goals, one for the ‘‘best’’ and one for the ‘‘worst’’ days) for every Class I area for each (approximately) 10-year implementation period. See 40 CFR 51.308(d), (f). The RHR does not mandate specific milestones or rates of progress, but instead calls for states to establish goals that provide for ‘‘reasonable progress’’ toward achieving natural visibility conditions. In setting RPGs, states must provide for an improvement in visibility for the most impaired days over the (approximately) 10-year period of the SIP, and ensure no degradation in visibility for the least impaired days over the same period. Id. In establishing RPGs, states are required to consider the following factors established in section 169A of the CAA and in our RHR at 40 CFR 51.308(d)(1)(i)(A): (1) The costs of compliance; (2) the time necessary for compliance; (3) the energy and non-air quality environmental impacts of compliance; and (4) the remaining useful life of any potentially affected sources. States must demonstrate in their SIPs how these factors are considered when selecting the RPGs for the best and worst days for each applicable Class I area. In setting the RPGs, states must also consider the rate of progress needed to reach natural visibility conditions by 2064 (referred to as the ‘‘uniform rate of progress’’ (URP) or the ‘‘glidepath’’) and the emission reduction measures needed to achieve that rate of progress over the 10-year period of the SIP. Uniform progress towards achievement of natural conditions by the year 2064 represents a rate of progress, which states are to use for analytical comparison to the amount of progress they expect to achieve. In setting RPGs, each state with one or more Class I areas (‘‘Class I state’’) must also consult with potentially ‘‘contributing states,’’ i.e., other nearby states with emission sources that may be affecting visibility impairment at the state’s Class I areas. 40 CFR 51.308(d)(1)(iv). In determining whether a state’s goals for visibility improvement provide for reasonable progress toward natural visibility conditions, EPA is required to evaluate the demonstrations developed by the state pursuant to paragraphs 40 CFR 51.308(d)(1)(i) and (d)(1)(ii). 40 CFR 51.308(d)(1)(iii). PO 00000 Frm 00006 Fmt 4701 Sfmt 4702 D. Best Available Retrofit Technology Section 169A of the CAA directs states to evaluate the use of retrofit controls at certain larger, often uncontrolled, older stationary sources in order to address visibility impacts from these sources. Specifically, section 169A(b)(2)(A) of the CAA requires states to revise their SIPs to contain such measures as may be necessary to make reasonable progress towards the natural visibility goal, including a requirement that certain categories of existing major stationary sources 6 built between 1962 and 1977 procure, install, and operate the ‘‘Best Available Retrofit Technology’’ as determined by the state. Under the RHR, states are directed to conduct BART determinations for such ‘‘BART-eligible’’ sources that may be anticipated to cause or contribute to any visibility impairment in a Class I area. Rather than requiring source-specific BART controls, states also have the flexibility to adopt an emissions trading program or other alternative program as long as the alternative provides greater reasonable progress towards improving visibility than BART. On July 6, 2005, EPA published the Guidelines for BART Determinations Under the Regional Haze Rule at appendix Y to 40 CFR part 51 (hereinafter referred to as the ‘‘BART Guidelines’’) to assist states in determining which of their sources should be subject to the BART requirements and in determining appropriate emission limits for each applicable source. 70 FR 39104. In making a BART determination for a fossil fuel-fired electric generating plant with a total generating capacity in excess of 750 megawatts (MW), a state must use the approach set forth in the BART Guidelines. A state is encouraged, but not required, to follow the BART Guidelines in making BART determinations for other types of sources. Regardless of source size or type, a state must meet the requirements of the CAA and our regulations for selection of BART, and the state’s BART analysis and determination must be reasonable in light of the overarching purpose of the regional haze program. The process of establishing BART emission limitations can be logically broken down into three steps: First, states identify those sources which meet the definition of ‘‘BART-eligible source’’ set forth in 40 CFR 51.301; 7 second, 6 The set of ‘‘major stationary sources’’ potentially subject-to-BART is listed in CAA section 169A(g)(7). 7 BART-eligible sources are those sources that have the potential to emit 250 tons or more of a visibility-impairing air pollutant, were not in E:\FR\FM\04JNP2.SGM 04JNP2 mstockstill on DSK4VPTVN1PROD with PROPOSALS2 Federal Register / Vol. 77, No. 107 / Monday, June 4, 2012 / Proposed Rules states determine which of such sources ‘‘emits any air pollutant which may reasonably be anticipated to cause or contribute to any impairment of visibility in any such area’’ (a source which fits this description is ‘‘subject to BART’’); and third, for each source subject-to-BART, states then identify the best available type and level of control for reducing emissions. States must address all visibilityimpairing pollutants emitted by a source in the BART determination process. The most significant visibility impairing pollutants are SO2, NOX, and PM. EPA has stated that states should use their best judgment in determining whether VOC or NH3 compounds impair visibility in Class I areas. Under the BART Guidelines, states may select an exemption threshold value for their BART modeling, below which a BART-eligible source would not be expected to cause or contribute to visibility impairment in any Class I area. The state must document this exemption threshold value in the SIP and must state the basis for its selection of that value. Any source with emissions that model above the threshold value would be subject to a BART determination review. The BART Guidelines acknowledge varying circumstances affecting different Class I areas. States should consider the number of emission sources affecting the Class I areas at issue and the magnitude of the individual sources’ impacts. Any exemption threshold set by the state should not be higher than 0.5 deciview. 40 CFR part 51, appendix Y, section III.A.1. In their SIPs, states must identify the sources that are subject-to-BART and document their BART control determination analyses for such sources. In making their BART determinations, section 169A(g)(2) of the CAA requires that states consider the following factors when evaluating potential control technologies: (1) The costs of compliance; (2) the energy and non-air quality environmental impacts of compliance; (3) any existing pollution control technology in use at the source; (4) the remaining useful life of the source; and (5) the degree of improvement in visibility which may reasonably be anticipated to result from the use of such technology. A regional haze SIP must include source-specific BART emission limits and compliance schedules for each source subject-to-BART. Once a state operation prior to August 7, 1962, but were in existence on August 7, 1977, and whose operations fall within one or more of 26 specifically listed source categories. 40 CFR 51.301. VerDate Mar<15>2010 17:21 Jun 01, 2012 Jkt 226001 33027 has made its BART determination, the BART controls must be installed and in operation as expeditiously as practicable, but no later than five years after the date of EPA approval of the regional haze SIP. CAA section 169(g)(4) and 40 CFR 51.308(e)(1)(iv). In addition to what is required by the RHR, general SIP requirements mandate that the SIP must also include all regulatory requirements related to monitoring, recordkeeping, and reporting for the BART controls on the source. See CAA section 110(a). As noted above, the RHR allows states to implement an alternative program in lieu of BART so long as the alternative program can be demonstrated to achieve greater reasonable progress toward the national visibility goal than would BART. developing their LTS: (1) Emission reductions due to ongoing air pollution control programs, including measures to address RAVI; (2) measures to mitigate the impacts of construction activities; (3) emissions limitations and schedules for compliance to achieve the RPG; (4) source retirement and replacement schedules; (5) smoke management techniques for agricultural and forestry management purposes including plans as currently exist within the state for these purposes; (6) enforceability of emissions limitations and control measures; and (7) the anticipated net effect on visibility due to projected changes in point, area, and mobile source emissions over the period addressed by the LTS. 40 CFR 51.308(d)(3)(v). E. Long-Term Strategy Consistent with the requirement in section 169A(b) of the CAA that states include in their regional haze SIP a 10 to 15 year strategy for making reasonable progress, section 51.308(d)(3) of the RHR requires that states include a LTS in their regional haze SIPs. The LTS is the compilation of all control measures a state will use during the implementation period of the specific SIP submittal to meet applicable RPGs. The LTS must include ‘‘enforceable emissions limitations, compliance schedules, and other measures as necessary to achieve the reasonable progress goals’’ for all Class I areas within, or affected by emissions from, the state. 40 CFR 51.308(d)(3). When a state’s emissions are reasonably anticipated to cause or contribute to visibility impairment in a Class I area located in another state, the RHR requires the impacted state to coordinate with the contributing states in order to develop coordinated emissions management strategies. 40 CFR 51.308(d)(3)(i). In such cases, the contributing state must demonstrate that it has included, in its SIP, all measures necessary to obtain its share of the emission reductions needed to meet the RPGs for the Class I area. Id. at (d)(3)(ii). The RPOs have provided forums for significant interstate consultation, but additional consultations between states may be required to sufficiently address interstate visibility issues. This is especially true where two states belong to different RPOs. States should consider all types of anthropogenic sources of visibility impairment in developing their longterm strategy, including stationary, minor, mobile, and area sources. At a minimum, states must describe how each of the following seven factors listed below are taken into account in F. Coordinating Regional Haze and Reasonably Attributable Visibility Impairment As part of the RHR, EPA revised 40 CFR 51.306(c) regarding the LTS for RAVI to require that the RAVI plan must provide for a periodic review and SIP revision not less frequently than every three years until the date of submission of the state’s first plan addressing regional haze visibility impairment, which was due December 17, 2007, in accordance with 40 CFR 51.308(b) and (c). On or before this date, the state must revise its plan to provide for review and revision of a coordinated LTS for addressing RAVI and regional haze, and the state must submit the first such coordinated LTS with its first regional haze SIP. Future coordinated LTS’s, and periodic progress reports evaluating progress towards RPGs, must be submitted consistent with the schedule for SIP submission and periodic progress reports set forth in 40 CFR 51.308(f) and 51.308(g), respectively. The periodic review of a state’s LTS must report on both regional haze and RAVI impairment and must be submitted to EPA as a SIP revision. PO 00000 Frm 00007 Fmt 4701 Sfmt 4702 G. Monitoring Strategy and Other Implementation Plan Requirements Section 51.308(d)(4) of the RHR includes the requirement for a monitoring strategy for measuring, characterizing, and reporting of regional haze visibility impairment that is representative of all mandatory Class I Federal areas within the state. The strategy must be coordinated with the monitoring strategy required in section 51.305 for RAVI. Compliance with this requirement may be met through ‘‘participation’’ in the IMPROVE network, i.e., review and use of monitoring data from the network. The monitoring strategy is due with the first E:\FR\FM\04JNP2.SGM 04JNP2 mstockstill on DSK4VPTVN1PROD with PROPOSALS2 33028 Federal Register / Vol. 77, No. 107 / Monday, June 4, 2012 / Proposed Rules regional haze SIP, and it must be reviewed every five years. The monitoring strategy must also provide for additional monitoring sites if the IMPROVE network is not sufficient to determine whether RPGs will be met. The SIP must also provide for the following: • Procedures for using monitoring data and other information in a state with mandatory Class I areas to determine the contribution of emissions from within the state to regional haze visibility impairment at Class I areas both within and outside the state; • Procedures for using monitoring data and other information in a state with no mandatory Class I areas to determine the contribution of emissions from within the state to regional haze visibility impairment at Class I areas in other states; • Reporting of all visibility monitoring data to the Administrator at least annually for each Class I area in the state, and where possible, in electronic format; • Developing a statewide inventory of emissions of pollutants that are reasonably anticipated to cause or contribute to visibility impairment in any Class I area. The inventory must include emissions for a baseline year, emissions for the most recent year for which data are available, and estimates of future projected emissions. A state must also make a commitment to update the inventory periodically; and • Other elements, including reporting, recordkeeping, and other measures necessary to assess and report on visibility. The RHR requires control strategies to cover an initial implementation period extending to the year 2018, with a comprehensive reassessment and revision of those strategies, as appropriate, every 10 years thereafter. Periodic SIP revisions must meet the core requirements of section 51.308(d) with the exception of BART. The requirement to evaluate sources for BART applies only to the first regional haze SIP. Facilities subject-to-BART must continue to comply with the BART provisions of section 51.308(e), as noted above. Periodic SIP revisions will assure that the statutory requirement of reasonable progress will continue to be met. H. Consultation With States and Federal Land Managers (FLMs) The RHR requires that states consult with FLMs before adopting and submitting their SIPs. 40 CFR 51.308(i). States must provide FLMs an opportunity for consultation, in person and at least 60 days prior to holding any VerDate Mar<15>2010 17:21 Jun 01, 2012 Jkt 226001 public hearing on the SIP. This consultation must include the opportunity for the FLMs to discuss their assessment of impairment of visibility in any Class I area and to offer recommendations on the development of the RPGs and on the development and implementation of strategies to address visibility impairment. Further, a state must include in its SIP a description of how it addressed any comments provided by the FLMs. Finally, a SIP must provide procedures for continuing consultation between the state and FLMs regarding the state’s visibility protection program, including development and review of SIP revisions, five-year progress reports, and the implementation of other programs having the potential to contribute to impairment of visibility in Class I areas. VI. EPA’s Evaluation of Wyoming’s Regional Haze SIP A. Affected Class I Areas Pursuant to 40 CFR 51.308(d), the State identified seven mandatory Class I areas in Wyoming: Grand Teton National Park, Yellowstone National Park, Bridger Wilderness, Fitzpatrick Wilderness, North Absaroka Wilderness, Teton Wilderness, and Washakie Wilderness. B. Baseline Visibility, Natural Visibility, and Uniform Rate of Progress As required by 40 CFR 51.308(d)(2), Wyoming provided baseline visibility, natural visibility, and the URP for each Class I area in the State. Natural background visibility, as defined in our 2003 Natural Visibility Guidance, is estimated by calculating the expected light extinction using default estimates of natural concentrations of fine particle components adjusted by site-specific estimates of humidity. This calculation uses the IMPROVE equation, which is a formula for estimating light extinction from the estimated natural concentrations of fine particle components (or from components measured by the IMPROVE monitors). As documented in our 2003 Natural Visibility Guidance, EPA allows states to use ‘‘refined’’ or alternative approaches to this guidance to estimate the values that characterize the natural visibility conditions of Class I areas. One alternative approach is to develop and justify the use of alternative estimates of natural concentrations of fine particle components. Another alternative is to use the ‘‘new IMPROVE equation’’ that was adopted for use by the IMPROVE PO 00000 Frm 00008 Fmt 4701 Sfmt 4702 Steering Committee in December 2005.8 The purpose of this refinement to the ‘‘old IMPROVE equation’’ is to provide more accurate estimates of the various factors that affect the calculation of light extinction. Wyoming used the new IMPROVE equation to calculate natural conditions and baseline visibility. The natural condition for each Class I area represents the visibility goal expressed in deciviews for the 20% worst days and the 20% best days that would exist if there were only naturally occurring visibility impairment. In accordance with 40 CFR 51.308(d)(2)(iii), the State calculated natural visibility conditions based on available monitoring information and appropriate data analysis techniques and in accordance with our 2003 Natural Visibility Guidance. The State also calculated the number of deciviews by which baseline conditions exceed natural conditions at each of its Class I areas to meet the requirements of 40 CFR 51.308(d)(2)(iv)(A). Wyoming established the baseline visibility for the best and worst visibility days for each Class I area based on data from the IMPROVE monitoring sites. Each IMPROVE monitor collects particulate concentration data which are converted into reconstructed light extinction through a complex calculation using the IMPROVE equation (see Chapter 13 of the SIP for more information on reconstructed light extinction and the IMPROVE equation). Per 40 CFR 51.308(d)(2)(i), the State calculated baseline visibility using a five-year average (2000 to 2004) of IMPROVE data for both the 20% best and 20% worst days. The State’s baseline calculations were made in accordance with our 2003 Tracking Progress Guidance. Pursuant to 40 CFR 51.308(d)(1)(i)(B), the State calculated the URP for each of its Class I areas. For the 20% worst days, the URP is the calculation of the deciview reduction needed to achieve natural conditions by 2064. For the 20% worst days, the State calculated the URP 8 The IMPROVE program is a cooperative measurement effort governed by a steering committee composed of representatives from Federal agencies (including representatives from EPA and the FLMs) and regional planning organizations. The IMPROVE monitoring program was established in 1985 to aid the creation of Federal and State implementation plans for the protection of visibility in Class I areas. One of the objectives of IMPROVE is to identify chemical species and emission sources responsible for existing anthropogenic visibility impairment. The IMPROVE program has also been a key participant in visibility-related research, including the advancement of monitoring instrumentation, analysis techniques, visibility modeling, policy formulation and source attribution field studies. E:\FR\FM\04JNP2.SGM 04JNP2 33029 Federal Register / Vol. 77, No. 107 / Monday, June 4, 2012 / Proposed Rules in deciviews per year using the following formula: URP = [Baseline Condition¥Natural Condition]/60 years. In order to determine the uniform progress needed by 2018 to be on the path to achieving natural visibility conditions by 2064, the State multiplied the URP by the 14 years in the first planning period (2004–2018). Table 1 shows the baseline visibility, natural conditions, and URP for each of the Class I areas. As indicated by the table, some Class I areas share a single monitor because of the proximity of the areas to each other. TABLE 1—BASELINE VISIBILITY, NATURAL CONDITIONS, AND URP FOR WYOMING CLASS I AREAS 20% Worst days 2000–2004 Baseline (deciview) 20% Best days Reduction needed to reach 2018 URP (delta deciview) Delta baseline— 2064 natural conditions 2000–2004 Baseline (deciview) Monitor name Yellowstone National Park Grand Teton National Park Teton Wilderness. North Absaroka Wilderness Washakie Wilderness. Bridger Wilderness Fitzpatrick Wilderness. YELL2 ... 11.8 10.5 1.3 6.44 5.36 2.58 NOABI ... 11.5 10.4 1.1 6.83 4.67 2.0 BRID1 .... 11.1 10.0 1.1 6.45 4.65 2.1 We have reviewed Wyoming’s baseline visibility, natural conditions, and URP. We find they have been calculated correctly and are proposing to approve them. mstockstill on DSK4VPTVN1PROD with PROPOSALS2 C. BART Determinations BART is an element of Wyoming’s LTS for the first implementation period. As discussed in more detail in section VI.D of this notice, the BART evaluation process consists of three components: (1) An identification of all the BARTeligible sources; (2) an assessment of whether those BART-eligible sources are in fact subject-to-BART; and (3) a determination of any BART controls. Wyoming addressed these steps as follows: 1. BART Eligible Sources The first step of a BART evaluation is to identify all the BART-eligible sources within the state’s boundaries. Wyoming identified the BART-eligible sources in Wyoming by utilizing the approach set out in the BART Guidelines (70 FR 39158). This approach provides three criteria for identifying BART-eligible sources: (1) One or more emission units at the facility fit within one of the 26 categories listed in the BART Guidelines; (2) the emission unit or units began operation on or after August 6, 1962, and were in existence on August 6, 1977; and (3) combined potential emissions of any visibilityimpairing pollutant from the units that meet the criteria in (1) and (2) are 250 tons or more per year. Wyoming reviewed source permits and emission data from 2001–2003 to identify facilities in the BART source categories with potential emissions of 250 tons per VerDate Mar<15>2010 17:21 Jun 01, 2012 Jkt 226001 2018 URP (deciview) 2064 Natural conditions (deciview) Wyoming class I areas year or more for any visibility-impairing pollutant from any unit or units that were in existence on August 7, 1977 and began operation on or after August 7, 1962. The BART Guidelines direct states to address SO2,9 NOX, and direct PM (including both coarse particulate matter (PM10) and PM2.5) emissions as visibility-impairing pollutants and to exercise their ‘‘best judgment to determine whether VOC or NH3 emissions from a source are likely to have an impact on visibility in an area.’’ (70 FR 39162). The State analyzed the emissions from VOC and NH3 from sources in the State and eliminated them from further consideration for BART controls. The State evaluated the BART-eligible sources and determined emissions of VOC and NH3 were negligible. Thus, the State has eliminated VOC and NH3 from further consideration for BART controls. We have reviewed this information and propose to accept this determination. The State determined the following were BART-eligible sources: PacifiCorp Jim Bridger, P4 Production, PacifiCorp Naughton, OCI Wyoming, FMC Granger, Dyno Nobel, FMC Westvaco, Sinclair Casper Refinery, Basin Electric Laramie River, Black Hills Neil Simpson 1, PacifiCorp Wyodak, Sinclair—Sinclair Refinery, PacifiCorp Dave Johnston, and General Chemical Green River. 9 Wyoming has elected to submit its RH SIP pursuant to the requirements of 40 CFR 51.309. For states electing to submit under section 309, States do not have to do a BART analysis for SO2. SO2 controls are included in the backstop trading program under 40 CFR 51.309(d)(4). PO 00000 Frm 00009 Fmt 4701 Sfmt 4702 We have reviewed this information and propose to accept this determination. 2. Sources Subject-to-BART The second step of the BART evaluation is to identify those BARTeligible sources that may reasonably be anticipated to cause or contribute to any visibility impairment at any Class I area, i.e., those sources that are subject-toBART. The BART Guidelines allow States to consider exempting some BART-eligible sources from further BART review because they may not reasonably be anticipated to cause or contribute to any visibility impairment in a Class I area. Consistent with the BART Guidelines, Wyoming performed dispersion modeling on the BARTeligible sources to assess the extent of their contribution to visibility impairment at surrounding Class I areas. a. Modeling Methodology The BART Guidelines provide that states may use the CALPUFF 10 modeling system or another appropriate model to predict the visibility impacts from a single source on a Class I area and to, therefore, determine whether an individual source is anticipated to cause 10 Note that our reference to CALPUFF encompasses the entire CALPUFF modeling system, which includes the CALMET, CALPUFF, and CALPOST models and other pre and post processors. The different versions of CALPUFF have corresponding versions of CALMET, CALPOST, etc. which may not be compatible with previous versions (e.g., the output from a newer version of CALMET may not be compatible with an older version of CALPUFF). The different versions of the CALPUFF modeling system are available from the model developer at https://www.src.com/ verio/download/download.htm. E:\FR\FM\04JNP2.SGM 04JNP2 33030 Federal Register / Vol. 77, No. 107 / Monday, June 4, 2012 / Proposed Rules or contribute to impairment of visibility in Class I areas, i.e., ‘‘is subject to BART.’’ The Guidelines state that CALPUFF is the best regulatory modeling application currently available for predicting a single source’s contribution to visibility impairment (70 FR 39162). The BART Guidelines also recommend that States develop a modeling protocol for making individual source attributions, and suggest that states may want to consult with EPA and their RPO to address any issues prior to modeling. Wyoming used the CALPUFF model for Wyoming BART sources in accordance with a protocol it developed titled BART Air Modeling Protocol Individual Source Visibility Impairment Analysis, March 2006, which was approved by EPA and is included in Chapter 6 of the State’s TSD. The Wyoming protocol follows recommendations for long-range transport described in appendix W to 40 CFR part 51, Guideline on Air Quality Models, and in EPA’s Interagency Workgroup on Air Quality Modeling (IWAQM) Phase 2 Summary Report and Recommendations for Modeling Long-Range Transport Impacts as recommended by the BART Guidelines. (40 CFR part 51, appendix Y, section III.A.3). To determine if each BART-eligible source has a significant impact on visibility, Wyoming used the CALPUFF model to estimate daily visibility impacts above estimated natural conditions at each Class I area within 300 km of any BART-eligible facility, based on maximum actual 24-hour emissions over a three year period (2001–2003). b. Contribution Threshold For States using modeling to determine the applicability of BART to single sources, the BART Guidelines note that the first step is to set a contribution threshold to assess whether the impact of a single source is sufficient to cause or contribute to visibility impairment at a Class I area. The BART Guidelines state that, ‘‘[a] single source that is responsible for a 1.0 deciview change or more should be considered to ‘cause’ visibility impairment.’’ (70 FR 39104, 39161). The BART Guidelines also state that ‘‘the appropriate threshold for determining whether a source contributes to visibility impairment may reasonably differ across States,’’ but, ‘‘[a]s a general matter, any threshold that you use for determining whether a source ‘‘contributes’’ to visibility impairment should not be higher than 0.5 deciviews.’’ Id. Further, in setting a contribution threshold, States should ‘‘consider the number of emissions sources affecting the Class I areas at issue and the magnitude of the individual sources’ impacts.’’ The Guidelines affirm that States are free to use a lower threshold if they conclude that the location of a large number of BART-eligible sources in proximity to a Class I area justifies this approach. Wyoming used a contribution threshold of 0.5 deciviews for determining which sources are subjectto-BART. By using a contribution threshold of 0.5 deciviews, Wyoming exempted seven of the fourteen BARTeligible sources in the State from further review under the BART requirements. Based on the modeling results, the State determined that P4 Production, FMC Granger,11 and OCI Wyoming had an impact of .07 deciview, 0.39 deciview, and 0.07 deciview, respectively, at Bridger Wilderness. Black Hills Neil Simpson 1, Sinclair Casper Refinery, and Sinclair—Sinclair Refinery have an impact of 0.27 deciview, 0.06 deciview, and 0.12 deciview, respectively, at Wind Cave. Dyno-Nobel had an impact of 0.22 deciview at Rocky Mountain National Park. These sources’ modeled visibility impacts fell below the State’s threshold of 0.5 deciview and were determined not to be subject-to-BART.12 Given the relatively limited impact on visibility from these seven sources, we propose to agree with Wyoming that 0.5 deciviews is a reasonable threshold for determining whether its BART-eligible sources are subject-to-BART. Because our recommended modeling approach already incorporates choices that tend to lower peak daily visibility impact values,13 our BART Guidelines state that a State should compare the 98th percentile (as opposed to the 90th or lower percentile) of CALPUFF modeling results against the ‘‘contribution’’ threshold established by the State for purposes of determining BART applicability. Wyoming used a 98th percentile comparison that we find appropriate. Further explanation on use of the 98th versus 90th percentile value is provided at 70 FR 39121. c. Sources Identified by Wyoming as Subject-to-BART Table 2 shows the sources identified by the State as subject-to-BART and the results of the CALPUFF modeling. TABLE 2—WYOMING SUBJECT-TO-BART SOURCES AND CALPUFF MODELING RESULTS Subject-to-BART units PacifiCorp—Jim Bridger ..................................................................... Basin Electric—Laramie River ............................................................ PacifiCorp—Dave Johnston ............................................................... PacifiCorp—Naughton ........................................................................ PacifiCorp—Wyodak ........................................................................... FMC—Westvaco ................................................................................. General Chemical—Green River ........................................................ mstockstill on DSK4VPTVN1PROD with PROPOSALS2 Facility name Units 1–4 ...................................................................... Units 1, 2 and 3 ............................................................ Units 3 and 4 ................................................................ Units 1–3 ...................................................................... Unit 1 ............................................................................ Units NS–1A and NS–1B ............................................. Boilers C and D ............................................................ 11 The State of Wyoming performed a refined CALPUFF visibility modeling analysis for the two BART-eligible units at the FMC Wyoming Granger Facility and demonstrated that the predicted 98th percentile impacts at Bridger Wilderness Area and Fitzpatrick Wilderness Area would be below 0.5 dv for all meteorological periods modeled. This VerDate Mar<15>2010 17:21 Jun 01, 2012 Jkt 226001 modeling used higher-resolution meteorological data as compared to the data used by the State for the initial screening modeling that identified the facility as subject-to-BART. 12 CALPUFF modeling results, which provide the maximum change in visibility are summarized in PO 00000 Frm 00010 Fmt 4701 Sfmt 4702 State modeling results—98th percentile delta-deciview 3.1 3.68 3.30 4.36 1.66 1.3 1.36 the WY BART Screening Analysis Results and the WY BART Screening Analysis Results DV Frequency, which can also be found in Chapter 6 of the State’s TSD. 13 See our BART Guidelines, Section III.A.3. E:\FR\FM\04JNP2.SGM 04JNP2 Federal Register / Vol. 77, No. 107 / Monday, June 4, 2012 / Proposed Rules We are proposing to approve the State’s determination of the subject-toBART sources. mstockstill on DSK4VPTVN1PROD with PROPOSALS2 3. BART Determinations and Federally Enforceable Limits The third step of a BART evaluation is to perform the BART analysis. The BART Guidelines (70 FR 39164) describe the BART analysis as consisting of the following five steps: • Step 1: Identify All Available Retrofit Control Technologies; • Step 2: Eliminate Technically Infeasible Options; • Step 3: Evaluate Control Effectiveness of Remaining Control Technologies; • Step 4: Evaluate Impacts and Document the Results; and • Step 5: Evaluate Visibility Impacts. In determining BART, the State must consider the five statutory factors in section 169A of the CAA: (1) The costs of compliance; (2) the energy and nonair quality environmental impacts of compliance; (3) any existing pollution control technology in use at the source; (4) the remaining useful life of the source; and (5) the degree of improvement in visibility which may reasonably be anticipated to result from the use of such technology. See also 40 CFR 51.308(e)(1)(ii)(A). The five-factor analysis occurs during steps 4 and 5 of the BART analysis. We find that Wyoming considered all five steps above in its BART determinations, but we find that its consideration of visibility improvement was inadequate, as explained below. a. Visibility Improvement Modeling The BART Guidelines provide that states may use the CALPUFF modeling system or another appropriate model to determine the visibility improvement expected at a Class I area from potential BART control technologies applied to the source. The BART Guidelines also recommend that states develop a modeling protocol for modeling visibility improvement, and suggest that states may want to consult with EPA and their RPO to address any issues prior to modeling. Wyoming developed a modeling protocol titled BART Air Modeling Protocol Individual Source Visibility Assessments for BART Control Analyses, September 2006, for sources to use when they performed their BART analysis (see Chapter 6 of the State’s TSD). The Wyoming protocol follows recommendations for long-range transport described in appendix W to 40 CFR part 51, Guideline on Air Quality Models, and in EPA’s Interagency Workgroup on Air Quality Modeling (IWAQM) Phase 2 Summary Report and VerDate Mar<15>2010 17:21 Jun 01, 2012 Jkt 226001 Recommendations for Modeling Long Range Transport Impacts, as recommended by the BART Guidelines (40 CFR part 51, appendix Y, section III.D.5). For the subject-to-BART PacifiCorp sources, the State’s analyses provide visibility improvement modeling results that combine the visibility improvement from NOX, PM, and SO2 control options.14 From the State’s modeling results, EPA could not ascertain what the visibility improvement would be from an individual NOX or PM control option. For Basin Electric’s Laramie River Station, the State did not provide the visibility improvement for the SNCR control option or for PM controls. While we are able to propose approval of the State’s PM BART determinations without having additional visibility improvement modeling for PM controls, as discussed below, additional visibility improvement modeling to address the NOX BART controls was needed and subsequently performed by EPA.15 b. Summary of BART Determinations and Federally Enforceable Limits For the subject-to-BART sources, the State provided BART analyses, as well as additional technical information and materials, in Attachment A to the SIP. Chapter 6 of the SIP provides a summary of the five-factor analyses. As noted above, EPA performed the NOX visibility improvement modeling for the control technology options analyzed for the subject-to-BART PacifiCorp sources.16 EPA also performed modeling for the visibility improvement SNCR for Basin Electric Laramie River Units 1, 2, and 3. In addition, Wyoming did not provide control efficiencies in their BART analysis for PM and NOX BART controls for the PacifiCorp sources nor did the State provide analysis for NOX BART controls for Basin Electric Laramie River Units 1, 2, and 3. Therefore, EPA calculated the control efficiencies shown for the PM and NOX BART controls for the PacifiCorp sources and NOX BART controls for Basin Electric from the emission reductions reported by Wyoming in Chapter 6.5 and Appendix A of their SIP. EPA is proposing to approve the State’s BART determinations for the 14 Per the BART Guidelines, States must use CALPUFF, or other appropriate dispersion model to determine the visibility improvement expected at a Class I area from the potential BART control technology applied to the source. 70 FR 39170. 15 A summary of EPA’s modeling methodology and results can be found in the docket under EPA BART and RP Modeling for Wyoming Sources. 16 The cumulative visibility impact will be higher than the 98th percentile impact that is shown in the BART summary tables. PO 00000 Frm 00011 Fmt 4701 Sfmt 4702 33031 following: NOX and PM BART for FMC Westvaco Unit NS–1A and NS–1B; NOX and PM BART for General Chemical Green River Boiler C and Boiler D; PM BART for Basin Electric Laramie River Units 1, 2, and 3; PM BART for PacifiCorp Dave Johnston Unit 3; NOX and PM BART for PacifiCorp Dave Johnston Unit 4; PM BART for PacifiCorp Jim Bridger Unit 1 and Unit 2; NOX and PM BART (including LTS controls) for PacifiCorp Jim Bridger Unit 3 and Unit 4; NOX and PM BART for PacifiCorp Naughton Units 1, 2, and 3; PM BART for PacifiCorp Wyodak Unit 1. A summary of the BART determination for each source is provided below. EPA is proposing to disapprove the State’s NOX BART determinations, and we are proposing to issue a BART FIP, for the following units: PacifiCorp Dave Johnston Unit 3; PacifiCorp Jim Bridger Units 1 and 2; PacifiCorp Wyodak Unit 1; and Basin Electric Laramie River Units 1, 2, and 3. EPA’s rationale for disapproving the State’s BART determinations for these units, as well as EPA’s BART FIP determinations and emission limits can be found in section VII.A of this notice. i. FMC Westvaco—Units NS–1A and NS–1B Background FMC’s Westvaco facility is a trona mine and sodium products plant located in Sweetwater County, Wyoming. FMC Westvaco has two existing coal-fired boilers, Unit NS–1A and Unit NS–1B, that are subject to BART. Unit NS–1A and Unit NS–1B each have a design heat input rate of 887 MMBtu/hr and were constructed in 1975. They are both wallfired, wet-bottom boilers burning subbituminous coal. The State’s BART determination can be found in Chapter 6.5.2 and Attachment A of the SIP. NOX BART Determination Units NS–1A and NS–1B are currently controlled with combustion air control with a permit limit of 0.7 lb/MMBtu (3hour rolling average). The State determined that low NOX burners (LNBs) and overfired air (OFA), LNBs and OFA with selective non-catalytic reduction (SNCR), and LNBs and OFA with selective catalytic reduction (SCR) were technically feasible for reducing NOX emissions at Unit NS–1A and NS– 1B. The State did not identify any technically infeasible options. The State did not identify any energy or non-air quality environmental impacts that would preclude the selection of any of the controls evaluated, and there are no remaining-useful-life issues for this E:\FR\FM\04JNP2.SGM 04JNP2 33032 Federal Register / Vol. 77, No. 107 / Monday, June 4, 2012 / Proposed Rules source. A summary of the State’s NOX BART analysis and the visibility impacts is provided in Table 3. Baseline NOX emissions are 2,719.5 tpy for each unit based on a heat input rate of 887 MMBtu/hr and 8,760 hours of operation per year. TABLE 3—SUMMARY OF FMC WESTVACO UNIT NS–1A AND UNIT NS–1B NOX BART ANALYSIS* Control technology Emission rate (lb/MMBtu) (30-day rolling average) Control efficiency (%) LNB + SOFA .................... LNB + SOFA + SNCR ..... LNB + SOFA + SCR ........ 50 70 85 Emission reduction (tpy) 0.35 0.21 0.10 Average cost effectiveness ($/ton) Annualized costs 1,359.7 1,903.6 2,331.0 $413,145 1,281,851 1,281,851 Visibility improvement (Delta dv for the maximum 98th percentile impact at Bridger Wilderness Area) $304 673 3,493 0.13 0.19 0.24 * This table reflects the costs and visibility improvements per boiler. Incremental cost effectiveness for the controls evaluated is as follows: LNB plus SOFA and SNCR: $1,597/ton, and LNB plus SOFA and SCR: $16,051/ ton.17 Based on its consideration of the five factors, the State determined that LNBs plus OFA are reasonable for BART. The State determined that the other control options were not reasonable based on the cost effectiveness and associated visibility improvement. The State has determined that NOX BART emission limits for FMC Westvaco Unit NS–1A and Unit MS–1B are 0.35 lb/MMBtu (30- day rolling average), 284 lb/hr (30-day rolling average), and 1,244 tpy. We agree with the State’s conclusions, and we are proposing to approve its NOX BART determinations for FMC Westvaco Unit NS–1A and Unit NS–1B. PM BART Determination Unit NS–1A and Unit NS–1B are currently controlled for PM emissions by electrostatic precipitators (ESPs). The units currently have a PM emission limit of 0.05 lb/MMBtu. The State determined that fabric filters on the wet scrubber, addition of an ESP downstream of the wet scrubber, and replacement of the ESPs with fabric filters were technically feasible control options. The State did not identify any energy or non-air quality environmental impacts that would preclude the selection of any of the controls evaluated, and there are no remaininguseful-life issues for this source. A summary of the State’s PM BART analysis is provided in Table 4 below. Baseline PM emissions are 197 tpy for each unit based on a heat input rate of 887 MMBtu/hr and 8,760 hours of operation per year. TABLE 4—SUMMARY OF FMC WESTVACO UNIT NS–1A AND UNIT NS–1B PM BART ANALYSIS * Control efficiency (%) Control technology Fabric Filter on Wet Scrubber ....................... ESP after Wet Scrubber ................................ Replace ESP with Fabric Filter ...................... Emission rate (lb/MMBtu) (30-day rolling average) 21.4 63.3 71.3 Emission reduction (tpy) 0.04 0.019 0.015 Annualized costs 41.7 123.3 138.8 $1,791,364 3,507,617 4,116,036 Average cost effectiveness ($/ton) $42,948 28,448 29,654 mstockstill on DSK4VPTVN1PROD with PROPOSALS2 * This table reflects the costs and visibility improvements per boiler. Given the high cost of controls, which are higher than what EPA, or other states have considered reasonable for PM, FMC did not evaluate the visibility improvement that would result from the PM controls evaluated. Previous visibility modeling analyses from the source indicate that the contribution in visibility degradation from PM is minor when compared to the contributing effects of NOX and SO2. Results from FMC’s visibility modeling screening and analysis confirm this conclusion and are discussed in further detail within the comprehensive visibility analysis included as part of FMC’s BART application (see Attachment A to the SIP). The State agreed with FMC’s conclusions and did not require FMC to perform additional visibility analyses for the PM control options. The State determined that the current ESP control was reasonable for PM BART. The State rejected other controls as being reasonable for BART because of the high cost effectiveness. The State has determined that the PM BART emission limits for FMC Westvaco Unit NS–1A and NS–1B are 0.05 lb/MMBtu, 45.0 lb/hr, and 197 tpy. We agree with the State’s conclusions, and we are proposing to approve its PM BART determinations for FMC Westvaco Unit NS–1A and Unit NS–1B. ii. General Chemical Green River— Boilers C and D 17 Incremental cost effectiveness for each option is the difference in total annual costs between that option and the next most stringent option, divided by the difference in emissions, after controls have been applied, between those two control options. VerDate Mar<15>2010 17:21 Jun 01, 2012 Jkt 226001 PO 00000 Frm 00012 Fmt 4701 Sfmt 4702 General Chemical Green River is a trona mine and sodium products plant. General Chemical’s two existing coalfired boilers, C and D, are co-located at the facility power plant. Both boilers burn low sulfur bituminous coal, and they supply power and process steam to mining and ore processing operations. Both boilers are tangentially fired using in-line coal pulverizers. The firing rate for Boiler C is 534 MMBtu/hr and 880 MMBtu/hr for Boiler D. The State’s BART determination can be found in Chapter 6.5.3 and Attachment A of the SIP. E:\FR\FM\04JNP2.SGM 04JNP2 33033 Federal Register / Vol. 77, No. 107 / Monday, June 4, 2012 / Proposed Rules NOX BART Determination Boiler C and Boiler D are currently controlled with LNBs plus OFA with a permit limit of 0.7 lb/MMBtu (3-hour rolling average). On August 7, 2009, the State issued a BART permit to General Chemical that required the source to meet a NOX emission limit of 0.32 lb/ MMBtu (30-day rolling average) for Boiler C and Boiler D. The State assumed the source could meet this emission limit with the installation and operation of new LNBs with the existing OFA. Upon further investigation, the source determined it could not meet a limit of 0.32 lbs/MMBtu with new LNBs and the existing OFA. In response to the additional information from the source, the State reexamined its BART determination for Boiler C and D. The State determined that installing SOFA in addition to the existing LNBs and OFA could achieve an emission limit of 0.28 lb/MMBtu. Since SOFA in conjunction with the existing NOX controls could achieve better emission reductions than new LNBs plus OFA, the State eliminated the latter from further consideration in the BART analysis. The State determined SNCR and SCR were also technically feasible. The State did not identify any technically infeasible options. The State did not identify any energy or non-air quality environmental impacts that would preclude the selection of any of the controls evaluated, and there are no remaininguseful-life issues for this source. A summary of the State’s NOX BART analysis and visibility impacts is provided in Tables 5 and 6 below. Baseline NOX emissions are 1,167 tpy for Boiler C and 1,816 tpy for Boiler D based on an average of 2001–2003 actual emissions. TABLE 5—SUMMARY OF GENERAL CHEMICAL—GREEN RIVER BOILER C NOX BART ANALYSIS Control technology Emission rate (lb/MMBtu) (30-day rolling average) Control efficiency (%) Existing LNBs with SOFA SNCR ............................... SCR .................................. 44 50 80 Incremental cost effectiveness for the control technologies evaluated is as Emission reduction (tpy) 0.28 0.35 0.14 Average cost effectiveness ($/ton) Annualized costs 512 584 934 $757,711 1,433,720 2,434,809 Visibility improvement (Delta dv for the maximum 98th percentile impact at Bridger Wilderness Area) $1,480 2,455 2,607 0.05 0.08 0.14 follows: SNCR: $4,782/ton, and SCR: $3,156/ton. TABLE 6—SUMMARY OF GENERAL CHEMICAL—GREEN RIVER BOILER D NOX BART ANALYSIS Control technology Control efficiency (%) Existing LNBs with SOFA SNCR ............................... SCR .................................. mstockstill on DSK4VPTVN1PROD with PROPOSALS2 Emission rate (lb/MMBtu) (30-day rolling average) 41 50 80 Incremental cost effectiveness for the control technologies evaluated is as follows: SNCR: $2,913/ton, and SCR: $4,342/ton. Based on its consideration of the five factors, the State determined that NOX BART is the existing LNBs with new SOFA, or a comparable performing technology. The State determined that SNCR and SCR were not reasonable based on the high cost effectiveness and low visibility improvement. The State determined the NOX BART emission limits for General Chemical Green River Boiler C are 0.28 lb/MMBtu (30-day rolling average), 149.5 lb/hr (30-day rolling average) and 654.9 tpy, and that the NOX BART emission limits for Boiler D are 0.28 lb/MMBtu (30-day rolling average), 246.4 lb/hr (30-day rolling average) and 1,079.2 tpy. VerDate Mar<15>2010 18:17 Jun 01, 2012 Jkt 226001 Emission reduction (tpy) 0.28 0.35 0.14 737 908 1,453 $943,549 1,486,581 3,399,266 We agree with the State’s conclusions, and we are proposing to approve its NOX BART determinations for General Chemical Green River—Boiler C and D. PM BART Determination Boiler C and D are currently controlled by ESPs with a permit limit of 50 lb/hr and 80 lb/hr, respectively. General Chemical addressed PM emissions through an abbreviated analysis by using PM BART information from FMC Westvaco, as discussed above. The facilities are similar in size and located about ten miles apart. Baseline PM emissions for Boiler C are 98 tpy and 161 tpy for Boiler D based on the average of 2001–2003 actual emissions. As discussed above, visibility modeling screening and analyses for FMC Westvaco indicate that PO 00000 Frm 00013 Fmt 4701 Sfmt 4702 Average cost effectiveness ($/ton) Annualized costs $1,280 3,176 3,510 Visibility improvement (Delta dv for the maximum 98th percentile impact at Bridger Wilderness Area) 0.07 0.12 0.17 the contribution in visibility degradation from PM for a source comparable to Boiler C and Boiler D is minor. Additionally, costs for controlling PM from similar boilers are high as indicated by FMC analysis for Westvaco. The State accepted General Chemical’s abbreviated PM BART analysis. The State determined that the current ESP control was reasonable for PM BART. The State rejected other controls as being reasonable for BART because of the high cost effectiveness. The State determined that the PM BART emission limits for Boiler C are 0.09 lb/ MMBtu, 50 lb/hr, and 219 tpy, and that the PM BART emissions limits for Boiler D are 0.09 lb/MMBtu, 80 lb/hr, and 350.4 tpy. E:\FR\FM\04JNP2.SGM 04JNP2 33034 Federal Register / Vol. 77, No. 107 / Monday, June 4, 2012 / Proposed Rules We agree with the State’s conclusions, and we are proposing to approve its PM BART determination for General Chemical Green River Boiler C and D. found in Chapter 6.5.8 and Attachment A of the SIP (The NOx BART analysis is discussed in section VII.A of this notice). iii. Basin Electric Laramie River Station—Units 1–3 PM BART Determination Basin Electric Laramie River Station is located in Platte County, Wyoming. Laramie River Station is comprised of three 550-MW dry-bottom, wall-fired boilers (Units 1, 2, and 3) burning subbituminous coal for a total net generating capacity of 1,650 MW. All three units are subject-to-BART. The State’s BART determination can be Laramie River Units 1, 2, and 3 are currently controlled with ESPs with a permit limit of 0.03 lb/MMBtu. The State determined that fabric filters were technically feasible for Unit 3 but not Units 1 and 2. Units 1 and 2 are controlled with wet flue gas desulfurization and fabric filters cannot be used downstream of such a system. The State determined that flue gas treatment and GE Max-9 hybrid were technically infeasible for all three units. Thus, the only technically feasible control option for PM is fabric filters on Unit 3. The State did not identify any energy or non-air quality environmental impacts that would preclude the selection of any of the controls evaluated, and there are no remaininguseful-life issues for this source. A summary of the State’s PM BART analysis for Unit 3 is provided in Table 7 below. Baseline PM emissions are 716 tpy for the unit based on 2001–2003 actual emissions. TABLE 7—SUMMARY OF BASIN ELECTRIC LARAMIE RIVER UNIT 3 PM BART ANALYSIS Control efficiency (%) Control technology Fabric Filter—Peak Rate for Lost Generating Costs ............................................................ Fabric Filter Non-Peak Rate for Lost Generating Costs ................................................... The State did not provide visibility improvement modeling for fabric filters, but EPA is proposing to conclude this is reasonable based on the high cost effectiveness of fabric filters at each of the units, which is higher than EPA or other state have considered reasonable for PM BART. Based on its consideration of the five factors, the State determined that the current ESPs are reasonable for PM BART, as fabric filters on Unit 3 are not cost-effective and there are no other technically feasible controls for Units 1 and 2. The State determined the PM BART emission limits for Laramie River Unit 1 and Unit 2 are 0.03 lb/MMBtu, 193 lb/hr, and 844 tpy, and the PM BART emission limits for Laramie River Unit 3 are 0.03 lb/MMBtu, 198 lb/hr, and 867 tpy. We agree with the State’s conclusions, and we are proposing to approve its PM BART determination for Basin Electric Laramie River Units 1, 2, and 3. Emission rate (lb/MMBtu) (30-day rolling average) Emission reduction (tpy) Annualized costs Average cost effectiveness ($/ton) 50 0.015 358 $194,809,000 $54,707 50 0.015 358 134,934,000 40,156 NOX BART Determination for Unit 4 iv. PacifiCorp Dave Johnston—Units 3 and 4 Background PacifiCorp Dave Johnston power plant is located in Converse County, Wyoming. Dave Johnston Power Plant is comprised of four units burning pulverized subbituminous Powder River Basin coal. Units 3 and 4 are the only units subject-to-BART. Dave Johnston Unit 3 is a nominal 230-MW pulverized coal-fired boiler that commenced service in 1964. It is equipped with burners in a cell configuration. Dave Johnston Unit 4 is a nominal 330-MW pulverized coal-fired boiler that commenced service in 1972. It is a tangential-fired boiler. The State’s BART analysis can be found in Chapter 6.5.5 and Appendix A of the SIP (The NOX BART determination for Dave Johnston Unit 3 is discussed in section VII.A of this notice). Unit 4 is currently controlled with LNBs that were placed in operation in 1976. The State determined LNBs with advanced OFA, LNBs with advanced OFA and SNCR, and LNBs with advanced OFA and SCR were technically feasible for controlling NOX emissions for Unit 4. The State did not identify any technically infeasible controls. The State did not identify any energy or non-air quality environmental impacts that would preclude the selection of any of the controls evaluated, and there are no remaininguseful-life issues for this source. Baseline NOX emissions are 8,566 tpy for Unit 4 based on unit heat input rate of 2,500 MMBtu/hr and 7,884 hours of operation. A summary of the State’s NOX BART analysis and the visibility impacts is provided in Table 8 below. mstockstill on DSK4VPTVN1PROD with PROPOSALS2 TABLE 8—SUMMARY OF DAVE JOHNSTON UNIT 4 NOX BART ANALYSIS Control technology Control efficiency (%) LNB with advanced OFA New LNB with advanced OFA and SNCR ............ LNB with advanced OFA and SCR ....................... VerDate Mar<15>2010 17:21 Jun 01, 2012 Emission rate (lb/MMBtu) (30-day rolling average) Emission reduction (tpy) Annualized costs Average cost effectiveness ($/ton) Visibility improvement (delta deciview for the maximum 98th percentile impact at Wind Cave National Park) 71.7 6,142 $841,527 $137 0.71 77.4 0.12 6,626 $2,141,786 $323 0.80 86.8 Jkt 226001 0.15 0.07 7,435 $16,430,528 $2,210 0.97 PO 00000 Frm 00014 Fmt 4701 Sfmt 4702 E:\FR\FM\04JNP2.SGM 04JNP2 33035 Federal Register / Vol. 77, No. 107 / Monday, June 4, 2012 / Proposed Rules Incremental costs for the controls evaluated are as follows: New LNB with advanced OFA and SNCR: $2,686/ton; and LNB with advanced OFA and SCR: $17,662/ton. Based on its consideration of the five factors, the State determined LNBs with advanced OFA was reasonable for NOX BART for Dave Johnston Unit 4. The State determined the NOX BART emission limits for Unit 4 are 0.15 lb/ MMBtu (30-day rolling average), 615 lb/ hr (30-day rolling average), and 2,694 tpy. We find it is reasonable for the State to eliminate higher performing control options (i.e., LNBs with advanced OFA plus SNCR and LNBs with advanced OFA plus SCR). The incremental cost effectiveness of achieving 0.07 lb/ MMBTU with SCR over achieving 0.15 lb/MMBTU with LNBs is $17,662, with a 0.26 delta deciview visibility improvement. The incremental cost effectiveness of SNCR over LNBs is $2,686 with an incremental visibility improvement of 0.09. Based on our examination of the State’s costs estimates, emission reductions, and the predicted visibility improvement, we agree with the State’s conclusions, and we are proposing to approve its NOX BART determination for PacifiCorp Dave Johnston Unit 4. PM BART Determination Units 3 and 4 are currently controlled with fabric filters installed in 2008 with an emission limit of 0.015 lb/MMBtu. The State determined that fabric filters represent the most stringent PM control technology and that 0.015 lb/MMBtu represents the most stringent emission limit. Consistent with the BART Guidelines, the State did not provide a five-factor analysis because the State determined BART to be the most stringent control technology and limit (70 FR 39165). The State determined that the PM BART emission limits for Unit 3 are 0.015 lb/MMBtu, 42.1 lb/hr, and 184 tpy and the PM BART emission limits for Unit 4 are 0.015 lb/MMBtu (30-day rolling average), 61.5 lb/hr, and 269 tpy. We agree with the State’s conclusions, and we are proposing to approve its PM BART determination for Dave Johnston Units 3 and 4. v. PacifiCorp Jim Bridger—Units 1–4 Background PacifiCorp’s Jim Bridger Power Plant is located in Sweetwater County, Wyoming. Jim Bridger is comprised of four identically sized nominal 530 MW tangentially fired boilers burning pulverized coal for a total net generating capacity of 2,120 MW. Jim Bridger Unit 1 was placed in service in 1974, Unit 2 in 1975, Unit 3 in 1976, and Unit 4 in 1979. The State’s BART determination can be found in Chapter 6.5.4 and Appendix A of the SIP (The NOX BART determination for Jim Bridger Units 1 and 2 is discussed in section VII.A of this notice). NOX BART Determination for Jim Bridger Units 3 and 4 PacifiCorp Jim Bridger Units 3 and 4 are equipped with early generation LNBs with a permit limit of 0.70 lb/ MMBtu (3-hour fixed). The State determined that LNBs with SOFA, LNBs with SOFA plus SNCR, and LNBs with SOFA plus SCR were technically feasible for controlling NOX emissions. The State did not identify any technically infeasible options. The State did not identify any energy or non-air quality environmental impacts that would preclude the selection of any of the controls evaluated, and there are no remaininguseful-life issues for this source. Baseline NOX emissions are 10,643 tons for both units based on unit heat input rate of 6,000 MMBtu/hr and 7,884 hours of operation. A summary of the State’s NOX BART analysis and the visibility impacts is provided in Table 9 below. TABLE 9—SUMMARY OF JIM BRIDGER UNITS 3 AND 4 NOX BART ANALYSIS—COSTS PER BOILER Control technology Control efficiency (%) mstockstill on DSK4VPTVN1PROD with PROPOSALS2 LNB with SOFA ................ New LNB with SOFA and SNCR ........................... LNB with SOFA and SCR Emission rate (lb/MMBtu) (30-day rolling average) Emission reduction (tpy) Annualized costs Average cost effectiveness ($/ton) 42.2 0.26 4,493 $1,144,969 $255 0.41/0.47 55.6 84.4 0.20 0.07 5,913 8,987 2,710.801 20,296,400 459 2,258 0.53/0.62 0.80/0.82 Incremental cost effectiveness for the control evaluated is as follows: New LNB with SOFA and SNCR: $1,103/ton, and LNB with SOFA and SCR: $5,721/ ton. The State determined the cost of compliance was high for SCR. The State determined that LNBs with SOFA were reasonable for NOX BART for Jim Bridger Units 3 and 4. The State determined the NOX BART emission limits for Jim Bridger Units 3 and 4 are 0.26 lb/MMBtu (30-day rolling average), 1,560 lb/hr (30-day average), and 6,833 tpy. The State is requiring PacifiCorp to install additional controls under its LTS. The State determined that based on the cost of compliance and visibility improvement presented by PacifiCorp in the BART applications for Jim Bridger Units 3 and 4 and taking into consideration the logistical challenge of managing multiple pollution control installations within the regulatory time allotted for installation of BART by the RHR, additional controls would be required under the LTS but not BART (see Chapter 8.3.3 of the SIP). With respect to Jim Bridger Units 3 and 4, the 18 Unit 4 has different modeling results as the stack parameters used in the modeling are different State has required PacifiCorp to install SCR, or other NOX control systems, to achieve an emission limit or otherwise reduce NOX emissions to achieve a 0.07 lb/MMBtu 30-day rolling average NOX emissions rate. PacifiCorp is required to meet the 0.07 lb/MMBtu emission rate on Unit 3 prior to December 31, 2015 and on Unit 4 prior to December 31, 2016. EPA does not agree with the State’s conclusion that a limit of 0.26 lb/ MMBtu is reasonable for BART for Jim Bridger Units 3 and 4, which can be achieved with the installation and enough from Units 1-3 to yield different modeled results. VerDate Mar<15>2010 17:21 Jun 01, 2012 Visibility improvement (delta deciview for the maximum 98th percentile impact at Mt. Zirkel Wilderness)-units 3/4 18 Jkt 226001 PO 00000 Frm 00015 Fmt 4701 Sfmt 4702 E:\FR\FM\04JNP2.SGM 04JNP2 33036 Federal Register / Vol. 77, No. 107 / Monday, June 4, 2012 / Proposed Rules operation on LNBs with SOFA. In particular, the cost effectiveness values for LNBs with SOFA plus SCR at each unit is $2,258 with approximately 0.80 delta deciview visibility improvement. The cost effectiveness values are reasonable and the visibility improvement significant for LNBs with SOFA plus SCR. In addition, the costs are within the range that Wyoming, other states, and we have considered reasonable in the BART context.19 LNBs with SOFA plus SCR would result in an additional reduction of 4,474 tpy of NOX emissions at each unit. This difference is substantial. We find that it was unreasonable for the State not to determine that LNBs with SOFA plus SCR was NOX BART for Jim Bridger Units 3 and 4. Based on our examination of the State’s costs estimates, emission reductions, and the predicted visibility improvement, we propose to find it reasonable that NOx BART for Jim Bridger Units 3 and 4 is LNBs with SOFA plus SCR at an emission limit of 0.07 lb/MMBtu. Though we do not agree with the State’s BART determination, the State is requiring PacifiCorp to install controls as part of the LTS that are equivalent to what EPA’s is proposing to determine is reasonable for BART. The State is requiring PacifiCorp to install the LTS controls within the timeline that BART controls would have to be installed pursuant to 40 CFR 51.308(e)(iv). Thus, we are proposing to approve the State’s compliance schedule and emission limit of 0.07 lb/ MMBtu for Jim Bridger Units 3 and 4 as meeting the BART requirements. PM BART Determination for Jim Bridger Units 1–4 Units 1, 2, 3, and 4 are currently controlled for PM with ESPs and flue gas conditioning (FGC). The current permit limit for all four units is 0.03 lb/ MMBtu. The State determined that fabric filters were technically feasible for controlling PM emissions. The State did not identify any technically infeasible controls. The State did not identify any energy or non-air quality environmental impacts that would preclude the selection of any of the controls evaluated, and there are no remaining-useful-life issues for this source. A summary of the State’s PM BART analyses for Units 1–4 is provided in Table 10 below. Baseline PM emissions are 1,064 tpy for Unit 1, 1,750 tpy for Unit 2, 1,348 tpy for Unit 3, and 710 tpy for Unit 4 based on unit heat input rate of 6,000 MMBtu/hr and 7,884 hours of operation per year. TABLE 10—SUMMARY OF PACIFICORP JIM BRIDGER UNITS 1–4 P.M. BART ANALYSIS Control efficiency (%) Control technology mstockstill on DSK4VPTVN1PROD with PROPOSALS2 Fabric Fabric Fabric Fabric Filter—Unit Filter—Unit Filter—Unit Filter—Unit 1 2 3 4 ......................................... ......................................... ......................................... ......................................... The State did not provide visibility improvement modeling for fabric filters, but EPA is proposing to conclude this is reasonable based on the high cost effectiveness of fabric filters at each of the units. In addition, we anticipate that the visibility improvement that would result from lowering the limit from 0.03 lb/MMBtu to 0.015 lb/MMBtu would be insignificant based on the State’s analysis.20 Based on its consideration of the fivefactors, the State determined the current ESPs with FGC were reasonable for BART. The State determined that fabric filters were not reasonable based on the high cost effectiveness. The State determined that the PM BART emission limits for Jim Bridger Units 1 through 4 are 0.03 lb/MMBtu, 180 lb/hr, and 788 tpy. We agree with the State’s conclusions, and we are proposing approve its PM BART determination for Jim Bridger Units 1–4. 19 Wyoming determined that LNBs with OFA and SCR was BART for Naughton Unit 3. The cost effectiveness of SCR for Naughton Unit 3 is $2,830 with 1 deciview of visibility improvement. VerDate Mar<15>2010 17:21 Jun 01, 2012 Jkt 226001 Emission rate (lb/MMBtu) (30-day rolling average) 66.6 79.7 73.7 50 Emission reduction (tpy) 0.015 0.015 0.015 0.015 vi. PacifiCorp Naughton Units 1–3 PacifiCorp Naughton is located in Lincoln County, Wyoming. Naughton is comprised of three pulverized coal-fired units with a total net generating capacity of 700 MW. Naughton Unit 1 generates a nominal 160 MW and commenced operation in 1963. Naughton Unit 2 generates a nominal 210 MW and commenced operation in 1968. Naughton Unit 3 generates a nominal 330 MW and commenced operation in 1971. All three boilers are tangentially fired boilers. The State’s BART determination can be found in Chapter 6.5.6 and Appendix A of the SIP. NOX BART Determination Naughton Unit 1 and Unit 2 are currently controlled for NOX emissions with good combustion practices with NOX emission limits of 0.75 lb/MMBtu (3-hour block) and 0.58 lb/MMBtu (annual). Naughton Unit 3 is currently controlled with LNBs with OFA with 20 The cumulative 3-year averaged visibility improvement from new LNB with separated OFA, upgraded wet FGD, and FGC for enhanced ESP with FGC (Post-Control Scenario 1) across the three Class I areas achieved with LNB and separated OFA, PO 00000 Frm 00016 Fmt 4701 Sfmt 4702 Annualized costs 709 1,395 993 355 $6,367,118 6,357,658 6,337,434 6,367,118 Average cost effectiveness ($/ton) $8,980 4,557 6,382 17,936 permit limits of 0.75 lb/MMBtu (93-hour block) and 0.58 lb/MMBtu (annual). The State determined that LNBs with OFA, LNBs with OFA and SNCR, and LNBs with OFA and SCR were all technically feasible for controlling NOX emissions from Unit 1 and Unit 2. The State determined that tuning the existing LNBs, existing LNBs with OFA and SNCR, and existing LNBs with OFA and SCR were all technically feasible for controlling NOX emissions from Unit 3. The State did not identify any technically infeasible options. The State did not identify any energy or non-air quality environmental impacts that would preclude the selection of any of the controls evaluated, and there no remaininguseful-life issues for this source. A summary of the State’s NOX BART analyses for Units 1–3 is provided in Tables 11, 12, and 13 below. Baseline NOx emissions are 4,230 tpy for Unit 1, 5,109 tpy for Unit 2, and 6,563 tpy for Unit 3 based on the unit heat input rate upgraded wet FGD, and adding a polishing fabric filter (Post-Control Scenario 2) was 0.095 delta dv from Unit 1, 0.090 delta dv from Unit 2, 0.089 delta dv from Unit 3 and 0.025 delta dv from Unit 4. E:\FR\FM\04JNP2.SGM 04JNP2 Federal Register / Vol. 77, No. 107 / Monday, June 4, 2012 / Proposed Rules 33037 of 3,700 MMBtu/hr and 7,884 hours of operation per year. TABLE 11—SUMMARY OF NAUGHTON UNIT 1 NOX BART ANALYSIS Control technology Control efficiency (%) LNBs with OFA ................ LNBs with OFA and SNCR ........................... LNBs with OFA and SCR Emission rate (lb/MMBtu) (30-day rolling average) Emission reduction (tpy) Annualized costs Average cost effectiveness ($/ton) Visibility improvement (Delta deciview) (Delta deciview for the maximum 98th percentile Impact at Bridger Wilderness Area) 55.2 0.26 2,334 $993,248 $426 0.79 63.8 87.9 0.21 0.07 2,699 3,720 1,972,363 10,231,210 731 2,750 0.80 1.07 Incremental cost effectiveness for the controls evaluated are as follows: LNBs with OFA and SNCR: $2,683/ton, and LNBs with OFA and SCR: $8,089/ton. TABLE 12—SUMMARY OF NAUGHTON UNIT 2 NOX BART ANALYSIS Control technology Control efficiency (%) LNBs with OFA ................ LNBs with OFA and SNCR ........................... LNBs with OFA and SCR Emission rate (lb/MMBtu) (30-day rolling average) Emission reduction (tpy) Annualized costs Cost effectiveness ($/ton) Visibility improvement (Delta deciview) (Delta deciview for the maximum 98th percentile Impact at Bridger Wilderness Area) 51.9 0.26 2,649 $945,683 $357 0.70 61.1 87 0.21 0.07 3,122 4,447 2,260,957 12,664,919 724 2,848 0.74 1.10 Incremental cost effectiveness for the controls evaluated are as follows: LNBs with OFA and SNCR: $2,781/ton, and LNBs with OFA and SCR: $7,852/ton. TABLE 13—SUMMARY OF NAUGHTON UNIT 3 NOX BART ANALYSIS Control technology Control efficiency (%) mstockstill on DSK4VPTVN1PROD with PROPOSALS2 Tuning Existing LNBs ...... Existing LNBs with OFA and SNCR .................... Existing LNB with OFA and SCR ....................... 18:17 Jun 01, 2012 Emission reduction (tpy) Annualized costs Average cost effectiveness ($/ton) Visibility improvement (Delta dv for the maximum 98th percentile impact at Bridger Wilderness Area) 17.8 0.37 1,167 $95,130 $82 0.25 33.3 0.30 2,188 1,916,039 876 0.46 84.4 0.07 5,542 15,682,702 2,830 1.00 Incremental cost effectiveness for the controls evaluated are as follows: LNBs with OFA and SNCR: $1,783; and LNBs with OFA and SCR: $4,105. Based on its consideration of the five factors, the State determined LNBs with OFA was reasonable for NOX BART for Unit 1 and Unit 2. The State determined SNCR and SCR were not reasonable based on the high cost effectiveness and associated visibility improvement. The State determined the NOX BART emission limits for Naughton Unit 1 are 0.26 lb/MMBtu (30-day rolling average), VerDate Mar<15>2010 Emission rate (lb/MMBtu) (30-day rolling average) Jkt 226001 481 lb/hr (30-day rolling average), and 2,107 tpy, and the NOX BART emission limits for Naughton Unit 2 are 0.26 lb/ MMBtu (30-day rolling average), 624 lb/ hr (30-day rolling average), and 2,733 tpy. Based on its consideration of the five factors, the State determined that the existing LNBs with OFA plus SCR was NOX BART for Unit 3. The State determined the NOX BART emission limits for Naughton Unit 3 are 0.07 lb/ MMBtu (30-day rolling average), 259 lb/ hr (30-day rolling average), and 1,134 tpy. PO 00000 Frm 00017 Fmt 4701 Sfmt 4702 We find it is reasonable for the State to eliminate higher performing control options for Units 1 and 2 (i.e., LNBs with advanced OFA plus SNCR and LNBs with advanced OFA plus SCR. The incremental cost effectiveness of LNBs with OFA plus SCR over LNBs with OFA is approximately $8,000 for each unit. The incremental cost effectiveness of LNBs with OFA plus SNCR over LNBs with OFA is approximately $2,700 for each unit, with incremental visibility improvement of 0.01 delta deciviews at E:\FR\FM\04JNP2.SGM 04JNP2 33038 Federal Register / Vol. 77, No. 107 / Monday, June 4, 2012 / Proposed Rules Unit 1 and 0.04 delta deciviews at Unit 2. Based on our examination of the State’s costs estimates, emission reductions, and the predicted visibility improvement, we agree with the State’s conclusions, and we are proposing to approve the State’s NOX BART determinations for PacifiCorp Naughton Units 1, 2, and 3. PM BART Determination Units 1 and 2 are currently controlled for PM with ESPs and FGC. The current permit limit for Units 1 and 2 is 0.04 lb/ MMBtu. Unit 3 is required by permit to install fabric filters for both Units by 2014 with a permit limit of 0.15 lb/ MMBtu. The State determined that fabric filters were technically feasible for controlling PM emissions for Units 1 and 2. The State did not identify any technically infeasible controls. The State determined that a fabric filter on Unit 3 represents the most stringent PM control technology and that 0.015 lb/ MMBtu represents the most stringent emission limit. Consistent with the BART Guidelines, the State did not provide a full five-factor analysis because the State determined BART to be the most stringent control technology and limit. The State did not identify any energy or non-air quality environmental impacts that would preclude the selection of any of the controls evaluated, and there are no remaininguseful-life issues for this source. A summary of the State’s PM BART analyses for Units 1 and 2 is provided in Table 14 below. Baseline emissions for Unit 1 are 409 tpy and 605 tpy for Unit 2 based on unit heat input rate of 1,850 MMBtu/hr and 7,884 hours of operation per year. TABLE 14—SUMMARY OF PACIFICORP NAUGHTON UNIT 1 AND UNIT 2 PM BART ANALYSIS Control Efficiency (%) Control technology Fabric Filter—Unit 1 ......................................... Fabric Filter—Unit 2 ......................................... The State did not provide visibility improvement modeling for fabric filters, but EPA is proposing to conclude this is reasonable based on the high cost effectiveness of fabric filters at each of the units, which is higher than EPA or other State have considered reasonable for PM BART. Based on its consideration of the five factors, the State determined that the existing ESPs with FGC were reasonable for PM BART for Units 1 and 2. The State determined that fabric filters were not reasonable based on the high cost effectiveness. The State determined that the PM BART emission limits for Naughton Unit 1 are 0.04 lb/MMBtu, 74 lb/hr, and 324 tpy and the PM BART emission limits for Naughton Unit 2 are 0.04 lb/MMBtu, 96 lb/hr, and 421 tpy. The State determined the PM BART emission limits for Naughton Unit 3 are 0.015 lb/MMBtu, 56 lb/hr, and 243 tpy. We agree with the State’s conclusions, and we are proposing to approve its BART determination for Naughton Units 1, 2, and 3. vii. PacifiCorp Wyodak—Unit 1 mstockstill on DSK4VPTVN1PROD with PROPOSALS2 Background PacifiCorp Wyodak Power Plant is located in Campbell County, Wyoming. Wyodak Power Plant is comprised of one coal-fired boiler, Unit 1, burning pulverized sub-bituminous Powder River Basin coal for a total net generating capacity of a nominal 335MW. Wyodak’s boiler commenced service in 1978. The State’s BART determination can be found in Chapter 6.5.7 and Appendix A of the SIP (The VerDate Mar<15>2010 17:21 Jun 01, 2012 Jkt 226001 Emission Rate (lb/MMBtu) (30-day rolling Average) 73.2 76.6 Emission Reduction (tpy) 0.015 0.015 Annualized Costs 299 464 $3,436,594 4,101,705 Average Cost Effectiveness ($/ton) $11,494 8,848 NOX BART analysis for Wyodak Unit 1 is discussed in Section VII.A of this notice). 2018 in all its Class I areas using the WRAP Community Multi-Scale Air Quality (CMAQ) modeling results. PM BART Determination Wyodak Unit 1 is currently controlled with fabric filters with an emission limit of 0.015 lb/MMBtu (30-day rolling average). The State determined that fabric filters on Wyodak Unit 1 represent the most stringent PM control technology and that 0.015 lb/MMBtu represents the most stringent emission limit. Consistent with the BART Guidelines, the State did not provide a full five-factor analysis because the State determined BART to be the most stringent control technology and limit. The State determined the PM BART emission limits for Wyodak Unit 1 are 0.015 lb/MMBtu, 71.0 lb/hr, and 308.8 tpy. We agree with the State’s conclusions, and we are proposing to approve its PM BART determination for Wyodak Unit 1. 1. Visibility Impairing Pollutants and Sources In order to determine the significant sources contributing to haze in Wyoming’s Class I areas, Wyoming relied upon two source apportionment analysis techniques developed by the WRAP. The first technique was regional modeling using the Comprehensive Air Quality Model (CAMx) and the PM Source Apportionment Technology (PSAT) tool, used for the attribution for sulfate and nitrate sources only. The second technique was the Weighted Emissions Potential (WEP) tool, used for attribution of sources of OC, EC, PM2.5, and PM10. The WEP tool is based on emissions and residence time, not modeling and looks at all sources throughout the modeling domain. PSAT uses the CAMx air quality model to simulate nitrate-sulfateammonia chemistry and apply this chemistry to a system of tracers or ‘‘tags’’ to track the chemical transformations, transport, and removal of NOX and SO2. These two pollutants are important because they tend to originate from anthropogenic sources. Therefore, the results from this analysis can be useful in determining contributing sources that may be controllable, both in-state and in neighboring states. WEP is a screening tool that helps to identify source regions that have the potential to contribute to haze formation at specific Class I areas. Unlike PSAT, D. Reasonable Progress Requirements In order to establish RPGs for its Class I areas, and to determine the controls needed for the LTS, Wyoming followed the process established in the RHR. Wyoming identified sources (other than BART sources) and source categories in Wyoming that are major contributors to visibility impairment and considered whether these sources should be controlled based on a consideration of the factors identified in the CAA and EPA’s regulations (see CAA 169A(g)(1) and 40 CFR 51.308(d)(1)(i)(A)). Wyoming then identified the anticipated visibility improvement in PO 00000 Frm 00018 Fmt 4701 Sfmt 4702 E:\FR\FM\04JNP2.SGM 04JNP2 33039 Federal Register / Vol. 77, No. 107 / Monday, June 4, 2012 / Proposed Rules this method does not account for chemistry or deposition. The WEP combines emissions inventories, wind patterns, and residence times of air masses over each area where emissions occur, to estimate the percent contribution of different pollutants. Like PSAT, the WEP tool compares baseline values (2000–2004) to 2018 values, to show the improvement expected by 2018 for OC, EC, PM2.5, and PM10. More information on the WRAP modeling methodologies is available in the document Technical Support Document for Technical Products Prepared by the Western Regional Air Partnership (WRAP) in Support of Western Regional Haze Plans in the Supporting and Related Materials section of the docket. Table 15 shows Wyoming’s contribution to extinction at its own Class I areas. TABLE 15—WYOMING SOURCES EXTINCTION CONTRIBUTION 2000–2004 FOR 20% WORST DAYS 21 Class I Area Pollutant Species Yellowstone National Park, Grand Teton National Park, Teton Wilderness. Sulfate .................... North Absaroka Wilderness, Washakie Wilderness ................ Bridger Wilderness, Fitzpatrick Wilderness ............................. Table 16 shows influences from sources both inside and outside of Wyoming per the PSAT modeling for 2018. As indicated, the outside domain (OD) region is the highest contributor to sulfate and nitrate at all Wyoming Class I areas. The outside domain region Nitrate .................... OC ......................... EC .......................... Fine PM ................. Coarse PM ............. Sea Salt ................. Sulfate .................... Nitrate .................... OC ......................... EC .......................... Fine PM ................. Coarse PM ............. Sea Salt ................. Sulfate .................... Nitrate .................... OC ......................... EC .......................... Fine PM ................. Coarse PM ............. Sea Salt ................. Species Contribution to Total Particulate Extinction (%) Wyoming Sources Contribution to Species Extinction (%) 16.7 Extinction (Mm¥1) 5.9 4.3 1.8 13.5 2.5 1.0 2.6 0.02 4.9 1.6 11.6 1.9 0.8 2.9 .............................. 5.0 1.4 10.5 2.0 1.1 2.5 0.04 represents the concentration of pollutants at the boundaries of the modeling domain. Depending on meteorology and the type of pollutant (particularly sulfate), these emissions can be transported great distances from regions such as Canada, Mexico, and the 7.0 52.4 9.7 3.9 10.1 0.08 20.7 6.8 48.9 8.0 3.4 12.2 0.04 22.2 6.2 46.6 8.9 4.9 11.1 0.2 4.7 72.6 66.8 24.0 20.0 ............................ 5.6 8.2 44.6 39.5 14.0 12.1 ............................ 15.4 19.4 58.5 51.0 30.3 27.4 ............................ Pacific Ocean. Wyoming is the second highest contributor of particulate sulfate and nitrate at Bridger and Fitzpatrick Wilderness areas, but is a lesser contributor at the other Class I areas. TABLE 16—PSAT SOURCE REGION APPORTIONMENT FOR 20% WORST DAYS 22 Class I Area 2018 Sulfate PSAT Yellowstone National Park, Grand Teton National Park, Teton Wilderness. North Absaroka Wilderness, Washakie Wilderness ... mstockstill on DSK4VPTVN1PROD with PROPOSALS2 Bridger Wilderness, Fitzpatrick Wilderness ................ Region ............. % Contribution Region ............. % Contribution Region ............. % Contribution OD 46.5 OD 50.1 OD 31.1 ID 8.1 CAN 12.5 WY 15.3 WY 5.8 MT 6.5 ID 7.6 CAN 5.4 ID 5.7 UT 5.9 2018 Nitrate PSAT OR 4.6 WY 5.5 CAN 5.1 OD 31.3 OD 30.7 OD 21.8 ID 28.2 ID 16.7 WY 19.3 WA 9.4 MT 14.8 UT 15.6 UT 7.4 CAN 11.5 ID 10.6 OR 7.0 WY 8.2 CA 6.8 Tables 17 shows the WEP contribution for EC, OC, PM2.5, and PM10. 21 Extinction and species contribution to total particulate extinction taken from IMPROVE data (https://vista.cira.colostate.edu/dev/web/Annual SummaryDev/Composition.aspx). IMPROVE data for NOABI based on available data for 2002–2004. VerDate Mar<15>2010 17:21 Jun 01, 2012 Jkt 226001 Contribution of sulfate and nitrate based on PSAT; OC, EC, PM2.5, and PM10 contribution based on WEP as taken from the WRAP TSS (https://vista.cira. colostate.edu/tss/). PO 00000 Frm 00019 Fmt 4701 Sfmt 4702 22 OD denotes Outside Domain; ID denotes Idaho, MT denotes Montana, CAN denotes Canada, UT denotes Utah, WA denotes Washington, WY denotes Wyoming, CA denotes California, and OR denotes Oregon. E:\FR\FM\04JNP2.SGM 04JNP2 33040 Federal Register / Vol. 77, No. 107 / Monday, June 4, 2012 / Proposed Rules TABLE 17—WEP SOURCE CATEGORY CONTRIBUTION FOR 20% WORST DAYS Class I Area Point Area Anthropogenic Fires Mobile Natural Fires and Biogenic OC Yellowstone National Park, Grand Teton National Park, Teton Wilderness ............................................ North Absaroka Wilderness, Washakie Wilderness .... Bridger Wilderness, Fitzpatrick Wilderness ................. 0.408 0.661 0.984 3.892 9.449 7.552 1.636 2.844 3.28 8.303 11.881 7.644 85.764 75.159 80.543 2.628 5.755 4.509 13.659 23.253 25.65 5.51 7.054 4.105 77.958 63.55 65.195 70.463 86.311 69.195 0.086 0.171 0.081 5.469 3.334 3.618 18.411 6.691 10.785 83.939 93.197 84.157 0.363 0.213 0.477 0.717 0.313 0.353 12.316 4.206 8.23 EC Yellowstone National Park, Grand Teton National Park, Teton Wilderness ............................................ North Absaroka Wilderness, Washakie Wilderness .... Bridger Wilderness, Fitzpatrick Wilderness ................. 0.243 0.386 0.54 PM2.5 Yellowstone National Park, Grand Teton National Park, Teton Wilderness ............................................ North Absaroka Wilderness, Washakie Wilderness .... Bridger Wilderness, Fitzpatrick Wilderness ................. 5.565 3.491 16.311 PM10 mstockstill on DSK4VPTVN1PROD with PROPOSALS2 Yellowstone National Park, Grand Teton National Park, Teton Wilderness ............................................ North Absaroka Wilderness, Washakie Wilderness .... Bridger Wilderness, Fitzpatrick Wilderness ................. Table 17 shows that EC, OC, PM2.5 and PM10 emissions come mainly from sources such as natural fire, windblown dust, and road dust. To select the sources that would undergo the required four factor analysis, Wyoming looked at State emission inventory data in conjunction with the source apportionment information discussed above (a summary of the State’s emission inventory can be found in section VI.E.1 of this notice). After evaluating this information, the State determined that stationary source emissions of NOX and SO2 were reasonable to evaluate for purposes of reasonable progress controls. The State also determined that emissions of NOX from oil and gas development should be analyzed for purposes of reasonable progress. Since emissions of OC, EC, PM2.5, and PM10 come from mainly uncontrollable sources, the State determined it was reasonable to not evaluate these pollutants for reasonable progress controls. The State submitted a January 12, 2011, SIP that addresses sources of SO2.23 Thus, the State evaluated emissions of the remaining pollutant, NOX, for reasonable progress in this SIP. 23 The State submitted a January 12, 2011 SIP submittal to address the requirements under 40 CFR 51.309, with the exception of the 40 CFR 51.309(g) requirements addressed in this SIP submittal. VerDate Mar<15>2010 17:21 Jun 01, 2012 Jkt 226001 2.655 2.066 6.775 2. Four Factor Analysis In determining the measures necessary to make reasonable progress, States must take into account the following four factors and demonstrate how they were taken into consideration in selecting reasonable progress goals for a Class I area: • Costs of Compliance; • Time Necessary for Compliance; • Energy and Non-air Quality Environmental Impacts of Compliance; and • Remaining Useful Life of any Potentially Affected Sources. CAA § 169A(g)(1) and 40 CFR 308(d)(1)(i)(A). The State performed a four factor analysis for each of the reasonable progress sources pursuant to 40 CFR 51.308(d)(1)(i)(A). a. Stationary Sources The State used a reasonable progress screening methodology termed ‘‘Q/d’’ to determine which stationary sources would be candidates for controls under reasonable progress. Q/d is a calculated ratio where Q represents (in this case) the NOX emission rate in tpy of the source divided by the distance in kilometers of the point source from the nearest Class I area, denoted by ‘‘d.’’ The State used the maximum permitted emission rate for each source to determine the tpy of NOX it used in the Q/d calculation. The State determined that a Q/d value of 10 is reasonable for PO 00000 Frm 00020 Fmt 4701 Sfmt 4702 determining which sources the State should consider for reasonable progress controls, since this value yielded sources of concern similar in magnitude to sources subject-to-BART. The State determined there were three units with a Q/d of greater than 10 that are not already being controlled under BART and the State completed a reasonable progress analysis for each of the sources. The sources are PacifiCorp Dave Johnson Unit 1 and Unit 2 and Mountain Cement Company Laramie Plant kiln. Dave Johnston Units 1 and 2 is addressed as part of our FIP in section VII.B of this notice. In addition, as previously mentioned, the State considered reasonable controls on oil and gas development sources. b. Summary of Reasonable Progress Determinations and Limits For the subject-to-reasonable progress sources, the State provided analyses that took into consideration the four factors as required by section 169A(g)(1) of the CAA and 40 CFR 51.308(d)(1)(i)(A). For the stationary sources, the State relied on the analysis found in Supplementary Information for Four-Factor Analyses for Selected Individual Facilities in Wyoming, May 6, 2009, Revised Draft Report Prepared by EC/R Incorporated. For oil and gas sources, the State relied on the analysis found in Supplementary Information for Four Factor Analyses by WRAP States, May 4, 2009 (Corrected 4/ E:\FR\FM\04JNP2.SGM 04JNP2 33041 Federal Register / Vol. 77, No. 107 / Monday, June 4, 2012 / Proposed Rules 20/10) Revised Draft Report Prepared by EC/R Incorporated (for a complete copy of the reports see Chapter 7 of the State’s TSD). The analyses considered EPA’s BART Guidelines as relevant to their reasonable progress evaluations, as well as EPA’s Guidance for Setting Reasonable Progress Goals Under the Regional Haze Program. In this action, EPA is proposing to approve the reasonable progress NOX determinations submitted by the State for oil and gas sources and for Mountain Cement Company Laramie Plant kiln. EPA is proposing to disapprove the State’s reasonable progress determinations and proposing to issue a reasonable progress determination NOX FIP for PacifiCorp Dave Johnston Unit 1 and Unit 2. EPA’s rationale for disapproving the State’s reasonable progress determination for these units, as well as EPA’s reasonable progress FIP determination, can be found in section VII.B of this notice. A summary of the reasonable progress analysis and determination for each source/source category that we are proposing to approve is provided below. i. Oil and Gas Area Sources Background Oil and gas exploration and production is occurring in numerous areas in Wyoming. The sources associated with oil and gas production mainly emit NOX and VOCs; in this context, the State considered NOX. Oil and gas production and exploration includes operation, maintenance, and servicing of production properties, including transportation to and from sites. EC/R evaluated reasonable progress control technologies for common sources in the oil and gas industry including compressor engines, turbines, process heaters, and drilling rig engines. The State’s NOX reasonable progress determination for oil and gas sources can be found in Chapter 7.3.5 of the SIP. NOX Reasonable Progress Determination For compressor engines, potential control options identified by the State include air-fuel ratio controls (AFRC), ignition timing retard, low-emission combustion (LEC) retrofit, SCR, SNCR, and replacement with electric motors. The State evaluated several control technologies for drilling rig engines including ignition timing retard, exhaust gas recirculation (EGR), SCR, replacement of Tier 2 engines with Tier 4 engines, and diesel oxidation catalyst. Potential controls for turbines identified by the State include water or steam injection, LNBs, SCR, and water or steam injection with SCR. NOX emission control technologies identified by the State for process heaters include LNBs, ultra-low NOX burners (ULNBs), LNBs with flue gas recirculation (FGR), SNCR, SCR, and LNBs installed in conjunction with SCR. NOX emissions vary based on the equipment and fuel source. Emissions from individual natural gas-fired turbines at production operations can be as high as 877 tpy of NOX, while emissions from individual natural gas turbines at exploration operations can reach 131 tpy of NOX. Individual gas reciprocating engines have comparable NOX emissions with up to 700 tpy at production operations and 210 tpy at exploration operations. Diesel engine emissions can approach 46 tpy for production operations and 10 tpy for exploration operations. Table 18 provides a summary of the reasonable progress NOX analysis for oil and gas sources. Both the capital and annual costs for each technology is dependent on the engine size or on the process throughput; therefore, for most of the control technologies listed in Table 18, the State has provided cost estimate ranges. The lower end of the cost/ton estimates represent the cost per unit for larger or higher production units, while the higher end of the cost/ ton estimates represent the cost per unit for the smaller or lower production units. TABLE 18—SUMMARY OF REASONABLE PROGRESS NOX ANALYSIS FOR OIL AND GAS EXPLORATION AND PRODUCTION EQUIPMENT Estimated Control Efficiency (%) Source Type Control Technology Compressor Engines ........ AFRC ................................ Ignition timing retard ......... LEC retrofit ....................... SCR .................................. SNCR ............................... Replacement with electric motors. Ignition timing retard ......... EGR .................................. SCR .................................. Replacement of Tier 2 engines with Tier 4. Water or steam injection .. LNB ................................... SCR .................................. Water or steam injection with SCR. LNB ................................... ULNB ................................ LNB and FGR ................... SNCR ............................... SCR .................................. LNB and SCR ................... Drilling Rig Engines and Other Engines. Turbines ............................ mstockstill on DSK4VPTVN1PROD with PROPOSALS2 Process Heaters ............... VerDate Mar<15>2010 17:21 Jun 01, 2012 Jkt 226001 PO 00000 Frm 00021 Pollutant Controlled Estimated Capital Cost ($/unit) Annual Cost ($/year/unit) Units Cost Effectiveness ($/ton) 10–40 15–30 80–90 90 90–99 100 NOX NOX NOX NOX NOX NOX ......... ......... ......... ......... ......... ......... 5.3–42 N/A 120–820 100–450 17–35 120–140 0.9–6.8 1–3 30–210 40–270 3–6 38–44 hp hp hp hp hp hp ............. ............ ............ ............ ............ ............ 68–2,500 42–1,200 320–2,500 870–31,000 16–36 100–4,700 15–30 40 80–95 87 NOX NOX NOX NOX ......... ......... ......... ......... 16–120 100 100–2,000 125 14–66 26–67 40–1,200 20 hp hp hp hp ............ ............ ............ ............ 1,000–2,200 780–2,000 3,000–7,700 900–2,400 68–80 68–84 90 93–96 NOX NOX NOX NOX ......... ......... ......... ......... 4.4–16 8–22 13–34 13–34 2–5 2.7–8.5 5.1–13 5.1–13 1000 1000 1000 1000 BTU BTU BTU BTU 560–3,100 2,000–10,000 1,000–6,700 1,000–6,700 40 75–85 48 60 70–90 70–90 NOX NOX NOX NOX NOX NOX ......... ......... ......... ......... ......... ......... 3.8–7.6 4.0–13 16 10–22 33–48 37–55 0.41–0.81 0.43–1.3 1.7 1.1–2.4 3.7–5.6 4–6.3 1000 1000 1000 1000 1000 1000 BTU BTU BTU BTU BTU BTU 2,100–2,800 1,500–2,000 2,600 4,700–5,200 2,900–6,700 2,900–6,300 Fmt 4701 Sfmt 4702 E:\FR\FM\04JNP2.SGM 04JNP2 33042 Federal Register / Vol. 77, No. 107 / Monday, June 4, 2012 / Proposed Rules Wyoming states that it would need up to two years to develop the necessary regulations to control oil and gas sources.24 The State estimated that companies would require a year to procure the necessary capital to purchase the control equipment. The time required to design, fabricate, and install control technologies will vary based on the control technology selected and other factors. The State determined that no additional controls for oil and gas sources were reasonable at this time. The State concluded that emissions from large stationary sources processing oil and gas in the WRAP region have been well quantified over the years, while smaller exploration and production sources that the State is evaluating for reasonable progress have not had the same degree of emission inventory development. The State points out that understanding the sources and volume of emissions at oil and gas production sites is necessary to recognizing the impact that these emissions have on visibility. To better understand the emissions from stationary and mobile equipment operated as part of oil and gas field operations, the WRAP has been working on developing an emission inventory to more fully characterize the oil and gas field operations emissions. The WRAP’s development of a more comprehensive emission inventory is still in process (as of the date of the State’s SIP submittal). The State determined it cannot complete the evaluation of oil and gas on visibility until the WRAP emission inventory study has been completed. The State points out that in the case of compressor engines, many facilities have already installed control equipment.25 For lean burn engines, oxidation catalysts are commonly installed, while SNCR with AFRC are commonly installed for rich burn engines. The State also points out that regulating drill rig engines can be problematic since drill rig engines are, for the most part, considered mobile sources and emission limits for mobile sources are set by the Federal government under section 202 of the CAA. We disagree with the State’s reasoning for not adopting reasonable progress controls for oil and gas sources. If the State determined that additional information was needed to potentially control oil and gas sources, the State should have developed the information. While we disagree with the State’s reasoning for not requiring any controls under reasonable progress, we are proposing to approve the State’s conclusion that no additional NOX controls are warranted for this planning period. As shown by the four factor analyses, the most reasonable controls are for compressor engines, which the State already controls through its minor source BACT requirements (see above). In addition, while the costs of some controls are within the range of cost effectiveness values Wyoming, other states, and we have considered as reasonable in the BART context, they are not so low that we are prepared to disapprove the State’s conclusion in the reasonable progress context. We are proposing to approve the State’s reasonable progress determination for oil and gas sources. ii. Mountain Cement Company Laramie Plant—Kiln Background The Mountain Cement Company Laramie Plant cement kiln is a long dry kiln with a capacity of 1,500 tons of clinker per day. Assuming the plant runs 365 days of the year, the result is 547,500 tpy of clinker. NOX Reasonable Progress Determination The kiln is currently uncontrolled for NOX emissions. The State determined that indirect and direct firing of LNBs, biosolid injection, NOxOUT SM, CemSTAR SM, LoTOx TM, SCR, SNCR (using urea), and SNCR (using ammonia) were technically feasible for controlling NOX emissions from the kiln. The State did not identify any technically infeasible controls. The State did not identify any energy or non-air quality environmental impacts that would preclude the selection of any of the controls evaluated, and there are no remaininguseful-life issues for this source. A summary of the State’s NOX reasonable progress analyses for the kiln is provided in Table 19 below. Baseline NOX emissions for the kiln are 524 tpy based on 2002 actual emissions. TABLE 19—SUMMARY OF MOUNTAIN CEMENT COMPANY KILN NOX REASONABLE PROGRESS ANALYSIS Control Efficiency (%) Control Technology mstockstill on DSK4VPTVN1PROD with PROPOSALS2 LNB (indirect) ........................................................................... LNB (direct) .............................................................................. Biosolid Injection 26 .................................................................. NOxOUT SM ............................................................................. CemSTAR SM 27 ....................................................................... LoTOxTM 28 .............................................................................. SCR ......................................................................................... SNCR (urea) 29 ........................................................................ SNCR (ammonia) .................................................................... 30–40 40 50 35 20–60 80–90 80 35 35 Emission Reduction (tpy) Annualized Costs 157–210 210 262 183 105–314 419–472 419 183 183 $205,000 449,000 ¥127,000 507,000 Unknown Unknown 7,553,000 Unknown Unknown Cost Effectiveness ($/ton) $6,568–4,910 13,853 1,324 8,023 Unknown Unknown 82,535 1,223 1,223 The State estimated that it could potentially take seven years to install control equipment on the kiln. This estimate includes the two years that will be necessary for the State to implement new regulations and the one-year Mountain Cement will likely need to obtain the necessary capital for the purchase of new emission control technology. The State estimates the total time necessary for compliance will vary based on the control technology selected. For example, the State predicts that one and a half years will be required to design, fabricate, and install 24 For all reasonable progress sources, the time necessary to develop regulations is not a consideration under the time necessary for compliance factor. If regulations are needed to implement reasonable progress controls, the State must develop them as part of the regional haze SIP. 25 Oil and gas sources are regulated by the State as part of its minor source BACT requirements in Wyoming Air Quality Standards and Regulations Chapter 6, Section 2. 26 A negative annual cost is given because cement kilns receive a credit for the biosolids tipping fee paid by facilities providing the biosolids to the cement plant. For the purposes of this analysis, the tipping fee is $5.00/ton. 27 Cost effectiveness figures for the CemStarSM process were not available for dry kilns. 28 Cost effectiveness figures for LoTOx TM were not available for dry kilns. 29 Capital and annual costs for SNCR have only been costed for preheater and precalcnier kilns. Only cost effectiveness figures were available for dry kilns. VerDate Mar<15>2010 17:21 Jun 01, 2012 Jkt 226001 PO 00000 Frm 00022 Fmt 4701 Sfmt 4702 E:\FR\FM\04JNP2.SGM 04JNP2 Federal Register / Vol. 77, No. 107 / Monday, June 4, 2012 / Proposed Rules mstockstill on DSK4VPTVN1PROD with PROPOSALS2 SCR or SNCR technology, while over two and a half years will be required to design, fabricate, and install LoTOx TM technology. The State determined no controls were reasonable for reasonable progress for Mountain Cement Company Laramie Plant kiln. The State cited that the fourfactor analysis was limited, in that no guidance was provided by EPA for identifying significant sources and EPA did not establish contribution to visibility impairment thresholds (a potential fifth factor for reasonable progress determinations).30 The State further claims that the State cannot, per Wyoming Statute 35–11–202, establish emission control requirements except through State rule or regulation. Furthermore, the Wyoming statute requires the State to consider the character and degree of injury of the emissions involved. In this case, the State claims it would need to have visibility modeling that assessed the degree of injury caused by the emissions, which the State does not have. The State believes it has taken a strong and reasonable first step in identifying potential contributors to visibility impairment, and that the next step of creating an appropriate rule or regulation will be accomplished in the next SIP revision. We disagree with the State’s reasoning for not adopting reasonable progress controls for Mountain Cement Company Laramie Plant kiln. If the State determined that it needed to adopt a rule or perform modeling to adequately assess and, if warranted, require reasonable progress controls, the State should have completed these steps before it submitted its regional haze SIP. The RHR does not allow for commitments to potentially implement strategies at some later date that are identified under reasonable progress or for the State to take credit for such commitments. Nor does it allow the State to consider the time to promulgate regulations as part of the time for compliance. 30 States must consider the four factors as listed above but can also take into account other relevant factors for the reasonable progress sources identified (see EPA’s Guidance for Setting Reasonable Progress Goals under the Regional Haze Program, (‘‘EPA’s Reasonable Progress Guidance’’), p. 2–3, July 1, 2007). VerDate Mar<15>2010 17:21 Jun 01, 2012 Jkt 226001 While we disagree with the State’s reasoning for not requiring any controls under reasonable progress, we are proposing to approve the State’s conclusion that no additional NOX controls are warranted for this planning period. While the costs of some controls (i.e., biosolid injection and SNCR) are within the range of cost effectiveness values Wyoming, other states, and we have considered as reasonable in the BART context, they are not so low that we are prepared to disapprove the State’s conclusion in the reasonable progress context. In addition, these controls afford relatively modest emission reductions. 3. Reasonable Progress Goals 40 CFR 51.308(d)(1) requires states to ‘‘establish goals’’ (in deciviews) that provide for reasonable progress towards achieving natural visibility conditions for each Class I area of the State. These RPGs are interim goals that must provide for incremental visibility improvement for the most impaired visibility days, and ensure no degradation for the least impaired visibility days. The RPGs for the first planning period are goals for the year 2018. Wyoming relied on WRAP modeling to establish its RPGs for 2018. The primary tool WRAP relied upon for modeling regional haze improvements by 2018, and for estimating Wyoming’s RPGs, was the CMAQ model. The CMAQ model was used to estimate 2018 visibility conditions in Wyoming and all western Class I areas, based on application of anticipated regional haze strategies in the various states’ regional haze plans, including assumed controls on BART sources. The Regional Modeling Center (RMC) at the University of California Riverside conducted the CMAQ modeling under the oversight of the WRAP Modeling Forum. The RMC developed air quality modeling inputs including annual meteorology and emissions inventories for: (1) A 2002 actual emissions base case; (2) a planning case to represent the 2000–2004 regional haze baseline period using averages for key emissions categories; and (3) a 2018 base case of projected emissions determined using factors known at the end of 2005. All emission inventories were spatially and PO 00000 Frm 00023 Fmt 4701 Sfmt 4702 33043 temporally allocated using the Sparse Matrix Operator Kernel Emissions (SMOKE) modeling system. Each of these inventories underwent a number of revisions throughout the development process to arrive at the final versions used in CMAQ modeling. The photochemical modeling of regional haze for the WRAP states for 2002 and 2018 was conducted on the 36-km resolution national regional planning organization domain that covered the continental United States, portions of Canada and Mexico, and portions of the Atlantic and Pacific Oceans along the east and west coasts. The RMC examined the model performance of the regional modeling for the areas of interest before determining whether the CMAQ model results were suitable for use in the regional haze assessment of the LTS and for use in the modeling assessment. The 2002 modeling efforts were used to evaluate air quality/visibility modeling for a historical episode, in this case, for calendar year 2002, to demonstrate the suitability of the modeling systems for subsequent planning, sensitivity, and emissions control strategy modeling. Model performance evaluation compares output from model simulations with ambient air quality data for the same time period to determine whether model performance is sufficiently accurate to justify using the model to simulate future conditions. Once the RMC determined that model performance was acceptable, it used the model to determine the 2018 RPGs using the current and future year air quality modeling predictions, and compared the RPGs to the uniform rate of progress. A more detailed description of the CMAQ modeling performed for the WRAP can be found in the Chapter 5 of the State’s TSD. The State determined that the WRAP 2018 projections represent significant visibility improvement and reasonable progress toward natural visibility based upon the State’s consideration of the factors required for BART and reasonable progress. The State adopted the WRAPs 2018 projections as their RPG for each Class I area. Table 20 shows the URP and the 2018 RPGs adopted by the State. E:\FR\FM\04JNP2.SGM 04JNP2 33044 Federal Register / Vol. 77, No. 107 / Monday, June 4, 2012 / Proposed Rules TABLE 20—WYOMING’S URP AND RPGS FOR 2018 20% Worst Days Wyoming Class I Areas 2000–2004 Baseline (deciview) Yellowstone National Park, Grand Teton National, Park Teton Wilderness ......... North Absaroka Wilderness, Washakie Wilderness ............................................ Bridger Wilderness, Fitzpatrick Wilderness ...................................................... 20% Best Days Reduction Needed to Reach URP Goal (Delta deciview) 2018 URP (deciview) 2018 CMAQ Modeling Projection— State’s RPG 2000–2004 Baseline (deciview) 2018 CMAQ Modeling Projection (deciview) 11.8 0.7 11.2 2.6 2.4 11.5 10.4 0.6 11.0 2.0 2.0 11.1 Table 20 shows that the State’s regional haze SIP is providing for improvement in visibility for the mostimpaired days for the period ending in 2018 and allows for no degradation in visibility for the least-impaired days. Table 20 also shows that Wyoming is not meeting the URP to meet natural visibility conditions by 2064. In this case, 40 CFR 51.308(d)(1)(ii) requires the State to demonstrate, based on the four factors in 51.308(d)(1)(i)(A), that the RPGs established in this SIP are reasonable for this planning period and that achieving the URP in this planning period is not reasonable. In its demonstration, the State cited many reasons why meeting the URP was not reasonable, including the following. First, emissions from natural sources greatly affect the State’s ability to meet the 2018 URP. As discussed earlier, WEP data shows that emissions of OC, EC, PM2.5, and PM10 come mainly from natural or non-anthropogenic sources, such as natural wildfire and windblown dust. The State has little or no control over OC, EC, PM2.5, and PM10 emissions associated with natural fire and windblown dust. Second, emissions from sources outside the WRAP modeling domain also affect the State’s ability to meet the 2018 URP. Sources outside of the modeling domain are the single largest source region contributor to sulfate and nitrate at the State’s Class I areas. These sources are not under the control of Wyoming or the surrounding states. Since the State is not meeting the URP, the State is required by 40 CFR 10.5 10.0 0.6 10.6 2.1 2.0 51.308(d)(1)(ii) to assess the number of years it would take to reach natural conditions if visibility improvement continues at the current rate of progress. The State has calculated the year and the length of time to reach natural visibility as follows: Yellowstone National Park, Grand Teton National Park, and Teton Wilderness: 2130 (126 years); North Absaroka Wilderness and Washakie Wilderness: 2136 (132 years); and Bridger Wilderness and Fitzpatrick Wilderness: 2165 (161 years). EPA disagrees with the State’s assessment that, based on the factors in 40 CFR 51.308(d)(1)(i)(a), all reasonable controls were implemented by the State for this first planning period of the regional haze program. In particular, as discussed in section VII.B.i below, we find unreasonable the State’s determination to not impose controls at PacifiCorp Dave Johnston Units 1 and 2. As a result, EPA is proposing to disapprove the State’s RPGs, and because we are proposing to disapprove Wyoming’s RPGs, we are also proposing a FIP to replace them. See discussion in section VII.C below. E. Long Term Strategy 1. Emission Inventories Section 51.308(d)(3)(iii) requires that Wyoming document the technical basis, including modeling, monitoring, and emissions information, on which it relied to determine its apportionment of emission reduction obligations necessary for achieving reasonable progress in each mandatory Class I Federal area it affects. Wyoming must identify the baseline emissions inventory on which its strategies are based. 40 CFR 51.308(d)(3)(iv) requires that Wyoming identify all anthropogenic sources of visibility impairment it considered in developing its LTS strategy. This includes major and minor stationary sources, mobile sources, and area sources. In order to meet these requirements, Wyoming relied on the emission inventory developed by the WRAP. The State has provided an emission inventory for SO2, NOX, VOC, OC, EC, PM2.5, PM10, and NH3. The inventory provides the baseline year 2002 emissions and provides projections of future emissions in 2018 based on expected controls, growth, and other factors. The following are the inventory source categories identified by the State: Point, area, on-road mobile, off-road mobile, anthropogenic fire, natural fire, road dust, fugitive dust, area source oil and gas, and biogenic emissions. The emission inventories developed by the WRAP were calculated using best available data and approved EPA methods.31 Following is a summary of the emission inventory for each pollutant by source. SO2 Sulfur dioxide emissions come primarily from coal combustion at EGUs, but smaller amounts come from natural gas combustion, mobile sources and wood combustion. mstockstill on DSK4VPTVN1PROD with PROPOSALS2 TABLE 21—WYOMING SO2 EMISSIONS—2002 AND 2018 Baseline 2002 Source Category Point ......................................................................................................................................................... Area ......................................................................................................................................................... 31 The methods WRAP used to develop these emission inventories are described in more detail in Technical Support Document for Technical VerDate Mar<15>2010 18:17 Jun 01, 2012 Jkt 226001 Products Prepared by the Western Regional Air Partnership (WRAP) in Support of Western Regional PO 00000 Frm 00024 Fmt 4701 Sfmt 4702 119,717 16,689 Future 2018 96,809 23,093 Percent Change ¥19 38 Haze Plans in the Supporting and Related Materials section of the docket. E:\FR\FM\04JNP2.SGM 04JNP2 33045 Federal Register / Vol. 77, No. 107 / Monday, June 4, 2012 / Proposed Rules TABLE 21—WYOMING SO2 EMISSIONS—2002 AND 2018—Continued Baseline 2002 Source Category Future 2018 Percent Change On-Road Mobile ....................................................................................................................................... Off-Road Mobile ....................................................................................................................................... Oil & Gas ................................................................................................................................................. Road Dust ................................................................................................................................................ Fugitive Dust ............................................................................................................................................ Windblown Dust ....................................................................................................................................... Anthropogenic Fire .................................................................................................................................. Natural Fire .............................................................................................................................................. Biogenic ................................................................................................................................................... 959 5,866 150 0 0 0 173 2,286 0 81 65 3 0 0 0 109 2,286 0 ¥92 ¥99 ¥98 0 0 0 ¥37 0 0 Total .................................................................................................................................................. 145,840 122,446 ¥16 The State expects a 16% reduction in SO2 emissions by 2018 due to planned controls on existing sources, even with expected growth in generating capacity for the State. NOX NOX emissions in Wyoming come mostly from point sources and from onroad and off-road mobile sources. TABLE 22—WYOMING NOX EMISSIONS—2002 AND 2018 Baseline 2002 Source Category Future 2018 Percent Change Point ......................................................................................................................................................... Area ......................................................................................................................................................... On-Road Mobile ....................................................................................................................................... Off-Road Mobile ....................................................................................................................................... Oil & Gas ................................................................................................................................................. Road Dust ................................................................................................................................................ Fugitive Dust ............................................................................................................................................ Windblown Dust ....................................................................................................................................... Anthropogenic Fire .................................................................................................................................. Natural Fire .............................................................................................................................................. Biogenic ................................................................................................................................................... 117,806 15,192 38,535 76,637 14,725 0 0 0 782 8,372 15,925 110,109 19,663 9,728 49,677 34,142 0 0 0 484 8,372 15,925 ¥7 29 ¥75 ¥35 132 0 0 0 ¥38 0 0 Total .................................................................................................................................................. 287,974 248,100 ¥14 The State expects NOX emissions to decrease by 14% by 2018, primarily due to significant reductions in mobile source emissions. The State projects that off-road and on-road vehicles emissions will decline by more than 55,760 tpy from the baseline 2002 emissions of 115,172 tpy. OC diesel emissions and combustion byproducts from wood and agricultural burning. A wide variety of sources contribute emissions to this pollutant, including TABLE 23—WYOMING OC EMISSIONS—2002 AND 2018 Baseline 2002 mstockstill on DSK4VPTVN1PROD with PROPOSALS2 Source Category Future 2018 Percent Change Point ......................................................................................................................................................... Area ......................................................................................................................................................... On-Road Mobile ....................................................................................................................................... Off-Road Mobile ....................................................................................................................................... Oil & Gas ................................................................................................................................................. Road Dust ................................................................................................................................................ Fugitive Dust ............................................................................................................................................ Windblown Dust ....................................................................................................................................... Anthropogenic Fire .................................................................................................................................. Natural Fire .............................................................................................................................................. Biogenic ................................................................................................................................................... 646 2,000 304 625 0 20 96 0 1,709 23,793 0 990 1,975 249 411 0 26 133 0 886 23,793 0 53 ¥1 ¥18 ¥34 0 30 39 0 ¥48 0 0 Total .................................................................................................................................................. 29,193 28,463 ¥3 OC emissions from all sources are expected to show a 3% decline. Natural VerDate Mar<15>2010 17:21 Jun 01, 2012 Jkt 226001 fire is the largest source contributing to OC emissions. The State does not have PO 00000 Frm 00025 Fmt 4701 Sfmt 4702 the ability to predict future emissions from natural fires and thus, the State E:\FR\FM\04JNP2.SGM 04JNP2 33046 Federal Register / Vol. 77, No. 107 / Monday, June 4, 2012 / Proposed Rules held this category constant in the inventory. EC EC is a byproduct of incomplete combustion. EC emissions mainly come from mobile sources and natural fires. TABLE 24—WYOMING EC EMISSIONS—2002 AND 2018 Baseline 2002 Source Category Future 2018 Percent Change Point ......................................................................................................................................................... Area ......................................................................................................................................................... On-Road Mobile ....................................................................................................................................... Off-Road Mobile ....................................................................................................................................... Oil & Gas ................................................................................................................................................. Road Dust ................................................................................................................................................ Fugitive Dust ............................................................................................................................................ Windblown Dust ....................................................................................................................................... Anthropogenic Fire .................................................................................................................................. Natural Fire .............................................................................................................................................. Biogenic ................................................................................................................................................... 104 304 443 1,986 0 2 7 0 298 4,922 0 180 335 86 1,161 0 2 9 0 153 4,922 0 73 10 ¥81 ¥42 0 0 29 0 ¥49 0 0 Total .................................................................................................................................................. 8,066 6,848 ¥15 The State predicts EC emissions to decrease approximately 15% by 2018. Reductions in manmade emissions of EC are largely due to mobile sources emission reductions resulting from new federal emission standards for mobile sources, especially for diesel engines. PM2.5 PM2.5 emissions come mainly from agricultural and mining activities, windblown dust from construction areas, and emissions from unpaved and paved roads. TABLE 25—WYOMING PM2.5 EMISSIONS—2002 AND 2018 Baseline 2002 Source Category Future 2018 Percent Change Point ......................................................................................................................................................... Area ......................................................................................................................................................... On-Road Mobile ....................................................................................................................................... Off-Road Mobile ....................................................................................................................................... Oil & Gas ................................................................................................................................................. Road Dust ................................................................................................................................................ Fugitive Dust ............................................................................................................................................ Windblown Dust ....................................................................................................................................... Anthropogenic Fire .................................................................................................................................. Natural Fire .............................................................................................................................................. Biogenic ................................................................................................................................................... 11,375 1,601 0 0 0 160 2,082 5,838 242 1,535 0 15,709 1,756 0 0 0 206 2,882 5,838 129 1,535 0 38 10 0 0 0 29 38 0 ¥47 0 0 Total .................................................................................................................................................. 22,833 28,055 23 The State predicts emissions of PM2.5 to increase 23% by 2018. Emission increases are related to population growth and an increase in vehicle miles traveled. PM10 PM10 emissions come from many of the same sources as PM2.5 emissions but other activities like rock crushing and processing, material transfer, open pit mining and unpaved road emissions can be prominent sources. TABLE 26—WYOMING PM10 EMISSIONS—2002 AND 2018 Baseline 2002 mstockstill on DSK4VPTVN1PROD with PROPOSALS2 Source Category Point ......................................................................................................................................................... Area ......................................................................................................................................................... On-Road Mobile ....................................................................................................................................... Off-Road Mobile ....................................................................................................................................... Oil & Gas ................................................................................................................................................. Road Dust ................................................................................................................................................ Fugitive Dust ............................................................................................................................................ Windblown Dust ....................................................................................................................................... Anthro Fire ............................................................................................................................................... Natural Fire .............................................................................................................................................. VerDate Mar<15>2010 17:21 Jun 01, 2012 Jkt 226001 PO 00000 Frm 00026 Fmt 4701 Sfmt 4702 E:\FR\FM\04JNP2.SGM 24,751 409 171 0 0 1,125 18,030 52,546 259 5,369 04JNP2 Future 2018 30,619 653 165 0 0 1,449 25,144 52,546 109 5,369 Percent Change 24 60 ¥4 0 0 29 39 0 ¥58 0 33047 Federal Register / Vol. 77, No. 107 / Monday, June 4, 2012 / Proposed Rules TABLE 26—WYOMING PM10 EMISSIONS—2002 AND 2018—Continued Baseline 2002 Source Category Future 2018 Percent Change Biogenic ................................................................................................................................................... 0 0 0 Total .................................................................................................................................................. 102,660 116,054 13 Overall, PM10 emissions are expected to increase by 13%. Increases in coarse PM emissions are linked to population growth and vehicle miles traveled. NH3 NH3 emissions come from a variety of sources including wastewater treatment facilities, livestock operations, fertilizer application, mobile sources, and point sources. TABLE 27—WYOMING NH3 EMISSIONS—2002 AND 2018 Baseline 2002 Source Category Future 2018 Percent Change Point ......................................................................................................................................................... Area ......................................................................................................................................................... On-Road Mobile ....................................................................................................................................... Off-Road Mobile ....................................................................................................................................... Oil & Gas ................................................................................................................................................. Road Dust ................................................................................................................................................ Fugitive Dust ............................................................................................................................................ Windblown Dust ....................................................................................................................................... Anthropogenic Fire .................................................................................................................................. Natural Fire .............................................................................................................................................. Biogenic ................................................................................................................................................... 685 29,776 538 41 0 0 0 0 218 1,775 0 1,398 29,901 724 57 0 0 0 0 119 1,775 0 104 0 35 39 0 0 0 0 ¥45 0 0 Total .................................................................................................................................................. 33,033 33,974 3 NH3 emissions are expected to increase by 3% by 2018. Increases in NH3 emissions are linked to population growth and increased vehicular traffic. mstockstill on DSK4VPTVN1PROD with PROPOSALS2 2. Consultation and Emissions Reductions for Other States’ Class I Areas 40 CFR 51.308(d)(3)(i) requires that Wyoming consult with another state if its emissions are reasonably anticipated to contribute to visibility impairment at that state’s Class I area(s), and that Wyoming consult with other states if those other states’ emissions are reasonably anticipated to contribute to visibility impairment at its Class I areas. The State participated in regional planning, coordination, and consultation with other states in developing emission management strategies through the WRAP. Through the WRAP consultation process, Wyoming has reviewed and analyzed contributions from other states that reasonably may cause or contribute to visibility impairment in Wyoming’s Class I areas and analyzed Wyoming’s impact on other states’ Class I areas. 40 CFR 51.308(d)(3)(ii) requires that if Wyoming emissions cause or contribute to impairment in another state’s Class I area, Wyoming must demonstrate that it has included in its regional haze SIP all measures necessary to obtain its share of VerDate Mar<15>2010 17:21 Jun 01, 2012 Jkt 226001 the emission reductions needed to meet the RPG for that Class I area. Section 51.308(d)(3)(ii) also requires that, since Wyoming participated in a regional planning process, it must ensure it has included all measures needed to achieve its apportionment of emission reduction obligations agreed upon through that process. As we state in the RHR, Wyoming’s commitments to participate in WRAP bind it to secure emission reductions agreed to as a result of that process. The State determined it did potentially impact Class I areas in South Dakota, Colorado, Utah, Idaho, Montana, and North Dakota (see Table 8.1.2.1–1 in the SIP). Wyoming accepted and incorporated the WRAP-developed visibility modeling into its regional haze SIP and the SIP includes the controls assumed in the modeling. Wyoming has satisfied the RHR requirements for consultation and included controls in the SIP sufficient to address the relevant requirements related to impacts on Class I areas in other states. We are proposing to find that the State has met the requirements for consultation under 40 CFR 51.308(d)(3)(i) and 40 CFR 51.308(d)(3)(ii). PO 00000 Frm 00027 Fmt 4701 Sfmt 4702 3. Mandatory Long-Term Strategy Requirements 40 CFR 51.308(d)(3)(v) requires that Wyoming, at a minimum, consider certain factors in developing its LTS. These are: (a) Emission reductions due to ongoing air pollution control programs, including measures to address RAVI; (b) measures to mitigate the impacts of construction activities; (c) emissions limitations and schedules for compliance to achieve the reasonable progress goals; (d) source retirement and replacement schedules; (e) smoke management techniques for agricultural and forestry management purposes including plans that currently exist within the state for these purposes; (f) enforceability of emissions limitations and control measures; and (g) the anticipated net effect on visibility due to projected changes in point, area, and mobile source emissions over the period addressed by the LTS. a. Reductions Due to Ongoing Air Pollution Programs In addition to its BART and reasonable progress determinations, the State’s LTS contains other reductions due to ongoing air pollution programs. The State’s LTS contains numerous ongoing air pollution programs, including: (1) New Source Review Program, which is a permit program for E:\FR\FM\04JNP2.SGM 04JNP2 33048 Federal Register / Vol. 77, No. 107 / Monday, June 4, 2012 / Proposed Rules the construction of new sources and the modification of existing sources; (2) Prevention of Significant Deterioration Program, which protects visibility impairment from proposed major stationary sources or major modifications to existing facilities; and (3) New Source Performance Standards, which the State incorporates by reference on an annual basis. For a complete listing of ongoing air pollution programs in Wyoming, see Chapter 8.2.1 of the SIP. b. Measures To Mitigate the Impacts of Construction Activities Chapter 3 of the Wyoming Air Quality Standards and Regulations (WAQSR) establishes limits on the quantity or concentration of emissions of air pollutants from numerous sources, including construction activities. Specifically, WAQSR Chapter 3, Section 2(f), prescribes measures to ensure the control of fugitive dust emissions during construction or demolition activities. WAQSR Chapter 3, Section 2(f) requires any person engaged in clearing or leveling of land, earthmoving, excavation, or movement of trucks or construction equipment over access haul roads or cleared land to take steps to minimize fugitive dust from such activities. Such control measures may include frequent watering and/or chemical stabilization. EPA approved WAQSR Chapter 3 into the SIP on July 28, 2004 (69 FR 44965). mstockstill on DSK4VPTVN1PROD with PROPOSALS2 c. Smoke Management WAQSR Chapter 10 establishes restrictions and requirements on different types of burning in Wyoming. WAQSR Chapter 10, Section 2 regulates open burning, including refuse burning, open burning of trade wastes, open burning at salvage operations, open burning for firefighting training, and small vegetative material open burning (not exceeding 0.25 tons per day of PM). WAQSR Chapter 10, Section 3 regulates emissions from wood waste burners. EPA approved WAQSR Chapter 10, Section 2 and 3 into the SIP on July 28, 2004 (69 FR 44965). WAQSR Chapter 10, Section 4 was adopted by the State and submitted to EPA to meet the requirements for programs related to fire under 40 CFR 51.309(d)(6). Chapter 10, Section 4 seeks to minimize the impacts from private and prescribed burning on visibility in Class I areas and potentially affected populations. EPA is proposing approval of Chapter 10, Section 4 in a separate action. VerDate Mar<15>2010 17:21 Jun 01, 2012 Jkt 226001 d. Emission Limitations and Schedules for Compliance Chapter 6.5 of the State’s SIP contains the emission limitations and schedules for compliance for BART sources. Chapter 6.5 of the SIP requires the BART sources to install and demonstrate compliance with the State’s BART determination as expeditiously as practicable but no later than five years after EPA approval of the SIP. For some sources where controls have already been installed, the State specifies an earlier compliance deadline in Chapter 6.5 of the SIP. In addition, Chapter 8.3.3 of the SIP contains the emission limits and compliance schedule for LTS controls on Jim Bridger Units 1–4. e. Source Retirement and Replacement Schedules The State is not currently aware of any specific scheduled shutdowns, retirements in upcoming years, or replacement schedules, such as planned installation of new control equipment to meet other regulations. If such actions occur, the State will factor them into upcoming reviews. f. Enforceability of Wyoming’s Measures As discussed in section VII.D of this notice, EPA is proposing to disapprove the State’s SIP because it contains inadequate monitoring, recordkeeping, and reporting requirements, and we are proposing a FIP to address the enforceability of BART and reasonable progress controls. g. Anticipated Net Effect on Visibility Due to Projected Changes The anticipated net effect on visibility due to projected changes in point, area, and mobile source emissions during this planning period is addressed in section VI.D.3 of this notice. 4. Our Conclusions on Wyoming’s LongTerm Strategy We propose to partially approve and partially disapprove Wyoming’s LTS. Because we are proposing to disapprove the NOX BART determinations for PacifiCorp Dave Johnston Unit 3, PacifiCorp Jim Bridger Units 1 and 2, PacifiCorp Wyodak Unit 1, and Basin Electric Laramie River Units 1, 2, and 3, we are also proposing to disapprove the corresponding emission limits and compliance schedules that Wyoming relied on as part of its LTS. Because we are proposing to disapprove the reasonable progress determination for PacifiCorp Dave Johnston Units 1 and 2, we are also proposing to disapprove the LTS because it does not include appropriate NOX reasonable progress emission limits and compliance PO 00000 Frm 00028 Fmt 4701 Sfmt 4702 schedules for Dave Johnston Units 1 and 2. We are also proposing to disapprove the State’s LTS because it does not contain the necessary monitoring, recordkeeping, and reporting requirements to make the BART and reasonable progress limits practically enforceable. Except for these elements, the State’s LTS satisfies the requirements of 40 CFR 51.308(d)(3), and we are proposing to approve it. F. Coordination of RAVI and Regional Haze Rule Requirements Per 40 CFR 51.306(c), the State must provide for review and revision of a coordinated LTS for addressing RAVI and regional haze, and the State must submit the first such coordinated LTS with its first regional haze SIP. The State failed to provide for the coordination of their RAVI and regional haze LTS. We are proposing to disapprove the State’s SIP as not meeting the requirements of 40 CFR 51.306(c). We are proposing a FIP as explained in section VII.F of this notice to meet the coordination requirements of 40 CFR 51.306(c). G. Monitoring Strategy and Other Implementation Plan Requirements 40 CFR 51.308(d)(4) requires that the SIP contain a monitoring strategy for measuring, characterizing, and reporting regional haze visibility impairment that is representative of all mandatory Class I Federal areas within the state. This monitoring strategy must be coordinated with the monitoring strategy required in 40 CFR 51.305 for RAVI. As 40 CFR 51.308(d)(4) notes, compliance with this requirement may be met through participation in the IMPROVE network. 40 CFR 51.308(d)(4)(i) further requires the establishment of any additional monitoring sites or equipment needed to assess whether the RPGs for all mandatory Class I Federal areas within the state are being achieved. Consistent with EPA’s monitoring regulations for RAVI and regional haze, Wyoming states in Chapter 9 of the regional haze SIP that it will rely on the IMPROVE network for compliance purposes, in addition to any additional visibility impairment monitoring that may be needed in the future. Section 51.308(d)(4)(ii) requires that states establish procedures by which monitoring data and other information are used in determining the contribution of emissions from within Wyoming to regional haze visibility impairment at mandatory Class I Federal areas both within and outside the state. The IMPROVE monitoring program is national in scope, and other states have similar monitoring and data reporting E:\FR\FM\04JNP2.SGM 04JNP2 mstockstill on DSK4VPTVN1PROD with PROPOSALS2 Federal Register / Vol. 77, No. 107 / Monday, June 4, 2012 / Proposed Rules procedures, ensuring a consistent and robust monitoring data collection system. As 40 CFR 51.308(d)(4) indicates, Wyoming’s participation in the IMPROVE program constitutes compliance with this requirement. 40 CFR 51.308(d)(4)(iv) requires that the SIP provide for the reporting of all visibility monitoring data to the Administrator, at least annually, for each mandatory Class I Federal area in the state. To the extent possible, Wyoming should report visibility monitoring data electronically. 40 CFR 51.308(d)(4)(vi) also requires that the SIP provide for other elements, including reporting, recordkeeping, and other measures, necessary to assess and report on visibility. We propose that Wyoming’s participation in the IMPROVE network ensures that the monitoring data is reported at least annually and is easily accessible; therefore, such participation complies with this requirement. IMPROVE data are centrally compiled and made available to EPA, states and the public via various electronic formats and Web sites including IMPROVE (https://vista. cira.colostate.edu/improve/) and VIEWS (https://vista.cira.colostate.edu/views/). 40 CFR 51.308(d)(4)(v) requires that Wyoming maintain a statewide inventory of emissions of pollutants that are reasonably anticipated to cause or contribute to visibility impairment in any mandatory Class I Federal area. The inventory must include emissions for a baseline year, emissions for the most recent year for which data are available, and estimates of future projected emissions. The State must also include a commitment to update the inventory periodically. The State’s emission inventory is discussed in section VI.F.1 of this notice. Wyoming states in Chapter 9 of the SIP that it intends to update the Wyoming statewide emissions inventories periodically and review periodic emissions information from other states and future emissions projections. We propose that this satisfies the requirement. 40 CFR 51.308(d)(4)(vi) requires that states provide for any additional reporting, recordkeeping, and measures necessary to evaluate and report on visibility. The State of Wyoming, in accordance with provisions of 40 CFR 51.308(d)(4)(vi), will track data related to regional haze for sources for which the State has regulatory authority, and will depend on the IMPROVE program and RPO sponsored collection and analysis efforts for monitoring and emissions inventory data, respectively. To ensure the availability of data and analyses to report on visibility conditions and progress toward Class I VerDate Mar<15>2010 17:21 Jun 01, 2012 Jkt 226001 area visibility goals, the State of Wyoming will collaborate with members of a RPO to ensure the continued operation of the IMPROVE program and RPO sponsored technical support analysis tools and systems. We propose to find that the State’s SIP satisfies the requirements of 40 CFR 51.308(d)(4). H. Consultation With FLMs Although the FLMs are very active in participating in the RPOs, the RHR grants the FLMs a special role in the review of the regional haze SIPs, summarized in section V.H, above. Under 40 CFR 51.308(i)(2), states are obligated to provide the FLMs with an opportunity for consultation, in person, and at least 60 days prior to holding a public hearing on the regional haze SIP. The State provided an opportunity for FLM consultation, in person and at least 60 days prior to holding any public hearing on the SIP. As required by 40 CFR Section 51.308(i)(3), the State has included FLM comments and State responses in Chapter 11 of the Wyoming TSD. 40 CFR 51.308(i)(3) requires that States provide in its regional haze SIP a description of how it addressed any comments provided by the FLMs. The FLMs formally commented on the Wyoming proposed SIP in November and December of 2010. The FLM comments provided support for the modeling approach used by the State in the BART determinations and complimented the State on thorough BART, reasonable progress, and area source analysis. The FLMs also recommended the State reevaluate costs and emission limits for some of the BART and reasonable progress sources. Chapter 11 of the State’s TSD provides detailed information on the State’s response to FLM comments. Lastly, 40 CFR 51.308(i)(4) specifies the regional haze SIP must provide procedures for continuing consultation between a State and FLMs on the implementation of the visibility protection program required by 40 CFR 51.308. This includes development and review of implementation plan revisions and five-year progress reports and the implementation of other programs having the potential to contribute to impairment of visibility in mandatory Class I Federal areas. Pursuant to Chapter 11.2 of the SIP, the State will provide the FLMs an opportunity to review and comment on SIP revisions, the five-year progress reports, and other developing programs that may contribute to Class I visibility impairment. PO 00000 Frm 00029 Fmt 4701 Sfmt 4702 33049 We are proposing that the State’s SIP satisfies the requirements of 40 CFR 51.308(i). I. Periodic SIP Revisions and 5-Year Progress Reports 40 CFR 51.308(f) requires a State to revise and submit its regional haze SIP to EPA by July 31, 2018, and every ten years thereafter. Pursuant to Chapter 10 of the SIP, the State will provide this revision. In accordance with the requirements listed in 40 CFR 51.308(g), the State will submit a report on reasonable progress to EPA every five years following the initial submittal of the SIP. That report will be in the form of an implementation plan revision. The State’s report will evaluate the progress made toward the RPGs for each mandatory Class I area located within the State and in each mandatory Class I area located outside the State, which have been identified as being affected by emissions from the State. The State will also evaluate the monitoring strategy adequacy in assessing RPGs. Based on the findings of the five-year progress report, 40 CFR 51.308(h) requires a State to make a determination of adequacy of the current implementation plan. The State must take one or more of the actions listed in 40 CFR 51.308(h)(1) through (4) that are applicable at the same time as the State submits a five-year progress report. Chapter 12 of the SIP requires the State to make an adequacy determination of the current SIP pursuant to 40 CFR 51.308(h)(1) through (4) at the same time a five-year progress report is due. We propose to find the State’s SIP satisfies the requirements of 40 CFR 51.308(f)–(h). VII. Federal Implementation Plan EPA is proposing a FIP to address the deficiencies indentified in our proposed partial disapproval of Wyoming’s regional haze SIP. In lieu of this proposed FIP, or a portion thereof, we would propose approval of a SIP revision if the State submits such a revision and the revision matches the terms of our proposed FIP. We encourage the State to submit a SIP revision to replace the FIP, either before or after our final action. A. Disapproval of the State’s NOX BART Determinations and Federal Implementation Plan for NOX BART Determinations and Limits As noted above, the State provided five-factor analyses that considered all factors, except analyzing the degree of visibility improvement modeling for each individual pollutant. Thus, in disapproving specific State BART E:\FR\FM\04JNP2.SGM 04JNP2 33050 Federal Register / Vol. 77, No. 107 / Monday, June 4, 2012 / Proposed Rules determinations, we are basing our analysis on information provided by the State in their BART analysis, with the exception of visibility improvement modeling. We have accepted the cost information provided by the State. As discussed above, visibility improvement modeling was performed by the EPA. EPA is proposing to disapprove the State’s NOX BART determinations, and we are proposing to issue a BART FIP, for the following units: PacifiCorp Dave Johnston Unit 3, PacifiCorp Jim Bridger Units 1 and 2, PacifiCorp Wyodak Unit 1, and Basin Electric Laramie River Units 1, 2, and 3. EPA’s rationale for disapproving the State’s BART determinations for these units, as well as EPA’s BART FIP determinations and emission limits, is discussed below. 1. Disapproval of the State’s Basin Electric Laramie River Units 1–3 NOX BART Determination and FIP To Address NOX BART Wyoming’s NOX BART Determination All three units are currently controlled with LNBs with a permit limit of 0.5 lbs/MMBtu (3-hour rolling average). The State determined that new LNBs, OFA, LNBs and OFA, SNCR/SCR hybrid, LNBs and OFA with SNCR, and SCR were technically feasible for reducing NOX emissions at Units 1–3. The State determined that natural gas reburn was technically infeasible. The State did not identify any energy or nonair quality environmental impacts that would preclude the selection of any of the controls evaluated, and there are no remaining-useful-life issues for this source. A summary of the State’s NOX BART analysis is provided in Tables 28–30 below. As discussed above, the visibility improvement modeling results in these tables were developed by EPA. Baseline NOX emissions are 6,320 tpy for Unit 1, 6,285 tpy for Unit 2, and 6,448 tpy for Unit 3 based on an average on 2001–2003 actual emissions. TABLE 28—SUMMARY OF BASIN ELECTRIC LARAMIE RIVER UNIT 1 NOX BART ANALYSIS Control Efficiency (%) Control Technology OFA .......................................................... LNBs ........................................................ LNBs with OFA ........................................ SNCR/SCR Hybrid ................................... LNBs with OFA and SNCR ...................... SCR .......................................................... Emission Rate (lb/MMBtu) (30-day Rolling Average) 14.8 14.8 14.8 25.9 55.6 74.1 Incremental cost effectiveness for the controls evaluated is as follows: LNBs Emission Reduction (tpy) 0.23 0.23 0.23 0.20 0.12 0.07 936 936 936 1,639 3,511 4,681 Annualized Costs $625,000 1,360,000 1,944,000 7,429,000 7,365,000 15,787,000 Average Cost Effectiveness ($/ton) Visibility Improvement (Delta dv for the Maximum 98th Percentile Impact at Wind Cave National Park) $668 1,453 2,077 4,534 2,098 3,372 0.08 0.08 0.08 ........................ 0.32 0.44 with OFA and SNCR: $2,105/ton, and SCR: $7,198/ton. TABLE 29—SUMMARY OF BASIN ELECTRIC LARAMIE RIVER UNIT 2 NOX BART ANALYSIS Control Efficiency (%) Control Technology OFA .......................................................... LNBs ........................................................ LNBs with OFA ........................................ SNCR/SCR Hybrid ................................... LNBs with OFA and SNCR ...................... SCR .......................................................... Emission Rate (lb/MMBtu) (30-day Rolling Average) 14.3 14.3 14.3 25.5 55.3 73.9 Incremental cost effectiveness for the controls evaluated is as follows: LNBs Emission Reduction (tpy) 0.23 0.23 0.23 0.20 0.12 0.07 931 931 931 1,630 3,492 4,656 Annualized Costs $625,000 1,360,000 1,944,000 7,429,000 7,365,000 15,787,000 Average Cost Effectiveness ($/ton) Visibility Improvement (Delta dv for the Maximum 98th Percentile Impact at Wind Cave National Park) $671 1,461 2,088 4,559 2,109 3,391 0.08 0.08 0.08 ........................ 0.32 0.44 with OFA and SNCR: $2,117/ton; and SCR: $7,242/ton. mstockstill on DSK4VPTVN1PROD with PROPOSALS2 TABLE 30—SUMMARY OF BASIN ELECTRIC LARAMIE RIVER UNIT 3 NOX BART ANALYSIS Control Efficiency (%) Control Technology OFA .......................................................... VerDate Mar<15>2010 17:21 Jun 01, 2012 Jkt 226001 Emission Rate (lb/MMBtu) (30-day Rolling Average) 16.5 PO 00000 Frm 00030 Emission Reduction (tpy) 0.23 Fmt 4701 Sfmt 4702 955 Annualized Costs $625,000 E:\FR\FM\04JNP2.SGM 04JNP2 Average Cost Effectiveness ($/ton) Visibility Improvement (Delta dv for the Maximum 98th Percentile Impact at Wind Cave National Park) $654 0.08 33051 Federal Register / Vol. 77, No. 107 / Monday, June 4, 2012 / Proposed Rules TABLE 30—SUMMARY OF BASIN ELECTRIC LARAMIE RIVER UNIT 3 NOX BART ANALYSIS—Continued Control Efficiency (%) Control Technology mstockstill on DSK4VPTVN1PROD with PROPOSALS2 LNBs ........................................................ LNBs with OFA ........................................ SNCR/SCR Hybrid ................................... LNBs with OFA and SNCR ...................... SCR .......................................................... 16.5 16.5 27.4 56.4 74.6 Incremental cost effectiveness for the controls evaluated is as follows: LNBs with OFA and SNCR: $2,064/ton, and SCR: $7,054/ton. The State eliminated the SNCR/SCR hybrid from further consideration because it has higher cost effectiveness and lower control efficiency compared to new LNBs plus OFA with SNCR. Based on its consideration of the five factors, the State determined LNBs with OFA was reasonable for NOX BART. The State determined that the NOX BART emission limits for Laramie River Unit 1 are 0.23 lb/MMBtu (30-day rolling average), 1,348 lb/hr (30-day rolling average), and 5,343 tpy. The State determined the NOX BART emission limits for Laramie River Unit 2 are 0.23 lb/MMBtu (30-day rolling average), 1,348 lb/hr (30-day rolling average), and 5,343 tpy. The State determined the NOX BART emission limits for Laramie River Unit 3 are 0.23 lb/MMBtu (30-day rolling average), 1,386 lb/hr (30-day rolling average), and 5,493 tpy. The State’s proposed SIP required additional NOX emission reductions for Laramie River under its LTS. Based on the costs and visibility improvement for Laramie River Station Units 1, 2, and 3, the State proposed installation of two SCRs, or equivalent performing emission control systems, at any of the three units. The State proposed that the add-on NOX control achieve an emission rate, on an individual unit basis, at or below 0.07 lb/MMBtu on a 30-day rolling average. The State proposed that the add-on controls be installed and operational on one of the Laramie River Station units by December 31, 2018 and on a second Laramie River Station unit by December 31, 2023. On March 8, 2010, Basin Electric Power Cooperative appealed the additional controls proposed by the State under its LTS before the Wyoming Environmental Quality Council. The State entered into a settlement VerDate Mar<15>2010 17:21 Jun 01, 2012 Jkt 226001 Emission Rate (lb/MMBtu) (30-day Rolling Average) Emission Reduction (tpy) 0.23 0.23 0.20 0.12 0.07 955 955 1,672 3,582 4,777 agreement on November 16, 2010 with Basin Electric Power Cooperative (a copy of the settlement agreement is included in the State’s revised NOX BART Analysis for Laramie River dated January 3, 2011). As part of the settlement agreement, the State agreed to remove the requirement for Basin Electric to install additional controls under the LTS. In return, Basin Electric agreed to additional NOX emissions reductions under BART. Under the settlement agreement, Basin Electric agreed to a NOX emission limit of 0.21 lb/MMBtu (30-day rolling average) on all three units. Basin Electric also agreed to a NOX emission limit for Unit 1 and Unit 2 of 4,780 tpy and a NOX emission limit for Unit 3 of 4,914 tpy, effectively capping emissions from all three units at 12,773 tpy. In the SIP adopted by the State, the State determined the emission limits in the settlement agreement were BART for Basin Electric Laramie River Units 1, 2, and 3. EPA’s Conclusions on Basin Electric Laramie River Units 1–3 NOX BART Determination and FIP for NOX BART EPA does not agree with the State’s conclusion that a limit of 0.21 lb/ MMBtu is reasonable for BART for Laramie River Units 1, 2, and 3, which can be achieved with the installation and operation of LNBs with OFA. In particular, the cost effectiveness values for LNBs with OFA plus SNCR at this unit is only slightly higher than LNBs with OFA (i.e., about $20/ton), with incremental costs of approximately $2,100.32 The increase in cost effectiveness for LNBs with OFA plus SNCR affords a visibility improvement of 0.23 delta deciview per unit over LNBs plus OFA. LNBs with OFA plus SNCR would result in total NOX 32 Since the State did not provide costs for the source to achieve a 0.21 lb/MMBtu emission limit and EPA did not model a 0.21 lb/MMBtu control option, we are basing our analysis on the information for LNBs with OFA at a limit of 0.23 lb/MMBtu. PO 00000 Frm 00031 Fmt 4701 Sfmt 4702 Annualized Costs 1,360,000 1,944,000 7,429,000 7,365,000 15,787,000 Average Cost Effectiveness ($/ton) Visibility Improvement (Delta dv for the Maximum 98th Percentile Impact at Wind Cave National Park) 1,424 2,036 4,444 2,056 3,305 0.08 0.08 ........................ 0.33 0.44 emissions of 8,468 tpy—4,305 tpy less than the State’s BART determination. We find that it was unreasonable for the State not to determine that LNBs with OFA plus SNCR was NOX BART for Laramie River Units 1–3. Thus, we are proposing to disapprove the State’s NOX BART determination for Basin Electric Laramie River Units 1, 2, and 3 and proposing a FIP for NOX BART as explained below. Based on our examination of the State’s costs estimates, emission reductions, and the predicted visibility improvement, we propose to find that LNBs with OFA plus SNCR at an emission limit of 0.12 lb/MMBtu (30day rolling average) is reasonable for NOX BART for Basin Electric Laramie River Units 1, 2, and 3. We are proposing that the FIP NOX BART emission limit for Basin Electric Laramie River Unit 1, Unit 2, and Unit 3 is 0.12 lb/MMBtu (30-day rolling average). We have eliminated the single highest performing option from consideration— LNBs with OFA plus SCR—because the cost effectiveness value is significantly higher than LNBs with OFA and there is a comparatively small incremental visibility improvement over LNBs with OFA. We propose that Basin Electric meet our proposed emission limit at Laramie River Units 1, 2, and 3 no later than five years after EPA finalizes action on our proposed FIP. This is consistent with the requirements of 40 CFR 51.308(e)(iv). 2. Disapproval of the State’s PacifiCorp Dave Johnston Unit 3 NOX BART Determination and FIP To Address NOX BART Wyoming’s NOX BART Determination Dave Johnston Unit 3 is currently uncontrolled for NOX. The State determined LNBs with advanced OFA, LNBs with advanced OFA and SNCR, and LNBs with advanced OFA and SCR were technically feasible for controlling E:\FR\FM\04JNP2.SGM 04JNP2 33052 Federal Register / Vol. 77, No. 107 / Monday, June 4, 2012 / Proposed Rules NOX emissions from Unit 3. The State did not identify any technically infeasible controls. The State did not identify any energy or non-air quality environmental impacts that would preclude the selection of any of the controls evaluated, and there are no remaininguseful-life issues for this source. Baseline NOX emissions are 5,814 tpy for Unit 3 based on unit heat input rate of 2,500 MMBtu/hr and 7,884 hours of operation. A summary of the State’s NOX BART analysis and the visibility impacts is provided in Table 31 below. TABLE 31—SUMMARY OF DAVE JOHNSTON UNIT 3 NOX BART ANALYSIS Control Efficiency (%) Control Technology LNB with advanced OFA ......................... New LNB with advanced OFA and SNCR ................................................... LNB with advanced OFA and SCR ......... mstockstill on DSK4VPTVN1PROD with PROPOSALS2 33 We are assuming the same costs for Unit 2 as the other Jim Bridger Units. The State analyzed Unit Jkt 226001 Annualized Costs Average Cost Effectiveness ($/ton) 0.28 2,723 $1,764,775 $648 0.77 63.9 86.7 EPA’s Conclusions on Dave Johnston Unit 3 NOX BART Determination and FIP for NOX BART EPA does not agree with the State’s conclusion that a limit of 0.28 lb/ MMBtu is reasonable for NOX BART for Dave Johnston Unit 3, which can be achieved with the installation and operation on LNBs with OFA. In particular, the cost effectiveness values for LNB with OFA and SNCR at this unit is only $73/ton higher than LNBs with OFA, with incremental costs of $920. The increase in cost effectiveness for LNBs with OFA plus SNCR affords visibility improvement over LNBs plus 17:21 Jun 01, 2012 Emission Reduction (tpy) 46.8 Incremental cost effectiveness for the controls evaluated is as follows: New LNB with advanced OFA and SNCR: $920/ton, and LNB with advanced OFA and SCR: $10,234/ton. Based on its consideration of the five factors, the State determined LNBs with OFA was reasonable for NOX BART. The State determined the cost of compliance (capital costs and annual operating and maintenance costs) were significantly higher for the addition of SCR. The State determined the NOX BART emission limits for Unit 3 are 0.28 lb/MMBtu (30-day rolling average), 784 lb/hr (30-day rolling average), and 3,434 tpy. VerDate Mar<15>2010 Emission Rate (lb/MMBtu) (30-day Rolling Average) Visibility Improvement (Delta deciview for the Maximum 98th Percentile Impact at Wind Cave National Park) 0.19 0.07 3,717 5,041 2,679,192 16,347,519 721 3,243 0.94 1.16 OFA of 0.17 delta deciview. LNBs with OFA plus SNCR would result in an additional reduction of 994 tons of NOX. We find that it was unreasonable for the State not to determine that LNBs with OFA plus SNCR was NOX BART for Dave Johnston Unit 3. Thus, we are proposing to disapprove the State’s NOX BART determination for Dave Johnston Unit 3 and proposing a FIP for NOX BART as explained below. Based on our examination of the State’s costs estimates, emission reductions, and the predicted visibility improvement, we propose to find that LNBs with OFA plus SNCR at an emission limit of 0.19 lb/MMBtu (30day rolling average) is reasonable for NOX BART for Dave Johnston Unit 3. We are proposing that the FIP NOX BART emission limit for PacifiCorp Dave Johnston Unit 3 is 0.19 lb/MMBtu (30-day rolling average). We have eliminated the single highest performing option from consideration— LNBs with OFA plus SCR—because the cost effectiveness value is significantly higher than LNBs with OFA and there is a comparatively small incremental visibility improvement over LNBs with OFA. We propose that PacifiCorp meet our proposed emission limit at Dave Johnston Unit 3 no later than five years 2 using post installation of LNBs/OFA costs so the PO 00000 Frm 00032 Fmt 4701 Sfmt 4702 after EPA finalizes action on our proposed FIP. This is consistent with the requirements of 40 CFR 51.308(e)(iv). 3. Disapproval of the State’s PacifiCorp Jim Bridger Units 1 and 2 NOX BART Determination and FIP To Address NOX BART Wyoming’s NOX BART Determination PacifiCorp Jim Bridger Units 1 and 2 are equipped with early generation LNBs with a permit limit of 0.70 lb/ MMBtu (3-hour fixed). The State determined that LNBs with SOFA, ROFA, LNBs with SOFA plus SNCR, and LNBs with SOFA plus SCR were technically feasible for controlling NOX emissions. The State did not identify any technically infeasible options. The State did not identify any energy or non-air quality environmental impacts that would preclude the selection of any of the controls evaluated, nor are there any remaininguseful-life issues for this source. Baseline NOX emissions are 10,643 tpy for all both units based on unit heat input rate of 6,000 MMBtu/hr and 7,884 hours of operation. A summary of the State’s NOX BART analysis and the visibility impacts is provided in Table 32 below.33 cost information provided in their analysis is not consistent with an uncontrolled baseline. E:\FR\FM\04JNP2.SGM 04JNP2 33053 Federal Register / Vol. 77, No. 107 / Monday, June 4, 2012 / Proposed Rules TABLE 32—SUMMARY OF JIM BRIDGER UNITS 1 AND 2 NOX BART ANALYSIS—COSTS PER BOILER Control Efficiency (%) Control Technology mstockstill on DSK4VPTVN1PROD with PROPOSALS2 LNB with SOFA .......................................... New LNB with SOFA and SNCR ............... LNB with SOFA and SCR .......................... Emission Rate (lb/MMBtu) (30-day Rolling Average) 42.2 55.6 84.4 Emission Reduction (tpy) 0.26 0.20 0.07 Annualized Costs Average Cost Effectiveness ($/ton) Visibility Improvement (Delta deciview for the Maximum 98th Percentile Impact at Mt. Zirkel Wilderness)— Units 1—3/4–34 $1,144,969 2,710,801 20,296,400 $255 459 2,258 .41/.47 .52/.62 .76/.82 4,493 5,913 8,987 Incremental cost effectiveness for the control evaluated is as follows: New LNB with SOFA and SNCR: $1,103/ton, and LNB with SOFA and SCR: $5,721/ ton. Based on its consideration of the five factors, the State determined LNBs with SOFA was reasonable for NOX BART. The State determined the cost of compliance (capital costs and annual operating and maintenance costs) were significantly higher for the addition of SCR. The State determined the NOX BART emission limits for Jim Bridger Units 1 and 2 are 0.28 lb/MMBtu (30day rolling average), 1,560 lb/hr (30-day average), and 6,833 tpy. PacifiCorp is required to install additional controls under the State’s LTS. The State determined that based on the cost of compliance and visibility improvement presented by PacifiCorp in the BART applications for Jim Bridger Units 1 and 2 and taking into consideration the logistical challenge of managing multiple pollution control installations within the regulatory time allotted for installation of BART by the RHR, additional controls would be required under the LTS but not BART. With respect to Jim Bridger Units 1 and 2, the State has required PacifiCorp to install SCR, or other NOX control systems, to achieve an emission limit or otherwise reduce NOX emissions to achieve a 0.07 lb/MMBtu 30-day rolling average NOX emissions rate. PacifiCorp is required to meet the 0.07 lb/MMBtu emission rate on Unit 1 prior to December 31, 2021 and on Unit 2 prior to December 31, 2022. EPA does not agree with the State’s conclusion that a limit of 0.26 lb/ MMBtu is reasonable for BART for Jim Bridger Units 1 and 2, which can be achieved with the installation and operation on LNBs with SOFA. In particular, the cost effectiveness values for LNBs with SOFA and SCR at each unit is $2,258 with approximately 0.80 delta deciview visibility improvement. The cost effectiveness values are reasonable and the visibility improvement significant for LNBs with SOFA plus SCR. In addition, the costs are within the range that Wyoming has considered reasonable in the BART context.35 LNBs with OFA plus SCR would result in an additional reduction of 4,494 tpy of NOX emissions at each unit. This difference is substantial. We find that it was unreasonable for the State not to determine that LNBs with OFA plus SCR was NOX BART for Jim Bridger Units 1 and 2. Though the State is requiring the installation of SCR on Units 1 and 2 under its LTS, the compliance date for both installations is beyond the five-years allowed for BART sources by 40 CFR 51.308(e)(iv). Thus, we are proposing to disapprove the State’s NOX BART determination for Jim Bridger Units 1 and 2 and proposing a FIP for NOX BART as explained below. Based on our examination of the State’s costs estimates, emission reductions, and the predicted visibility improvement, we propose to find that LNBs with SOFA plus SCR at an emission limit of 0.07 lb/MMBtu (30day rolling average) is reasonable for NOX BART for Jim Bridger Units 1 and 2. Because our examination of the factors leads us to propose SCR is reasonable for BART, we have eliminated SNCR from further consideration. We are proposing that the FIP NOX BART emission limit for PacifiCorp Units 1 and 2 is 0.07 lb/ MMBtu (30-day rolling average). We propose that PacifiCorp meet our proposed emission limit at Jim Bridger Unit 1 and 2 no later than five years after EPA finalizes action on our proposed FIP. This is consistent with the requirements of 40 CFR 51.308(e)(iv). 34 Unit 4 has different modeling results than the other three units as the stack parameters used in the modeling are different enough from Units 1–3 to yield different modeled results. 35 Wyoming determined that LNBs with OFA and SCR was BART for Naughton Unit 3. The cost effectiveness of SCR for Naughton Unit 3 is $2,830 with 1.0 deciview of visibility improvement. VerDate Mar<15>2010 17:21 Jun 01, 2012 Jkt 226001 PO 00000 Frm 00033 Fmt 4701 Sfmt 4702 4. Proposals in the Alternative for PacifiCorp Jim Bridger Units 1, 2, 3, and 4 NOX BART As noted above, EPA is seeking comment on a proposal (‘‘first proposed approach’’) to approve in part and disapprove in part the regional haze plan submitted by the State. Among other things, EPA’s proposal would determine that BART for Units 1 and 2 of the BART-eligible Jim Bridger power plant is SCR, and would establish corresponding NOx emission limits for these units that would have to be achieved within 5 years of our final action.36 This would have the effect of accelerating the installation of the SCR controls at these units that the State and source owner (PacifiCorp) had proposed to install later (in the 2021–2022 timeperiod). The State determined that BART for these units is LNB plus OFA, and selected the 2021–2022 time-period for SCR-based emission limits as a reasonable progress measure. The delay was based on the large number of actions PacifiCorp is undertaking (or helping to finance) at a large number of EGUs in Wyoming, Utah, Colorado, and Arizona that it owns and operates or coowns. EPA is also seeking comment on an alternative approach (‘‘second proposed approach’’) that differs from our first proposed approach only with regard to Units 3 and 4 at Jim Bridger. The second proposed approach would only differ from the first proposed approach by allowing PacifiCorp to install SCR at Jim Bridger Units 3 and 4 within five years from the date of our final action. This would differ from the first proposed approach that requires PacifiCorp to install SCR at Unit 3 by 2015 and Unit 4 by 2016, while we would still propose SCR on Units 1 and 2 within the five year BART installation timeframe. This second proposed approach would allow PacifiCorp flexibility on timing for the 36 The proposed regulatory language for this rulemaking only covers our first proposed approach. E:\FR\FM\04JNP2.SGM 04JNP2 mstockstill on DSK4VPTVN1PROD with PROPOSALS2 33054 Federal Register / Vol. 77, No. 107 / Monday, June 4, 2012 / Proposed Rules installation of SCR on all four Jim Bridger Units within the BART installation timeline allowed by the RHR. Installing SCR on all four units within the statutory five year period would provide PacifiCorp maximum flexibility to manage the implementation of controls on all the units. EPA also is seeking comment on another alternative approach (‘‘third proposed approach’’) that differs from the first proposed approach only with regard to Units 1 and 2 at Jim Bridger. This third proposed approach would include a different determination regarding BART for these units and would have the effect of approving the state’s timeline for the installation of SCR technologies at Units 1 and 2. PacifiCorp asserted to the State during formulation of the SIP proposal, and has since asserted directly to EPA, that a number of factors, when considered together, suggest that requiring installation of SCR at Jim Bridger Units 1 and 2 earlier than 2021–2022 is not reasonable. First, PacifiCorp points to the large number of retrofit actions it is taking at 20 coal-fired electric generating units in Wyoming, Utah, and Arizona in order to reduce their emissions.37 These retrofits are intended to comply with the requirements in the regional haze SIPs that these states have submitted to EPA and with other regulatory requirements, including required controls for mercury and acid gases under the recent Mercury and Air Toxics Standards rule. The company claims that there are high capital costs for the measures required for these air quality-improving retrofits. Moreover, PacifiCorp states that accelerating the required installation of SCR at Jim Bridger Units 1 and 2 to late 2017, rather than the 2021 and 2022 dates established by the State, would significantly increase the costs to the utility and to its customers.38 In addition, the company asserts that it has designed the installation schedule in order to minimize the number of units that are out of service system wide for installation of emissions controls at any one time. Its goal, it asserts, is to be able to maintain service to its customers with an adequate capacity margin. The company asserts that accelerating the timeline for installation of SCR would upset the orderly shut-down schedule they have devised and would threaten both service interruptions and an 37 For a listing of PacifiCorp’s retrofit actions, see Table 1 of Exhibit A—PacifiCorp’s Emissions Reductions Plan in Chapter 6 of the State’s TSD. 38 See Exhibit A—PacifiCorp’s Emissions Reductions Plan in Chapter 6 of the State’s TSD. VerDate Mar<15>2010 17:21 Jun 01, 2012 Jkt 226001 increased risk of spot-purchases of more expensive electrical energy, if it is available, to serve customers, but that either eventuality would significantly increase costs to its customers.39 Taken together, PacifiCorp claims that the schedule for installation of emissions control devices envisioned in our first proposed approach would be excessively costly and would pose service interruption risks for electrical energy customers over a large part of the region. EPA notes that PacifiCorp has offered these claims taking into account only the requirements in the SIPs that have been submitted to EPA by Wyoming, Utah, Colorado, and Arizona. Today’s proposal includes requirements that would likely require the additional installation of SNCRs at two units owned by PacifiCorp in Wyoming. In addition, we have proposed to partially disapprove the SIP for Utah, and the eventual resolution of this disapproval may involve requirements for retrofits of more units owned by PacifiCorp in that state. We have not yet proposed action on the SIP for Arizona, and the possibility that the Cholla power plant that is partially owned by PacifiCorp may require retrofits not already in PacifiCorp’s plans, cannot be ruled out at this time. Based on the claims made both by the State and PacifiCorp and noting the additional requirements in the proposed FIP for Wyoming and the possibility of additional requirements in future FIPs or SIPs in Utah and Arizona, EPA is seeking comment on these assertions of cost infeasibility and risk to electrical power reliability, as well as the desirability of the third proposed approach including the possible rationale for this third approach as described below. Our third proposed approach has two parts, one addressing BART and one addressing reasonable progress with respect to Jim Bridger. First, EPA would determine that the facts indicate that BART for the all the units at Jim Bridger is SCR when the units are considered individually based on the five factors without regard the status of those factors for other units in the PacifiCorp system. However, when the five factors are considered across all the units in that system, including the fact that EPA’s actions on the SIPs for Wyoming, Utah, and Arizona may create additional retrofit obligations for other PacifiCorpowned EGUs, BART for Jim Bridger as a whole is SCR on Units 3 and 4 and LNB plus OFA on Units 1 and 2. Costs, considered broadly, would be 39 See Exhibit A—PacifiCorp’s Emissions Reductions Plan in Chapter 6 of the State’s TSD. PO 00000 Frm 00034 Fmt 4701 Sfmt 4702 unreasonable to require any further retrofits at this source within 5 years of our final action. We note that the CAA establishes 5 years at the longest period that can be allowed for compliance with BART emission limits. The second part of our third proposed approach is that EPA would approve the SIP with regard to the State’s determination that the appropriate level of NOX control for Units 1 and 2 at Jim Bridger for purposes of reasonable progress is the SCR-based emission limit in the SIP, with compliance dates of December 31, 2021 for Unit 2 and December 31, 2022 for Unit 1. We believe it may be reasonable and feasible for these retrofits to be completed somewhat earlier than these dates even if, as would be necessary to conclude this third approach to have merit, they cannot be completed within 5 years of our final action. However, in the context of reasonable progress in the second planning period of the regional haze program, we believe it may be appropriate to give considerable deference to the State’s conclusions about what controls are reasonable and when they should be implemented. Thus, assuming that we were to finalize this third approach, we do not believe at this time that it would be appropriate to disapprove the State’s preferred compliance deadlines for Units 1 and 2. Under the third proposed approach, we would approve the SIP’s provisions for Units 1 and 2 and not adopt a FIP, because while we would disagree with the State’s reasoning, we would be agreeing with the outcome in terms of the sequence of emission limits that apply to these units and their compliance deadlines. We would be agreeing with the outcome within the context of the phased regional haze statutory and regulatory framework. As stated above, we are asking for comments and information pertaining to our second and third proposed approaches. We need more information to be able to support either alternative approach. If we receive such information, we will provide notice to the public on the availability of such information. We request that any information be submitted as soon as possible, but preferably no later than 30 days after the publication date of this notice. We are requesting that information be submitted within this timeframe to give the public an opportunity to review and comment on the information before the end of the comment period. E:\FR\FM\04JNP2.SGM 04JNP2 33055 Federal Register / Vol. 77, No. 107 / Monday, June 4, 2012 / Proposed Rules 5. Disapproval of the State’s PacifiCorp Wyodak Unit 1 NOX BART Determination and FIP To Address NOX BART Wyoming’s NOX BART Determination Wyodak Unit 1 is currently controlled for NOX emissions with early generation LNBs with a permit limit of 0.70 lb/ MMBtu (3-hour block). The State determined new LNBs with OFA, existing LNBs with ROFA, new LNBs with OFA plus SNCR, and LNBs with OFA plus SCR were technically feasible for controlling NOX emissions. The State did not identify any technically infeasible control options. The State did not identify any energy or non-air quality environmental impacts that would preclude the selection of any of the controls evaluated, and there are no remaininguseful-life issues for this source. A summary of the State’s NOX BART analyses for Unit 1 is provided in Table 33 below. Baseline NOX emissions are 5,744 tpy based on the unit heat input rate of 4,700 MMBtu/hr and 7,884 hours of operation per year. TABLE 33—SUMMARY OF WYODAK UNIT 1 NOX BART ANALYSIS Control Efficiency (%) Control Technology LNBs with OFA ........................................ LNBs with OFA and SNCR ...................... LNBs with OFA and SCR ........................ 25.8 41.9 77.4 Incremental cost effectiveness for the controls evaluated is as follows: LNBs with OFA and SNCR: $1,080/ton, and LNBs with OFA and SCR: $8,147/ton. Based on its consideration of the five factors, the State determined LNBs with OFA was reasonable for NOX BART for Unit 1. The State determined other control technologies were not reasonable based on the high cost effectiveness and low visibility improvement. The State determined the NOX BART emission limits for Wyodak Unit 1 are 0.23 lb/MMBtu (30-day rolling average), 1,081 lb/MMBtu (30day rolling average), and 4,735 tpy. mstockstill on DSK4VPTVN1PROD with PROPOSALS2 EPA’s Conclusions on Wyodak Unit 1 NOX BART Determination and FIP for NOX BART EPA does not agree with the State’s conclusion that a limit of 0.23 lb/ MMBtu is reasonable for NOX BART for Wyodak Unit 1, which can be achieved with the installation and operation of LNBs with OFA. In particular, the cost effectiveness value for LNB with OFA plus SNCR at this unit is only $77/ton higher than LNBs with OFA, with an incremental cost of $1,080. The increase in cost effectiveness for LNBs with OFA plus SNCR affords a visibility improvement of 0.15 deciviews over LNBs plus OFA. LNBs with OFA plus SNCR would result in an additional reduction of around 900 tons of NOX. We find that it was unreasonable for the State not to determine that LNBs with OFA plus SNCR was NOX BART for Wyodak Unit 1. Thus, we are proposing to disapprove the State’s NOX BART determination for Wyodak Unit 1 and VerDate Mar<15>2010 17:21 Jun 01, 2012 Jkt 226001 Emission Rate (lb/MMBtu) (30-day Rolling Average) Emission Reduction (tpy) 0.23 0.18 0.07 1,483 2,409 4,447 proposing a FIP for NOX BART as explained below. Based on our examination of the State’s costs estimates, emission reductions, and the predicted visibility improvement, we propose to find that LNBs with OFA plus SNCR at an emission limit of 0.18 lb/MMBtu (30day rolling average) is reasonable for NOX BART for Wyodak Unit 1. We are proposing that the FIP NOX BART emission limit for PacifiCorp Wyodak Unit 1 is 0.18 lb/MMBtu (30-day rolling average). We have eliminated the single highest performing option from consideration— LNBs with OFA plus SCR—because the cost effectiveness value is significantly higher than LNBs with OFA and there is a comparatively small incremental visibility improvement over LNBs with OFA. We propose that PacifiCorp meet our proposed emission limit at Wyodak Unit 1 no later than five years after EPA finalizes action on our proposed FIP. This is consistent with the requirements of 40 CFR 51.308(e)(iv). B. Disapproval of the State’s NOX Reasonable Progress Determinations and Federal Implementation Plan for NOX Reasonable Progress Determinations and Limits We are proposing to disapprove the State’s reasonable progress determination for PacifiCorp Dave Johnston Unit 1 and Unit 2, and we are proposing a reasonable progress NOX FIP for these units, as explained below. As noted above, the State provided fourfactor analyses that adequately evaluated the required factors. Thus, in disapproving the State’s reasonable PO 00000 Frm 00035 Fmt 4701 Sfmt 4702 Annualized Costs $1,306,203 2,306,728 18,910,781 Average Cost Effectiveness ($/ton) Visibility Improvement (Delta dv for the Maximum 98th Percentile Impact at Wind Cave National Park) $881 958 4,252 0.25 0.40 0.72 progress determination, we are basing our analysis on information provided by the State in its reasonable progress analysis, with the exception of visibility improvement modeling. We concluded that it is also appropriate for this facility to consider a fifth factor for evaluating potential reasonable progress control options— the degree of visibility improvement that may reasonably be anticipated from the use of the reasonable progress controls. Our reasonable progress guidance contemplates that states (or EPA in lieu of a state) may be able to consider other relevant factors for reasonable progress sources (see EPA’s Guidance for Setting Reasonable Progress Goals under the Regional Haze Program, (‘‘Reasonable Progress Guidance’’), pp. 2–3, July 1, 2007). We find it appropriate, in certain circumstances, to consider visibility improvement when evaluating potential reasonable progress controls. Thus, EPA conducted visibility improvement modeling for Dave Johnston Units 1 and 2.40 1. PacifiCorp Dave Johnston—Units 1 and 2 Background PacifiCorp’s Dave Johnston Power Plant is comprised of four units burning pulverized subbituminous Powder River Basin coal. Both are nominal 106 MW pulverized coal-fired units. Unit 1 began operation in 1958 and Unit 2 in 1960. 40 A summary of EPA’s modeling methodology and results can be found in the docket under EPA BART and RP Modeling for Wyoming Sources. E:\FR\FM\04JNP2.SGM 04JNP2 33056 Federal Register / Vol. 77, No. 107 / Monday, June 4, 2012 / Proposed Rules The State did not identify any energy or non-air quality environmental impacts that would preclude the selection of any of the controls evaluated, and there are no remaininguseful-life issues for this source. A summary of the State’s NOX reasonable progress analyses for Unit 1 and Unit 2, along with our visibility modeling Wyoming’s NOX Reasonable Progress Determination Unit 1 and Unit 2 are currently uncontrolled for NOX emissions. The State determined that LNBs, LNBs with OFA, SNCR, and SCR were technically feasible for controlling NOX emissions. The State did not identify any technically infeasible control options. results, is provided in Tables 34 and 35 below. Baseline NOX emissions are 2,256 tpy for Unit 1 and 2,174 tpy for Unit 2 based on 2002 actual emissions. Wyoming did not provide controlled emission rates in their reasonable progress analysis. EPA calculated the controlled emission rates shown here. TABLE 34—SUMMARY OF DAVE JOHNSTON UNIT 1 NOX REASONABLE PROGRESS ANALYSIS Emission Rate (lb/MMBtu) (30-day Rolling Average) Control Efficiency (%) Control Technology LNBs ........................................................ LNBs with OFA ........................................ SNCR ....................................................... SCR .......................................................... 51 65 40 80 Emission Reduction (tpy) 0.28 0.20 0.35 0.12 1,150 1,466 902 1,804 Annualized Costs $631,000 962,000 2,490,000 3,390,000 Average cost Effectiveness ($/ton) $528 632 2,659 1,810 Visibility Improvement (Delta dv for the Maximum 98th Percentile Impact at Wind Cave National Park) 0.37 0.49 0.26 0.58 TABLE 35—SUMMARY OF DAVE JOHNSTON UNIT 2 NOX REASONABLE PROGRESS ANALYSIS mstockstill on DSK4VPTVN1PROD with PROPOSALS2 LNBs ........................................................ LNBs with OFA ........................................ SNCR ....................................................... SCR .......................................................... 51 65 40 80 The State estimated that it would take nearly five and a half years for NOX reduction strategies to become effective. The State determined that roughly two years would be necessary for the State to develop the necessary regulations to implement the selected control measures. The State estimated that it would take up to a year for the source to secure the capital necessary to purchase emission control devices and approximately 18 months would be required for the company to design, fabricate, and install SCR or SNCR technology. Since there are two boilers being evaluated at Dave Johnston, the State determined an additional year may be required for staging the installation process. The State determined that no controls were reasonable for this planning period. The State cited that the fourfactor analysis was limited, in that no guidance was provided by EPA for identifying significant sources and EPA did not establish contribution to visibility impairment thresholds (a potential fifth factor for reasonable VerDate Mar<15>2010 17:21 Jun 01, 2012 Emission Rate (lb/MMBtu) (30-day Rolling Average) Control Efficiency (%) Control Technology Jkt 226001 Emission Reduction (tpy) 0.28 0.20 0.35 0.12 1,108 1,413 869 1,739 progress determinations).41 The State further claims that the State cannot, per Wyoming Statute 35–11–202, establish emission control requirements except through State rule or regulation. Furthermore, the Wyoming statute requires the State to consider the character and degree of injury of the emissions involved. In this case, the State claims it would need to have visibility modeling that assessed the degree of injury caused by the emissions, which the State does not have. The State believes it has taken a strong and reasonable first step in identifying potential contributors to visibility impairment, and that the next step of creating an appropriate rule or regulation will be accomplished in the next SIP revision. 41 States must consider the four factors as listed above but can also take into account other relevant factors for the reasonable progress sources identified (see EPA’s Guidance for Setting Reasonable Progress Goals under the Regional Haze Program, (‘‘EPA’s Reasonable Progress Guidance’’), p. 2–3, July 1, 2007). PO 00000 Frm 00036 Fmt 4701 Sfmt 4702 Annualized Costs $631,000 962,000 2,490,000 3,390,000 Average Cost Effectiveness ($/ton) Visibility Improvement (Delta dv for the Maximum 98th Percentile Impact at Wind Cave National Park) $538 644 2,709 1,844 0.38 0.49 0.28 0.58 EPA’s Conclusions on Dave Johnston Units 1 and 2 NOX Reasonable Progress Determination and FIP for NOX Reasonable Progress Controls We disagree with the State’s reasoning for not adopting reasonable progress controls for Dave Johnston Unit 1 and Unit 2. If the State determined that it needed to adopt a rule or perform modeling to adequately assess and, if warranted, require reasonable progress controls, the State should have completed these steps before it submitted its regional haze SIP. The RHR does not allow for commitments to potentially implement strategies at some later date that are identified under reasonable progress or for the State to take credit for such commitments. In addition, the cost effectiveness values for LNBs with OFA at each unit are $632 and $644 per ton. These values are very reasonable and far less than some of the cost effectiveness values the State found reasonable in making its BART determinations. Given predicted NOX reductions of approximately 1,400 tpy per unit, visibility improvement of E:\FR\FM\04JNP2.SGM 04JNP2 Federal Register / Vol. 77, No. 107 / Monday, June 4, 2012 / Proposed Rules mstockstill on DSK4VPTVN1PROD with PROPOSALS2 approximately 0.5 deciviews per unit, and the fact that Wyoming’s reasonable progress goals will not meet the URP, we find that it was unreasonable for the State to reject these very inexpensive controls. Thus, we are proposing to disapprove the State’s NOX reasonable progress determination for Dave Johnston Unit 1 and Unit 2 and proposing a FIP for NOX reasonable progress controls as explained below. Based on our examination of the State’s costs estimates, emission reductions, and the predicted visibility improvement, we propose to find that LNBs with OFA at an emission limit of 0.20 lb/MMBtu (30-day rolling average) is reasonable for NOX reasonable progress controls for Dave Johnston Units 1 and 2. We are proposing that the FIP NOX reasonable progress emission limit for PacifiCorp Dave Johnston Unit 1 and Unit 2 is 0.20 lb/MMBtu (30-day rolling average). We have eliminated higher performing options from consideration—LNBs with OFA plus SCR—because the cost effectiveness values are significantly higher than LNBs with OFA and there is a comparatively small incremental visibility improvement over LNBs with OFA. We propose that PacifiCorp meet our proposed emission limit at Dave Johnston Units 1 and 2 as expeditiously as possible, but no later than July 31, 2018. This is consistent with the requirement that the SIP cover an initial planning period that ends July 31, 2018. C. Reasonable Progress Goals We are proposing to impose reasonable progress controls on Dave Johnston Units 1 and 2, as well as more stringent NOX BART controls on PacifiCorp Dave Johnston Unit 3, PacifiCorp Jim Bridger Units 1 and 2, PacifiCorp Wyodak Unit 1, and Basin Electric Laramie River Units 1, 2, and 3, than WRAP assumed in modeling Wyoming’s RPGs. We could not re-run the WRAP modeling due to time and resource constraints, but anticipate that the additional controls would result in an increase in visibility improvement during the 20% worst days. As noted in our analyses, many of our proposed controls would result in significant incremental visibility benefits when modeled against natural background. We anticipate that this would translate into some measurable improvement if modeled on the 20% best days as well. While we expect our proposed controls will result in additional visibility improvement, we do not expect that these improvements will result in the VerDate Mar<15>2010 17:21 Jun 01, 2012 Jkt 226001 State achieving the URP. For the reasons discussed in section VI.D.3, we find it reasonable for the State to not achieve the URP during this planning period. We expect the State to quantify the visibility improvement in its next regional haze SIP revision. For purposes of this action, we are proposing RPGs that are consistent with the additional controls we are proposing. While we would prefer to quantify the RPGs, we note that the RPGs themselves are not enforceable values. The more critical elements for our FIP are the emissions limits we are proposing to impose, which will be enforceable. D. Federal Monitoring, Recordkeeping, and Reporting Requirements The CAA requires that SIPs, including the regional haze SIP, contain elements sufficient to ensure emission limits are practically enforceable.42 Other applicable regulatory provisions are contained in Appendix V to Part 51— Criteria for Determining the Completeness of Plan Submissions.43 We are proposing to find that the State’s regional haze SIP does not contain adequate monitoring, recordkeeping and reporting requirements. Chapter 6.4, Section V of the SIP contains monitoring and reporting requirements that we find inadequate for numerous reasons, summarized as follows: (1) The State’s language includes references to WAQSR Chapters that EPA has not approved as part of the SIP and are thus 42 CAA Section 110(a)(2) states that SIPs ‘‘shall (A) include enforceable emission limitations and other control measures, means, or techniques (including economic incentives such as fees, marketable permits, and auctions of emissions rights), as well as schedules and timetables for compliance, as may be necessary or appropriate to meet the applicable requirements of this chapter; (C) include a program to provide for the enforcement of the measures described in subparagraph (A), and regulation of the modification and construction of any stationary source within the areas covered by the plan as necessary to assure that national ambient air quality standards are achieved, including a permit program as required in parts C and D of this subchapter; (F) require, as may be prescribed by the Administrator—(i) the installation, maintenance, and replacement of equipment, and the implementation of other necessary steps, by owners or operators of stationary sources to monitor emissions from such sources, (ii) periodic reports on the nature and amounts of emissions and emissions-related data from such sources, and (iii) correlation of such reports by the State agency with any emission limitations or standards established pursuant to this chapter, which reports shall be available at reasonable times for public inspection’’ 43 Appendix V part 51 states in section 2.2 that complete SIPs contain: ‘‘(g) Evidence that the plan contains emission limitations, work practice standards and recordkeeping/reporting requirements, where necessary, to ensure emission levels’’; and ‘‘(h) Compliance/enforcement strategies, including how compliance will be determined in practice.’’ PO 00000 Frm 00037 Fmt 4701 Sfmt 4702 33057 not federally enforceable. These references should be to the appropriate sections in the CFR; (2) Definitions have not been included; (3) The State’s language allows for data substitution pursuant to 40 CFR part 75. The data substitution procedures of 40 CFR part 75 were never intended to apply to BART sources; (4) There are numerous language clarifications and rewordings needed; and (5) The State did not include appropriate recordkeeping language.44 EPA is proposing to disapprove the State’s monitoring, recordkeeping, and reporting requirements in Chapter 6.4 of the SIP. EPA is proposing regulatory language as part of our FIP that specifies monitoring, recordkeeping, and reporting requirements for all BART and reasonable progress sources. For purposes of consistency, EPA is proposing to adopt language that is the same we have adopted for other states in Region 8. E. Federal Implementation Plan for the Long-Term Strategy We are proposing regulatory language as part of our FIP that specifies NOX emission limits and compliance schedules for the following sources: PacifiCorp Dave Johnston Units 1–3, PacifiCorp Jim Bridger Units 1 and 2, PacifiCorp Wyodak Unit 1, and Basin Electric Laramie River Units 1, 2, and 3. We are also proposing monitoring, recordkeeping, and reporting requirements for all BART SIP and FIP sources and for Dave Johnston Units 1 and 2. We are proposing this regulatory language to fill the gap in the LTS that would be left by our proposed partial disapproval of the LTS. F. Federal Implementation Plan for Coordination of RAVI and Regional Haze Long-Term Strategy In response to EPA’s RAVI rules, Wyoming adopted WAQSR Chapter 9, Section 2. EPA approved WAQSR Chapter 9, Section 2 as part of the SIP on July 28, 2004 (69 FR 44965). As discussed above, the State is required to coordinate the review of its RAVI and regional haze LTS and conduct the reviews together. WAQSR Chapter 9, Section 2(f) requires the State to review its RAVI LTS every three years, which does not coordinate with the five-year review for the State’s regional haze LTS. 44 On July 6, 2011, EPA sent an email to the State with detailed comments (that are summarized above) on the State’s monitoring, recordkeeping, and reporting requirements in Chapter 6.4, Section V of the SIP. The July 6, 2011 email from Laurel Dygowski, EPA Region 8, to Tina Anderson, State of Wyoming, is included in the Supporting and Related Materials section of the docket. E:\FR\FM\04JNP2.SGM 04JNP2 33058 Federal Register / Vol. 77, No. 107 / Monday, June 4, 2012 / Proposed Rules Thus, we are proposing to disapprove the State’s SIP because it does not meet the requirements of 40 CFR 51.306(c). We are proposing a FIP in which EPA commits to coordinating the State’s RAVI LTS review with the regional haze LTS review. Thus, EPA is committing to provide a review of the State’s RAVI LTS every five years in coordination with the State’s regional haze LTS review. EPA is proposing that our review of the State’s RAVI LTS will follow those items as indicated by 40 CFR 51.306(c). mstockstill on DSK4VPTVN1PROD with PROPOSALS2 VIII. EPA’s Proposed Action EPA is proposing to partially approve and partially disapprove a regional haze SIP revision submitted by the State of Wyoming on January 12, 2011. Specifically, we are proposing to disapprove the following: • The State’s NOX BART determinations for PacifiCorp Dave Johnston Unit 3, PacifiCorp Jim Bridger Units 1 and 2, PacifiCorp Wyodak Unit 1, and Basin Electric Laramie River Units 1, 2, and, 3. • The State’s NOX reasonable progress determination for PacifiCorp Dave Johnston Units 1 and 2. • Wyoming’s Reasonable Progress Goals (RPGs) • The State’s monitoring and recordkeeping requirements in Chapter 6.4 of the SIP. • Portions of the State’s long-term strategy (LTS) that rely on or reflect other aspects of the regional haze SIP we are proposing to disapprove. • The State’s SIP because it does not contain the necessary provisions to meet the requirements for the coordination of the review of the reasonably attributable visibility impairment (RAVI) and the regional haze long-term strategy (LTS). We are proposing to approve the remaining aspects of the State’s January 12, 2011, SIP submittal. We are also seeking comment on two alternative proposals related to the State’s NOX BART determination for PacifiCorp Jim Bridger Units 1 and 2. We are proposing the promulgation of a FIP to address the deficiencies in the Wyoming regional haze SIP that we have identified in this proposal. The proposed FIP includes the following elements: • NOX BART determinations and limits for PacifiCorp Dave Johnston Unit 3, PacifiCorp Jim Bridger Units 1 and 2, PacifiCorp Wyodak Unit 1, and Basin Electric Laramie River Units 1, 2, and 3. • NOX reasonable progress determination and limits for PacifiCorp Dave Johnston Units 1 and 2. VerDate Mar<15>2010 17:21 Jun 01, 2012 Jkt 226001 • RPGs consistent with the SIP limits proposed for approval and the proposed FIP limits. • Monitoring, record-keeping, and reporting requirements applicable to all BART and reasonable progress sources for which there is a SIP or FIP emissions limit. • LTS elements pertaining to emission limits and compliance schedules for the proposed BART and reasonable progress FIP limits. • Provisions to ensure the coordination of the RAVI and regional haze LTS. IX. Statutory and Executive Order Reviews A. Executive Order 12866: Regulatory Planning and Review and Executive Order 13563: Improving Regulation and Regulatory Review This action is not a ‘‘significant regulatory action’’ under the terms of Executive Order 12866 (58 FR 51735, October 4, 1993) and is therefore not subject to review under Executive Orders 12866 and 13563 (76 FR 3821, January 21, 2011). As discussed in section C below, the proposed FIP applies to only four facilities. It is therefore not a rule of general applicability. B. Paperwork Reduction Act This action does not impose an information collection burden under the provisions of the Paperwork Reduction Act, 44 U.S.C. 3501 et seq. Burden is defined at 5 CFR 1320.3(b). Because the proposed FIP applies to just four facilities, the Paperwork Reduction Act does not apply. See 5 CFR 1320(c). C. Regulatory Flexibility Act The Regulatory Flexibility Act (RFA) generally requires an agency to prepare a regulatory flexibility analysis of any rule subject to notice and comment rulemaking requirements under the Administrative Procedure Act or any other statute unless the agency certifies that the rule will not have a significant economic impact on a substantial number of small entities. Small entities include small businesses, small organizations, and small governmental jurisdictions. For purposes of assessing the impacts of today’s proposed rule on small entities, small entity is defined as: (1) A small business as defined by the Small Business Administration’s (SBA) regulations at 13 CFR 121.201; (2) a small governmental jurisdiction that is a government of a city, county, town, school district or special district with a population of less than 50,000; and (3) PO 00000 Frm 00038 Fmt 4701 Sfmt 4702 a small organization that is any not-forprofit enterprise which is independently owned and operated and is not dominant in its field. After considering the economic impacts of today’s proposed rule on small entities, I certify that this action will not have a significant economic impact on a substantial number of small entities. The Regional Haze FIP that EPA is proposing for purposes of the regional haze program consists of imposing federal controls to meet the BART requirement for NOX emissions on specific units at four sources in Wyoming, and imposing controls to meet the reasonable progress requirement for NOX emissions at one additional source in Wyoming. The net result of this FIP action is that EPA is proposing direct emission controls on selected units at only four sources. The sources in question are each large electric generating plants that are not owned by small entities, and therefore are not small entities. The proposed partial approval of the SIP, if finalized, merely approves state law as meeting Federal requirements and imposes no additional requirements beyond those imposed by state law. See Mid-Tex Electric Cooperative, Inc. v. FERC, 773 F.2d 327 (D.C. Cir. 1985). We continue to be interested in the potential impacts of the proposed rule on small entities and welcome comments on issues related to such impacts. D. Unfunded Mandates Reform Act (UMRA) Title II of the Unfunded Mandates Reform Act of 1995 (UMRA), Public Law 104–4, establishes requirements for federal agencies to assess the effects of their regulatory actions on State, local, and Tribal governments and the private sector. Under section 202 of UMRA, EPA generally must prepare a written statement, including a cost-benefit analysis, for proposed and final rules with ‘‘Federal mandates’’ that may result in expenditures to State, local, and Tribal governments, in the aggregate, or to the private sector, of $100 million or more (adjusted for inflation) in any one year. Before promulgating an EPA rule for which a written statement is needed, section 205 of UMRA generally requires EPA to identify and consider a reasonable number of regulatory alternatives and adopt the least costly, most costeffective, or least burdensome alternative that achieves the objectives of the rule. The provisions of section 205 of UMRA do not apply when they are inconsistent with applicable law. Moreover, section 205 of UMRA allows E:\FR\FM\04JNP2.SGM 04JNP2 Federal Register / Vol. 77, No. 107 / Monday, June 4, 2012 / Proposed Rules mstockstill on DSK4VPTVN1PROD with PROPOSALS2 EPA to adopt an alternative other than the least costly, most cost-effective, or least burdensome alternative if the Administrator publishes with the final rule an explanation why that alternative was not adopted. Before EPA establishes any regulatory requirements that may significantly or uniquely affect small governments, including Tribal governments, it must have developed under section 203 of UMRA a small government agency plan. The plan must provide for notifying potentially affected small governments, enabling officials of affected small governments to have meaningful and timely input in the development of EPA regulatory proposals with significant federal intergovernmental mandates, and informing, educating, and advising small governments on compliance with the regulatory requirements. Under Title II of UMRA, EPA has determined that this proposed rule does not contain a federal mandate that may result in expenditures that exceed the inflation-adjusted UMRA threshold of $100 million by State, local, or Tribal governments or the private sector in any one year. In addition, this proposed rule does not contain a significant federal intergovernmental mandate as described by section 203 of UMRA nor does it contain any regulatory requirements that might significantly or uniquely affect small governments. E. Executive Order 13132: Federalism Federalism (64 FR 43255, August 10, 1999) revokes and replaces Executive Orders 12612 (Federalism) and 12875 (Enhancing the Intergovernmental Partnership). Executive Order 13132 requires EPA to develop an accountable process to ensure ‘‘meaningful and timely input by State and local officials in the development of regulatory policies that have federalism implications.’’ ‘‘Policies that have federalism implications’’ is defined in the Executive Order to include regulations that have ‘‘substantial direct effects on the States, on the relationship between the national government and the States, or on the distribution of power and responsibilities among the various levels of government.’’ Under Executive Order 13132, EPA may not issue a regulation that has federalism implications, that imposes substantial direct compliance costs, and that is not required by statute, unless the federal government provides the funds necessary to pay the direct compliance costs incurred by state and local governments, or EPA consults with state and local officials early in the process of developing the proposed regulation. EPA also may not issue a regulation that VerDate Mar<15>2010 17:21 Jun 01, 2012 Jkt 226001 has federalism implications and that preempts state law unless the Agency consults with state and local officials early in the process of developing the proposed regulation. This rule will not have substantial direct effects on the states, on the relationship between the national government and the states, or on the distribution of power and responsibilities among the various levels of government, as specified in Executive Order 13132, because it merely addresses the State not fully meeting its obligation to prohibit emissions from interfering with other states measures to protect visibility established in the CAA. Thus, Executive Order 13132 does not apply to this action. In the spirit of Executive Order 13132, and consistent with EPA policy to promote communications between EPA and state and local governments, EPA specifically solicits comment on this proposed rule from state and local officials. F. Executive Order 13175: Consultation and Coordination With Indian Tribal Governments Executive Order 13175, entitled Consultation and Coordination With Indian Tribal Governments (65 FR 67249, November 9, 2000), requires EPA to develop an accountable process to ensure ‘‘meaningful and timely input by tribal officials in the development of regulatory policies that have tribal implications.’’ This proposed rule does not have tribal implications, as specified in Executive Order 13175. It will not have substantial direct effects on tribal governments. Thus, Executive Order 13175 does not apply to this rule. G. Executive Order 13045: Protection of Children From Environmental Health Risks and Safety Risks EPA interprets EO 13045 (62 FR 19885, April 23, 1997) as applying only to those regulatory actions that concern health or safety risks, such that the analysis required under section 5–501 of the EO has the potential to influence the regulation. This action is not subject to EO 13045 because it implements specific standards established by Congress in statutes. However, to the extent this proposed rule will limit emissions of NOx, SO2, and PM, the rule will have a beneficial effect on children’s health by reducing air pollution. PO 00000 Frm 00039 Fmt 4701 Sfmt 4702 33059 H. Executive Order 13211: Actions Concerning Regulations That Significantly Affect Energy Supply, Distribution, or Use This action is not subject to Executive Order 13211 (66 FR 28355 (May 22, 2001)), because it is not a significant regulatory action under Executive Order 12866. I. National Technology Transfer and Advancement Act Section 12(d) of the National Technology Transfer and Advancement Act of 1995 (‘‘NTTAA’’), Public Law No. 104–113, 12(d) (15 U.S.C. 272 note) directs EPA to use voluntary consensus standards in its regulatory activities unless to do so would be inconsistent with applicable law or otherwise impractical. Voluntary consensus standards are technical standards (e.g., materials specifications, test methods, sampling procedures, and business practices) that are developed or adopted by voluntary consensus standards bodies. NTTAA directs EPA to provide Congress, through OMB, explanations when the Agency decides not to use available and applicable voluntary consensus standards. This proposed rulemaking does not involve technical standards. Therefore, EPA is not considering the use of any voluntary consensus standards. J. Executive Order 12898: Federal Actions To Address Environmental Justice in Minority Populations and Low-Income Populations Executive Order 12898 (59 FR 7629, February 16, 1994), establishes federal executive policy on environmental justice. Its main provision directs federal agencies, to the greatest extent practicable and permitted by law, to make environmental justice part of their mission by identifying and addressing, as appropriate, disproportionately high and adverse human health or environmental effects of their programs, policies, and activities on minority populations and low-income populations in the United States. We have determined that this proposed action, if finalized, will not have disproportionately high and adverse human health or environmental effects on minority or low-income populations because it increases the level of environmental protection for all affected populations without having any disproportionately high and adverse human health or environmental effects on any population, including any minority or low-income population. This proposed rule limits emissions of NOX from four facilities in Wyoming. E:\FR\FM\04JNP2.SGM 04JNP2 33060 Federal Register / Vol. 77, No. 107 / Monday, June 4, 2012 / Proposed Rules The partial approval of the SIP, if finalized, merely approves state law as meeting Federal requirements and imposes no additional requirements beyond those imposed by state law. K. Congressional Review Act The Congressional Review Act, 5 U.S.C. 801 et seq., as added by the Small Business Regulatory Enforcement Fairness Act of 1996, does not apply because this action is not a ‘‘major rule’’ as defined by 5 U.S.C. 804(2). List of Subjects in 40 CFR Part 52 Environmental protection, Air pollution control, Intergovernmental relations, Nitrogen dioxide, Particulate matter, Reporting and recordkeeping requirements, Sulfur oxides, Volatile organic compounds. Dated: May 15, 2012. James B. Martin, Regional Administrator, Region 8. 40 CFR part 52 is proposed to be amended as follows: PART 52—[AMENDED] 1. The authority citation for part 52 continues to read as follows: Authority: 42 U.S.C. 7401 et seq. Subpart ZZ—Wyoming 2. Add section 52.2636 to read as follows: § 52.2636 Federal implementation plan for regional haze. (a) Applicability. This section applies to each owner and operator of the following emissions units in the State of Wyoming for which EPA proposes to approve the State’s BART determination: FMC Westvaco Trona Plant Units NS– 1A and NS–1B (PM and NOX); TATA Chemicals Partners (previously General Chemical) Boilers C and D (PM and NOX); Basin Electric Power Cooperative Laramie River Station Units 1, 2, and 3 (PM); Pacificorp Dave Johnston Power Plant Unit 3 (PM); Pacificorp Dave Johnston Power Plant Unit 4 (PM and NOX); Pacificorp Jim Bridger Power Plant Units 1 and 2 (PM); Pacificorp Jim Bridger Power Plant Units 3 and 4 (PM and NOX); Pacificorp Naughton Power Plant Units 1, 2, and 3 (PM and NOX); and Pacificorp Wyodak Power Plant Unit 1 (PM). This section also applies to each owner and operator of the following emissions units in the State of Wyoming for which EPA proposes to disapprove the State’s BART determination and issue a NOX BART Federal Implementation Plan: Basin Electric Power Cooperative Laramie River Station Units 1, 2, and 3; Pacificorp Dave Johnston Power Plant Unit 3; Pacificorp Jim Bridger Power Plant Units 1 and 2; and Pacificorp Wyodak Power Plant Unit 1. This section also applies to each owner and operator of the following emissions units in the State of Wyoming for which EPA proposes to disapprove the State’s reasonable progress determinations and issue a reasonable progress determination NOX Federal Implementation Plan: Pacificorp Dave Johnston Power Plant Units 1 and 2. (b) Definitions. Terms not defined below shall have the meaning given them in the Clean Air Act or EPA’s regulations implementing the Clean Air Act. For purposes of this section: (1) BART means Best Available Retrofit Technology. (2) BART unit means any unit subject to a Regional Haze emission limit in Table 1 and Table 2 of this section. (3) CAM means Compliance Assurance Monitoring as required by 40 CFR part 64. (4) Continuous emission monitoring system or CEMS means the equipment required by this section to sample, analyze, measure, and provide, by means of readings recorded at least once every 15 minutes (using an automated data acquisition and handling system (DAHS)), a permanent record of NOX emissions, diluent, or stack gas volumetric flow rate. (5) FIP means Federal Implementation Plan. (6) Lb/hr means pounds per hour. (7) Lb/MMBtu means pounds per million British thermal units of heat input to the fuel-burning unit. (8) NOX means nitrogen oxides. (9) Operating day means a 24-hour period between 12 midnight and the following midnight during which any fuel is combusted at any time in the BART or RP unit. It is not necessary for fuel to be combusted for the entire 24hour period. (10) The owner/operator means any person who owns or who operates, controls, or supervises a unit identified in paragraph (a) of this section. (11) PM means filterable total particulate matter. (12) RP unit means any Reasonable Progress unit subject to a Regional Haze emission limit in Table 3 of this section. (13) Unit means any of the units identified in paragraph (a) of this section. (c) Emissions limitations. (1) The owners/operators of emissions units subject to this section shall not emit, or cause to be emitted, PM or NOX in excess of the following limitations: TABLE 1—EMISSION LIMITS FOR BART UNITS FOR WHICH EPA PROPOSES TO APPROVE THE STATE’S BART DETERMINATION PM Emission Limits NOX Emission Limits Source Name/BART Unit mstockstill on DSK4VPTVN1PROD with PROPOSALS2 lb/MMBtu FMC Westvaco Trona Plant/Unit NS–1A .................... FMC Westvaco Trona Plant/Unit NS–1B .................... TATA Chemicals Partners (General Chemical) Green River Trona Plant/Boiler C ....................................... TATA Chemicals Partners (General Chemical) Green River Trona Plant/Boiler D ....................................... Basin Electric Power Cooperative Laramie River Station/Unit 1 ................................................................. Basin Electric Power Cooperative Laramie River Station/Unit 2 ................................................................. Basin Electric Power Cooperative Laramie River Station/Unit 3 ................................................................. Pacificorp Dave Johnston Power Plant/Unit 3 ............. Pacificorp Dave Johnston Power Plant/Unit 4 ............. VerDate Mar<15>2010 17:21 Jun 01, 2012 Jkt 226001 PO 00000 lb/hr Tons per year 0.05 0.05 45 45 197 197 0.35 0.35 284 284 0.09 50 219 0.28 149.5 654.9 0.09 80 350.4 0.28 246.4 1,079.2 0.03 193 844 N/A N/A N/A 0.03 193 844 N/A N/A N/A 0.03 0.015 0.015 198 42.1 61.5 867 184 269 N/A N/A 0.15 N/A N/A 615 N/A N/A 2,694 Frm 00040 Fmt 4701 Sfmt 4702 lb/MMBtu E:\FR\FM\04JNP2.SGM 04JNP2 lb/hr Tons per year 1244 1244 33061 Federal Register / Vol. 77, No. 107 / Monday, June 4, 2012 / Proposed Rules TABLE 1—EMISSION LIMITS FOR BART UNITS FOR WHICH EPA PROPOSES TO APPROVE THE STATE’S BART DETERMINATION—Continued PM Emission Limits NOX Emission Limits Source Name/BART Unit lb/MMBtu Pacificorp Pacificorp Pacificorp Pacificorp Pacificorp Pacificorp Pacificorp Pacificorp Jim Bridger Power Plant/Unit 1 .................. Jim Bridger Power Plant/Unit 2 .................. Jim Bridger Power Plant/Unit 3 .................. Jim Bridger Power Plant/Unit 4 .................. Naughton Power Plant/Unit 1 ..................... Naughton Power Plant/Unit 2 ..................... Naughton Power Plant/Unit 3 ..................... Wyodak Power Plant/Unit 1 ........................ TABLE 2—EMISSION LIMITS FOR BART UNITS FOR WHICH EPA PROPOSES TO DISAPPROVE THE STATE’S BART DETERMINATION AND IMPLEMENT A FIP Source Name/BART Unit NOX Emission Limit (lb/MMBtu) Basin Electric Power Cooperative Laramie River Station/Unit 1 .......................... Basin Electric Power Cooperative Laramie River Station/Unit 2 .......................... Basin Electric Power Cooperative Laramie River Station/Unit 3 .......................... Pacificorp Dave Johnston Power Plant/Unit 3 ............ Pacificorp Jim Bridger Power Plant/Unit 1 ....................... Pacificorp Jim Bridger Power Plant/Unit 2 ....................... Pacificorp Wyodak Power Plant/Unit 1 ....................... 0.12 0.12 0.12 0.19 0.07 0.07 0.18 TABLE 3—EMISSION LIMITS FOR RP UNITS FOR WHICH EPA PROPOSES TO DISAPPROVE THE STATE’S RP DETERMINATION AND IMPLEMENT A FIP Source Name/RP Unit NOX Emission Limit (lb/MMBtu) mstockstill on DSK4VPTVN1PROD with PROPOSALS2 Pacificorp Dave Johnston Power Plant/Unit 1 ............ Pacificorp Dave Johnston Power Plant/Unit 2 ............ 0.20 0.20 (2) These emission limitations shall apply at all times, including startups, shutdowns, emergencies, and malfunctions. (d) Compliance date. The owners and operators of the BART and RP sources subject to this section shall comply with the emissions limitations and other requirements of this section within five years of the effective date of this rule (e) Compliance determinations for NOX. VerDate Mar<15>2010 17:21 Jun 01, 2012 Jkt 226001 0.03 0.03 0.03 0.03 0.04 0.04 0.015 0.015 lb/hr Tons per year 180 180 180 180 74 96 56 71 788 788 788 788 324 421 243 308.8 (1) For all BART and RP units other than Trona Plant units: (i) CEMS. At all times after the compliance date specified in paragraph (d) of this section, the owner/operator of each unit shall maintain, calibrate, and operate a CEMS, in full compliance with the requirements found at 40 CFR part 75, to accurately measure NOX, diluent, and stack gas volumetric flow rate from each unit. The CEMS shall be used to determine compliance with the emission limitations in paragraph (c) of this section for each unit. (ii) Method. (a) For any hour in which fuel is combusted in a unit, the owner/operator of each unit shall calculate the hourly average NOX concentration in lb/ MMBtu and lb/hr at the CEMS in accordance with the requirements of 40 CFR part 75. At the end of each operating day, the owner/operator shall calculate and record a new 30-day rolling average emission rate in lb/ MMBtu and lb/hr from the arithmetic average of all valid hourly emission rates from the CEMS for the current operating day and the previous 29 successive operating days. (b) An hourly average NOX emission rate in lb/MMBtu or lb/hr is valid only if the minimum number of data points, as specified in 40 CFR part 75, is acquired by both the pollutant concentration monitor (NOX) and the diluent monitor (O2 or CO2). (c) Compliance with tons-per-year emission limits shall be calculated on a rolling 12-month basis. At the end of each calendar month, the owner/ operator shall calculate and record a new 12-month rolling average emission rate from the arithmetic average of all valid hourly emission rates from the CEMS for the current month and the previous 11 months and the report the result in tons. (d) Data reported to meet the requirements of this section shall not include data substituted using the missing data substitution procedures of subpart D of 40 CFR part 75, nor shall the data have been bias adjusted PO 00000 Frm 00041 Fmt 4701 Sfmt 4702 lb/MMBtu N/A N/A 0.07 0.07 0.26 0.26 0.07 N/A lb/hr Tons per year N/A N/A N/A N/A 481 624 259 N/A N/A N/A N/A N/A 2,107 2,733 1,134 N/A according to the procedures of 40 CFR part 75. (2) For all Trona Plant BART units: (i) CEMS. At all times after the compliance date specified in paragraph (d) of this section, the owner/operator of each unit shall maintain, calibrate, and operate a CEMS, in full compliance with the requirements found at 40 CFR part 60, to accurately measure NOX, diluent, and stack gas volumetric flow rate from each unit, including the CEMS quality assurance requirements in appendix F of 40 CFR part 60. The CEMS shall be used to determine compliance with the emission limitations in paragraph (c) of this section for each unit. (ii) Method. (a) For any hour in which fuel is combusted in a unit, the owner/operator of each unit shall calculate the hourly average NOX concentration in lb/ MMBtu and lb/hr at the CEMS in accordance with the requirements of 40 CFR part 60. At the end of each operating day, the owner/operator shall calculate and record a new 30-day rolling average emission rate in lb/ MMBtu and lb/hr from the arithmetic average of all valid hourly emission rates from the CEMS for the current operating day and the previous 29 successive operating days. (b) An hourly average NOX emission rate in lb/MMBtu or lb/hr is valid only if the minimum number of data points, as specified in 40 CFR part 60, is acquired by both the pollutant concentration monitor (NOX) and the diluent monitor (O2 or CO2). (c) Compliance with tons-per-year emission limits shall be calculated on a rolling 12-month basis. At the end of each calendar month, the owner/ operator shall calculate and record a new 12-month rolling average emission rate from the arithmetic average of all valid hourly emission rates from the CEMS for the current month and the previous 11 months and report results in tons. (f) Compliance determinations for particulate matter. E:\FR\FM\04JNP2.SGM 04JNP2 33062 Federal Register / Vol. 77, No. 107 / Monday, June 4, 2012 / Proposed Rules mstockstill on DSK4VPTVN1PROD with PROPOSALS2 Compliance with the particulate matter emission limit for each BART and RP unit shall be determined from annual performance stack tests. Within 60 days of the compliance deadline specified in section (d), and on at least an annual basis thereafter, the owner/ operator of each unit shall conduct a stack test on each unit to measure particulate emissions using EPA Method 5, 5B, 5D, or 17, as appropriate, in 40 CFR part 60, Appendix A. A test shall consist of three runs, with each run at least 120 minutes in duration and each run collecting a minimum sample of 60 dry standard cubic feet. Results shall be reported in lb/MMBtu and lb/hr. In addition to annual stack tests, the owner/operator shall monitor particulate emissions for compliance with the BART emission limits in accordance with the applicable Compliance Assurance Monitoring (CAM) plan developed and approved by the State in accordance with 40 CFR part 64. (g) Recordkeeping. The owner/ operator shall maintain the following records for at least five years: (1) All CEMS data, including the date, place, and time of sampling or measurement; parameters sampled or measured; and results. (2) Records of quality assurance and quality control activities for emissions measuring systems including, but not limited to, any records required by 40 CFR part 75. Or, for Trona Plant units, records of quality assurance and quality control activities for emissions measuring systems including, but not limited to appendix F of 40 CFR part 60. (3) Records of all major maintenance activities conducted on emission units, air pollution control equipment, and CEMS. (4) Any other CEMS records required by 40 CFR part 75. Or, for Trona Plant units, any other CEMs records required by 40 CFR part 60. (5) Records of all particulate stack test results. (6) All data collected pursuant to the CAM plan. (h) Reporting. All reports under this section shall be submitted to the VerDate Mar<15>2010 17:21 Jun 01, 2012 Jkt 226001 Director, Office of Enforcement, Compliance and Environmental Justice, U.S. Environmental Protection Agency, Region 8, Mail Code 8ENF–AT, 1595 Wynkoop Street, Denver, Colorado 80202–1129. (1) The owner/operator of each unit shall submit quarterly excess emissions reports for NOX BART and RP units no later than the 30th day following the end of each calendar quarter. Excess emissions means emissions that exceed the emissions limits specified in paragraph (c) of this section. The reports shall include the magnitude, date(s), and duration of each period of excess emissions, specific identification of each period of excess emissions that occurs during startups, shutdowns, and malfunctions of the unit, the nature and cause of any malfunction (if known), and the corrective action taken or preventative measures adopted. The owner/operator shall also submit reports of any exceedances of tons-per-year emission limits. (2) The owner/operator of each unit shall submit quarterly CEMS performance reports, to include dates and duration of each period during which the CEMS was inoperative (except for zero and span adjustments and calibration checks), reason(s) why the CEMS was inoperative and steps taken to prevent recurrence, and any CEMS repairs or adjustments. The owner/operator of each unit shall also submit results of any CEMS performance tests required by 40 CFR part 75. Or, for Trona Plant units, the owner/operator of each unit shall also submit results of any CEMs performance test required appendix F of 40 CFR part 60 (Relative Accuracy Test Audits, Relative Accuracy Audits, and Cylinder Gas Audits). (3) When no excess emissions have occurred or the CEMS has not been inoperative, repaired, or adjusted during the reporting period, such information shall be stated in the quarterly reports required by sections (h)(1) and (2) above. (4) The owner/operator of each unit shall submit results of any particulate matter stack tests conducted for PO 00000 Frm 00042 Fmt 4701 Sfmt 9990 demonstrating compliance with the particulate matter BART limits in section (c) above, within 60 calendar days after completion of the test. (5) The owner/operator of each unit shall submit semi-annual reports of any excursions under the approved CAM plan in accordance with the schedule specified in the source’s title V permit. (i) Notifications. (1) The owner/operator shall submit notification of commencement of construction of any equipment which is being constructed to comply with the NOX emission limits in paragraph (c) of this section. (2) The owner/operator shall submit semi-annual progress reports on construction of any such equipment. (3) The owner/operator shall submit notification of initial startup of any such equipment. (j) Equipment operation. At all times, the owner/operator shall maintain each unit, including associated air pollution control equipment, in a manner consistent with good air pollution control practices for minimizing emissions. (k) Credible Evidence. Nothing in this section shall preclude the use, including the exclusive use, of any credible evidence or information, relevant to whether a source would have been in compliance with requirements of this section if the appropriate performance or compliance test procedures or method had been performed. 3. Add section 52.2637 to read as follows: § 52.2637 Federal implementation plan for reasonable attributable visibility impairment long-term strategy. As required by 40 CFR 41.306(c), EPA will ensure that the review of the State’s reasonably attributable visibility impairment long-term strategy is coordinated with the regional haze longterm strategy under 40 CFR 51.308(g). EPA’s review will be in accordance with the requirements of 40 CFR 51.306(c). [FR Doc. 2012–12923 Filed 6–1–12; 8:45 am] BILLING CODE 6560–50–P E:\FR\FM\04JNP2.SGM 04JNP2

Agencies

[Federal Register Volume 77, Number 107 (Monday, June 4, 2012)]
[Proposed Rules]
[Pages 33022-33062]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-12923]



[[Page 33021]]

Vol. 77

Monday,

No. 107

June 4, 2012

Part II





Environmental Protection Agency





-----------------------------------------------------------------------





40 CFR Part 52





Approval, Disapproval and Promulgation of Implementation Plans; State 
of Wyoming; Regional Haze State Implementation Plan; Federal 
Implementation Plan for Regional Haze; Proposed Rule

Federal Register / Vol. 77, No. 107 / Monday, June 4, 2012 / Proposed 
Rules

[[Page 33022]]


-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY

40 CFR Part 52

[EPA-R08-OAR-2012-0026, FRL-9678-9]


Approval, Disapproval and Promulgation of Implementation Plans; 
State of Wyoming; Regional Haze State Implementation Plan; Federal 
Implementation Plan for Regional Haze

AGENCY: Environmental Protection Agency.

ACTION: Proposed rule.

-----------------------------------------------------------------------

SUMMARY: EPA is proposing to partially approve and partially disapprove 
approve a State Implementation Plan (SIP) revision submitted by the 
State of Wyoming on January 12, 2011, that addresses regional haze. 
This SIP revision was submitted to address the requirements of the 
Clean Air Act (CAA or ``the Act'') and our rules that require states to 
prevent any future and remedy any existing anthropogenic impairment of 
visibility in mandatory Class I areas caused by emissions of air 
pollutants from numerous sources located over a wide geographic area 
(also referred to as the ``regional haze program''). States are 
required to assure reasonable progress toward the national goal of 
achieving natural visibility conditions in Class I areas. EPA is taking 
this action pursuant to section 110 of the CAA.
    EPA is proposing a Federal Implementation Plan (FIP) to address the 
deficiencies identified in our proposed partial disapproval of 
Wyoming's regional haze SIP. In lieu of this proposed FIP, or a portion 
thereof, we propose approval of a SIP revision if the State submits 
such a revision and the revision matches the terms of our proposed FIP.

DATES: Comments: Written comments must be received at the address below 
on or before August 3, 2012. Public Hearings: A public hearing for this 
proposal is scheduled to be held on Tuesday, June 26, 2012, at the 
Hershchler Building, Room B-63, 122 W. 25th St., Cheyenne, Wyoming 
82002. Another public hearing is scheduled to be held on Thursday, June 
28, 2012, at Western Wyoming Community College, Room 1005, 2500 College 
Drive, Rock Springs, Wyoming 82901. The public hearings will be held 
from 1 p.m. until 5 p.m., and again from 6 p.m. until 8 p.m.

ADDRESSES: Submit your comments, identified by Docket ID No. EPA-R08-
OAR-2012-0026, by one of the following methods:
     https://www.regulations.gov. Follow the on-line 
instructions for submitting comments.
     Email: r8airrulemakings@epa.gov.
     Fax: (303) 312-6064 (please alert the individual listed in 
the FOR FURTHER INFORMATION CONTACT if you are faxing comments).
     Mail: Carl Daly, Director, Air Program, Environmental 
Protection Agency (EPA), Region 8, Mailcode 8P-AR, 1595 Wynkoop Street, 
Denver, Colorado 80202-1129.
     Hand Delivery: Carl Daly, Director, Air Program, 
Environmental Protection Agency (EPA), Region 8, Mailcode 8P-AR, 1595 
Wynkoop, Denver, Colorado 80202-1129. Such deliveries are only accepted 
Monday through Friday, 8 a.m. to 4:30 p.m., excluding Federal holidays. 
Special arrangements should be made for deliveries of boxed 
information.
    Instructions: Direct your comments to Docket ID No. EPA-R08-OAR-
2012-0026. EPA's policy is that all comments received will be included 
in the public docket without change and may be made available online at 
https://www.regulations.gov, including any personal information 
provided, unless the comment includes information claimed to be 
Confidential Business Information (CBI) or other information whose 
disclosure is restricted by statute. Do not submit information that you 
consider to be CBI or otherwise protected through https://www.regulations.gov or email. The https://www.regulations.gov Web site 
is an ``anonymous access'' system, which means EPA will not know your 
identity or contact information unless you provide it in the body of 
your comment. If you send an email comment directly to EPA, without 
going through https://www.regulations.gov, your email address will be 
automatically captured and included as part of the comment that is 
placed in the public docket and made available on the Internet. If you 
submit an electronic comment, EPA recommends that you include your name 
and other contact information in the body of your comment and with any 
disk or CD-ROM you submit. If EPA cannot read your comment due to 
technical difficulties and cannot contact you for clarification, EPA 
may not be able to consider your comment. Electronic files should avoid 
the use of special characters, any form of encryption, and be free of 
any defects or viruses. For additional instructions on submitting 
comments, go to Section I. General Information of the SUPPLEMENTARY 
INFORMATION section of this document.
    Docket: All documents in the docket are listed in the https://www.regulations.gov index. Although listed in the index, some 
information is not publicly available, e.g., CBI or other information 
whose disclosure is restricted by statute. Certain other material, such 
as copyrighted material, will be publicly available only in hard copy. 
Publicly-available docket materials are available either electronically 
in https://www.regulations.gov or in hard copy at the Air Program, 
Environmental Protection Agency (EPA), Region 8, Mailcode 8P-AR, 1595 
Wynkoop, Denver, Colorado 80202-1129. EPA requests that if at all 
possible, you contact the individual listed in the FOR FURTHER 
INFORMATION CONTACT section to view the hard copy of the docket. You 
may view the hard copy of the docket Monday through Friday, 8 a.m. to 4 
p.m., excluding Federal holidays.

FOR FURTHER INFORMATION CONTACT: Laurel Dygowski, Air Program, U.S. 
Environmental Protection Agency, Region 8, Mailcode 8P-AR, 1595 
Wynkoop, Denver, Colorado 80202-1129, (303) 312-6144, 
dygowski.laurel@epa.gov.

SUPPLEMENTARY INFORMATION: 

Definitions

    For the purpose of this document, we are giving meaning to certain 
words or initials as follows:

    i. The words or initials Act or CAA mean or refer to the Clean 
Air Act, unless the context indicates otherwise.
    ii. The initials AFRC mean or refer to air-fuel ratio controls.
    iii. The initials BART mean or refer to Best Available Retrofit 
Technology.
    iv. The initials CAMx mean or refer to Comprehensive Air Quality 
Model.
    v. The initials CMAQ mean or refer to Community Multi-Scale Air 
Quality modeling system.
    vi. The initials CEMS mean or refer to continuous emission 
monitoring systems.
    vii. The initials EC mean or refer to elemental carbon.
    viii. The initials EGUs mean or refer to Electric Generating 
Units.
    ix. The initials EGR mean or refer to exhaust gas recirculation.
    x. The words EPA, we, us or our mean or refer to the United 
States Environmental Protection Agency.
    xi. The initials ESP mean or refer to electrostatic 
precipitator.
    xii. The initials FGC mean or refer to flue gas conditioning.
    xiii. The initials FGD mean or refer to flue gas 
desulfurization.
    xiv. The initials FGR mean or refer to external flue gas 
recirculation.
    xv. The initials FIP mean or refer to Federal Implementation 
Plan.
    xvi. The initials FLMs mean or refer to Federal Land Managers.

[[Page 33023]]

    xvii. The initials FS mean or refer to the U.S. Forest Service.
    xviii. The initials IMPROVE mean or refer to Interagency 
Monitoring of Protected Visual Environments monitoring network.
    xix. The initials IWAQM mean or refer to Interagency Workgroup 
on Air Quality Modeling.
    xx. The initials LEC mean or refer to low-emission combustion.
    xxi. The initials LNB mean or refer to low NOX 
burner.
    xxii. The initials LTS mean or refer to the long-term strategy.
    xxiii. The initials MW mean or refer to megawatts.
    xxiv. The initials NH3 mean or refer to ammonia.
    xxv. The initials NOX mean or refer to nitrogen oxides.
    xxvi. The initials NPS mean or refer to National Park Service.
    xxvii. The initials OC mean or refer to organic carbon.
    xxviii. The initials OFA mean or refer to overfire air.
    xxix. The initials PM2.5 mean or refer to particulate matter 
with an aerodynamic diameter of less than 2.5 micrometers.
    xxx. The initials PM10 mean or refer to particulate matter with 
an aerodynamic diameter of less than 10 micrometers.
    xxxi. The initials PSAT mean or refer to Particle Source 
Apportionment Technology.
    xxxii. The initials PSD mean or refer to Prevention of 
Signification Deterioration.
    xxxiii. The initials RAVI mean or refer to Reasonably 
Attributable Visibility Impairment.
    xxxiv. The initials RHR mean or refer to the Regional Haze Rule.
    xxxv. The initials RMC mean or refer to the Regional Modeling 
Center at the University of California Riverside.
    xxxvi. The initials RPGs mean or refer to Reasonable Progress 
Goals.
    xxxvii. The initials RPOs mean or refer to regional planning 
organizations.
    xxxviii. The initials SCR mean or refer to selective catalytic 
reduction.
    xxxix. The initials SIP mean or refer to State Implementation 
Plan.
    xl. The initials SNCR mean or refer to selective non-catalytic 
reduction.
    xli. The initials SO2 mean or refer to sulfur dioxide.
    xlii. The initials SOFA mean or refer to separated overfire air.
    xliii. The initials TSD mean or refer to Technical Support 
Document.
    xliv. The initials ULNB mean or refer to ultra-low 
NOX burners.
    xlv. The initials URP mean or refer to Uniform Rate of Progress.
    xlvi. The initials VOC mean or refer to volatile organic 
compounds.
    xlvii. The initials WAQSR mean or refer to Wyoming Air Quality 
Standards and Regulations.
    xlviii. The initials WEP mean or refer to Weighted Emissions 
Potential.
    xlix. The initials WRAP mean or refer to the Western Regional 
Air Partnership.
    l. The words Wyoming and State mean the State of Wyoming.

Table of Contents

I. General Information
    A. What should I consider as I prepare my comments for EPA?
II. Overview of Proposed Actions
III. SIP and FIP Background
IV. Background
    A. Regional Haze
    B. Requirements of the CAA and EPA's Regional Haze Rule (RHR)
    C. Roles of Agencies in Addressing Regional Haze
V. Requirements for the Regional Haze SIPs
    A. The CAA and the Regional Haze Rule
    B. Determination of Baseline, Natural, and Current Visibility 
Conditions
    C. Determination of Reasonable Progress Goals
    D. Best Available Retrofit Technology
    E. Long-Term Strategy
    F. Coordinating Regional Haze and Reasonably Attributable 
Visibility Impairment
    G. Monitoring Strategy and Other Implementation Plan 
Requirements
    H. Consultation With States and Federal Land Managers (FLMs)
VI. EPA's Evaluation of Wyoming's Regional Haze SIP
    A. Affected Class I Areas
    B. Baseline Visibility, Natural Visibility, and Uniform Rate of 
Progress
    C. BART Determinations
    1. BART-Eligible Sources
    2. Sources Subject-to-BART
    a. Modeling Methodology
    b. Contribution Threshold
    c. Sources Identified by Wyoming as Subject-to-BART
    3. BART Determinations and Federally Enforceable Limits
    a. Visibility Improvement Modeling
    b. Summary of BART Determinations and Federally Enforceable 
Limits
    i. FMC Westvaco--Units NS-1A and NS-1B
    ii. General Chemical Green River--Boilers C and D
    iii. Basin Electric Laramie River Station--Units 1-3
    iv. PacifiCorp Dave Johnston--Units 3 and 4
    v. PacifiCorp Jim Bridger Units 1-4
    vi. PacifiCorp Naughton Units 1-3
    vii. PacifiCorp Wyodak--Unit 1
    D. Reasonable Progress Requirements
    1. Visibility Impairing Pollutants and Sources
    2. Four-Factor Analyses
    a. Stationary Sources
    b. Summary of Reasonable Progress Determinations and Limits
    i. Oil and Gas Area Sources
    ii. Mountain Cement Company Laramie Plant--Kiln
    3. Reasonable Progress Goals
    E. Long Term Strategy
    1. Emission Inventories
    2. Consultation and Emissions Reductions for Other States' Class 
I Areas
    3. Mandatory Long-Term Strategy Requirements
    a. Reductions Due to Ongoing Air Pollution Programs
    b. Measures to Mitigate the Impacts of Construction Activities
    c. Smoke Management
    d. Emission Limitations and Schedules for Compliance
    e. Source Retirement and Replacement Schedules
    f. Enforceability of Wyoming's Measures
    g. Anticipated Net Effect on Visibility Due to Projected Changes
    4. Our Conclusions on Wyoming's Long-Term Strategy
    F. Coordination of RAVI and Regional Haze Rule Requirements
    G. Monitoring Strategy and Other Implementation Plan 
Requirements
    H. Consultation With FLMs
    I. Periodic SIP Revisions and 5-Year Progress Reports
VII. Federal Implementation Plan
    A. Disapproval of the State's NOX BART Determinations 
and Federal Implementation Plan for NOX BART 
Determinations and Limits
    1. Disapproval of the State's Basin Electric Laramie River Units 
1-3 NOX BART Determination and FIP to Address 
NOX BART
    2. Disapproval of the State's PacifiCorp Dave Johnston Unit 3 
NOX BART Determination and FIP to Address NOX 
BART
    3. Disapproval of the State's PacifiCorp Jim Bridger Unit 1 and 
2 NOX BART Determination and FIP to Address 
NOX BART
    4. Proposals in the Alternative for PacifiCorp Jim Bridger Units 
1, 2, 3, and 4 NOX BART
    5. Disapproval of the State's PacifiCorp Wyodak Unit 1 
NOX BART Determination and FIP to Address NOX 
BART
    B. Disapproval of the State's NOX Reasonable Progress 
Determinations and Federal Implementation Plan for NOX 
Reasonable Progress Determinations and Limits
    1. PacifiCorp Dave Johnston--Units 1 and 2
    C. Reasonable Progress Goals
    D. Federal Monitoring, Recordkeeping, and Reporting Requirements
    E. Federal Implementation Plan for the Long-Term Strategy
    F. Federal Implementation Plan for Coordination of RAVI and 
Regional Haze Long-Term Strategy
VIII. EPA's Proposed Action
IX. Statutory and Executive Order Reviews

I. General Information

A. What should I consider as I prepare my comments for EPA?

    1. Submitting CBI. Do not submit CBI to EPA through https://www.regulations.gov or email. Clearly mark the part or all of the 
information that you claim to be CBI. For CBI information in a disk or 
CD-ROM that you mail to EPA, mark the outside of the disk or CD-ROM as 
CBI and then identify electronically within the disk or CD-ROM the 
specific information that is claimed as CBI. In addition to one 
complete version of the comment that

[[Page 33024]]

includes information claimed as CBI, a copy of the comment that does 
not contain the information claimed as CBI must be submitted for 
inclusion in the public docket. Information so marked will not be 
disclosed except in accordance with procedures set forth in 40 CFR part 
2.
    2. Tips for Preparing Your Comments. When submitting comments, 
remember to:
    a. Identify the rulemaking by docket number and other identifying 
information (subject heading, Federal Register date and page number).
    b. Follow directions--The agency may ask you to respond to specific 
questions or organize comments by referencing a Code of Federal 
Regulations (CFR) part or section number.
    c. Explain why you agree or disagree; suggest alternatives and 
substitute language for your requested changes.
    d. Describe any assumptions and provide any technical information 
and/or data that you used.
    e. If you estimate potential costs or burdens, explain how you 
arrived at your estimate in sufficient detail to allow for it to be 
reproduced.
    f. Provide specific examples to illustrate your concerns, and 
suggest alternatives.
    g. Explain your views as clearly as possible, avoiding the use of 
profanity or personal threats.
    h. Make sure to submit your comments by the comment period deadline 
identified.

II. Overview of Proposed Actions

    EPA is proposing to partially approve and partially disapprove a 
regional haze SIP revision submitted by the State of Wyoming on January 
12, 2011. Specifically, we are proposing to disapprove the following:
     The State's nitrogen oxides (NOX) best 
available retrofit technology (BART) determinations for PacifiCorp Dave 
Johnston Unit 3, PacifiCorp Jim Bridger Units 1 and 2, PacifiCorp 
Wyodak Unit 1, and Basin Electric Laramie River Units 1, 2, and 3.
     The State's NOX reasonable progress 
determination for PacifiCorp Dave Johnston Units 1 and 2.
     Wyoming's Reasonable Progress Goals (RPGs).
     The State's monitoring, recordkeeping, and reporting 
requirements in Chapter 6.4 of the SIP.
     Portions of the State's long-term strategy (LTS) that rely 
on or reflect other aspects of the regional haze SIP.
     The State's SIP because it does not contain the necessary 
provisions to meet the requirements for the coordination of the review 
of the reasonably attributable visibility impairment (RAVI) and the 
regional haze LTS.
    We are proposing to approve the remaining aspects of the State's 
January 12, 2011, SIP submittal. We are also seeking comment on two 
alternative proposals related to the State's NOX BART 
determination for PacifiCorp Jim Bridger Units 1 and 2.
    We are proposing the promulgation of a FIP to address the 
deficiencies in the Wyoming regional haze SIP that we have identified 
in this proposal. The proposed FIP includes the following elements:
     NOX BART determinations and limits for 
PacifiCorp Dave Johnston Unit 3, PacifiCorp Jim Bridger Units 1 and 2, 
PacifiCorp Wyodak Unit 1, and Basin Electric Laramie River Units 1, 2, 
and 3.
     NOX reasonable progress determination and 
limits for PacifiCorp Dave Johnston Units 1 and 2.
     RPGs consistent with the SIP limits proposed for approval 
and the proposed FIP limits.
     Monitoring, recordkeeping, and reporting requirements 
applicable to all BART and reasonable progress sources for which there 
is a SIP or FIP emissions limit.
     LTS elements pertaining to emission limits and compliance 
schedules for the proposed BART and reasonable progress FIP emission 
limits.
     Provisions to ensure the coordination of the RAVI and 
regional haze LTS.
    In lieu of our proposed FIP, or a portion thereof, we would propose 
approval of a SIP revision if the State submits such a revision and the 
revision matches the terms of our proposed FIP. We encourage the State 
to submit a SIP revision to replace the FIP, either before or after our 
final action.

III. SIP and FIP Background

    The CAA requires each state to develop plans to meet various air 
quality requirements, including protection of visibility. CAA sections 
110(a), 169A, and 169B. The plans developed by a state are referred to 
as SIPs. A state must submit its SIPs and SIP revisions to us for 
approval. Once approved, a SIP is enforceable by EPA and citizens under 
the CAA, also known as being federally enforceable. If a state fails to 
make a required SIP submittal or if we find that a state's required 
submittal is incomplete or unapprovable, then we must promulgate a FIP 
to fill this regulatory gap. CAA section 110(c)(1). As discussed 
elsewhere in this notice, we are proposing to disapprove aspects of 
Wyoming's regional haze SIP. We are proposing FIPs to address the 
deficiencies in Wyoming's regional haze SIP.

IV. Background

A. Regional Haze

    Regional haze is visibility impairment that is produced by a 
multitude of sources and activities which are located across a broad 
geographic area and emit fine particles (PM2.5) (e.g., 
sulfates, nitrates, organic carbon (OC), elemental carbon (EC), and 
soil dust), and their precursors (e.g., sulfur dioxide 
(SO2), NOX, and in some cases, ammonia 
(NH3) and volatile organic compounds (VOC)). Fine particle 
precursors react in the atmosphere to form PM2.5, which 
impairs visibility by scattering and absorbing light. Visibility 
impairment reduces the clarity, color, and visible distance that one 
can see. PM2.5 can also cause serious health effects and 
mortality in humans and contributes to environmental effects such as 
acid deposition and eutrophication.
    Data from the existing visibility monitoring network, the 
``Interagency Monitoring of Protected Visual Environments'' (IMPROVE) 
monitoring network, show that visibility impairment caused by air 
pollution occurs virtually all the time at most national park and 
wilderness areas. The average visual range \1\ in many Class I areas 
(i.e., national parks and memorial parks, wilderness areas, and 
international parks meeting certain size criteria) in the western 
United States is 100-150 kilometers, or about one-half to two-thirds of 
the visual range that would exist without anthropogenic air pollution. 
In most of the eastern Class I areas of the United States, the average 
visual range is less than 30 kilometers, or about one-fifth of the 
visual range that would exist under estimated natural conditions. 64 FR 
35715 (July 1, 1999).
---------------------------------------------------------------------------

    \1\ Visual range is the greatest distance, in kilometers or 
miles, at which a dark object can be viewed against the sky.
---------------------------------------------------------------------------

B. Requirements of the CAA and EPA's Regional Haze Rule (RHR)

    In section 169A of the 1977 Amendments to the CAA, Congress created 
a program for protecting visibility in the nation's national parks and 
wilderness areas. This section of the CAA establishes as a national 
goal the ``prevention of any future, and the remedying of any existing, 
impairment of visibility in mandatory Class I Federal areas \2\ which 
impairment

[[Page 33025]]

results from manmade air pollution.'' On December 2, 1980, EPA 
promulgated regulations to address visibility impairment in Class I 
areas that is ``reasonably attributable'' to a single source or small 
group of sources, i.e., ``reasonably attributable visibility 
impairment.'' 45 FR 80084. These regulations represented the first 
phase in addressing visibility impairment. EPA deferred action on 
regional haze that emanates from a variety of sources until monitoring, 
modeling and scientific knowledge about the relationships between 
pollutants and visibility impairment were improved.
---------------------------------------------------------------------------

    \2\ Areas designated as mandatory Class I Federal areas consist 
of national parks exceeding 6000 acres, wilderness areas and 
national memorial parks exceeding 5000 acres, and all international 
parks that were in existence on August 7, 1977. 42 U.S.C. 7472(a). 
In accordance with section 169A of the CAA, EPA, in consultation 
with the Department of Interior, promulgated a list of 156 areas 
where visibility is identified as an important value. 44 FR 69122 
(November 30, 1979). The extent of a mandatory Class I area includes 
subsequent changes in boundaries, such as park expansions. 42 U.S.C. 
7472(a). Although states and tribes may designate as Class I 
additional areas which they consider to have visibility as an 
important value, the requirements of the visibility program set 
forth in section 169A of the CAA apply only to ``mandatory Class I 
Federal areas.'' Each mandatory Class I Federal area is the 
responsibility of a ``Federal Land Manager.'' 42 U.S.C. 7602(i). 
When we use the term ``Class I area'' in this action, we mean a 
``mandatory Class I Federal area.''
---------------------------------------------------------------------------

    Congress added section 169B to the CAA in 1990 to address regional 
haze issues. EPA promulgated a rule to address regional haze on July 1, 
1999. 64 FR 35714 (July 1, 1999), codified at 40 CFR part 51, subpart 
P. The RHR revised the existing visibility regulations to integrate 
into the regulation provisions addressing regional haze impairment and 
established a comprehensive visibility protection program for Class I 
areas. The requirements for regional haze, found at 40 CFR 51.308 and 
51.309, are included in EPA's visibility protection regulations at 40 
CFR 51.300-309. Some of the main elements of the regional haze 
requirements are summarized in section III of this preamble. The 
requirement to submit a regional haze SIP applies to all 50 states, the 
District of Columbia and the Virgin Islands. 40 CFR 51.308(b) requires 
states to submit the first implementation plan addressing regional haze 
visibility impairment no later than December 17, 2007.\3\
---------------------------------------------------------------------------

    \3\ EPA's regional haze regulations require subsequent updates 
to the regional haze SIPs. 40 CFR 51.308(g)-(i).
---------------------------------------------------------------------------

    Few states submitted a regional haze SIP prior to the December 17, 
2007 deadline, and on January 15, 2009, EPA found that 37 states 
(including Colorado), the District of Columbia, and the Virgin Islands, 
had failed to submit SIPs addressing the regional haze requirements. 74 
FR 2392. Once EPA has found that a state has failed to make a required 
submission, EPA is required to promulgate a FIP within two years unless 
the state submits a SIP and the Agency approves it within the two-year 
period. CAA Sec.  110(c)(1).

C. Roles of Agencies in Addressing Regional Haze

    Successful implementation of the regional haze program will require 
long-term regional coordination among states, tribal governments and 
various federal agencies. As noted above, pollution affecting the air 
quality in Class I areas can be transported over long distances, even 
hundreds of kilometers. Therefore, to effectively address the problem 
of visibility impairment in Class I areas, states need to develop 
strategies in coordination with one another, taking into account the 
effect of emissions from one jurisdiction on the air quality in 
another.
    Because the pollutants that lead to regional haze can originate 
from sources located across broad geographic areas, EPA has encouraged 
the states and tribes across the United States to address visibility 
impairment from a regional perspective. Five regional planning 
organizations (RPOs) were developed to address regional haze and 
related issues. The RPOs first evaluated technical information to 
better understand how their states and tribes impact Class I areas 
across the country, and then pursued the development of regional 
strategies to reduce emissions of particulate matter (PM) and other 
pollutants leading to regional haze.
    The Western Regional Air Partnership (WRAP) RPO is a collaborative 
effort of state governments, tribal governments, and various federal 
agencies established to initiate and coordinate activities associated 
with the management of regional haze, visibility and other air quality 
issues in the western United States. WRAP member state governments 
include: Alaska, Arizona, California, Colorado, Idaho, Montana, New 
Mexico, North Dakota, Oregon, South Dakota, Utah, Washington, and 
Wyoming. Tribal members include Campo Band of Kumeyaay Indians, 
Confederated Salish and Kootenai Tribes, Cortina Indian Rancheria, Hopi 
Tribe, Hualapai Nation of the Grand Canyon, Native Village of Shungnak, 
Nez Perce Tribe, Northern Cheyenne Tribe, Pueblo of Acoma, Pueblo of 
San Felipe, and Shoshone-Bannock Tribes of Fort Hall.

V. Requirements for Regional Haze SIPs

    The following is a summary of the requirements of the RHR. See 40 
CFR 51.308 for further detail regarding the requirements of the rule.

A. The CAA and the Regional Haze Rule

    Regional haze SIPs must assure reasonable progress towards the 
national goal of achieving natural visibility conditions in Class I 
areas. Section 169A of the CAA and EPA's implementing regulations 
require states to establish long-term strategies for making reasonable 
progress toward meeting this goal. Implementation plans must also give 
specific attention to certain stationary sources that were in existence 
on August 7, 1977, but were not in operation before August 7, 1962, and 
require these sources, where appropriate, to install BART controls for 
the purpose of eliminating or reducing visibility impairment. The 
specific regional haze SIP requirements are discussed in further detail 
below.

B. Determination of Baseline, Natural, and Current Visibility 
Conditions

    The RHR establishes the deciview as the principal metric or unit 
for expressing visibility. See 70 FR 39104, 39118. This visibility 
metric expresses uniform changes in the degree of haze in terms of 
common increments across the entire range of visibility conditions, 
from pristine to extremely hazy conditions. Visibility expressed in 
deciviews is determined by using air quality measurements to estimate 
light extinction and then transforming the value of light extinction 
using a logarithm function. The deciview is a more useful measure for 
tracking progress in improving visibility than light extinction itself 
because each deciview change is an equal incremental change in 
visibility perceived by the human eye. Most people can detect a change 
in visibility at one deciview.\4\
---------------------------------------------------------------------------

    \4\ The preamble to the RHR provides additional details about 
the dv. 64 FR 35714, 35725 (July 1, 1999).
---------------------------------------------------------------------------

    The deciview is used in expressing RPGs (which are interim 
visibility goals towards meeting the national visibility goal), 
defining baseline, current, and natural conditions, and tracking 
changes in visibility. The regional haze SIPs must contain measures 
that ensure ``reasonable progress'' toward the national goal of 
preventing and remedying visibility impairment in Class I areas caused 
by anthropogenic air pollution by reducing anthropogenic emissions that 
cause regional haze. The national goal is a return to natural 
conditions, i.e., anthropogenic sources of air pollution would no 
longer impair visibility in Class I areas.

[[Page 33026]]

    To track changes in visibility over time at each of the 156 Class I 
areas covered by the visibility program (40 CFR 81.401-437), and as 
part of the process for determining reasonable progress, states must 
calculate the degree of existing visibility impairment at each Class I 
area at the time of each regional haze SIP submittal and periodically 
review progress every five years midway through each 10-year 
implementation period. To do this, the RHR requires states to determine 
the degree of impairment (in deciviews) for the average of the 20 
percent least impaired (``best'') and 20 percent most impaired 
(``worst'') visibility days over a specified time period at each of 
their Class I areas. In addition, states must also develop an estimate 
of natural visibility conditions for the purpose of comparing progress 
toward the national goal. Natural visibility is determined by 
estimating the natural concentrations of pollutants that cause 
visibility impairment and then calculating total light extinction based 
on those estimates. We have provided guidance to states regarding how 
to calculate baseline, natural and current visibility conditions.\5\
---------------------------------------------------------------------------

    \5\ Guidance for Estimating Natural Visibility Conditions Under 
the Regional Haze Rule, September 2003, EPA-454/B-03-005, available 
at https://www.epa.gov/ttncaaa1/t1/memoranda/RegionalHaze_envcurhr_gd.pdf, (hereinafter referred to as ``our 2003 Natural Visibility 
Guidance''); and Guidance for Tracking Progress Under the Regional 
Haze Rule, September 2003, EPA-454/B-03-004, available at https://www.epa.gov/ttncaaa1/t1/memoranda/rh_tpurhr_gd.pdf, (hereinafter 
referred to as our ``2003 Tracking Progress Guidance'').
---------------------------------------------------------------------------

    For the first regional haze SIPs that were due by December 17, 
2007, ``baseline visibility conditions'' were the starting points for 
assessing ``current'' visibility impairment. Baseline visibility 
conditions represent the degree of visibility impairment for the 20 
percent least impaired days and 20 percent most impaired days for each 
calendar year from 2000 to 2004. Using monitoring data for 2000 through 
2004, states are required to calculate the average degree of visibility 
impairment for each Class I area, based on the average of annual values 
over the five-year period. The comparison of initial baseline 
visibility conditions to natural visibility conditions indicates the 
amount of improvement necessary to attain natural visibility, while the 
future comparison of baseline conditions to the then current conditions 
will indicate the amount of progress made. In general, the 2000-2004 
baseline period is considered the time from which improvement in 
visibility is measured.

C. Determination of Reasonable Progress Goals

    The vehicle for ensuring continuing progress towards achieving the 
natural visibility goal is the submission of a series of regional haze 
SIPs from the states that establish two RPGs (i.e., two distinct goals, 
one for the ``best'' and one for the ``worst'' days) for every Class I 
area for each (approximately) 10-year implementation period. See 40 CFR 
51.308(d), (f). The RHR does not mandate specific milestones or rates 
of progress, but instead calls for states to establish goals that 
provide for ``reasonable progress'' toward achieving natural visibility 
conditions. In setting RPGs, states must provide for an improvement in 
visibility for the most impaired days over the (approximately) 10-year 
period of the SIP, and ensure no degradation in visibility for the 
least impaired days over the same period. Id.
    In establishing RPGs, states are required to consider the following 
factors established in section 169A of the CAA and in our RHR at 40 CFR 
51.308(d)(1)(i)(A): (1) The costs of compliance; (2) the time necessary 
for compliance; (3) the energy and non-air quality environmental 
impacts of compliance; and (4) the remaining useful life of any 
potentially affected sources. States must demonstrate in their SIPs how 
these factors are considered when selecting the RPGs for the best and 
worst days for each applicable Class I area. In setting the RPGs, 
states must also consider the rate of progress needed to reach natural 
visibility conditions by 2064 (referred to as the ``uniform rate of 
progress'' (URP) or the ``glidepath'') and the emission reduction 
measures needed to achieve that rate of progress over the 10-year 
period of the SIP. Uniform progress towards achievement of natural 
conditions by the year 2064 represents a rate of progress, which states 
are to use for analytical comparison to the amount of progress they 
expect to achieve. In setting RPGs, each state with one or more Class I 
areas (``Class I state'') must also consult with potentially 
``contributing states,'' i.e., other nearby states with emission 
sources that may be affecting visibility impairment at the state's 
Class I areas. 40 CFR 51.308(d)(1)(iv). In determining whether a 
state's goals for visibility improvement provide for reasonable 
progress toward natural visibility conditions, EPA is required to 
evaluate the demonstrations developed by the state pursuant to 
paragraphs 40 CFR 51.308(d)(1)(i) and (d)(1)(ii). 40 CFR 
51.308(d)(1)(iii).

D. Best Available Retrofit Technology

    Section 169A of the CAA directs states to evaluate the use of 
retrofit controls at certain larger, often uncontrolled, older 
stationary sources in order to address visibility impacts from these 
sources. Specifically, section 169A(b)(2)(A) of the CAA requires states 
to revise their SIPs to contain such measures as may be necessary to 
make reasonable progress towards the natural visibility goal, including 
a requirement that certain categories of existing major stationary 
sources \6\ built between 1962 and 1977 procure, install, and operate 
the ``Best Available Retrofit Technology'' as determined by the state. 
Under the RHR, states are directed to conduct BART determinations for 
such ``BART-eligible'' sources that may be anticipated to cause or 
contribute to any visibility impairment in a Class I area. Rather than 
requiring source-specific BART controls, states also have the 
flexibility to adopt an emissions trading program or other alternative 
program as long as the alternative provides greater reasonable progress 
towards improving visibility than BART.
---------------------------------------------------------------------------

    \6\ The set of ``major stationary sources'' potentially subject-
to-BART is listed in CAA section 169A(g)(7).
---------------------------------------------------------------------------

    On July 6, 2005, EPA published the Guidelines for BART 
Determinations Under the Regional Haze Rule at appendix Y to 40 CFR 
part 51 (hereinafter referred to as the ``BART Guidelines'') to assist 
states in determining which of their sources should be subject to the 
BART requirements and in determining appropriate emission limits for 
each applicable source. 70 FR 39104. In making a BART determination for 
a fossil fuel-fired electric generating plant with a total generating 
capacity in excess of 750 megawatts (MW), a state must use the approach 
set forth in the BART Guidelines. A state is encouraged, but not 
required, to follow the BART Guidelines in making BART determinations 
for other types of sources. Regardless of source size or type, a state 
must meet the requirements of the CAA and our regulations for selection 
of BART, and the state's BART analysis and determination must be 
reasonable in light of the overarching purpose of the regional haze 
program.
    The process of establishing BART emission limitations can be 
logically broken down into three steps: First, states identify those 
sources which meet the definition of ``BART-eligible source'' set forth 
in 40 CFR 51.301; \7\ second,

[[Page 33027]]

states determine which of such sources ``emits any air pollutant which 
may reasonably be anticipated to cause or contribute to any impairment 
of visibility in any such area'' (a source which fits this description 
is ``subject to BART''); and third, for each source subject-to-BART, 
states then identify the best available type and level of control for 
reducing emissions.
---------------------------------------------------------------------------

    \7\ BART-eligible sources are those sources that have the 
potential to emit 250 tons or more of a visibility-impairing air 
pollutant, were not in operation prior to August 7, 1962, but were 
in existence on August 7, 1977, and whose operations fall within one 
or more of 26 specifically listed source categories. 40 CFR 51.301.
---------------------------------------------------------------------------

    States must address all visibility-impairing pollutants emitted by 
a source in the BART determination process. The most significant 
visibility impairing pollutants are SO2, NOX, and 
PM. EPA has stated that states should use their best judgment in 
determining whether VOC or NH3 compounds impair visibility 
in Class I areas.
    Under the BART Guidelines, states may select an exemption threshold 
value for their BART modeling, below which a BART-eligible source would 
not be expected to cause or contribute to visibility impairment in any 
Class I area. The state must document this exemption threshold value in 
the SIP and must state the basis for its selection of that value. Any 
source with emissions that model above the threshold value would be 
subject to a BART determination review. The BART Guidelines acknowledge 
varying circumstances affecting different Class I areas. States should 
consider the number of emission sources affecting the Class I areas at 
issue and the magnitude of the individual sources' impacts. Any 
exemption threshold set by the state should not be higher than 0.5 
deciview. 40 CFR part 51, appendix Y, section III.A.1.
    In their SIPs, states must identify the sources that are subject-
to-BART and document their BART control determination analyses for such 
sources. In making their BART determinations, section 169A(g)(2) of the 
CAA requires that states consider the following factors when evaluating 
potential control technologies: (1) The costs of compliance; (2) the 
energy and non-air quality environmental impacts of compliance; (3) any 
existing pollution control technology in use at the source; (4) the 
remaining useful life of the source; and (5) the degree of improvement 
in visibility which may reasonably be anticipated to result from the 
use of such technology.
    A regional haze SIP must include source-specific BART emission 
limits and compliance schedules for each source subject-to-BART. Once a 
state has made its BART determination, the BART controls must be 
installed and in operation as expeditiously as practicable, but no 
later than five years after the date of EPA approval of the regional 
haze SIP. CAA section 169(g)(4) and 40 CFR 51.308(e)(1)(iv). In 
addition to what is required by the RHR, general SIP requirements 
mandate that the SIP must also include all regulatory requirements 
related to monitoring, recordkeeping, and reporting for the BART 
controls on the source. See CAA section 110(a). As noted above, the RHR 
allows states to implement an alternative program in lieu of BART so 
long as the alternative program can be demonstrated to achieve greater 
reasonable progress toward the national visibility goal than would 
BART.

E. Long-Term Strategy

    Consistent with the requirement in section 169A(b) of the CAA that 
states include in their regional haze SIP a 10 to 15 year strategy for 
making reasonable progress, section 51.308(d)(3) of the RHR requires 
that states include a LTS in their regional haze SIPs. The LTS is the 
compilation of all control measures a state will use during the 
implementation period of the specific SIP submittal to meet applicable 
RPGs. The LTS must include ``enforceable emissions limitations, 
compliance schedules, and other measures as necessary to achieve the 
reasonable progress goals'' for all Class I areas within, or affected 
by emissions from, the state. 40 CFR 51.308(d)(3).
    When a state's emissions are reasonably anticipated to cause or 
contribute to visibility impairment in a Class I area located in 
another state, the RHR requires the impacted state to coordinate with 
the contributing states in order to develop coordinated emissions 
management strategies. 40 CFR 51.308(d)(3)(i). In such cases, the 
contributing state must demonstrate that it has included, in its SIP, 
all measures necessary to obtain its share of the emission reductions 
needed to meet the RPGs for the Class I area. Id. at (d)(3)(ii). The 
RPOs have provided forums for significant interstate consultation, but 
additional consultations between states may be required to sufficiently 
address interstate visibility issues. This is especially true where two 
states belong to different RPOs.
    States should consider all types of anthropogenic sources of 
visibility impairment in developing their long-term strategy, including 
stationary, minor, mobile, and area sources. At a minimum, states must 
describe how each of the following seven factors listed below are taken 
into account in developing their LTS: (1) Emission reductions due to 
ongoing air pollution control programs, including measures to address 
RAVI; (2) measures to mitigate the impacts of construction activities; 
(3) emissions limitations and schedules for compliance to achieve the 
RPG; (4) source retirement and replacement schedules; (5) smoke 
management techniques for agricultural and forestry management purposes 
including plans as currently exist within the state for these purposes; 
(6) enforceability of emissions limitations and control measures; and 
(7) the anticipated net effect on visibility due to projected changes 
in point, area, and mobile source emissions over the period addressed 
by the LTS. 40 CFR 51.308(d)(3)(v).

F. Coordinating Regional Haze and Reasonably Attributable Visibility 
Impairment

    As part of the RHR, EPA revised 40 CFR 51.306(c) regarding the LTS 
for RAVI to require that the RAVI plan must provide for a periodic 
review and SIP revision not less frequently than every three years 
until the date of submission of the state's first plan addressing 
regional haze visibility impairment, which was due December 17, 2007, 
in accordance with 40 CFR 51.308(b) and (c). On or before this date, 
the state must revise its plan to provide for review and revision of a 
coordinated LTS for addressing RAVI and regional haze, and the state 
must submit the first such coordinated LTS with its first regional haze 
SIP. Future coordinated LTS's, and periodic progress reports evaluating 
progress towards RPGs, must be submitted consistent with the schedule 
for SIP submission and periodic progress reports set forth in 40 CFR 
51.308(f) and 51.308(g), respectively. The periodic review of a state's 
LTS must report on both regional haze and RAVI impairment and must be 
submitted to EPA as a SIP revision.

G. Monitoring Strategy and Other Implementation Plan Requirements

    Section 51.308(d)(4) of the RHR includes the requirement for a 
monitoring strategy for measuring, characterizing, and reporting of 
regional haze visibility impairment that is representative of all 
mandatory Class I Federal areas within the state. The strategy must be 
coordinated with the monitoring strategy required in section 51.305 for 
RAVI. Compliance with this requirement may be met through 
``participation'' in the IMPROVE network, i.e., review and use of 
monitoring data from the network. The monitoring strategy is due with 
the first

[[Page 33028]]

regional haze SIP, and it must be reviewed every five years. The 
monitoring strategy must also provide for additional monitoring sites 
if the IMPROVE network is not sufficient to determine whether RPGs will 
be met.
    The SIP must also provide for the following:
     Procedures for using monitoring data and other information 
in a state with mandatory Class I areas to determine the contribution 
of emissions from within the state to regional haze visibility 
impairment at Class I areas both within and outside the state;
     Procedures for using monitoring data and other information 
in a state with no mandatory Class I areas to determine the 
contribution of emissions from within the state to regional haze 
visibility impairment at Class I areas in other states;
     Reporting of all visibility monitoring data to the 
Administrator at least annually for each Class I area in the state, and 
where possible, in electronic format;
     Developing a statewide inventory of emissions of 
pollutants that are reasonably anticipated to cause or contribute to 
visibility impairment in any Class I area. The inventory must include 
emissions for a baseline year, emissions for the most recent year for 
which data are available, and estimates of future projected emissions. 
A state must also make a commitment to update the inventory 
periodically; and
     Other elements, including reporting, recordkeeping, and 
other measures necessary to assess and report on visibility.
    The RHR requires control strategies to cover an initial 
implementation period extending to the year 2018, with a comprehensive 
reassessment and revision of those strategies, as appropriate, every 10 
years thereafter. Periodic SIP revisions must meet the core 
requirements of section 51.308(d) with the exception of BART. The 
requirement to evaluate sources for BART applies only to the first 
regional haze SIP. Facilities subject-to-BART must continue to comply 
with the BART provisions of section 51.308(e), as noted above. Periodic 
SIP revisions will assure that the statutory requirement of reasonable 
progress will continue to be met.

H. Consultation With States and Federal Land Managers (FLMs)

    The RHR requires that states consult with FLMs before adopting and 
submitting their SIPs. 40 CFR 51.308(i). States must provide FLMs an 
opportunity for consultation, in person and at least 60 days prior to 
holding any public hearing on the SIP. This consultation must include 
the opportunity for the FLMs to discuss their assessment of impairment 
of visibility in any Class I area and to offer recommendations on the 
development of the RPGs and on the development and implementation of 
strategies to address visibility impairment. Further, a state must 
include in its SIP a description of how it addressed any comments 
provided by the FLMs. Finally, a SIP must provide procedures for 
continuing consultation between the state and FLMs regarding the 
state's visibility protection program, including development and review 
of SIP revisions, five-year progress reports, and the implementation of 
other programs having the potential to contribute to impairment of 
visibility in Class I areas.

VI. EPA's Evaluation of Wyoming's Regional Haze SIP

A. Affected Class I Areas

    Pursuant to 40 CFR 51.308(d), the State identified seven mandatory 
Class I areas in Wyoming: Grand Teton National Park, Yellowstone 
National Park, Bridger Wilderness, Fitzpatrick Wilderness, North 
Absaroka Wilderness, Teton Wilderness, and Washakie Wilderness.

B. Baseline Visibility, Natural Visibility, and Uniform Rate of 
Progress

    As required by 40 CFR 51.308(d)(2), Wyoming provided baseline 
visibility, natural visibility, and the URP for each Class I area in 
the State. Natural background visibility, as defined in our 2003 
Natural Visibility Guidance, is estimated by calculating the expected 
light extinction using default estimates of natural concentrations of 
fine particle components adjusted by site-specific estimates of 
humidity. This calculation uses the IMPROVE equation, which is a 
formula for estimating light extinction from the estimated natural 
concentrations of fine particle components (or from components measured 
by the IMPROVE monitors). As documented in our 2003 Natural Visibility 
Guidance, EPA allows states to use ``refined'' or alternative 
approaches to this guidance to estimate the values that characterize 
the natural visibility conditions of Class I areas.
    One alternative approach is to develop and justify the use of 
alternative estimates of natural concentrations of fine particle 
components. Another alternative is to use the ``new IMPROVE equation'' 
that was adopted for use by the IMPROVE Steering Committee in December 
2005.\8\ The purpose of this refinement to the ``old IMPROVE equation'' 
is to provide more accurate estimates of the various factors that 
affect the calculation of light extinction.
---------------------------------------------------------------------------

    \8\ The IMPROVE program is a cooperative measurement effort 
governed by a steering committee composed of representatives from 
Federal agencies (including representatives from EPA and the FLMs) 
and regional planning organizations. The IMPROVE monitoring program 
was established in 1985 to aid the creation of Federal and State 
implementation plans for the protection of visibility in Class I 
areas. One of the objectives of IMPROVE is to identify chemical 
species and emission sources responsible for existing anthropogenic 
visibility impairment. The IMPROVE program has also been a key 
participant in visibility-related research, including the 
advancement of monitoring instrumentation, analysis techniques, 
visibility modeling, policy formulation and source attribution field 
studies.
---------------------------------------------------------------------------

    Wyoming used the new IMPROVE equation to calculate natural 
conditions and baseline visibility. The natural condition for each 
Class I area represents the visibility goal expressed in deciviews for 
the 20% worst days and the 20% best days that would exist if there were 
only naturally occurring visibility impairment. In accordance with 40 
CFR 51.308(d)(2)(iii), the State calculated natural visibility 
conditions based on available monitoring information and appropriate 
data analysis techniques and in accordance with our 2003 Natural 
Visibility Guidance. The State also calculated the number of deciviews 
by which baseline conditions exceed natural conditions at each of its 
Class I areas to meet the requirements of 40 CFR 51.308(d)(2)(iv)(A).
    Wyoming established the baseline visibility for the best and worst 
visibility days for each Class I area based on data from the IMPROVE 
monitoring sites. Each IMPROVE monitor collects particulate 
concentration data which are converted into reconstructed light 
extinction through a complex calculation using the IMPROVE equation 
(see Chapter 13 of the SIP for more information on reconstructed light 
extinction and the IMPROVE equation). Per 40 CFR 51.308(d)(2)(i), the 
State calculated baseline visibility using a five-year average (2000 to 
2004) of IMPROVE data for both the 20% best and 20% worst days. The 
State's baseline calculations were made in accordance with our 2003 
Tracking Progress Guidance.
    Pursuant to 40 CFR 51.308(d)(1)(i)(B), the State calculated the URP 
for each of its Class I areas. For the 20% worst days, the URP is the 
calculation of the deciview reduction needed to achieve natural 
conditions by 2064. For the 20% worst days, the State calculated the 
URP

[[Page 33029]]

in deciviews per year using the following formula: URP = [Baseline 
Condition-Natural Condition]/60 years. In order to determine the 
uniform progress needed by 2018 to be on the path to achieving natural 
visibility conditions by 2064, the State multiplied the URP by the 14 
years in the first planning period (2004-2018).
    Table 1 shows the baseline visibility, natural conditions, and URP 
for each of the Class I areas. As indicated by the table, some Class I 
areas share a single monitor because of the proximity of the areas to 
each other.

                                   Table 1--Baseline Visibility, Natural Conditions, and URP for Wyoming Class I Areas
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                             20% Worst days                                                                20% Best days
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                                                             Reduction
                                                             2000-2004                       needed to     2064 Natural        Delta         2000-2004
       Wyoming class I areas            Monitor  name        Baseline        2018 URP       reach  2018     conditions      baseline--       Baseline
                                                            (deciview)      (deciview)      URP  (delta     (deciview)     2064 natural     (deciview)
                                                                                             deciview)                      conditions
--------------------------------------------------------------------------------------------------------------------------------------------------------
Yellowstone National Park Grand     YELL2...............            11.8            10.5             1.3            6.44            5.36            2.58
 Teton National Park Teton
 Wilderness.
North Absaroka Wilderness Washakie  NOABI...............            11.5            10.4             1.1            6.83            4.67            2.0
 Wilderness.
Bridger Wilderness Fitzpatrick      BRID1...............            11.1            10.0             1.1            6.45            4.65            2.1
 Wilderness.
--------------------------------------------------------------------------------------------------------------------------------------------------------

    We have reviewed Wyoming's baseline visibility, natural conditions, 
and URP. We find they have been calculated correctly and are proposing 
to approve them.

C. BART Determinations

    BART is an element of Wyoming's LTS for the first implementation 
period. As discussed in more detail in section VI.D of this notice, the 
BART evaluation process consists of three components: (1) An 
identification of all the BART-eligible sources; (2) an assessment of 
whether those BART-eligible sources are in fact subject-to-BART; and 
(3) a determination of any BART controls. Wyoming addressed these steps 
as follows:
1. BART Eligible Sources
    The first step of a BART evaluation is to identify all the BART-
eligible sources within the state's boundaries. Wyoming identified the 
BART-eligible sources in Wyoming by utilizing the approach set out in 
the BART Guidelines (70 FR 39158). This approach provides three 
criteria for identifying BART-eligible sources: (1) One or more 
emission units at the facility fit within one of the 26 categories 
listed in the BART Guidelines; (2) the emission unit or units began 
operation on or after August 6, 1962, and were in existence on August 
6, 1977; and (3) combined potential emissions of any visibility-
impairing pollutant from the units that meet the criteria in (1) and 
(2) are 250 tons or more per year. Wyoming reviewed source permits and 
emission data from 2001-2003 to identify facilities in the BART source 
categories with potential emissions of 250 tons per year or more for 
any visibility-impairing pollutant from any unit or units that were in 
existence on August 7, 1977 and began operation on or after August 7, 
1962. The BART Guidelines direct states to address SO2,\9\ 
NOX, and direct PM (including both coarse particulate matter 
(PM10) and PM2.5) emissions as visibility-
impairing pollutants and to exercise their ``best judgment to determine 
whether VOC or NH3 emissions from a source are likely to 
have an impact on visibility in an area.'' (70 FR 39162).
---------------------------------------------------------------------------

    \9\ Wyoming has elected to submit its RH SIP pursuant to the 
requirements of 40 CFR 51.309. For states electing to submit under 
section 309, States do not have to do a BART analysis for 
SO2. SO2 controls are included in the backstop 
trading program under 40 CFR 51.309(d)(4).
---------------------------------------------------------------------------

    The State analyzed the emissions from VOC and NH3 from 
sources in the State and eliminated them from further consideration for 
BART controls. The State evaluated the BART-eligible sources and 
determined emissions of VOC and NH3 were negligible. Thus, 
the State has eliminated VOC and NH3 from further 
consideration for BART controls.
    We have reviewed this information and propose to accept this 
determination.
    The State determined the following were BART-eligible sources: 
PacifiCorp Jim Bridger, P4 Production, PacifiCorp Naughton, OCI 
Wyoming, FMC Granger, Dyno Nobel, FMC Westvaco, Sinclair Casper 
Refinery, Basin Electric Laramie River, Black Hills Neil Simpson 1, 
PacifiCorp Wyodak, Sinclair--Sinclair Refinery, PacifiCorp Dave 
Johnston, and General Chemical Green River.
    We have reviewed this information and propose to accept this 
determination.
2. Sources Subject-to-BART
    The second step of the BART evaluation is to identify those BART-
eligible sources that may reasonably be anticipated to cause or 
contribute to any visibility impairment at any Class I area, i.e., 
those sources that are subject-to-BART. The BART Guidelines allow 
States to consider exempting some BART-eligible sources from further 
BART review because they may not reasonably be anticipated to cause or 
contribute to any visibility impairment in a Class I area. Consistent 
with the BART Guidelines, Wyoming performed dispersion modeling on the 
BART-eligible sources to assess the extent of their contribution to 
visibility impairment at surrounding Class I areas.
a. Modeling Methodology
    The BART Guidelines provide that states may use the CALPUFF \10\ 
modeling system or another appropriate model to predict the visibility 
impacts from a single source on a Class I area and to, therefore, 
determine whether an individual source is anticipated to cause

[[Page 33030]]

or contribute to impairment of visibility in Class I areas, i.e., ``is 
subject to BART.'' The Guidelines state that CALPUFF is the best 
regulatory modeling application currently available for predicting a 
single source's contribution to visibility impairment (70 FR 39162).
---------------------------------------------------------------------------

    \10\ Note that our reference to CALPUFF encompasses the entire 
CALPUFF modeling system, which includes the CALMET, CALPUFF, and 
CALPOST models and other pre and post processors. The different 
versions of CALPUFF have corresponding versions of CALMET, CALPOST, 
etc. which may not be compatible with previous versions (e.g., the 
output from a newer version of CALMET may not be compatible with an 
older version of CALPUFF). The different versions of the CALPUFF 
modeling system are available from the model developer at https://www.src.com/verio/download/download.htm.
---------------------------------------------------------------------------

    The BART Guidelines also recommend that States develop a modeling 
protocol for making individual source attributions, and suggest that 
states may want to consult with EPA and their RPO to address any issues 
prior to modeling. Wyoming used the CALPUFF model for Wyoming BART 
sources in accordance with a protocol it developed titled BART Air 
Modeling Protocol Individual Source Visibility Impairment Analysis, 
March 2006, which was approved by EPA and is included in Chapter 6 of 
the State's TSD. The Wyoming protocol follows recommendations for long-
range transport described in appendix W to 40 CFR part 51, Guideline on 
Air Quality Models, and in EPA's Interagency Workgroup on Air Quality 
Modeling (IWAQM) Phase 2 Summary Report and Recommendations for 
Modeling Long-Range Transport Impacts as recommended by the BART 
Guidelines. (40 CFR part 51, appendix Y, section III.A.3). To determine 
if each BART-eligible source has a significant impact on visibility, 
Wyoming used the CALPUFF model to estimate daily visibility impacts 
above estimated natural conditions at each Class I area within 300 km 
of any BART-eligible facility, based on maximum actual 24-hour 
emissions over a three year period (2001-2003).
b. Contribution Threshold
    For States using modeling to determine the applicability of BART to 
single sources, the BART Guidelines note that the first step is to set 
a contribution threshold to assess whether the impact of a single 
source is sufficient to cause or contribute to visibility impairment at 
a Class I area. The BART Guidelines state that, ``[a] single source 
that is responsible for a 1.0 deciview change or more should be 
considered to `cause' visibility impairment.'' (70 FR 39104, 39161). 
The BART Guidelines also state that ``the appropriate threshold for 
determining whether a source contributes to visibility impairment may 
reasonably differ across States,'' but, ``[a]s a general matter, any 
threshold that you use for determining whether a source ``contributes'' 
to visibility impairment should not be higher than 0.5 deciviews.'' Id. 
Further, in setting a contribution threshold, States should ``consider 
the number of emissions sources affecting the Class I areas at issue 
and the magnitude of the individual sources' impacts.'' The Guidelines 
affirm that States are free to use a lower threshold if they conclude 
that the location of a large number of BART-eligible sources in 
proximity to a Class I area justifies this approach.
    Wyoming used a contribution threshold of 0.5 deciviews for 
determining which sources are subject-to-BART. By using a contribution 
threshold of 0.5 deciviews, Wyoming exempted seven of the fourteen 
BART-eligible sources in the State from further review under the BART 
requirements. Based on the modeling results, the State determined that 
P4 Production, FMC Granger,\11\ and OCI Wyoming had an impact of .07 
deciview, 0.39 deciview, and 0.07 deciview, respectively, at Bridger 
Wilderness. Black Hills Neil Simpson 1, Sinclair Casper Refinery, and 
Sinclair--Sinclair Refinery have an impact of 0.27 deciview, 0.06 
deciview, and 0.12 deciview, respectively, at Wind Cave. Dyno-Nobel had 
an impact of 0.22 deciview at Rocky Mountain National Park. These 
sources' modeled visibility impacts fell below the State's threshold of 
0.5 deciview and were determined not to be subject-to-BART.\12\ Given 
the relatively limited impact on visibility from these seven sources, 
we propose to agree with Wyoming that 0.5 deciviews is a reasonable 
threshold for determining whether its BART-eligible sources are 
subject-to-BART.
---------------------------------------------------------------------------

    \11\ The State of Wyoming performed a refined CALPUFF visibility 
modeling analysis for the two BART-eligible units at the FMC Wyoming 
Granger Facility and demonstrated that the predicted 98th percentile 
impacts at Bridger Wilderness Area and Fitzpatrick Wilderness Area 
would be below 0.5 dv for all meteorological periods modeled. This 
modeling used higher-resolution meteorological data as compared to 
the data used by the State for the initial screening modeling that 
identified the facility as subject-to-BART.
    \12\ CALPUFF modeling results, which provide the maximum change 
in visibility are summarized in the WY BART Screening Analysis 
Results and the WY BART Screening Analysis Results DV Frequency, 
which can also be found in Chapter 6 of the State's TSD.
---------------------------------------------------------------------------

    Because our recommended modeling approach already incorporates 
choices that tend to lower peak daily visibility impact values,\13\ our 
BART Guidelines state that a State should compare the 98th percentile 
(as opposed to the 90th or lower percentile) of CALPUFF modeling 
results against the ``contribution'' threshold established by the State 
for purposes of determining BART applicability. Wyoming used a 98th 
percentile comparison that we find appropriate. Further explanation on 
use of the 98th versus 90th percentile value is provided at 70 FR 
39121.
---------------------------------------------------------------------------

    \13\ See our BART Guidelines, Section III.A.3.
---------------------------------------------------------------------------

c. Sources Identified by Wyoming as Subject-to-BART
    Table 2 shows the sources identified by the State as subject-to-
BART and the results of the CALPUFF modeling.

  Table 2--Wyoming Subject-to-BART Sources and CALPUFF Modeling Results
------------------------------------------------------------------------
                                                         State modeling
                                                         results--98th
         Facility name          Subject-to-BART units  percentile  delta-
                                                            deciview
------------------------------------------------------------------------
PacifiCorp--Jim Bridger.......  Units 1-4............               3.1
Basin Electric--Laramie River.  Units 1, 2 and 3.....               3.68
PacifiCorp--Dave Johnston.....  Units 3 and 4........               3.30
PacifiCorp--Naughton..........  Units 1-3............               4.36
PacifiCorp--Wyodak............  Unit 1...............               1.66
FMC--Westvaco.................  Units NS-1A and NS-1B               1.3
General Chemical--Green River.  Boilers C and D......               1.36
------------------------------------------------------------------------


[[Page 33031]]

    We are proposing to approve the State's determination of the 
subject-to-BART sources.
3. BART Determinations and Federally Enforceable Limits
    The third step of a BART evaluation is to perform the BART 
analysis. The BART Guidelines (70 FR 39164) describe the BART analysis 
as consisting of the following five steps:
     Step 1: Identify All Available Retrofit Control 
Technologies;
     Step 2: Eliminate Technically Infeasible Options;
     Step 3: Evaluate Control Effectiveness of Remaining 
Control Technologies;
     Step 4: Evaluate Impacts and Document the Results; and
     Step 5: Evaluate Visibility Impacts.
    In determining BART, the State must consider the five statutory 
factors in section 169A of the CAA: (1) The costs of compliance; (2) 
the energy and non-air quality environmental impacts of compliance; (3) 
any existing pollution control technology in use at the source; (4) the 
remaining useful life of the source; and (5) the degree of improvement 
in visibility which may reasonably be anticipated to result from the 
use of such technology. See also 40 CFR 51.308(e)(1)(ii)(A). The five-
factor analysis occurs during steps 4 and 5 of the BART analysis.
    We find that Wyoming considered all five steps above in its BART 
determinations, but we find that its consideration of visibility 
improvement was inadequate, as explained below.
a. Visibility Improvement Modeling
    The BART Guidelines provide that states may use the CALPUFF 
modeling system or another appropriate model to determine the 
visibility improvement expected at a Class I area from potential BART 
control technologies applied to the source. The BART Guidelines also 
recommend that states develop a modeling protocol for modeling 
visibility improvement, and suggest that states may want to consult 
with EPA and their RPO to address any issues prior to modeling. Wyoming 
developed a modeling protocol titled BART Air Modeling Protocol 
Individual Source Visibility Assessments for BART Control Analyses, 
September 2006, for sources to use when they performed their BART 
analysis (see Chapter 6 of the State's TSD). The Wyoming protocol 
follows recommendations for long-range transport described in appendix 
W to 40 CFR part 51, Guideline on Air Quality Models, and in EPA's 
Interagency Workgroup on Air Quality Modeling (IWAQM) Phase 2 Summary 
Report and Recommendations for Modeling Long Range Transport Impacts, 
as recommended by the BART Guidelines (40 CFR part 51, appendix Y, 
section III.D.5).
    For the subject-to-BART PacifiCorp sources, the State's analyses 
provide visibility improvement modeling results that combine the 
visibility improvement from NOX, PM, and SO2 
control options.\14\ From the State's modeling results, EPA could not 
ascertain what the visibility improvement would be from an individual 
NOX or PM control option. For Basin Electric's Laramie River 
Station, the State did not provide the visibility improvement for the 
SNCR control option or for PM controls. While we are able to propose 
approval of the State's PM BART determinations without having 
additional visibility improvement modeling for PM controls, as 
discussed below, additional visibility improvement modeling to address 
the NOX BART controls was needed and subsequently performed 
by EPA.\15\
---------------------------------------------------------------------------

    \14\ Per the BART Guidelines, States must use CALPUFF, or other 
appropriate dispersion model to determine the visibility improvement 
expected at a Class I area from the potential BART control 
technology applied to the source. 70 FR 39170.
    \15\ A summary of EPA's modeling methodology and results can be 
found in the docket under EPA BART and RP Modeling for Wyoming 
Sources.
---------------------------------------------------------------------------

b. Summary of BART Determinations and Federally Enforceable Limits
    For the subject-to-BART sources, the State provided BART analyses, 
as well as additional technical information and materials, in 
Attachment A to the SIP. Chapter 6 of the SIP provides a summary of the 
five-factor analyses. As noted above, EPA performed the NOX 
visibility improvement modeling for the control technology options 
analyzed for the subject-to-BART PacifiCorp sources.\16\ EPA also 
performed modeling for the visibility improvement SNCR for Basin 
Electric Laramie River Units 1, 2, and 3. In addition, Wyoming did not 
provide control efficiencies in their BART analysis for PM and 
NOX BART controls for the PacifiCorp sources nor did the 
State provide analysis for NOX BART controls for Basin 
Electric Laramie River Units 1, 2, and 3. Therefore, EPA calculated the 
control efficiencies shown for the PM and NOX BART controls 
for the PacifiCorp sources and NOX BART controls for Basin 
Electric from the emission reductions reported by Wyoming in Chapter 
6.5 and Appendix A of their SIP.
---------------------------------------------------------------------------

    \16\ The cumulative visibility impact will be higher than the 
98th percentile impact that is shown in the BART summary tables.
---------------------------------------------------------------------------

    EPA is proposing to approve the State's BART determinations for the 
following: NOX and PM BART for FMC Westvaco Unit NS-1A and 
NS-1B; NOX and PM BART for General Chemical Green River 
Boiler C and Boiler D; PM BART for Basin Electric Laramie River Units 
1, 2, and 3; PM BART for PacifiCorp Dave Johnston Unit 3; 
NOX and PM BART for PacifiCorp Dave Johnston Unit 4; PM BART 
for PacifiCorp Jim Bridger Unit 1 and Unit 2; NOX and PM 
BART (including LTS controls) for PacifiCorp Jim Bridger Unit 3 and 
Unit 4; NOX and PM BART for PacifiCorp Naughton Units 1, 2, 
and 3; PM BART for PacifiCorp Wyodak Unit 1. A summary of the BART 
determination for each source is provided below.
    EPA is proposing to disapprove the State's NOX BART 
determinations, and we are proposing to issue a BART FIP, for the 
following units: PacifiCorp Dave Johnston Unit 3; PacifiCorp Jim 
Bridger Units 1 and 2; PacifiCorp Wyodak Unit 1; and Basin Electric 
Laramie River Units 1, 2, and 3. EPA's rationale for disapproving the 
State's BART determinations for these units, as well as EPA's BART FIP 
determinations and emission limits can be found in section VII.A of 
this notice.
i. FMC Westvaco--Units NS-1A and NS-1B
Background
    FMC's Westvaco facility is a trona mine and sodium products plant 
located in Sweetwater County, Wyoming. FMC Westvaco has two existing 
coal-fired boilers, Unit NS-1A and Unit NS-1B, that are subject to 
BART. Unit NS-1A and Unit NS-1B each have a design heat input rate of 
887 MMBtu/hr and were constructed in 1975. They are both wall-fired, 
wet-bottom boilers burning subbituminous coal. The State's BART 
determination can be found in Chapter 6.5.2 and Attachment A of the 
SIP.
NOX BART Determination
    Units NS-1A and NS-1B are currently controlled with combustion air 
control with a permit limit of 0.7 lb/MMBtu (3-hour rolling average). 
The State determined that low NOX burners (LNBs) and 
overfired air (OFA), LNBs and OFA with selective non-catalytic 
reduction (SNCR), and LNBs and OFA with selective catalytic reduction 
(SCR) were technically feasible for reducing NOX emissions 
at Unit NS-1A and NS-1B. The State did not identify any technically 
infeasible options. The State did not identify any energy or non-air 
quality environmental impacts that would preclude the selection of any 
of the controls evaluated, and there are no remaining-useful-life 
issues for this

[[Page 33032]]

source. A summary of the State's NOX BART analysis and the 
visibility impacts is provided in Table 3. Baseline NOX 
emissions are 2,719.5 tpy for each unit based on a heat input rate of 
887 MMBtu/hr and 8,760 hours of operation per year.

                                      Table 3--Summary of FMC Westvaco Unit NS-1A and Unit NS-1B NOX BART Analysis*
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                                                                                                           Visibility
                                                                                                                                           improvement
                                                                                                                                          (Delta dv for
                                                                  Emission rate                                         Average cost       the maximum
             Control  technology                   Control      (lb/MMBtu)  (30-      Emission         Annualized       effectiveness    98th percentile
                                               efficiency  (%)     day rolling    reduction  (tpy)        costs            ($/ton)          impact at
                                                                    average)                                                                 Bridger
                                                                                                                                           Wilderness
                                                                                                                                              Area)
--------------------------------------------------------------------------------------------------------------------------------------------------------
LNB + SOFA..................................                50              0.35           1,359.7          $413,145              $304              0.13
LNB + SOFA + SNCR...........................                70              0.21           1,903.6         1,281,851               673              0.19
LNB + SOFA + SCR............................                85              0.10           2,331.0         1,281,851             3,493              0.24
--------------------------------------------------------------------------------------------------------------------------------------------------------
* This table reflects the costs and visibility improvements per boiler.

    Incremental cost effectiveness for the controls evaluated is as 
follows: LNB plus SOFA and SNCR: $1,597/ton, and LNB plus SOFA and SCR: 
$16,051/ton.\17\
---------------------------------------------------------------------------

    \17\ Incremental cost effectiveness for each option is the 
difference in total annual costs between that option and the next 
most stringent option, divided by the difference in emissions, after 
controls have been applied, between those two control options.
---------------------------------------------------------------------------

    Based on its consideration of the five factors, the State 
determined that LNBs plus OFA are reasonable for BART. The State 
determined that the other control options were not reasonable based on 
the cost effectiveness and associated visibility improvement. The State 
has determined that NOX BART emission limits for FMC 
Westvaco Unit NS-1A and Unit MS-1B are 0.35 lb/MMBtu (30-day rolling 
average), 284 lb/hr (30-day rolling average), and 1,244 tpy.
    We agree with the State's conclusions, and we are proposing to 
approve its NOX BART determinations for FMC Westvaco Unit 
NS-1A and Unit NS-1B.
PM BART Determination
    Unit NS-1A and Unit NS-1B are currently controlled for PM emissions 
by electrostatic precipitators (ESPs). The units currently have a PM 
emission limit of 0.05 lb/MMBtu. The State determined that fabric 
filters on the wet scrubber, addition of an ESP downstream of the wet 
scrubber, and replacement of the ESPs with fabric filters were 
technically feasible control options. The State did not identify any 
energy or non-air quality environmental impacts that would preclude the 
selection of any of the controls evaluated, and there are no remaining-
useful-life issues for this source. A summary of the State's PM BART 
analysis is provided in Table 4 below. Baseline PM emissions are 197 
tpy for each unit based on a heat input rate of 887 MMBtu/hr and 8,760 
hours of operation per year.

                                      Table 4--Summary of FMC Westvaco Unit NS-1A and Unit NS-1B PM BART Analysis *
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                                                   Emission rate
                                                                    Control       (lb/MMBtu)  (30-      Emission         Annualized       Average cost
                      Control technology                        efficiency  (%)     day rolling     reduction  (tpy)        costs         effectiveness
                                                                                      average)                                               ($/ton)
--------------------------------------------------------------------------------------------------------------------------------------------------------
Fabric Filter on Wet Scrubber................................              21.4              0.04               41.7        $1,791,364           $42,948
ESP after Wet Scrubber.......................................              63.3              0.019             123.3         3,507,617            28,448
Replace ESP with Fabric Filter...............................              71.3              0.015             138.8         4,116,036            29,654
--------------------------------------------------------------------------------------------------------------------------------------------------------
* This table reflects the costs and visibility improvements per boiler.

    Given the high cost of controls, which are higher than what EPA, or 
other states have considered reasonable for PM, FMC did not evaluate 
the visibility improvement that would result from the PM controls 
evaluated. Previous visibility modeling analyses from the source 
indicate that the contribution in visibility degradation from PM is 
minor when compared to the contributing effects of NOX and 
SO2. Results from FMC's visibility modeling screening and 
analysis confirm this conclusion and are discussed in further detail 
within the comprehensive visibility analysis included as part of FMC's 
BART application (see Attachment A to the SIP). The State agreed with 
FMC's conclusions and did not require FMC to perform additional 
visibility analyses for the PM control options.
    The State determined that the current ESP control was reasonable 
for PM BART. The State rejected other controls as being reasonable for 
BART because of the high cost effectiveness. The State has determined 
that the PM BART emission limits for FMC Westvaco Unit NS-1A and NS-1B 
are 0.05 lb/MMBtu, 45.0 lb/hr, and 197 tpy.
    We agree with the State's conclusions, and we are proposing to 
approve its PM BART determinations for FMC Westvaco Unit NS-1A and Unit 
NS-1B.
ii. General Chemical Green River--Boilers C and D
    General Chemical Green River is a trona mine and sodium products 
plant. General Chemical's two existing coal-fired boilers, C and D, are 
co-located at the facility power plant. Both boilers burn low sulfur 
bituminous coal, and they supply power and process steam to mining and 
ore processing operations. Both boilers are tangentially fired using 
in-line coal pulverizers. The firing rate for Boiler C is 534 MMBtu/hr 
and 880 MMBtu/hr for Boiler D. The State's BART determination can be 
found in Chapter 6.5.3 and Attachment A of the SIP.

[[Page 33033]]

NOX BART Determination
    Boiler C and Boiler D are currently controlled with LNBs plus OFA 
with a permit limit of 0.7 lb/MMBtu (3-hour rolling average). On August 
7, 2009, the State issued a BART permit to General Chemical that 
required the source to meet a NOX emission limit of 0.32 lb/
MMBtu (30-day rolling average) for Boiler C and Boiler D. The State 
assumed the source could meet this emission limit with the installation 
and operation of new LNBs with the existing OFA. Upon further 
investigation, the source determined it could not meet a limit of 0.32 
lbs/MMBtu with new LNBs and the existing OFA.
    In response to the additional information from the source, the 
State reexamined its BART determination for Boiler C and D. The State 
determined that installing SOFA in addition to the existing LNBs and 
OFA could achieve an emission limit of 0.28 lb/MMBtu. Since SOFA in 
conjunction with the existing NOX controls could achieve 
better emission reductions than new LNBs plus OFA, the State eliminated 
the latter from further consideration in the BART analysis. The State 
determined SNCR and SCR were also technically feasible. The State did 
not identify any technically infeasible options.
    The State did not identify any energy or non-air quality 
environmental impacts that would preclude the selection of any of the 
controls evaluated, and there are no remaining-useful-life issues for 
this source. A summary of the State's NOX BART analysis and 
visibility impacts is provided in Tables 5 and 6 below. Baseline 
NOX emissions are 1,167 tpy for Boiler C and 1,816 tpy for 
Boiler D based on an average of 2001-2003 actual emissions.

                                      Table 5--Summary of General Chemical--Green River Boiler C NOX BART Analysis
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                                                                                                           Visibility
                                                                                                                                           improvement
                                                                  Emission rate                                                           (Delta dv for
                                                   Control      (lb/MMBtu)  (30-      Emission         Annualized       Average cost       the maximum
             Control  technology               efficiency  (%)     day rolling    reduction  (tpy)        costs         effectiveness    98th percentile
                                                                    average)                                               ($/ton)          impact at
                                                                                                                                             Bridger
                                                                                                                                        Wilderness Area)
--------------------------------------------------------------------------------------------------------------------------------------------------------
Existing LNBs with SOFA.....................                44              0.28               512          $757,711            $1,480              0.05
SNCR........................................                50              0.35               584         1,433,720             2,455              0.08
SCR.........................................                80              0.14               934         2,434,809             2,607              0.14
--------------------------------------------------------------------------------------------------------------------------------------------------------

    Incremental cost effectiveness for the control technologies 
evaluated is as follows: SNCR: $4,782/ton, and SCR: $3,156/ton.

                                      Table 6--Summary of General Chemical--Green River Boiler D NOX BART Analysis
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                                                                                                           Visibility
                                                                                                                                           improvement
                                                                  Emission rate                                                           (Delta dv for
                                                   Control      (lb/MMBtu)  (30-      Emission         Annualized       Average cost       the maximum
             Control  technology               efficiency  (%)     day rolling    reduction  (tpy)        costs         effectiveness    98th percentile
                                                                    average)                                               ($/ton)          impact at
                                                                                                                                             Bridger
                                                                                                                                        Wilderness Area)
--------------------------------------------------------------------------------------------------------------------------------------------------------
Existing LNBs with SOFA.....................                41              0.28               737          $943,549            $1,280              0.07
SNCR........................................                50              0.35               908         1,486,581             3,176              0.12
SCR.........................................                80              0.14             1,453         3,399,266             3,510              0.17
--------------------------------------------------------------------------------------------------------------------------------------------------------

    Incremental cost effectiveness for the control technologies 
evaluated is as follows: SNCR: $2,913/ton, and SCR: $4,342/ton.
    Based on its consideration of the five factors, the State 
determined that NOX BART is the existing LNBs with new SOFA, 
or a comparable performing technology. The State determined that SNCR 
and SCR were not reasonable based on the high cost effectiveness and 
low visibility improvement. The State determined the NOX 
BART emission limits for General Chemical Green River Boiler C are 0.28 
lb/MMBtu (30-day rolling average), 149.5 lb/hr (30-day rolling average) 
and 654.9 tpy, and that the NOX BART emission limits for 
Boiler D are 0.28 lb/MMBtu (30-day rolling average), 246.4 lb/hr (30-
day rolling average) and 1,079.2 tpy.
    We agree with the State's conclusions, and we are proposing to 
approve its NOX BART determinations for General Chemical 
Green River--Boiler C and D.
PM BART Determination
    Boiler C and D are currently controlled by ESPs with a permit limit 
of 50 lb/hr and 80 lb/hr, respectively. General Chemical addressed PM 
emissions through an abbreviated analysis by using PM BART information 
from FMC Westvaco, as discussed above. The facilities are similar in 
size and located about ten miles apart. Baseline PM emissions for 
Boiler C are 98 tpy and 161 tpy for Boiler D based on the average of 
2001-2003 actual emissions. As discussed above, visibility modeling 
screening and analyses for FMC Westvaco indicate that the contribution 
in visibility degradation from PM for a source comparable to Boiler C 
and Boiler D is minor. Additionally, costs for controlling PM from 
similar boilers are high as indicated by FMC analysis for Westvaco.
    The State accepted General Chemical's abbreviated PM BART analysis. 
The State determined that the current ESP control was reasonable for PM 
BART. The State rejected other controls as being reasonable for BART 
because of the high cost effectiveness. The State determined that the 
PM BART emission limits for Boiler C are 0.09 lb/MMBtu, 50 lb/hr, and 
219 tpy, and that the PM BART emissions limits for Boiler D are 0.09 
lb/MMBtu, 80 lb/hr, and 350.4 tpy.

[[Page 33034]]

    We agree with the State's conclusions, and we are proposing to 
approve its PM BART determination for General Chemical Green River 
Boiler C and D.
iii. Basin Electric Laramie River Station--Units 1-3
    Basin Electric Laramie River Station is located in Platte County, 
Wyoming. Laramie River Station is comprised of three 550-MW dry-bottom, 
wall-fired boilers (Units 1, 2, and 3) burning subbituminous coal for a 
total net generating capacity of 1,650 MW. All three units are subject-
to-BART. The State's BART determination can be found in Chapter 6.5.8 
and Attachment A of the SIP (The NOx BART analysis is discussed in 
section VII.A of this notice).
PM BART Determination
    Laramie River Units 1, 2, and 3 are currently controlled with ESPs 
with a permit limit of 0.03 lb/MMBtu. The State determined that fabric 
filters were technically feasible for Unit 3 but not Units 1 and 2. 
Units 1 and 2 are controlled with wet flue gas desulfurization and 
fabric filters cannot be used downstream of such a system. The State 
determined that flue gas treatment and GE Max-9 hybrid were technically 
infeasible for all three units. Thus, the only technically feasible 
control option for PM is fabric filters on Unit 3.
    The State did not identify any energy or non-air quality 
environmental impacts that would preclude the selection of any of the 
controls evaluated, and there are no remaining-useful-life issues for 
this source. A summary of the State's PM BART analysis for Unit 3 is 
provided in Table 7 below. Baseline PM emissions are 716 tpy for the 
unit based on 2001-2003 actual emissions.

                                        Table 7--Summary of Basin Electric Laramie River Unit 3 PM BART Analysis
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                                                    Emission rate
                                                                     Control      (lb/MMBtu)  (30-      Emission                          Average cost
                      Control technology                         efficiency (%)      day rolling    reduction  (tpy)  Annualized costs    effectiveness
                                                                                      average)                                               ($/ton)
--------------------------------------------------------------------------------------------------------------------------------------------------------
Fabric Filter--Peak Rate for Lost Generating Costs............                50             0.015               358      $194,809,000           $54,707
Fabric Filter Non-Peak Rate for Lost Generating Costs.........                50             0.015               358       134,934,000            40,156
--------------------------------------------------------------------------------------------------------------------------------------------------------

    The State did not provide visibility improvement modeling for 
fabric filters, but EPA is proposing to conclude this is reasonable 
based on the high cost effectiveness of fabric filters at each of the 
units, which is higher than EPA or other state have considered 
reasonable for PM BART.
    Based on its consideration of the five factors, the State 
determined that the current ESPs are reasonable for PM BART, as fabric 
filters on Unit 3 are not cost-effective and there are no other 
technically feasible controls for Units 1 and 2. The State determined 
the PM BART emission limits for Laramie River Unit 1 and Unit 2 are 
0.03 lb/MMBtu, 193 lb/hr, and 844 tpy, and the PM BART emission limits 
for Laramie River Unit 3 are 0.03 lb/MMBtu, 198 lb/hr, and 867 tpy.
    We agree with the State's conclusions, and we are proposing to 
approve its PM BART determination for Basin Electric Laramie River 
Units 1, 2, and 3.
iv. PacifiCorp Dave Johnston--Units 3 and 4
Background
    PacifiCorp Dave Johnston power plant is located in Converse County, 
Wyoming. Dave Johnston Power Plant is comprised of four units burning 
pulverized subbituminous Powder River Basin coal. Units 3 and 4 are the 
only units subject-to-BART. Dave Johnston Unit 3 is a nominal 230-MW 
pulverized coal-fired boiler that commenced service in 1964. It is 
equipped with burners in a cell configuration. Dave Johnston Unit 4 is 
a nominal 330-MW pulverized coal-fired boiler that commenced service in 
1972. It is a tangential-fired boiler. The State's BART analysis can be 
found in Chapter 6.5.5 and Appendix A of the SIP (The NOX 
BART determination for Dave Johnston Unit 3 is discussed in section 
VII.A of this notice).
NOX BART Determination for Unit 4
    Unit 4 is currently controlled with LNBs that were placed in 
operation in 1976. The State determined LNBs with advanced OFA, LNBs 
with advanced OFA and SNCR, and LNBs with advanced OFA and SCR were 
technically feasible for controlling NOX emissions for Unit 
4. The State did not identify any technically infeasible controls.
    The State did not identify any energy or non-air quality 
environmental impacts that would preclude the selection of any of the 
controls evaluated, and there are no remaining-useful-life issues for 
this source. Baseline NOX emissions are 8,566 tpy for Unit 4 
based on unit heat input rate of 2,500 MMBtu/hr and 7,884 hours of 
operation. A summary of the State's NOX BART analysis and 
the visibility impacts is provided in Table 8 below.

                                               Table 8--Summary of Dave Johnston Unit 4 NOX BART Analysis
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                                                                                                           Visibility
                                                                                                                                           improvement
                                                                  Emission rate                                                          (delta deciview
                                                   Control      (lb/MMBtu)  (30-      Emission                          Average cost     for the maximum
             Control technology                efficiency (%)      day rolling    reduction  (tpy)  Annualized costs    effectiveness    98th percentile
                                                                    average)                                               ($/ton)       impact at Wind
                                                                                                                                         Cave  National
                                                                                                                                              Park)
--------------------------------------------------------------------------------------------------------------------------------------------------------
LNB with advanced OFA.......................              71.7              0.15             6,142          $841,527              $137              0.71
New LNB with advanced OFA and SNCR..........              77.4              0.12             6,626        $2,141,786              $323              0.80
LNB with advanced OFA and SCR...............              86.8              0.07             7,435       $16,430,528            $2,210              0.97
--------------------------------------------------------------------------------------------------------------------------------------------------------


[[Page 33035]]

    Incremental costs for the controls evaluated are as follows: New 
LNB with advanced OFA and SNCR: $2,686/ton; and LNB with advanced OFA 
and SCR: $17,662/ton.
    Based on its consideration of the five factors, the State 
determined LNBs with advanced OFA was reasonable for NOX 
BART for Dave Johnston Unit 4. The State determined the NOX 
BART emission limits for Unit 4 are 0.15 lb/MMBtu (30-day rolling 
average), 615 lb/hr (30-day rolling average), and 2,694 tpy.
    We find it is reasonable for the State to eliminate higher 
performing control options (i.e., LNBs with advanced OFA plus SNCR and 
LNBs with advanced OFA plus SCR). The incremental cost effectiveness of 
achieving 0.07 lb/MMBTU with SCR over achieving 0.15 lb/MMBTU with LNBs 
is $17,662, with a 0.26 delta deciview visibility improvement. The 
incremental cost effectiveness of SNCR over LNBs is $2,686 with an 
incremental visibility improvement of 0.09.
    Based on our examination of the State's costs estimates, emission 
reductions, and the predicted visibility improvement, we agree with the 
State's conclusions, and we are proposing to approve its NOX 
BART determination for PacifiCorp Dave Johnston Unit 4.
PM BART Determination
    Units 3 and 4 are currently controlled with fabric filters 
installed in 2008 with an emission limit of 0.015 lb/MMBtu. The State 
determined that fabric filters represent the most stringent PM control 
technology and that 0.015 lb/MMBtu represents the most stringent 
emission limit. Consistent with the BART Guidelines, the State did not 
provide a five-factor analysis because the State determined BART to be 
the most stringent control technology and limit (70 FR 39165). The 
State determined that the PM BART emission limits for Unit 3 are 0.015 
lb/MMBtu, 42.1 lb/hr, and 184 tpy and the PM BART emission limits for 
Unit 4 are 0.015 lb/MMBtu (30-day rolling average), 61.5 lb/hr, and 269 
tpy.
    We agree with the State's conclusions, and we are proposing to 
approve its PM BART determination for Dave Johnston Units 3 and 4.
v. PacifiCorp Jim Bridger--Units 1-4
Background
    PacifiCorp's Jim Bridger Power Plant is located in Sweetwater 
County, Wyoming. Jim Bridger is comprised of four identically sized 
nominal 530 MW tangentially fired boilers burning pulverized coal for a 
total net generating capacity of 2,120 MW. Jim Bridger Unit 1 was 
placed in service in 1974, Unit 2 in 1975, Unit 3 in 1976, and Unit 4 
in 1979. The State's BART determination can be found in Chapter 6.5.4 
and Appendix A of the SIP (The NOX BART determination for 
Jim Bridger Units 1 and 2 is discussed in section VII.A of this 
notice).
NOX BART Determination for Jim Bridger Units 3 and 4
    PacifiCorp Jim Bridger Units 3 and 4 are equipped with early 
generation LNBs with a permit limit of 0.70 lb/MMBtu (3-hour fixed). 
The State determined that LNBs with SOFA, LNBs with SOFA plus SNCR, and 
LNBs with SOFA plus SCR were technically feasible for controlling 
NOX emissions. The State did not identify any technically 
infeasible options.
    The State did not identify any energy or non-air quality 
environmental impacts that would preclude the selection of any of the 
controls evaluated, and there are no remaining-useful-life issues for 
this source. Baseline NOX emissions are 10,643 tons for both 
units based on unit heat input rate of 6,000 MMBtu/hr and 7,884 hours 
of operation. A summary of the State's NOX BART analysis and 
the visibility impacts is provided in Table 9 below.
---------------------------------------------------------------------------

    \18\ Unit 4 has different modeling results as the stack 
parameters used in the modeling are different enough from Units 1-3 
to yield different modeled results.

                                    Table 9--Summary of Jim Bridger Units 3 and 4 NOX BART Analysis--Costs per Boiler
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                                                                                                           Visibility
                                                                                                                                           improvement
                                                                                                                                         (delta deciview
                                                                  Emission rate                                         Average cost     for the maximum
             Control technology                    Control      (lb/MMBtu)  (30-      Emission      Annualized costs    effectiveness    98th percentile
                                               efficiency (%)      day rolling     reduction (tpy)                         ($/ton)        impact at Mt.
                                                                    average)                                                                 Zirkel
                                                                                                                                          Wilderness)-
                                                                                                                                         units 3/4 \18\
--------------------------------------------------------------------------------------------------------------------------------------------------------
LNB with SOFA...............................              42.2              0.26             4,493        $1,144,969              $255         0.41/0.47
New LNB with SOFA and SNCR..................              55.6              0.20             5,913         2,710.801               459         0.53/0.62
LNB with SOFA and SCR.......................              84.4              0.07             8,987        20,296,400             2,258         0.80/0.82
--------------------------------------------------------------------------------------------------------------------------------------------------------

    Incremental cost effectiveness for the control evaluated is as 
follows: New LNB with SOFA and SNCR: $1,103/ton, and LNB with SOFA and 
SCR: $5,721/ton.
    The State determined the cost of compliance was high for SCR. The 
State determined that LNBs with SOFA were reasonable for NOX 
BART for Jim Bridger Units 3 and 4. The State determined the 
NOX BART emission limits for Jim Bridger Units 3 and 4 are 
0.26 lb/MMBtu (30-day rolling average), 1,560 lb/hr (30-day average), 
and 6,833 tpy.
    The State is requiring PacifiCorp to install additional controls 
under its LTS. The State determined that based on the cost of 
compliance and visibility improvement presented by PacifiCorp in the 
BART applications for Jim Bridger Units 3 and 4 and taking into 
consideration the logistical challenge of managing multiple pollution 
control installations within the regulatory time allotted for 
installation of BART by the RHR, additional controls would be required 
under the LTS but not BART (see Chapter 8.3.3 of the SIP). With respect 
to Jim Bridger Units 3 and 4, the State has required PacifiCorp to 
install SCR, or other NOX control systems, to achieve an 
emission limit or otherwise reduce NOX emissions to achieve 
a 0.07 lb/MMBtu 30-day rolling average NOX emissions rate. 
PacifiCorp is required to meet the 0.07 lb/MMBtu emission rate on Unit 
3 prior to December 31, 2015 and on Unit 4 prior to December 31, 2016.
    EPA does not agree with the State's conclusion that a limit of 0.26 
lb/MMBtu is reasonable for BART for Jim Bridger Units 3 and 4, which 
can be achieved with the installation and

[[Page 33036]]

operation on LNBs with SOFA. In particular, the cost effectiveness 
values for LNBs with SOFA plus SCR at each unit is $2,258 with 
approximately 0.80 delta deciview visibility improvement. The cost 
effectiveness values are reasonable and the visibility improvement 
significant for LNBs with SOFA plus SCR. In addition, the costs are 
within the range that Wyoming, other states, and we have considered 
reasonable in the BART context.\19\ LNBs with SOFA plus SCR would 
result in an additional reduction of 4,474 tpy of NOX 
emissions at each unit. This difference is substantial. We find that it 
was unreasonable for the State not to determine that LNBs with SOFA 
plus SCR was NOX BART for Jim Bridger Units 3 and 4.
---------------------------------------------------------------------------

    \19\ Wyoming determined that LNBs with OFA and SCR was BART for 
Naughton Unit 3. The cost effectiveness of SCR for Naughton Unit 3 
is $2,830 with 1 deciview of visibility improvement.
---------------------------------------------------------------------------

    Based on our examination of the State's costs estimates, emission 
reductions, and the predicted visibility improvement, we propose to 
find it reasonable that NOx BART for Jim Bridger Units 3 and 4 is LNBs 
with SOFA plus SCR at an emission limit of 0.07 lb/MMBtu. Though we do 
not agree with the State's BART determination, the State is requiring 
PacifiCorp to install controls as part of the LTS that are equivalent 
to what EPA's is proposing to determine is reasonable for BART. The 
State is requiring PacifiCorp to install the LTS controls within the 
timeline that BART controls would have to be installed pursuant to 40 
CFR 51.308(e)(iv). Thus, we are proposing to approve the State's 
compliance schedule and emission limit of 0.07 lb/MMBtu for Jim Bridger 
Units 3 and 4 as meeting the BART requirements.
PM BART Determination for Jim Bridger Units 1-4
    Units 1, 2, 3, and 4 are currently controlled for PM with ESPs and 
flue gas conditioning (FGC). The current permit limit for all four 
units is 0.03 lb/MMBtu. The State determined that fabric filters were 
technically feasible for controlling PM emissions. The State did not 
identify any technically infeasible controls. The State did not 
identify any energy or non-air quality environmental impacts that would 
preclude the selection of any of the controls evaluated, and there are 
no remaining-useful-life issues for this source. A summary of the 
State's PM BART analyses for Units 1-4 is provided in Table 10 below. 
Baseline PM emissions are 1,064 tpy for Unit 1, 1,750 tpy for Unit 2, 
1,348 tpy for Unit 3, and 710 tpy for Unit 4 based on unit heat input 
rate of 6,000 MMBtu/hr and 7,884 hours of operation per year.

                                        Table 10--Summary of PacifiCorp Jim Bridger Units 1-4 p.m. BART Analysis
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                                                    Emission rate
                                                                     Control      (lb/MMBtu)  (30-      Emission                          Average cost
                      Control technology                         efficiency (%)      day rolling    reduction  (tpy)  Annualized costs    effectiveness
                                                                                      average)                                               ($/ton)
--------------------------------------------------------------------------------------------------------------------------------------------------------
Fabric Filter--Unit 1.........................................              66.6             0.015               709        $6,367,118            $8,980
Fabric Filter--Unit 2.........................................              79.7             0.015             1,395         6,357,658             4,557
Fabric Filter--Unit 3.........................................              73.7             0.015               993         6,337,434             6,382
Fabric Filter--Unit 4.........................................                50             0.015               355         6,367,118            17,936
--------------------------------------------------------------------------------------------------------------------------------------------------------

    The State did not provide visibility improvement modeling for 
fabric filters, but EPA is proposing to conclude this is reasonable 
based on the high cost effectiveness of fabric filters at each of the 
units. In addition, we anticipate that the visibility improvement that 
would result from lowering the limit from 0.03 lb/MMBtu to 0.015 lb/
MMBtu would be insignificant based on the State's analysis.\20\
---------------------------------------------------------------------------

    \20\ The cumulative 3-year averaged visibility improvement from 
new LNB with separated OFA, upgraded wet FGD, and FGC for enhanced 
ESP with FGC (Post-Control Scenario 1) across the three Class I 
areas achieved with LNB and separated OFA, upgraded wet FGD, and 
adding a polishing fabric filter (Post-Control Scenario 2) was 0.095 
delta dv from Unit 1, 0.090 delta dv from Unit 2, 0.089 delta dv 
from Unit 3 and 0.025 delta dv from Unit 4.
---------------------------------------------------------------------------

    Based on its consideration of the five-factors, the State 
determined the current ESPs with FGC were reasonable for BART. The 
State determined that fabric filters were not reasonable based on the 
high cost effectiveness. The State determined that the PM BART emission 
limits for Jim Bridger Units 1 through 4 are 0.03 lb/MMBtu, 180 lb/hr, 
and 788 tpy.
    We agree with the State's conclusions, and we are proposing approve 
its PM BART determination for Jim Bridger Units 1-4.
vi. PacifiCorp Naughton Units 1-3
    PacifiCorp Naughton is located in Lincoln County, Wyoming. Naughton 
is comprised of three pulverized coal-fired units with a total net 
generating capacity of 700 MW. Naughton Unit 1 generates a nominal 160 
MW and commenced operation in 1963. Naughton Unit 2 generates a nominal 
210 MW and commenced operation in 1968. Naughton Unit 3 generates a 
nominal 330 MW and commenced operation in 1971. All three boilers are 
tangentially fired boilers. The State's BART determination can be found 
in Chapter 6.5.6 and Appendix A of the SIP.
NOX BART Determination
    Naughton Unit 1 and Unit 2 are currently controlled for 
NOX emissions with good combustion practices with 
NOX emission limits of 0.75 lb/MMBtu (3-hour block) and 0.58 
lb/MMBtu (annual). Naughton Unit 3 is currently controlled with LNBs 
with OFA with permit limits of 0.75 lb/MMBtu (93-hour block) and 0.58 
lb/MMBtu (annual). The State determined that LNBs with OFA, LNBs with 
OFA and SNCR, and LNBs with OFA and SCR were all technically feasible 
for controlling NOX emissions from Unit 1 and Unit 2. The 
State determined that tuning the existing LNBs, existing LNBs with OFA 
and SNCR, and existing LNBs with OFA and SCR were all technically 
feasible for controlling NOX emissions from Unit 3. The 
State did not identify any technically infeasible options.
    The State did not identify any energy or non-air quality 
environmental impacts that would preclude the selection of any of the 
controls evaluated, and there no remaining-useful-life issues for this 
source. A summary of the State's NOX BART analyses for Units 
1-3 is provided in Tables 11, 12, and 13 below. Baseline NOx emissions 
are 4,230 tpy for Unit 1, 5,109 tpy for Unit 2, and 6,563 tpy for Unit 
3 based on the unit heat input rate

[[Page 33037]]

of 3,700 MMBtu/hr and 7,884 hours of operation per year.

                                                 Table 11--Summary of Naughton Unit 1 NOX BART Analysis
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                                                                                                           Visibility
                                                                                                                                           improvement
                                                                                                                                        (Delta deciview)
                                                                  Emission rate                                         Average cost     (Delta deciview
             Control technology                    Control      (lb/MMBtu)  (30-      Emission      Annualized costs    effectiveness    for the maximum
                                               efficiency (%)      day rolling    reduction  (tpy)                         ($/ton)       98th percentile
                                                                    average)                                                                Impact at
                                                                                                                                             Bridger
                                                                                                                                        Wilderness Area)
--------------------------------------------------------------------------------------------------------------------------------------------------------
LNBs with OFA...............................              55.2              0.26             2,334          $993,248              $426              0.79
LNBs with OFA and SNCR......................              63.8              0.21             2,699         1,972,363               731              0.80
LNBs with OFA and SCR.......................              87.9              0.07             3,720        10,231,210             2,750              1.07
--------------------------------------------------------------------------------------------------------------------------------------------------------

    Incremental cost effectiveness for the controls evaluated are as 
follows: LNBs with OFA and SNCR: $2,683/ton, and LNBs with OFA and SCR: 
$8,089/ton.

                                                 Table 12--Summary of Naughton Unit 2 NOX BART Analysis
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                                                                                                           Visibility
                                                                                                                                           improvement
                                                                                                                                        (Delta deciview)
                                                                  Emission rate                                             Cost         (Delta deciview
             Control technology                    Control      (lb/MMBtu)  (30-      Emission      Annualized costs    effectiveness    for the maximum
                                               efficiency (%)      day rolling    reduction  (tpy)                         ($/ton)       98th percentile
                                                                    average)                                                                Impact at
                                                                                                                                             Bridger
                                                                                                                                        Wilderness Area)
--------------------------------------------------------------------------------------------------------------------------------------------------------
LNBs with OFA...............................              51.9              0.26             2,649          $945,683              $357              0.70
LNBs with OFA and SNCR......................              61.1              0.21             3,122         2,260,957               724              0.74
LNBs with OFA and SCR.......................                87              0.07             4,447        12,664,919             2,848              1.10
--------------------------------------------------------------------------------------------------------------------------------------------------------

    Incremental cost effectiveness for the controls evaluated are as 
follows: LNBs with OFA and SNCR: $2,781/ton, and LNBs with OFA and SCR: 
$7,852/ton.

                                                 Table 13--Summary of Naughton Unit 3 NOX BART Analysis
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                                                                                                           Visibility
                                                                                                                                           improvement
                                                                  Emission rate                                                           (Delta dv for
                                                   Control      (lb/MMBtu)  (30-      Emission                          Average cost    the maximum 98th
             Control technology                efficiency (%)      day rolling    reduction  (tpy)  Annualized costs  effectiveness ($/    percentile
                                                                    average)                                                ton)            impact at
                                                                                                                                             Bridger
                                                                                                                                        Wilderness Area)
--------------------------------------------------------------------------------------------------------------------------------------------------------
Tuning Existing LNBs........................              17.8              0.37             1,167           $95,130               $82              0.25
Existing LNBs with OFA and SNCR.............              33.3              0.30             2,188         1,916,039               876              0.46
Existing LNB with OFA and SCR...............              84.4              0.07             5,542        15,682,702             2,830              1.00
--------------------------------------------------------------------------------------------------------------------------------------------------------

    Incremental cost effectiveness for the controls evaluated are as 
follows: LNBs with OFA and SNCR: $1,783; and LNBs with OFA and SCR: 
$4,105.
    Based on its consideration of the five factors, the State 
determined LNBs with OFA was reasonable for NOX BART for 
Unit 1 and Unit 2. The State determined SNCR and SCR were not 
reasonable based on the high cost effectiveness and associated 
visibility improvement. The State determined the NOX BART 
emission limits for Naughton Unit 1 are 0.26 lb/MMBtu (30-day rolling 
average), 481 lb/hr (30-day rolling average), and 2,107 tpy, and the 
NOX BART emission limits for Naughton Unit 2 are 0.26 lb/
MMBtu (30-day rolling average), 624 lb/hr (30-day rolling average), and 
2,733 tpy. Based on its consideration of the five factors, the State 
determined that the existing LNBs with OFA plus SCR was NOX 
BART for Unit 3. The State determined the NOX BART emission 
limits for Naughton Unit 3 are 0.07 lb/MMBtu (30-day rolling average), 
259 lb/hr (30-day rolling average), and 1,134 tpy.
    We find it is reasonable for the State to eliminate higher 
performing control options for Units 1 and 2 (i.e., LNBs with advanced 
OFA plus SNCR and LNBs with advanced OFA plus SCR. The incremental cost 
effectiveness of LNBs with OFA plus SCR over LNBs with OFA is 
approximately $8,000 for each unit. The incremental cost effectiveness 
of LNBs with OFA plus SNCR over LNBs with OFA is approximately $2,700 
for each unit, with incremental visibility improvement of 0.01 delta 
deciviews at

[[Page 33038]]

Unit 1 and 0.04 delta deciviews at Unit 2.
    Based on our examination of the State's costs estimates, emission 
reductions, and the predicted visibility improvement, we agree with the 
State's conclusions, and we are proposing to approve the State's 
NOX BART determinations for PacifiCorp Naughton Units 1, 2, 
and 3.
PM BART Determination
    Units 1 and 2 are currently controlled for PM with ESPs and FGC. 
The current permit limit for Units 1 and 2 is 0.04 lb/MMBtu. Unit 3 is 
required by permit to install fabric filters for both Units by 2014 
with a permit limit of 0.15 lb/MMBtu. The State determined that fabric 
filters were technically feasible for controlling PM emissions for 
Units 1 and 2. The State did not identify any technically infeasible 
controls. The State determined that a fabric filter on Unit 3 
represents the most stringent PM control technology and that 0.015 lb/
MMBtu represents the most stringent emission limit. Consistent with the 
BART Guidelines, the State did not provide a full five-factor analysis 
because the State determined BART to be the most stringent control 
technology and limit.
    The State did not identify any energy or non-air quality 
environmental impacts that would preclude the selection of any of the 
controls evaluated, and there are no remaining-useful-life issues for 
this source. A summary of the State's PM BART analyses for Units 1 and 
2 is provided in Table 14 below. Baseline emissions for Unit 1 are 409 
tpy and 605 tpy for Unit 2 based on unit heat input rate of 1,850 
MMBtu/hr and 7,884 hours of operation per year.

                                       Table 14--Summary of PacifiCorp Naughton Unit 1 and Unit 2 PM BART Analysis
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                                                    Emission Rate
                                                                     Control      (lb/MMBtu)  (30-      Emission                          Average Cost
                      Control technology                         Efficiency (%)      day rolling    Reduction  (tpy)  Annualized Costs  Effectiveness ($/
                                                                                      Average)                                                ton)
--------------------------------------------------------------------------------------------------------------------------------------------------------
Fabric Filter--Unit 1.........................................              73.2             0.015               299        $3,436,594           $11,494
Fabric Filter--Unit 2.........................................              76.6             0.015               464         4,101,705             8,848
--------------------------------------------------------------------------------------------------------------------------------------------------------

    The State did not provide visibility improvement modeling for 
fabric filters, but EPA is proposing to conclude this is reasonable 
based on the high cost effectiveness of fabric filters at each of the 
units, which is higher than EPA or other State have considered 
reasonable for PM BART.
    Based on its consideration of the five factors, the State 
determined that the existing ESPs with FGC were reasonable for PM BART 
for Units 1 and 2. The State determined that fabric filters were not 
reasonable based on the high cost effectiveness. The State determined 
that the PM BART emission limits for Naughton Unit 1 are 0.04 lb/MMBtu, 
74 lb/hr, and 324 tpy and the PM BART emission limits for Naughton Unit 
2 are 0.04 lb/MMBtu, 96 lb/hr, and 421 tpy. The State determined the PM 
BART emission limits for Naughton Unit 3 are 0.015 lb/MMBtu, 56 lb/hr, 
and 243 tpy.
    We agree with the State's conclusions, and we are proposing to 
approve its BART determination for Naughton Units 1, 2, and 3.
vii. PacifiCorp Wyodak--Unit 1
Background
    PacifiCorp Wyodak Power Plant is located in Campbell County, 
Wyoming. Wyodak Power Plant is comprised of one coal-fired boiler, Unit 
1, burning pulverized sub-bituminous Powder River Basin coal for a 
total net generating capacity of a nominal 335MW. Wyodak's boiler 
commenced service in 1978. The State's BART determination can be found 
in Chapter 6.5.7 and Appendix A of the SIP (The NOX BART 
analysis for Wyodak Unit 1 is discussed in Section VII.A of this 
notice).
PM BART Determination
    Wyodak Unit 1 is currently controlled with fabric filters with an 
emission limit of 0.015 lb/MMBtu (30-day rolling average). The State 
determined that fabric filters on Wyodak Unit 1 represent the most 
stringent PM control technology and that 0.015 lb/MMBtu represents the 
most stringent emission limit. Consistent with the BART Guidelines, the 
State did not provide a full five-factor analysis because the State 
determined BART to be the most stringent control technology and limit. 
The State determined the PM BART emission limits for Wyodak Unit 1 are 
0.015 lb/MMBtu, 71.0 lb/hr, and 308.8 tpy.
    We agree with the State's conclusions, and we are proposing to 
approve its PM BART determination for Wyodak Unit 1.

D. Reasonable Progress Requirements

    In order to establish RPGs for its Class I areas, and to determine 
the controls needed for the LTS, Wyoming followed the process 
established in the RHR. Wyoming identified sources (other than BART 
sources) and source categories in Wyoming that are major contributors 
to visibility impairment and considered whether these sources should be 
controlled based on a consideration of the factors identified in the 
CAA and EPA's regulations (see CAA 169A(g)(1) and 40 CFR 
51.308(d)(1)(i)(A)). Wyoming then identified the anticipated visibility 
improvement in 2018 in all its Class I areas using the WRAP Community 
Multi-Scale Air Quality (CMAQ) modeling results.
1. Visibility Impairing Pollutants and Sources
    In order to determine the significant sources contributing to haze 
in Wyoming's Class I areas, Wyoming relied upon two source 
apportionment analysis techniques developed by the WRAP. The first 
technique was regional modeling using the Comprehensive Air Quality 
Model (CAMx) and the PM Source Apportionment Technology (PSAT) tool, 
used for the attribution for sulfate and nitrate sources only. The 
second technique was the Weighted Emissions Potential (WEP) tool, used 
for attribution of sources of OC, EC, PM2.5, and 
PM10. The WEP tool is based on emissions and residence time, 
not modeling and looks at all sources throughout the modeling domain.
    PSAT uses the CAMx air quality model to simulate nitrate-sulfate-
ammonia chemistry and apply this chemistry to a system of tracers or 
``tags'' to track the chemical transformations, transport, and removal 
of NOX and SO2. These two pollutants are 
important because they tend to originate from anthropogenic sources. 
Therefore, the results from this analysis can be useful in determining 
contributing sources that may be controllable, both in-state and in 
neighboring states.
    WEP is a screening tool that helps to identify source regions that 
have the potential to contribute to haze formation at specific Class I 
areas. Unlike PSAT,

[[Page 33039]]

this method does not account for chemistry or deposition. The WEP 
combines emissions inventories, wind patterns, and residence times of 
air masses over each area where emissions occur, to estimate the 
percent contribution of different pollutants. Like PSAT, the WEP tool 
compares baseline values (2000-2004) to 2018 values, to show the 
improvement expected by 2018 for OC, EC, PM2.5, and 
PM10. More information on the WRAP modeling methodologies is 
available in the document Technical Support Document for Technical 
Products Prepared by the Western Regional Air Partnership (WRAP) in 
Support of Western Regional Haze Plans in the Supporting and Related 
Materials section of the docket. Table 15 shows Wyoming's contribution 
to extinction at its own Class I areas.
---------------------------------------------------------------------------

    \21\ Extinction and species contribution to total particulate 
extinction taken from IMPROVE data (https://vista.cira.colostate.edu/dev/web/AnnualSummaryDev/Composition.aspx). IMPROVE data for NOABI 
based on available data for 2002-2004. Contribution of sulfate and 
nitrate based on PSAT; OC, EC, PM2.5, and PM10 
contribution based on WEP as taken from the WRAP TSS (https://vista.cira.colostate.edu/tss/).

               Table 15--Wyoming Sources Extinction Contribution 2000-2004 for 20% Worst Days \21\
----------------------------------------------------------------------------------------------------------------
                                                                                  Species        Wyoming Sources
                                                                              Contribution to    Contribution to
            Class I Area              Pollutant Species   Extinction (Mm-1)  Total Particulate       Species
                                                                               Extinction (%)    Extinction (%)
----------------------------------------------------------------------------------------------------------------
Yellowstone National Park, Grand     Sulfate............               4.3               16.7                5.9
 Teton National Park, Teton
 Wilderness.
                                     Nitrate............               1.8                7.0                4.7
                                     OC.................              13.5               52.4               72.6
                                     EC.................               2.5                9.7               66.8
                                     Fine PM............               1.0                3.9               24.0
                                     Coarse PM..........               2.6               10.1               20.0
                                     Sea Salt...........               0.02               0.08  ................
North Absaroka Wilderness, Washakie  Sulfate............               4.9               20.7                5.6
 Wilderness.
                                     Nitrate............               1.6                6.8                8.2
                                     OC.................              11.6               48.9               44.6
                                     EC.................               1.9                8.0               39.5
                                     Fine PM............               0.8                3.4               14.0
                                     Coarse PM..........               2.9               12.2               12.1
                                     Sea Salt...........  .................               0.04  ................
Bridger Wilderness, Fitzpatrick      Sulfate............               5.0               22.2               15.4
 Wilderness.
                                     Nitrate............               1.4                6.2               19.4
                                     OC.................              10.5               46.6               58.5
                                     EC.................               2.0                8.9               51.0
                                     Fine PM............               1.1                4.9               30.3
                                     Coarse PM..........               2.5               11.1               27.4
                                     Sea Salt...........               0.04               0.2   ................
----------------------------------------------------------------------------------------------------------------

    Table 16 shows influences from sources both inside and outside of 
Wyoming per the PSAT modeling for 2018. As indicated, the outside 
domain (OD) region is the highest contributor to sulfate and nitrate at 
all Wyoming Class I areas. The outside domain region represents the 
concentration of pollutants at the boundaries of the modeling domain. 
Depending on meteorology and the type of pollutant (particularly 
sulfate), these emissions can be transported great distances from 
regions such as Canada, Mexico, and the Pacific Ocean. Wyoming is the 
second highest contributor of particulate sulfate and nitrate at 
Bridger and Fitzpatrick Wilderness areas, but is a lesser contributor 
at the other Class I areas.
---------------------------------------------------------------------------

    \22\ OD denotes Outside Domain; ID denotes Idaho, MT denotes 
Montana, CAN denotes Canada, UT denotes Utah, WA denotes Washington, 
WY denotes Wyoming, CA denotes California, and OR denotes Oregon.

                                           Table 16--PSAT Source Region Apportionment for 20% Worst Days \22\
--------------------------------------------------------------------------------------------------------------------------------------------------------
 
--------------------------------------------------------------------------------------------------------------------------------------------------------
                  Class I Area                                                              2018 Sulfate PSAT
                                                                       2018 Nitrate PSAT
--------------------------------------------------------------------------------------------------------------------------------------------------------
Yellowstone National Park, Grand Teton National  Region...........................     OD     ID     WY    CAN     OR     OD     ID     WA     UT     OR
 Park, Teton Wilderness.                         % Contribution...................   46.5    8.1    5.8    5.4    4.6   31.3   28.2    9.4    7.4    7.0
North Absaroka Wilderness, Washakie Wilderness.  Region...........................     OD    CAN     MT     ID     WY     OD     ID     MT    CAN     WY
                                                 % Contribution...................   50.1   12.5    6.5    5.7    5.5   30.7   16.7   14.8   11.5    8.2
Bridger Wilderness, Fitzpatrick Wilderness.....  Region...........................     OD     WY     ID     UT    CAN     OD     WY     UT     ID     CA
                                                 % Contribution...................   31.1   15.3    7.6    5.9    5.1   21.8   19.3   15.6   10.6    6.8
--------------------------------------------------------------------------------------------------------------------------------------------------------

    Tables 17 shows the WEP contribution for EC, OC, PM2.5, 
and PM10.

[[Page 33040]]



                          Table 17--WEP Source Category Contribution for 20% Worst Days
----------------------------------------------------------------------------------------------------------------
                                                                                   Anthropogenic   Natural Fires
          Class I Area                 Point           Area           Mobile           Fires       and Biogenic
----------------------------------------------------------------------------------------------------------------
                                                       OC
----------------------------------------------------------------------------------------------------------------
Yellowstone National Park, Grand           0.408           3.892           1.636           8.303          85.764
 Teton National Park, Teton
 Wilderness.....................
North Absaroka Wilderness,                 0.661           9.449           2.844          11.881          75.159
 Washakie Wilderness............
Bridger Wilderness, Fitzpatrick            0.984           7.552           3.28            7.644          80.543
 Wilderness.....................
----------------------------------------------------------------------------------------------------------------
                                                       EC
----------------------------------------------------------------------------------------------------------------
Yellowstone National Park, Grand           0.243           2.628          13.659           5.51           77.958
 Teton National Park, Teton
 Wilderness.....................
North Absaroka Wilderness,                 0.386           5.755          23.253           7.054          63.55
 Washakie Wilderness............
Bridger Wilderness, Fitzpatrick            0.54            4.509          25.65            4.105          65.195
 Wilderness.....................
----------------------------------------------------------------------------------------------------------------
                                                      PM2.5
----------------------------------------------------------------------------------------------------------------
Yellowstone National Park, Grand           5.565          70.463           0.086           5.469          18.411
 Teton National Park, Teton
 Wilderness.....................
North Absaroka Wilderness,                 3.491          86.311           0.171           3.334           6.691
 Washakie Wilderness............
Bridger Wilderness, Fitzpatrick           16.311          69.195           0.081           3.618          10.785
 Wilderness.....................
----------------------------------------------------------------------------------------------------------------
                                                      PM10
----------------------------------------------------------------------------------------------------------------
Yellowstone National Park, Grand           2.655          83.939           0.363           0.717          12.316
 Teton National Park, Teton
 Wilderness.....................
North Absaroka Wilderness,                 2.066          93.197           0.213           0.313           4.206
 Washakie Wilderness............
Bridger Wilderness, Fitzpatrick            6.775          84.157           0.477           0.353           8.23
 Wilderness.....................
----------------------------------------------------------------------------------------------------------------

    Table 17 shows that EC, OC, PM2.5 and PM10 
emissions come mainly from sources such as natural fire, windblown 
dust, and road dust. To select the sources that would undergo the 
required four factor analysis, Wyoming looked at State emission 
inventory data in conjunction with the source apportionment information 
discussed above (a summary of the State's emission inventory can be 
found in section VI.E.1 of this notice). After evaluating this 
information, the State determined that stationary source emissions of 
NOX and SO2 were reasonable to evaluate for 
purposes of reasonable progress controls. The State also determined 
that emissions of NOX from oil and gas development should be 
analyzed for purposes of reasonable progress. Since emissions of OC, 
EC, PM2.5, and PM10 come from mainly 
uncontrollable sources, the State determined it was reasonable to not 
evaluate these pollutants for reasonable progress controls. The State 
submitted a January 12, 2011, SIP that addresses sources of 
SO2.\23\ Thus, the State evaluated emissions of the 
remaining pollutant, NOX, for reasonable progress in this 
SIP.
---------------------------------------------------------------------------

    \23\ The State submitted a January 12, 2011 SIP submittal to 
address the requirements under 40 CFR 51.309, with the exception of 
the 40 CFR 51.309(g) requirements addressed in this SIP submittal.
---------------------------------------------------------------------------

2. Four Factor Analysis
    In determining the measures necessary to make reasonable progress, 
States must take into account the following four factors and 
demonstrate how they were taken into consideration in selecting 
reasonable progress goals for a Class I area:
     Costs of Compliance;
     Time Necessary for Compliance;
     Energy and Non-air Quality Environmental Impacts of 
Compliance; and
     Remaining Useful Life of any Potentially Affected Sources.
    CAA Sec.  169A(g)(1) and 40 CFR 308(d)(1)(i)(A).
    The State performed a four factor analysis for each of the 
reasonable progress sources pursuant to 40 CFR 51.308(d)(1)(i)(A).
a. Stationary Sources
    The State used a reasonable progress screening methodology termed 
``Q/d'' to determine which stationary sources would be candidates for 
controls under reasonable progress. Q/d is a calculated ratio where Q 
represents (in this case) the NOX emission rate in tpy of 
the source divided by the distance in kilometers of the point source 
from the nearest Class I area, denoted by ``d.'' The State used the 
maximum permitted emission rate for each source to determine the tpy of 
NOX it used in the Q/d calculation. The State determined 
that a Q/d value of 10 is reasonable for determining which sources the 
State should consider for reasonable progress controls, since this 
value yielded sources of concern similar in magnitude to sources 
subject-to-BART.
    The State determined there were three units with a Q/d of greater 
than 10 that are not already being controlled under BART and the State 
completed a reasonable progress analysis for each of the sources. The 
sources are PacifiCorp Dave Johnson Unit 1 and Unit 2 and Mountain 
Cement Company Laramie Plant kiln. Dave Johnston Units 1 and 2 is 
addressed as part of our FIP in section VII.B of this notice. In 
addition, as previously mentioned, the State considered reasonable 
controls on oil and gas development sources.
b. Summary of Reasonable Progress Determinations and Limits
    For the subject-to-reasonable progress sources, the State provided 
analyses that took into consideration the four factors as required by 
section 169A(g)(1) of the CAA and 40 CFR 51.308(d)(1)(i)(A). For the 
stationary sources, the State relied on the analysis found in 
Supplementary Information for Four-Factor Analyses for Selected 
Individual Facilities in Wyoming, May 6, 2009, Revised Draft Report 
Prepared by EC/R Incorporated. For oil and gas sources, the State 
relied on the analysis found in Supplementary Information for Four 
Factor Analyses by WRAP States, May 4, 2009 (Corrected 4/

[[Page 33041]]

20/10) Revised Draft Report Prepared by EC/R Incorporated (for a 
complete copy of the reports see Chapter 7 of the State's TSD). The 
analyses considered EPA's BART Guidelines as relevant to their 
reasonable progress evaluations, as well as EPA's Guidance for Setting 
Reasonable Progress Goals Under the Regional Haze Program.
    In this action, EPA is proposing to approve the reasonable progress 
NOX determinations submitted by the State for oil and gas 
sources and for Mountain Cement Company Laramie Plant kiln. EPA is 
proposing to disapprove the State's reasonable progress determinations 
and proposing to issue a reasonable progress determination 
NOX FIP for PacifiCorp Dave Johnston Unit 1 and Unit 2. 
EPA's rationale for disapproving the State's reasonable progress 
determination for these units, as well as EPA's reasonable progress FIP 
determination, can be found in section VII.B of this notice.
    A summary of the reasonable progress analysis and determination for 
each source/source category that we are proposing to approve is 
provided below.
i. Oil and Gas Area Sources
Background
    Oil and gas exploration and production is occurring in numerous 
areas in Wyoming. The sources associated with oil and gas production 
mainly emit NOX and VOCs; in this context, the State 
considered NOX. Oil and gas production and exploration 
includes operation, maintenance, and servicing of production 
properties, including transportation to and from sites. EC/R evaluated 
reasonable progress control technologies for common sources in the oil 
and gas industry including compressor engines, turbines, process 
heaters, and drilling rig engines. The State's NOX 
reasonable progress determination for oil and gas sources can be found 
in Chapter 7.3.5 of the SIP.
NOX Reasonable Progress Determination
    For compressor engines, potential control options identified by the 
State include air-fuel ratio controls (AFRC), ignition timing retard, 
low-emission combustion (LEC) retrofit, SCR, SNCR, and replacement with 
electric motors. The State evaluated several control technologies for 
drilling rig engines including ignition timing retard, exhaust gas 
recirculation (EGR), SCR, replacement of Tier 2 engines with Tier 4 
engines, and diesel oxidation catalyst. Potential controls for turbines 
identified by the State include water or steam injection, LNBs, SCR, 
and water or steam injection with SCR. NOX emission control 
technologies identified by the State for process heaters include LNBs, 
ultra-low NOX burners (ULNBs), LNBs with flue gas 
recirculation (FGR), SNCR, SCR, and LNBs installed in conjunction with 
SCR.
    NOX emissions vary based on the equipment and fuel 
source. Emissions from individual natural gas-fired turbines at 
production operations can be as high as 877 tpy of NOX, 
while emissions from individual natural gas turbines at exploration 
operations can reach 131 tpy of NOX. Individual gas 
reciprocating engines have comparable NOX emissions with up 
to 700 tpy at production operations and 210 tpy at exploration 
operations. Diesel engine emissions can approach 46 tpy for production 
operations and 10 tpy for exploration operations.
    Table 18 provides a summary of the reasonable progress 
NOX analysis for oil and gas sources. Both the capital and 
annual costs for each technology is dependent on the engine size or on 
the process throughput; therefore, for most of the control technologies 
listed in Table 18, the State has provided cost estimate ranges. The 
lower end of the cost/ton estimates represent the cost per unit for 
larger or higher production units, while the higher end of the cost/ton 
estimates represent the cost per unit for the smaller or lower 
production units.

                       Table 18--Summary of Reasonable Progress NOX Analysis for Oil and Gas Exploration and Production Equipment
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                            Estimated                        Estimated
                                                             Control         Pollutant        Capital    Annual Cost                           Cost
            Source Type               Control Technology    Efficiency      Controlled        Cost ($/     ($/year/          Units         Effectiveness
                                                               (%)                             unit)        unit)                             ($/ton)
--------------------------------------------------------------------------------------------------------------------------------------------------------
Compressor Engines................  AFRC.................        10-40  NOX...............       5.3-42      0.9-6.8  hp................        68-2,500
                                    Ignition timing              15-30  NOX...............          N/A          1-3  hp................        42-1,200
                                     retard.
                                    LEC retrofit.........        80-90  NOX...............      120-820       30-210  hp................       320-2,500
                                    SCR..................           90  NOX...............      100-450       40-270  hp................      870-31,000
                                    SNCR.................        90-99  NOX...............        17-35          3-6  hp................           16-36
                                    Replacement with               100  NOX...............      120-140        38-44  hp................       100-4,700
                                     electric motors.
Drilling Rig Engines and Other      Ignition timing              15-30  NOX...............       16-120        14-66  hp................     1,000-2,200
 Engines.                            retard.                        40  NOX...............          100        26-67  hp................       780-2,000
                                    EGR..................        80-95  NOX...............    100-2,000     40-1,200  hp................     3,000-7,700
                                    SCR..................
                                    Replacement of Tier 2           87  NOX...............          125           20  hp................       900-2,400
                                     engines with Tier 4.
Turbines..........................  Water or steam               68-80  NOX...............       4.4-16          2-5  1000 BTU..........       560-3,100
                                     injection.
                                    LNB..................        68-84  NOX...............         8-22      2.7-8.5  1000 BTU..........    2,000-10,000
                                    SCR..................           90  NOX...............        13-34       5.1-13  1000 BTU..........     1,000-6,700
                                    Water or steam               93-96  NOX...............        13-34       5.1-13  1000 BTU..........     1,000-6,700
                                     injection with SCR.
Process Heaters...................  LNB..................           40  NOX...............      3.8-7.6    0.41-0.81  1000 BTU..........     2,100-2,800
                                    ULNB.................        75-85  NOX...............       4.0-13     0.43-1.3  1000 BTU..........     1,500-2,000
                                    LNB and FGR..........           48  NOX...............           16          1.7  1000 BTU..........           2,600
                                    SNCR.................           60  NOX...............        10-22      1.1-2.4  1000 BTU..........     4,700-5,200
                                    SCR..................        70-90  NOX...............        33-48      3.7-5.6  1000 BTU..........     2,900-6,700
                                    LNB and SCR..........        70-90  NOX...............        37-55        4-6.3  1000 BTU..........     2,900-6,300
--------------------------------------------------------------------------------------------------------------------------------------------------------


[[Page 33042]]

    Wyoming states that it would need up to two years to develop the 
necessary regulations to control oil and gas sources.\24\ The State 
estimated that companies would require a year to procure the necessary 
capital to purchase the control equipment. The time required to design, 
fabricate, and install control technologies will vary based on the 
control technology selected and other factors.
---------------------------------------------------------------------------

    \24\ For all reasonable progress sources, the time necessary to 
develop regulations is not a consideration under the time necessary 
for compliance factor. If regulations are needed to implement 
reasonable progress controls, the State must develop them as part of 
the regional haze SIP.
---------------------------------------------------------------------------

    The State determined that no additional controls for oil and gas 
sources were reasonable at this time. The State concluded that 
emissions from large stationary sources processing oil and gas in the 
WRAP region have been well quantified over the years, while smaller 
exploration and production sources that the State is evaluating for 
reasonable progress have not had the same degree of emission inventory 
development. The State points out that understanding the sources and 
volume of emissions at oil and gas production sites is necessary to 
recognizing the impact that these emissions have on visibility.
    To better understand the emissions from stationary and mobile 
equipment operated as part of oil and gas field operations, the WRAP 
has been working on developing an emission inventory to more fully 
characterize the oil and gas field operations emissions. The WRAP's 
development of a more comprehensive emission inventory is still in 
process (as of the date of the State's SIP submittal). The State 
determined it cannot complete the evaluation of oil and gas on 
visibility until the WRAP emission inventory study has been completed.
    The State points out that in the case of compressor engines, many 
facilities have already installed control equipment.\25\ For lean burn 
engines, oxidation catalysts are commonly installed, while SNCR with 
AFRC are commonly installed for rich burn engines. The State also 
points out that regulating drill rig engines can be problematic since 
drill rig engines are, for the most part, considered mobile sources and 
emission limits for mobile sources are set by the Federal government 
under section 202 of the CAA.
---------------------------------------------------------------------------

    \25\ Oil and gas sources are regulated by the State as part of 
its minor source BACT requirements in Wyoming Air Quality Standards 
and Regulations Chapter 6, Section 2.
---------------------------------------------------------------------------

    We disagree with the State's reasoning for not adopting reasonable 
progress controls for oil and gas sources. If the State determined that 
additional information was needed to potentially control oil and gas 
sources, the State should have developed the information. While we 
disagree with the State's reasoning for not requiring any controls 
under reasonable progress, we are proposing to approve the State's 
conclusion that no additional NOX controls are warranted for 
this planning period. As shown by the four factor analyses, the most 
reasonable controls are for compressor engines, which the State already 
controls through its minor source BACT requirements (see above). In 
addition, while the costs of some controls are within the range of cost 
effectiveness values Wyoming, other states, and we have considered as 
reasonable in the BART context, they are not so low that we are 
prepared to disapprove the State's conclusion in the reasonable 
progress context.
    We are proposing to approve the State's reasonable progress 
determination for oil and gas sources.
ii. Mountain Cement Company Laramie Plant--Kiln
Background
    The Mountain Cement Company Laramie Plant cement kiln is a long dry 
kiln with a capacity of 1,500 tons of clinker per day. Assuming the 
plant runs 365 days of the year, the result is 547,500 tpy of clinker.
NOX Reasonable Progress Determination
    The kiln is currently uncontrolled for NOX emissions. 
The State determined that indirect and direct firing of LNBs, biosolid 
injection, NOxOUT \SM\, CemSTAR \SM\, LoTOx TM, SCR, SNCR 
(using urea), and SNCR (using ammonia) were technically feasible for 
controlling NOX emissions from the kiln. The State did not 
identify any technically infeasible controls.
    The State did not identify any energy or non-air quality 
environmental impacts that would preclude the selection of any of the 
controls evaluated, and there are no remaining-useful-life issues for 
this source. A summary of the State's NOX reasonable 
progress analyses for the kiln is provided in Table 19 below. Baseline 
NOX emissions for the kiln are 524 tpy based on 2002 actual 
emissions.
---------------------------------------------------------------------------

    \26\ A negative annual cost is given because cement kilns 
receive a credit for the biosolids tipping fee paid by facilities 
providing the biosolids to the cement plant. For the purposes of 
this analysis, the tipping fee is $5.00/ton.
    \27\ Cost effectiveness figures for the CemStar\SM\ process were 
not available for dry kilns.
    \28\ Cost effectiveness figures for LoTOx TM were not 
available for dry kilns.
    \29\ Capital and annual costs for SNCR have only been costed for 
preheater and precalcnier kilns. Only cost effectiveness figures 
were available for dry kilns.

               Table 19--Summary of Mountain Cement Company Kiln NOX Reasonable Progress Analysis
----------------------------------------------------------------------------------------------------------------
                                                                                                      Cost
         Control Technology                Control            Emission      Annualized  Costs  Effectiveness  ($/
                                       Efficiency  (%)    Reduction (tpy)                             ton)
----------------------------------------------------------------------------------------------------------------
LNB (indirect)......................              30-40            157-210           $205,000       $6,568-4,910
LNB (direct)........................                 40                210            449,000             13,853
Biosolid Injection \26\.............                 50                262           -127,000              1,324
NOxOUT \SM\.........................                 35                183            507,000              8,023
CemSTAR \SM\ \27\...................              20-60            105-314            Unknown            Unknown
LoTOxTM \28\........................              80-90            419-472            Unknown            Unknown
SCR.................................                 80                419          7,553,000             82,535
SNCR (urea) \29\....................                 35                183            Unknown              1,223
SNCR (ammonia)......................                 35                183            Unknown              1,223
----------------------------------------------------------------------------------------------------------------

    The State estimated that it could potentially take seven years to 
install control equipment on the kiln. This estimate includes the two 
years that will be necessary for the State to implement new regulations 
and the one-year Mountain Cement will likely need to obtain the 
necessary capital for the purchase of new emission control technology. 
The State estimates the total time necessary for compliance will vary 
based on the control technology selected. For example, the State 
predicts that one and a half years will be required to design, 
fabricate, and install

[[Page 33043]]

SCR or SNCR technology, while over two and a half years will be 
required to design, fabricate, and install LoTOx \TM\ technology.
    The State determined no controls were reasonable for reasonable 
progress for Mountain Cement Company Laramie Plant kiln. The State 
cited that the four-factor analysis was limited, in that no guidance 
was provided by EPA for identifying significant sources and EPA did not 
establish contribution to visibility impairment thresholds (a potential 
fifth factor for reasonable progress determinations).\30\ The State 
further claims that the State cannot, per Wyoming Statute 35-11-202, 
establish emission control requirements except through State rule or 
regulation. Furthermore, the Wyoming statute requires the State to 
consider the character and degree of injury of the emissions involved. 
In this case, the State claims it would need to have visibility 
modeling that assessed the degree of injury caused by the emissions, 
which the State does not have. The State believes it has taken a strong 
and reasonable first step in identifying potential contributors to 
visibility impairment, and that the next step of creating an 
appropriate rule or regulation will be accomplished in the next SIP 
revision.
---------------------------------------------------------------------------

    \30\ States must consider the four factors as listed above but 
can also take into account other relevant factors for the reasonable 
progress sources identified (see EPA's Guidance for Setting 
Reasonable Progress Goals under the Regional Haze Program, (``EPA's 
Reasonable Progress Guidance''), p. 2-3, July 1, 2007).
---------------------------------------------------------------------------

    We disagree with the State's reasoning for not adopting reasonable 
progress controls for Mountain Cement Company Laramie Plant kiln. If 
the State determined that it needed to adopt a rule or perform modeling 
to adequately assess and, if warranted, require reasonable progress 
controls, the State should have completed these steps before it 
submitted its regional haze SIP. The RHR does not allow for commitments 
to potentially implement strategies at some later date that are 
identified under reasonable progress or for the State to take credit 
for such commitments. Nor does it allow the State to consider the time 
to promulgate regulations as part of the time for compliance.
    While we disagree with the State's reasoning for not requiring any 
controls under reasonable progress, we are proposing to approve the 
State's conclusion that no additional NOX controls are 
warranted for this planning period. While the costs of some controls 
(i.e., biosolid injection and SNCR) are within the range of cost 
effectiveness values Wyoming, other states, and we have considered as 
reasonable in the BART context, they are not so low that we are 
prepared to disapprove the State's conclusion in the reasonable 
progress context. In addition, these controls afford relatively modest 
emission reductions.
3. Reasonable Progress Goals
    40 CFR 51.308(d)(1) requires states to ``establish goals'' (in 
deciviews) that provide for reasonable progress towards achieving 
natural visibility conditions for each Class I area of the State. These 
RPGs are interim goals that must provide for incremental visibility 
improvement for the most impaired visibility days, and ensure no 
degradation for the least impaired visibility days. The RPGs for the 
first planning period are goals for the year 2018.
    Wyoming relied on WRAP modeling to establish its RPGs for 2018. The 
primary tool WRAP relied upon for modeling regional haze improvements 
by 2018, and for estimating Wyoming's RPGs, was the CMAQ model. The 
CMAQ model was used to estimate 2018 visibility conditions in Wyoming 
and all western Class I areas, based on application of anticipated 
regional haze strategies in the various states' regional haze plans, 
including assumed controls on BART sources.
    The Regional Modeling Center (RMC) at the University of California 
Riverside conducted the CMAQ modeling under the oversight of the WRAP 
Modeling Forum. The RMC developed air quality modeling inputs including 
annual meteorology and emissions inventories for: (1) A 2002 actual 
emissions base case; (2) a planning case to represent the 2000-2004 
regional haze baseline period using averages for key emissions 
categories; and (3) a 2018 base case of projected emissions determined 
using factors known at the end of 2005. All emission inventories were 
spatially and temporally allocated using the Sparse Matrix Operator 
Kernel Emissions (SMOKE) modeling system. Each of these inventories 
underwent a number of revisions throughout the development process to 
arrive at the final versions used in CMAQ modeling.
    The photochemical modeling of regional haze for the WRAP states for 
2002 and 2018 was conducted on the 36-km resolution national regional 
planning organization domain that covered the continental United 
States, portions of Canada and Mexico, and portions of the Atlantic and 
Pacific Oceans along the east and west coasts. The RMC examined the 
model performance of the regional modeling for the areas of interest 
before determining whether the CMAQ model results were suitable for use 
in the regional haze assessment of the LTS and for use in the modeling 
assessment. The 2002 modeling efforts were used to evaluate air 
quality/visibility modeling for a historical episode, in this case, for 
calendar year 2002, to demonstrate the suitability of the modeling 
systems for subsequent planning, sensitivity, and emissions control 
strategy modeling. Model performance evaluation compares output from 
model simulations with ambient air quality data for the same time 
period to determine whether model performance is sufficiently accurate 
to justify using the model to simulate future conditions. Once the RMC 
determined that model performance was acceptable, it used the model to 
determine the 2018 RPGs using the current and future year air quality 
modeling predictions, and compared the RPGs to the uniform rate of 
progress. A more detailed description of the CMAQ modeling performed 
for the WRAP can be found in the Chapter 5 of the State's TSD.
    The State determined that the WRAP 2018 projections represent 
significant visibility improvement and reasonable progress toward 
natural visibility based upon the State's consideration of the factors 
required for BART and reasonable progress. The State adopted the WRAPs 
2018 projections as their RPG for each Class I area. Table 20 shows the 
URP and the 2018 RPGs adopted by the State.

[[Page 33044]]



                                                        Table 20--Wyoming's URP and RPGs for 2018
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                                                  20% Worst Days                                   20% Best Days
                                                         -----------------------------------------------------------------------------------------------
                                                                                             Reduction
                  Wyoming Class I Areas                      2000-2004                       Needed to       2018 CMAQ       2000-2004       2018 CMAQ
                                                             Baseline        2018 URP     Reach URP Goal     Modeling        Baseline        Modeling
                                                            (deciview)      (deciview)        (Delta       Projection--     (deciview)      Projection
                                                                                             deciview)      State's RPG                     (deciview)
--------------------------------------------------------------------------------------------------------------------------------------------------------
Yellowstone National Park, Grand Teton National, Park               11.8            10.5             0.7            11.2             2.6             2.4
 Teton Wilderness.......................................
North Absaroka Wilderness, Washakie Wilderness..........            11.5            10.4             0.6            11.0             2.0             2.0
Bridger Wilderness, Fitzpatrick Wilderness..............            11.1            10.0             0.6            10.6             2.1             2.0
--------------------------------------------------------------------------------------------------------------------------------------------------------

    Table 20 shows that the State's regional haze SIP is providing for 
improvement in visibility for the most-impaired days for the period 
ending in 2018 and allows for no degradation in visibility for the 
least-impaired days.
    Table 20 also shows that Wyoming is not meeting the URP to meet 
natural visibility conditions by 2064. In this case, 40 CFR 
51.308(d)(1)(ii) requires the State to demonstrate, based on the four 
factors in 51.308(d)(1)(i)(A), that the RPGs established in this SIP 
are reasonable for this planning period and that achieving the URP in 
this planning period is not reasonable. In its demonstration, the State 
cited many reasons why meeting the URP was not reasonable, including 
the following. First, emissions from natural sources greatly affect the 
State's ability to meet the 2018 URP. As discussed earlier, WEP data 
shows that emissions of OC, EC, PM2.5, and PM10 
come mainly from natural or non-anthropogenic sources, such as natural 
wildfire and windblown dust. The State has little or no control over 
OC, EC, PM2.5, and PM10 emissions associated with 
natural fire and windblown dust. Second, emissions from sources outside 
the WRAP modeling domain also affect the State's ability to meet the 
2018 URP. Sources outside of the modeling domain are the single largest 
source region contributor to sulfate and nitrate at the State's Class I 
areas. These sources are not under the control of Wyoming or the 
surrounding states.
    Since the State is not meeting the URP, the State is required by 40 
CFR 51.308(d)(1)(ii) to assess the number of years it would take to 
reach natural conditions if visibility improvement continues at the 
current rate of progress. The State has calculated the year and the 
length of time to reach natural visibility as follows: Yellowstone 
National Park, Grand Teton National Park, and Teton Wilderness: 2130 
(126 years); North Absaroka Wilderness and Washakie Wilderness: 2136 
(132 years); and Bridger Wilderness and Fitzpatrick Wilderness: 2165 
(161 years).
    EPA disagrees with the State's assessment that, based on the 
factors in 40 CFR 51.308(d)(1)(i)(a), all reasonable controls were 
implemented by the State for this first planning period of the regional 
haze program. In particular, as discussed in section VII.B.i below, we 
find unreasonable the State's determination to not impose controls at 
PacifiCorp Dave Johnston Units 1 and 2. As a result, EPA is proposing 
to disapprove the State's RPGs, and because we are proposing to 
disapprove Wyoming's RPGs, we are also proposing a FIP to replace them. 
See discussion in section VII.C below.

E. Long Term Strategy

1. Emission Inventories
    Section 51.308(d)(3)(iii) requires that Wyoming document the 
technical basis, including modeling, monitoring, and emissions 
information, on which it relied to determine its apportionment of 
emission reduction obligations necessary for achieving reasonable 
progress in each mandatory Class I Federal area it affects. Wyoming 
must identify the baseline emissions inventory on which its strategies 
are based. 40 CFR 51.308(d)(3)(iv) requires that Wyoming identify all 
anthropogenic sources of visibility impairment it considered in 
developing its LTS strategy. This includes major and minor stationary 
sources, mobile sources, and area sources.
    In order to meet these requirements, Wyoming relied on the emission 
inventory developed by the WRAP. The State has provided an emission 
inventory for SO2, NOX, VOC, OC, EC, 
PM2.5, PM10, and NH3. The inventory 
provides the baseline year 2002 emissions and provides projections of 
future emissions in 2018 based on expected controls, growth, and other 
factors. The following are the inventory source categories identified 
by the State: Point, area, on-road mobile, off-road mobile, 
anthropogenic fire, natural fire, road dust, fugitive dust, area source 
oil and gas, and biogenic emissions. The emission inventories developed 
by the WRAP were calculated using best available data and approved EPA 
methods.\31\ Following is a summary of the emission inventory for each 
pollutant by source.
---------------------------------------------------------------------------

    \31\ The methods WRAP used to develop these emission inventories 
are described in more detail in Technical Support Document for 
Technical Products Prepared by the Western Regional Air Partnership 
(WRAP) in Support of Western Regional Haze Plans in the Supporting 
and Related Materials section of the docket.
---------------------------------------------------------------------------

SO2
    Sulfur dioxide emissions come primarily from coal combustion at 
EGUs, but smaller amounts come from natural gas combustion, mobile 
sources and wood combustion.

             Table 21--Wyoming SO2 Emissions--2002 and 2018
------------------------------------------------------------------------
                                     Baseline                  Percent
         Source Category               2002     Future 2018     Change
------------------------------------------------------------------------
Point............................      119,717       96,809          -19
Area.............................       16,689       23,093           38

[[Page 33045]]

 
On-Road Mobile...................          959           81          -92
Off-Road Mobile..................        5,866           65          -99
Oil & Gas........................          150            3          -98
Road Dust........................            0            0            0
Fugitive Dust....................            0            0            0
Windblown Dust...................            0            0            0
Anthropogenic Fire...............          173          109          -37
Natural Fire.....................        2,286        2,286            0
Biogenic.........................            0            0            0
                                  --------------------------------------
    Total........................      145,840      122,446          -16
------------------------------------------------------------------------

    The State expects a 16% reduction in SO2 emissions by 
2018 due to planned controls on existing sources, even with expected 
growth in generating capacity for the State.
NOX
    NOX emissions in Wyoming come mostly from point sources 
and from on-road and off-road mobile sources.

             Table 22--Wyoming NOX Emissions--2002 and 2018
------------------------------------------------------------------------
                                     Baseline                  Percent
         Source Category               2002     Future 2018     Change
------------------------------------------------------------------------
Point............................      117,806      110,109           -7
Area.............................       15,192       19,663           29
On-Road Mobile...................       38,535        9,728          -75
Off-Road Mobile..................       76,637       49,677          -35
Oil & Gas........................       14,725       34,142          132
Road Dust........................            0            0            0
Fugitive Dust....................            0            0            0
Windblown Dust...................            0            0            0
Anthropogenic Fire...............          782          484          -38
Natural Fire.....................        8,372        8,372            0
Biogenic.........................       15,925       15,925            0
                                  --------------------------------------
    Total........................      287,974      248,100          -14
------------------------------------------------------------------------

    The State expects NOX emissions to decrease by 14% by 
2018, primarily due to significant reductions in mobile source 
emissions. The State projects that off-road and on-road vehicles 
emissions will decline by more than 55,760 tpy from the baseline 2002 
emissions of 115,172 tpy.
OC
    A wide variety of sources contribute emissions to this pollutant, 
including diesel emissions and combustion byproducts from wood and 
agricultural burning.

              Table 23--Wyoming OC Emissions--2002 and 2018
------------------------------------------------------------------------
                                     Baseline                  Percent
         Source Category               2002     Future 2018     Change
------------------------------------------------------------------------
Point............................          646          990           53
Area.............................        2,000        1,975           -1
On-Road Mobile...................          304          249          -18
Off-Road Mobile..................          625          411          -34
Oil & Gas........................            0            0            0
Road Dust........................           20           26           30
Fugitive Dust....................           96          133           39
Windblown Dust...................            0            0            0
Anthropogenic Fire...............        1,709          886          -48
Natural Fire.....................       23,793       23,793            0
Biogenic.........................            0            0            0
                                  --------------------------------------
    Total........................       29,193       28,463           -3
------------------------------------------------------------------------

    OC emissions from all sources are expected to show a 3% decline. 
Natural fire is the largest source contributing to OC emissions. The 
State does not have the ability to predict future emissions from 
natural fires and thus, the State

[[Page 33046]]

held this category constant in the inventory.
EC
    EC is a byproduct of incomplete combustion. EC emissions mainly 
come from mobile sources and natural fires.

              Table 24--Wyoming EC Emissions--2002 and 2018
------------------------------------------------------------------------
                                     Baseline                  Percent
         Source Category               2002     Future 2018     Change
------------------------------------------------------------------------
Point............................          104          180           73
Area.............................          304          335           10
On-Road Mobile...................          443           86          -81
Off-Road Mobile..................        1,986        1,161          -42
Oil & Gas........................            0            0            0
Road Dust........................            2            2            0
Fugitive Dust....................            7            9           29
Windblown Dust...................            0            0            0
Anthropogenic Fire...............          298          153          -49
Natural Fire.....................        4,922        4,922            0
Biogenic.........................            0            0            0
                                  --------------------------------------
    Total........................        8,066        6,848          -15
------------------------------------------------------------------------

    The State predicts EC emissions to decrease approximately 15% by 
2018. Reductions in manmade emissions of EC are largely due to mobile 
sources emission reductions resulting from new federal emission 
standards for mobile sources, especially for diesel engines.
PM2.5
    PM2.5 emissions come mainly from agricultural and mining 
activities, windblown dust from construction areas, and emissions from 
unpaved and paved roads.

            Table 25--Wyoming PM2.5 Emissions--2002 and 2018
------------------------------------------------------------------------
                                     Baseline                  Percent
         Source Category               2002     Future 2018     Change
------------------------------------------------------------------------
Point............................       11,375       15,709           38
Area.............................        1,601        1,756           10
On-Road Mobile...................            0            0            0
Off-Road Mobile..................            0            0            0
Oil & Gas........................            0            0            0
Road Dust........................          160          206           29
Fugitive Dust....................        2,082        2,882           38
Windblown Dust...................        5,838        5,838            0
Anthropogenic Fire...............          242          129          -47
Natural Fire.....................        1,535        1,535            0
Biogenic.........................            0            0            0
                                  --------------------------------------
    Total........................       22,833       28,055           23
------------------------------------------------------------------------

    The State predicts emissions of PM2.5 to increase 23% by 
2018. Emission increases are related to population growth and an 
increase in vehicle miles traveled.
PM10
    PM10 emissions come from many of the same sources as 
PM2.5 emissions but other activities like rock crushing and 
processing, material transfer, open pit mining and unpaved road 
emissions can be prominent sources.

             Table 26--Wyoming PM10 Emissions--2002 and 2018
------------------------------------------------------------------------
                                     Baseline                  Percent
         Source Category               2002     Future 2018     Change
------------------------------------------------------------------------
Point............................       24,751       30,619           24
Area.............................          409          653           60
On-Road Mobile...................          171          165           -4
Off-Road Mobile..................            0            0            0
Oil & Gas........................            0            0            0
Road Dust........................        1,125        1,449           29
Fugitive Dust....................       18,030       25,144           39
Windblown Dust...................       52,546       52,546            0
Anthro Fire......................          259          109          -58
Natural Fire.....................        5,369        5,369            0

[[Page 33047]]

 
Biogenic.........................            0            0            0
                                  --------------------------------------
    Total........................      102,660      116,054           13
------------------------------------------------------------------------

    Overall, PM10 emissions are expected to increase by 13%. 
Increases in coarse PM emissions are linked to population growth and 
vehicle miles traveled.
NH3
    NH3 emissions come from a variety of sources including 
wastewater treatment facilities, livestock operations, fertilizer 
application, mobile sources, and point sources.

             Table 27--Wyoming NH3 Emissions--2002 and 2018
------------------------------------------------------------------------
                                     Baseline                  Percent
         Source Category               2002     Future 2018     Change
------------------------------------------------------------------------
Point............................          685        1,398          104
Area.............................       29,776       29,901            0
On-Road Mobile...................          538          724           35
Off-Road Mobile..................           41           57           39
Oil & Gas........................            0            0            0
Road Dust........................            0            0            0
Fugitive Dust....................            0            0            0
Windblown Dust...................            0            0            0
Anthropogenic Fire...............          218          119          -45
Natural Fire.....................        1,775        1,775            0
Biogenic.........................            0            0            0
                                  --------------------------------------
    Total........................       33,033       33,974            3
------------------------------------------------------------------------

    NH3 emissions are expected to increase by 3% by 2018. 
Increases in NH3 emissions are linked to population growth 
and increased vehicular traffic.
2. Consultation and Emissions Reductions for Other States' Class I 
Areas
    40 CFR 51.308(d)(3)(i) requires that Wyoming consult with another 
state if its emissions are reasonably anticipated to contribute to 
visibility impairment at that state's Class I area(s), and that Wyoming 
consult with other states if those other states' emissions are 
reasonably anticipated to contribute to visibility impairment at its 
Class I areas. The State participated in regional planning, 
coordination, and consultation with other states in developing emission 
management strategies through the WRAP. Through the WRAP consultation 
process, Wyoming has reviewed and analyzed contributions from other 
states that reasonably may cause or contribute to visibility impairment 
in Wyoming's Class I areas and analyzed Wyoming's impact on other 
states' Class I areas.
    40 CFR 51.308(d)(3)(ii) requires that if Wyoming emissions cause or 
contribute to impairment in another state's Class I area, Wyoming must 
demonstrate that it has included in its regional haze SIP all measures 
necessary to obtain its share of the emission reductions needed to meet 
the RPG for that Class I area. Section 51.308(d)(3)(ii) also requires 
that, since Wyoming participated in a regional planning process, it 
must ensure it has included all measures needed to achieve its 
apportionment of emission reduction obligations agreed upon through 
that process. As we state in the RHR, Wyoming's commitments to 
participate in WRAP bind it to secure emission reductions agreed to as 
a result of that process.
    The State determined it did potentially impact Class I areas in 
South Dakota, Colorado, Utah, Idaho, Montana, and North Dakota (see 
Table 8.1.2.1-1 in the SIP). Wyoming accepted and incorporated the 
WRAP-developed visibility modeling into its regional haze SIP and the 
SIP includes the controls assumed in the modeling. Wyoming has 
satisfied the RHR requirements for consultation and included controls 
in the SIP sufficient to address the relevant requirements related to 
impacts on Class I areas in other states.
    We are proposing to find that the State has met the requirements 
for consultation under 40 CFR 51.308(d)(3)(i) and 40 CFR 
51.308(d)(3)(ii).
3. Mandatory Long-Term Strategy Requirements
    40 CFR 51.308(d)(3)(v) requires that Wyoming, at a minimum, 
consider certain factors in developing its LTS. These are: (a) Emission 
reductions due to ongoing air pollution control programs, including 
measures to address RAVI; (b) measures to mitigate the impacts of 
construction activities; (c) emissions limitations and schedules for 
compliance to achieve the reasonable progress goals; (d) source 
retirement and replacement schedules; (e) smoke management techniques 
for agricultural and forestry management purposes including plans that 
currently exist within the state for these purposes; (f) enforceability 
of emissions limitations and control measures; and (g) the anticipated 
net effect on visibility due to projected changes in point, area, and 
mobile source emissions over the period addressed by the LTS.
a. Reductions Due to Ongoing Air Pollution Programs
    In addition to its BART and reasonable progress determinations, the 
State's LTS contains other reductions due to ongoing air pollution 
programs. The State's LTS contains numerous ongoing air pollution 
programs, including: (1) New Source Review Program, which is a permit 
program for

[[Page 33048]]

the construction of new sources and the modification of existing 
sources; (2) Prevention of Significant Deterioration Program, which 
protects visibility impairment from proposed major stationary sources 
or major modifications to existing facilities; and (3) New Source 
Performance Standards, which the State incorporates by reference on an 
annual basis. For a complete listing of ongoing air pollution programs 
in Wyoming, see Chapter 8.2.1 of the SIP.
b. Measures To Mitigate the Impacts of Construction Activities
    Chapter 3 of the Wyoming Air Quality Standards and Regulations 
(WAQSR) establishes limits on the quantity or concentration of 
emissions of air pollutants from numerous sources, including 
construction activities. Specifically, WAQSR Chapter 3, Section 2(f), 
prescribes measures to ensure the control of fugitive dust emissions 
during construction or demolition activities. WAQSR Chapter 3, Section 
2(f) requires any person engaged in clearing or leveling of land, 
earthmoving, excavation, or movement of trucks or construction 
equipment over access haul roads or cleared land to take steps to 
minimize fugitive dust from such activities. Such control measures may 
include frequent watering and/or chemical stabilization. EPA approved 
WAQSR Chapter 3 into the SIP on July 28, 2004 (69 FR 44965).
c. Smoke Management
    WAQSR Chapter 10 establishes restrictions and requirements on 
different types of burning in Wyoming. WAQSR Chapter 10, Section 2 
regulates open burning, including refuse burning, open burning of trade 
wastes, open burning at salvage operations, open burning for 
firefighting training, and small vegetative material open burning (not 
exceeding 0.25 tons per day of PM). WAQSR Chapter 10, Section 3 
regulates emissions from wood waste burners. EPA approved WAQSR Chapter 
10, Section 2 and 3 into the SIP on July 28, 2004 (69 FR 44965). WAQSR 
Chapter 10, Section 4 was adopted by the State and submitted to EPA to 
meet the requirements for programs related to fire under 40 CFR 
51.309(d)(6). Chapter 10, Section 4 seeks to minimize the impacts from 
private and prescribed burning on visibility in Class I areas and 
potentially affected populations. EPA is proposing approval of Chapter 
10, Section 4 in a separate action.
d. Emission Limitations and Schedules for Compliance
    Chapter 6.5 of the State's SIP contains the emission limitations 
and schedules for compliance for BART sources. Chapter 6.5 of the SIP 
requires the BART sources to install and demonstrate compliance with 
the State's BART determination as expeditiously as practicable but no 
later than five years after EPA approval of the SIP. For some sources 
where controls have already been installed, the State specifies an 
earlier compliance deadline in Chapter 6.5 of the SIP. In addition, 
Chapter 8.3.3 of the SIP contains the emission limits and compliance 
schedule for LTS controls on Jim Bridger Units 1-4.
e. Source Retirement and Replacement Schedules
    The State is not currently aware of any specific scheduled 
shutdowns, retirements in upcoming years, or replacement schedules, 
such as planned installation of new control equipment to meet other 
regulations. If such actions occur, the State will factor them into 
upcoming reviews.
f. Enforceability of Wyoming's Measures
    As discussed in section VII.D of this notice, EPA is proposing to 
disapprove the State's SIP because it contains inadequate monitoring, 
recordkeeping, and reporting requirements, and we are proposing a FIP 
to address the enforceability of BART and reasonable progress controls.
g. Anticipated Net Effect on Visibility Due to Projected Changes
    The anticipated net effect on visibility due to projected changes 
in point, area, and mobile source emissions during this planning period 
is addressed in section VI.D.3 of this notice.
4. Our Conclusions on Wyoming's Long-Term Strategy
    We propose to partially approve and partially disapprove Wyoming's 
LTS. Because we are proposing to disapprove the NOX BART 
determinations for PacifiCorp Dave Johnston Unit 3, PacifiCorp Jim 
Bridger Units 1 and 2, PacifiCorp Wyodak Unit 1, and Basin Electric 
Laramie River Units 1, 2, and 3, we are also proposing to disapprove 
the corresponding emission limits and compliance schedules that Wyoming 
relied on as part of its LTS. Because we are proposing to disapprove 
the reasonable progress determination for PacifiCorp Dave Johnston 
Units 1 and 2, we are also proposing to disapprove the LTS because it 
does not include appropriate NOX reasonable progress 
emission limits and compliance schedules for Dave Johnston Units 1 and 
2. We are also proposing to disapprove the State's LTS because it does 
not contain the necessary monitoring, recordkeeping, and reporting 
requirements to make the BART and reasonable progress limits 
practically enforceable. Except for these elements, the State's LTS 
satisfies the requirements of 40 CFR 51.308(d)(3), and we are proposing 
to approve it.

F. Coordination of RAVI and Regional Haze Rule Requirements

    Per 40 CFR 51.306(c), the State must provide for review and 
revision of a coordinated LTS for addressing RAVI and regional haze, 
and the State must submit the first such coordinated LTS with its first 
regional haze SIP. The State failed to provide for the coordination of 
their RAVI and regional haze LTS. We are proposing to disapprove the 
State's SIP as not meeting the requirements of 40 CFR 51.306(c). We are 
proposing a FIP as explained in section VII.F of this notice to meet 
the coordination requirements of 40 CFR 51.306(c).

G. Monitoring Strategy and Other Implementation Plan Requirements

    40 CFR 51.308(d)(4) requires that the SIP contain a monitoring 
strategy for measuring, characterizing, and reporting regional haze 
visibility impairment that is representative of all mandatory Class I 
Federal areas within the state. This monitoring strategy must be 
coordinated with the monitoring strategy required in 40 CFR 51.305 for 
RAVI. As 40 CFR 51.308(d)(4) notes, compliance with this requirement 
may be met through participation in the IMPROVE network. 40 CFR 
51.308(d)(4)(i) further requires the establishment of any additional 
monitoring sites or equipment needed to assess whether the RPGs for all 
mandatory Class I Federal areas within the state are being achieved.
    Consistent with EPA's monitoring regulations for RAVI and regional 
haze, Wyoming states in Chapter 9 of the regional haze SIP that it will 
rely on the IMPROVE network for compliance purposes, in addition to any 
additional visibility impairment monitoring that may be needed in the 
future.
    Section 51.308(d)(4)(ii) requires that states establish procedures 
by which monitoring data and other information are used in determining 
the contribution of emissions from within Wyoming to regional haze 
visibility impairment at mandatory Class I Federal areas both within 
and outside the state. The IMPROVE monitoring program is national in 
scope, and other states have similar monitoring and data reporting

[[Page 33049]]

procedures, ensuring a consistent and robust monitoring data collection 
system. As 40 CFR 51.308(d)(4) indicates, Wyoming's participation in 
the IMPROVE program constitutes compliance with this requirement.
    40 CFR 51.308(d)(4)(iv) requires that the SIP provide for the 
reporting of all visibility monitoring data to the Administrator, at 
least annually, for each mandatory Class I Federal area in the state. 
To the extent possible, Wyoming should report visibility monitoring 
data electronically. 40 CFR 51.308(d)(4)(vi) also requires that the SIP 
provide for other elements, including reporting, recordkeeping, and 
other measures, necessary to assess and report on visibility. We 
propose that Wyoming's participation in the IMPROVE network ensures 
that the monitoring data is reported at least annually and is easily 
accessible; therefore, such participation complies with this 
requirement. IMPROVE data are centrally compiled and made available to 
EPA, states and the public via various electronic formats and Web sites 
including IMPROVE (https://vista.cira.colostate.edu/improve/) and VIEWS 
(https://vista.cira.colostate.edu/views/).
    40 CFR 51.308(d)(4)(v) requires that Wyoming maintain a statewide 
inventory of emissions of pollutants that are reasonably anticipated to 
cause or contribute to visibility impairment in any mandatory Class I 
Federal area. The inventory must include emissions for a baseline year, 
emissions for the most recent year for which data are available, and 
estimates of future projected emissions. The State must also include a 
commitment to update the inventory periodically. The State's emission 
inventory is discussed in section VI.F.1 of this notice. Wyoming states 
in Chapter 9 of the SIP that it intends to update the Wyoming statewide 
emissions inventories periodically and review periodic emissions 
information from other states and future emissions projections. We 
propose that this satisfies the requirement.
    40 CFR 51.308(d)(4)(vi) requires that states provide for any 
additional reporting, recordkeeping, and measures necessary to evaluate 
and report on visibility. The State of Wyoming, in accordance with 
provisions of 40 CFR 51.308(d)(4)(vi), will track data related to 
regional haze for sources for which the State has regulatory authority, 
and will depend on the IMPROVE program and RPO sponsored collection and 
analysis efforts for monitoring and emissions inventory data, 
respectively. To ensure the availability of data and analyses to report 
on visibility conditions and progress toward Class I area visibility 
goals, the State of Wyoming will collaborate with members of a RPO to 
ensure the continued operation of the IMPROVE program and RPO sponsored 
technical support analysis tools and systems.
    We propose to find that the State's SIP satisfies the requirements 
of 40 CFR 51.308(d)(4).

H. Consultation With FLMs

    Although the FLMs are very active in participating in the RPOs, the 
RHR grants the FLMs a special role in the review of the regional haze 
SIPs, summarized in section V.H, above. Under 40 CFR 51.308(i)(2), 
states are obligated to provide the FLMs with an opportunity for 
consultation, in person, and at least 60 days prior to holding a public 
hearing on the regional haze SIP. The State provided an opportunity for 
FLM consultation, in person and at least 60 days prior to holding any 
public hearing on the SIP. As required by 40 CFR Section 51.308(i)(3), 
the State has included FLM comments and State responses in Chapter 11 
of the Wyoming TSD.
    40 CFR 51.308(i)(3) requires that States provide in its regional 
haze SIP a description of how it addressed any comments provided by the 
FLMs. The FLMs formally commented on the Wyoming proposed SIP in 
November and December of 2010. The FLM comments provided support for 
the modeling approach used by the State in the BART determinations and 
complimented the State on thorough BART, reasonable progress, and area 
source analysis. The FLMs also recommended the State reevaluate costs 
and emission limits for some of the BART and reasonable progress 
sources. Chapter 11 of the State's TSD provides detailed information on 
the State's response to FLM comments.
    Lastly, 40 CFR 51.308(i)(4) specifies the regional haze SIP must 
provide procedures for continuing consultation between a State and FLMs 
on the implementation of the visibility protection program required by 
40 CFR 51.308. This includes development and review of implementation 
plan revisions and five-year progress reports and the implementation of 
other programs having the potential to contribute to impairment of 
visibility in mandatory Class I Federal areas. Pursuant to Chapter 11.2 
of the SIP, the State will provide the FLMs an opportunity to review 
and comment on SIP revisions, the five-year progress reports, and other 
developing programs that may contribute to Class I visibility 
impairment.
    We are proposing that the State's SIP satisfies the requirements of 
40 CFR 51.308(i).

I. Periodic SIP Revisions and 5-Year Progress Reports

    40 CFR 51.308(f) requires a State to revise and submit its regional 
haze SIP to EPA by July 31, 2018, and every ten years thereafter. 
Pursuant to Chapter 10 of the SIP, the State will provide this 
revision. In accordance with the requirements listed in 40 CFR 
51.308(g), the State will submit a report on reasonable progress to EPA 
every five years following the initial submittal of the SIP. That 
report will be in the form of an implementation plan revision. The 
State's report will evaluate the progress made toward the RPGs for each 
mandatory Class I area located within the State and in each mandatory 
Class I area located outside the State, which have been identified as 
being affected by emissions from the State. The State will also 
evaluate the monitoring strategy adequacy in assessing RPGs.
    Based on the findings of the five-year progress report, 40 CFR 
51.308(h) requires a State to make a determination of adequacy of the 
current implementation plan. The State must take one or more of the 
actions listed in 40 CFR 51.308(h)(1) through (4) that are applicable 
at the same time as the State submits a five-year progress report. 
Chapter 12 of the SIP requires the State to make an adequacy 
determination of the current SIP pursuant to 40 CFR 51.308(h)(1) 
through (4) at the same time a five-year progress report is due.
    We propose to find the State's SIP satisfies the requirements of 40 
CFR 51.308(f)-(h).

VII. Federal Implementation Plan

    EPA is proposing a FIP to address the deficiencies indentified in 
our proposed partial disapproval of Wyoming's regional haze SIP. In 
lieu of this proposed FIP, or a portion thereof, we would propose 
approval of a SIP revision if the State submits such a revision and the 
revision matches the terms of our proposed FIP. We encourage the State 
to submit a SIP revision to replace the FIP, either before or after our 
final action.

A. Disapproval of the State's NOX BART Determinations and 
Federal Implementation Plan for NOX BART Determinations and 
Limits

    As noted above, the State provided five-factor analyses that 
considered all factors, except analyzing the degree of visibility 
improvement modeling for each individual pollutant. Thus, in 
disapproving specific State BART

[[Page 33050]]

determinations, we are basing our analysis on information provided by 
the State in their BART analysis, with the exception of visibility 
improvement modeling. We have accepted the cost information provided by 
the State. As discussed above, visibility improvement modeling was 
performed by the EPA. EPA is proposing to disapprove the State's 
NOX BART determinations, and we are proposing to issue a 
BART FIP, for the following units: PacifiCorp Dave Johnston Unit 3, 
PacifiCorp Jim Bridger Units 1 and 2, PacifiCorp Wyodak Unit 1, and 
Basin Electric Laramie River Units 1, 2, and 3. EPA's rationale for 
disapproving the State's BART determinations for these units, as well 
as EPA's BART FIP determinations and emission limits, is discussed 
below.
1. Disapproval of the State's Basin Electric Laramie River Units 1-3 
NOX BART Determination and FIP To Address NOX 
BART
Wyoming's NOX BART Determination
    All three units are currently controlled with LNBs with a permit 
limit of 0.5 lbs/MMBtu (3-hour rolling average). The State determined 
that new LNBs, OFA, LNBs and OFA, SNCR/SCR hybrid, LNBs and OFA with 
SNCR, and SCR were technically feasible for reducing NOX 
emissions at Units 1-3. The State determined that natural gas reburn 
was technically infeasible. The State did not identify any energy or 
non-air quality environmental impacts that would preclude the selection 
of any of the controls evaluated, and there are no remaining-useful-
life issues for this source. A summary of the State's NOX 
BART analysis is provided in Tables 28-30 below. As discussed above, 
the visibility improvement modeling results in these tables were 
developed by EPA. Baseline NOX emissions are 6,320 tpy for 
Unit 1, 6,285 tpy for Unit 2, and 6,448 tpy for Unit 3 based on an 
average on 2001-2003 actual emissions.

                                       Table 28--Summary of Basin Electric Laramie River Unit 1 NOX BART Analysis
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                                                                                                            Visibility
                                                                                                                                            Improvement
                                                                                                                                           (Delta dv for
                                                                           Emission Rate     Emission                      Average Cost     the Maximum
                   Control Technology                         Control     (lb/MMBtu) (30-    Reduction      Annualized     Effectiveness       98th
                                                          Efficiency (%)    day Rolling        (tpy)           Costs          ($/ton)       Percentile
                                                                             Average)                                                     Impact at Wind
                                                                                                                                           Cave National
                                                                                                                                               Park)
--------------------------------------------------------------------------------------------------------------------------------------------------------
OFA.....................................................            14.8            0.23             936        $625,000            $668            0.08
LNBs....................................................            14.8            0.23             936       1,360,000           1,453            0.08
LNBs with OFA...........................................            14.8            0.23             936       1,944,000           2,077            0.08
SNCR/SCR Hybrid.........................................            25.9            0.20           1,639       7,429,000           4,534  ..............
LNBs with OFA and SNCR..................................            55.6            0.12           3,511       7,365,000           2,098            0.32
SCR.....................................................            74.1            0.07           4,681      15,787,000           3,372            0.44
--------------------------------------------------------------------------------------------------------------------------------------------------------

    Incremental cost effectiveness for the controls evaluated is as 
follows: LNBs with OFA and SNCR: $2,105/ton, and SCR: $7,198/ton.

                                       Table 29--Summary of Basin Electric Laramie River Unit 2 NOX BART Analysis
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                                                                                                            Visibility
                                                                                                                                            Improvement
                                                                                                                                           (Delta dv for
                                                                           Emission Rate     Emission                      Average Cost     the Maximum
                   Control Technology                         Control     (lb/MMBtu) (30-    Reduction      Annualized     Effectiveness       98th
                                                          Efficiency (%)    day Rolling        (tpy)           Costs          ($/ton)       Percentile
                                                                             Average)                                                     Impact at Wind
                                                                                                                                           Cave National
                                                                                                                                               Park)
--------------------------------------------------------------------------------------------------------------------------------------------------------
OFA.....................................................            14.3            0.23             931        $625,000            $671            0.08
LNBs....................................................            14.3            0.23             931       1,360,000           1,461            0.08
LNBs with OFA...........................................            14.3            0.23             931       1,944,000           2,088            0.08
SNCR/SCR Hybrid.........................................            25.5            0.20           1,630       7,429,000           4,559  ..............
LNBs with OFA and SNCR..................................            55.3            0.12           3,492       7,365,000           2,109            0.32
SCR.....................................................            73.9            0.07           4,656      15,787,000           3,391            0.44
--------------------------------------------------------------------------------------------------------------------------------------------------------

    Incremental cost effectiveness for the controls evaluated is as 
follows: LNBs with OFA and SNCR: $2,117/ton; and SCR: $7,242/ton.

                                       Table 30--Summary of Basin Electric Laramie River Unit 3 NOX BART Analysis
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                                                                                                            Visibility
                                                                                                                                            Improvement
                                                                                                                                           (Delta dv for
                                                                           Emission Rate     Emission                      Average Cost     the Maximum
                   Control Technology                         Control     (lb/MMBtu) (30-    Reduction      Annualized     Effectiveness       98th
                                                          Efficiency (%)    day Rolling        (tpy)           Costs          ($/ton)       Percentile
                                                                             Average)                                                     Impact at Wind
                                                                                                                                           Cave National
                                                                                                                                               Park)
--------------------------------------------------------------------------------------------------------------------------------------------------------
OFA.....................................................            16.5            0.23             955        $625,000            $654            0.08

[[Page 33051]]

 
LNBs....................................................            16.5            0.23             955       1,360,000           1,424            0.08
LNBs with OFA...........................................            16.5            0.23             955       1,944,000           2,036            0.08
SNCR/SCR Hybrid.........................................            27.4            0.20           1,672       7,429,000           4,444  ..............
LNBs with OFA and SNCR..................................            56.4            0.12           3,582       7,365,000           2,056            0.33
SCR.....................................................            74.6            0.07           4,777      15,787,000           3,305            0.44
--------------------------------------------------------------------------------------------------------------------------------------------------------

    Incremental cost effectiveness for the controls evaluated is as 
follows: LNBs with OFA and SNCR: $2,064/ton, and SCR: $7,054/ton.
    The State eliminated the SNCR/SCR hybrid from further consideration 
because it has higher cost effectiveness and lower control efficiency 
compared to new LNBs plus OFA with SNCR.
    Based on its consideration of the five factors, the State 
determined LNBs with OFA was reasonable for NOX BART. The 
State determined that the NOX BART emission limits for 
Laramie River Unit 1 are 0.23 lb/MMBtu (30-day rolling average), 1,348 
lb/hr (30-day rolling average), and 5,343 tpy. The State determined the 
NOX BART emission limits for Laramie River Unit 2 are 0.23 
lb/MMBtu (30-day rolling average), 1,348 lb/hr (30-day rolling 
average), and 5,343 tpy. The State determined the NOX BART 
emission limits for Laramie River Unit 3 are 0.23 lb/MMBtu (30-day 
rolling average), 1,386 lb/hr (30-day rolling average), and 5,493 tpy.
    The State's proposed SIP required additional NOX 
emission reductions for Laramie River under its LTS. Based on the costs 
and visibility improvement for Laramie River Station Units 1, 2, and 3, 
the State proposed installation of two SCRs, or equivalent performing 
emission control systems, at any of the three units. The State proposed 
that the add-on NOX control achieve an emission rate, on an 
individual unit basis, at or below 0.07 lb/MMBtu on a 30-day rolling 
average. The State proposed that the add-on controls be installed and 
operational on one of the Laramie River Station units by December 31, 
2018 and on a second Laramie River Station unit by December 31, 2023.
    On March 8, 2010, Basin Electric Power Cooperative appealed the 
additional controls proposed by the State under its LTS before the 
Wyoming Environmental Quality Council. The State entered into a 
settlement agreement on November 16, 2010 with Basin Electric Power 
Cooperative (a copy of the settlement agreement is included in the 
State's revised NOX BART Analysis for Laramie River dated 
January 3, 2011). As part of the settlement agreement, the State agreed 
to remove the requirement for Basin Electric to install additional 
controls under the LTS. In return, Basin Electric agreed to additional 
NOX emissions reductions under BART. Under the settlement 
agreement, Basin Electric agreed to a NOX emission limit of 
0.21 lb/MMBtu (30-day rolling average) on all three units. Basin 
Electric also agreed to a NOX emission limit for Unit 1 and 
Unit 2 of 4,780 tpy and a NOX emission limit for Unit 3 of 
4,914 tpy, effectively capping emissions from all three units at 12,773 
tpy. In the SIP adopted by the State, the State determined the emission 
limits in the settlement agreement were BART for Basin Electric Laramie 
River Units 1, 2, and 3.
EPA's Conclusions on Basin Electric Laramie River Units 1-3 
NOX BART Determination and FIP for NOX BART
    EPA does not agree with the State's conclusion that a limit of 0.21 
lb/MMBtu is reasonable for BART for Laramie River Units 1, 2, and 3, 
which can be achieved with the installation and operation of LNBs with 
OFA. In particular, the cost effectiveness values for LNBs with OFA 
plus SNCR at this unit is only slightly higher than LNBs with OFA 
(i.e., about $20/ton), with incremental costs of approximately 
$2,100.\32\ The increase in cost effectiveness for LNBs with OFA plus 
SNCR affords a visibility improvement of 0.23 delta deciview per unit 
over LNBs plus OFA. LNBs with OFA plus SNCR would result in total 
NOX emissions of 8,468 tpy--4,305 tpy less than the State's 
BART determination. We find that it was unreasonable for the State not 
to determine that LNBs with OFA plus SNCR was NOX BART for 
Laramie River Units 1-3. Thus, we are proposing to disapprove the 
State's NOX BART determination for Basin Electric Laramie 
River Units 1, 2, and 3 and proposing a FIP for NOX BART as 
explained below.
---------------------------------------------------------------------------

    \32\ Since the State did not provide costs for the source to 
achieve a 0.21 lb/MMBtu emission limit and EPA did not model a 0.21 
lb/MMBtu control option, we are basing our analysis on the 
information for LNBs with OFA at a limit of 0.23 lb/MMBtu.
---------------------------------------------------------------------------

    Based on our examination of the State's costs estimates, emission 
reductions, and the predicted visibility improvement, we propose to 
find that LNBs with OFA plus SNCR at an emission limit of 0.12 lb/MMBtu 
(30-day rolling average) is reasonable for NOX BART for 
Basin Electric Laramie River Units 1, 2, and 3. We are proposing that 
the FIP NOX BART emission limit for Basin Electric Laramie 
River Unit 1, Unit 2, and Unit 3 is 0.12 lb/MMBtu (30-day rolling 
average).
    We have eliminated the single highest performing option from 
consideration--LNBs with OFA plus SCR--because the cost effectiveness 
value is significantly higher than LNBs with OFA and there is a 
comparatively small incremental visibility improvement over LNBs with 
OFA.
    We propose that Basin Electric meet our proposed emission limit at 
Laramie River Units 1, 2, and 3 no later than five years after EPA 
finalizes action on our proposed FIP. This is consistent with the 
requirements of 40 CFR 51.308(e)(iv).
2. Disapproval of the State's PacifiCorp Dave Johnston Unit 3 
NOX BART Determination and FIP To Address NOX 
BART
Wyoming's NOX BART Determination
    Dave Johnston Unit 3 is currently uncontrolled for NOX. 
The State determined LNBs with advanced OFA, LNBs with advanced OFA and 
SNCR, and LNBs with advanced OFA and SCR were technically feasible for 
controlling

[[Page 33052]]

NOX emissions from Unit 3. The State did not identify any 
technically infeasible controls.
    The State did not identify any energy or non-air quality 
environmental impacts that would preclude the selection of any of the 
controls evaluated, and there are no remaining-useful-life issues for 
this source. Baseline NOX emissions are 5,814 tpy for Unit 3 
based on unit heat input rate of 2,500 MMBtu/hr and 7,884 hours of 
operation. A summary of the State's NOX BART analysis and 
the visibility impacts is provided in Table 31 below.

                                               Table 31--Summary of Dave Johnston Unit 3 NOX BART Analysis
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                                                                                                            Visibility
                                                                                                                                            Improvement
                                                                                                                                              (Delta
                                                                           Emission Rate                                                   deciview for
                                                              Control     (lb/MMBtu) (30-    Emission       Annualized     Average Cost     the Maximum
                   Control Technology                       Efficiency      day Rolling      Reduction         Costs       Effectiveness       98th
                                                                (%)          Average)          (tpy)                          ($/ton)       Percentile
                                                                                                                                          Impact at Wind
                                                                                                                                           Cave National
                                                                                                                                               Park)
--------------------------------------------------------------------------------------------------------------------------------------------------------
LNB with advanced OFA...................................            46.8            0.28           2,723      $1,764,775            $648            0.77
New LNB with advanced OFA and SNCR......................            63.9            0.19           3,717       2,679,192             721            0.94
LNB with advanced OFA and SCR...........................            86.7            0.07           5,041      16,347,519           3,243            1.16
--------------------------------------------------------------------------------------------------------------------------------------------------------

    Incremental cost effectiveness for the controls evaluated is as 
follows: New LNB with advanced OFA and SNCR: $920/ton, and LNB with 
advanced OFA and SCR: $10,234/ton.
    Based on its consideration of the five factors, the State 
determined LNBs with OFA was reasonable for NOX BART. The 
State determined the cost of compliance (capital costs and annual 
operating and maintenance costs) were significantly higher for the 
addition of SCR. The State determined the NOX BART emission 
limits for Unit 3 are 0.28 lb/MMBtu (30-day rolling average), 784 lb/hr 
(30-day rolling average), and 3,434 tpy.
EPA's Conclusions on Dave Johnston Unit 3 NOX BART 
Determination and FIP for NOX BART
    EPA does not agree with the State's conclusion that a limit of 0.28 
lb/MMBtu is reasonable for NOX BART for Dave Johnston Unit 
3, which can be achieved with the installation and operation on LNBs 
with OFA. In particular, the cost effectiveness values for LNB with OFA 
and SNCR at this unit is only $73/ton higher than LNBs with OFA, with 
incremental costs of $920. The increase in cost effectiveness for LNBs 
with OFA plus SNCR affords visibility improvement over LNBs plus OFA of 
0.17 delta deciview. LNBs with OFA plus SNCR would result in an 
additional reduction of 994 tons of NOX. We find that it was 
unreasonable for the State not to determine that LNBs with OFA plus 
SNCR was NOX BART for Dave Johnston Unit 3. Thus, we are 
proposing to disapprove the State's NOX BART determination 
for Dave Johnston Unit 3 and proposing a FIP for NOX BART as 
explained below.
    Based on our examination of the State's costs estimates, emission 
reductions, and the predicted visibility improvement, we propose to 
find that LNBs with OFA plus SNCR at an emission limit of 0.19 lb/MMBtu 
(30-day rolling average) is reasonable for NOX BART for Dave 
Johnston Unit 3. We are proposing that the FIP NOX BART 
emission limit for PacifiCorp Dave Johnston Unit 3 is 0.19 lb/MMBtu 
(30-day rolling average).
    We have eliminated the single highest performing option from 
consideration--LNBs with OFA plus SCR--because the cost effectiveness 
value is significantly higher than LNBs with OFA and there is a 
comparatively small incremental visibility improvement over LNBs with 
OFA.
    We propose that PacifiCorp meet our proposed emission limit at Dave 
Johnston Unit 3 no later than five years after EPA finalizes action on 
our proposed FIP. This is consistent with the requirements of 40 CFR 
51.308(e)(iv).
3. Disapproval of the State's PacifiCorp Jim Bridger Units 1 and 2 
NOX BART Determination and FIP To Address NOX 
BART
Wyoming's NOX BART Determination
    PacifiCorp Jim Bridger Units 1 and 2 are equipped with early 
generation LNBs with a permit limit of 0.70 lb/MMBtu (3-hour fixed). 
The State determined that LNBs with SOFA, ROFA, LNBs with SOFA plus 
SNCR, and LNBs with SOFA plus SCR were technically feasible for 
controlling NOX emissions. The State did not identify any 
technically infeasible options.
    The State did not identify any energy or non-air quality 
environmental impacts that would preclude the selection of any of the 
controls evaluated, nor are there any remaining-useful-life issues for 
this source. Baseline NOX emissions are 10,643 tpy for all 
both units based on unit heat input rate of 6,000 MMBtu/hr and 7,884 
hours of operation. A summary of the State's NOX BART 
analysis and the visibility impacts is provided in Table 32 below.\33\
---------------------------------------------------------------------------

    \33\ We are assuming the same costs for Unit 2 as the other Jim 
Bridger Units. The State analyzed Unit 2 using post installation of 
LNBs/OFA costs so the cost information provided in their analysis is 
not consistent with an uncontrolled baseline.

[[Page 33053]]



                                   Table 32--Summary of Jim Bridger Units 1 and 2 NOX BART Analysis--Costs per Boiler
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                                                                                                           Visibility
                                                                                                                                          Improvement
                                                                                                                                        (Delta deciview
                                                               Control     Emission Rate     Emission                   Average Cost    for  the Maximum
                     Control Technology                       Efficiency  (lb/MMBtu) (30-    Reduction     Annualized   Effectiveness   98th Percentile
                                                                 (%)        day Rolling        (tpy)         Costs         ($/ton)       Impact at  Mt.
                                                                             Average)                                                        Zirkel
                                                                                                                                         Wilderness)--
                                                                                                                                       Units 1--3/4-\34\
--------------------------------------------------------------------------------------------------------------------------------------------------------
LNB with SOFA..............................................         42.2            0.26           4,493   $1,144,969            $255            .41/.47
New LNB with SOFA and SNCR.................................         55.6            0.20           5,913    2,710,801             459            .52/.62
LNB with SOFA and SCR......................................         84.4            0.07           8,987   20,296,400           2,258            .76/.82
--------------------------------------------------------------------------------------------------------------------------------------------------------

    Incremental cost effectiveness for the control evaluated is as 
follows: New LNB with SOFA and SNCR: $1,103/ton, and LNB with SOFA and 
SCR: $5,721/ton.
---------------------------------------------------------------------------

    \34\ Unit 4 has different modeling results than the other three 
units as the stack parameters used in the modeling are different 
enough from Units 1-3 to yield different modeled results.
---------------------------------------------------------------------------

    Based on its consideration of the five factors, the State 
determined LNBs with SOFA was reasonable for NOX BART. The 
State determined the cost of compliance (capital costs and annual 
operating and maintenance costs) were significantly higher for the 
addition of SCR. The State determined the NOX BART emission 
limits for Jim Bridger Units 1 and 2 are 0.28 lb/MMBtu (30-day rolling 
average), 1,560 lb/hr (30-day average), and 6,833 tpy.
    PacifiCorp is required to install additional controls under the 
State's LTS. The State determined that based on the cost of compliance 
and visibility improvement presented by PacifiCorp in the BART 
applications for Jim Bridger Units 1 and 2 and taking into 
consideration the logistical challenge of managing multiple pollution 
control installations within the regulatory time allotted for 
installation of BART by the RHR, additional controls would be required 
under the LTS but not BART. With respect to Jim Bridger Units 1 and 2, 
the State has required PacifiCorp to install SCR, or other 
NOX control systems, to achieve an emission limit or 
otherwise reduce NOX emissions to achieve a 0.07 lb/MMBtu 
30-day rolling average NOX emissions rate. PacifiCorp is 
required to meet the 0.07 lb/MMBtu emission rate on Unit 1 prior to 
December 31, 2021 and on Unit 2 prior to December 31, 2022.
    EPA does not agree with the State's conclusion that a limit of 0.26 
lb/MMBtu is reasonable for BART for Jim Bridger Units 1 and 2, which 
can be achieved with the installation and operation on LNBs with SOFA. 
In particular, the cost effectiveness values for LNBs with SOFA and SCR 
at each unit is $2,258 with approximately 0.80 delta deciview 
visibility improvement. The cost effectiveness values are reasonable 
and the visibility improvement significant for LNBs with SOFA plus SCR. 
In addition, the costs are within the range that Wyoming has considered 
reasonable in the BART context.\35\ LNBs with OFA plus SCR would result 
in an additional reduction of 4,494 tpy of NOX emissions at 
each unit. This difference is substantial. We find that it was 
unreasonable for the State not to determine that LNBs with OFA plus SCR 
was NOX BART for Jim Bridger Units 1 and 2. Though the State 
is requiring the installation of SCR on Units 1 and 2 under its LTS, 
the compliance date for both installations is beyond the five-years 
allowed for BART sources by 40 CFR 51.308(e)(iv). Thus, we are 
proposing to disapprove the State's NOX BART determination 
for Jim Bridger Units 1 and 2 and proposing a FIP for NOX 
BART as explained below.
---------------------------------------------------------------------------

    \35\ Wyoming determined that LNBs with OFA and SCR was BART for 
Naughton Unit 3. The cost effectiveness of SCR for Naughton Unit 3 
is $2,830 with 1.0 deciview of visibility improvement.
---------------------------------------------------------------------------

    Based on our examination of the State's costs estimates, emission 
reductions, and the predicted visibility improvement, we propose to 
find that LNBs with SOFA plus SCR at an emission limit of 0.07 lb/MMBtu 
(30-day rolling average) is reasonable for NOX BART for Jim 
Bridger Units 1 and 2. Because our examination of the factors leads us 
to propose SCR is reasonable for BART, we have eliminated SNCR from 
further consideration. We are proposing that the FIP NOX 
BART emission limit for PacifiCorp Units 1 and 2 is 0.07 lb/MMBtu (30-
day rolling average).
    We propose that PacifiCorp meet our proposed emission limit at Jim 
Bridger Unit 1 and 2 no later than five years after EPA finalizes 
action on our proposed FIP. This is consistent with the requirements of 
40 CFR 51.308(e)(iv).
4. Proposals in the Alternative for PacifiCorp Jim Bridger Units 1, 2, 
3, and 4 NOX BART
    As noted above, EPA is seeking comment on a proposal (``first 
proposed approach'') to approve in part and disapprove in part the 
regional haze plan submitted by the State. Among other things, EPA's 
proposal would determine that BART for Units 1 and 2 of the BART-
eligible Jim Bridger power plant is SCR, and would establish 
corresponding NOx emission limits for these units that would have to be 
achieved within 5 years of our final action.\36\ This would have the 
effect of accelerating the installation of the SCR controls at these 
units that the State and source owner (PacifiCorp) had proposed to 
install later (in the 2021-2022 time-period). The State determined that 
BART for these units is LNB plus OFA, and selected the 2021-2022 time-
period for SCR-based emission limits as a reasonable progress measure. 
The delay was based on the large number of actions PacifiCorp is 
undertaking (or helping to finance) at a large number of EGUs in 
Wyoming, Utah, Colorado, and Arizona that it owns and operates or co-
owns.
---------------------------------------------------------------------------

    \36\ The proposed regulatory language for this rulemaking only 
covers our first proposed approach.
---------------------------------------------------------------------------

    EPA is also seeking comment on an alternative approach (``second 
proposed approach'') that differs from our first proposed approach only 
with regard to Units 3 and 4 at Jim Bridger. The second proposed 
approach would only differ from the first proposed approach by allowing 
PacifiCorp to install SCR at Jim Bridger Units 3 and 4 within five 
years from the date of our final action. This would differ from the 
first proposed approach that requires PacifiCorp to install SCR at Unit 
3 by 2015 and Unit 4 by 2016, while we would still propose SCR on Units 
1 and 2 within the five year BART installation timeframe. This second 
proposed approach would allow PacifiCorp flexibility on timing for the

[[Page 33054]]

installation of SCR on all four Jim Bridger Units within the BART 
installation timeline allowed by the RHR. Installing SCR on all four 
units within the statutory five year period would provide PacifiCorp 
maximum flexibility to manage the implementation of controls on all the 
units.
    EPA also is seeking comment on another alternative approach 
(``third proposed approach'') that differs from the first proposed 
approach only with regard to Units 1 and 2 at Jim Bridger. This third 
proposed approach would include a different determination regarding 
BART for these units and would have the effect of approving the state's 
timeline for the installation of SCR technologies at Units 1 and 2.
    PacifiCorp asserted to the State during formulation of the SIP 
proposal, and has since asserted directly to EPA, that a number of 
factors, when considered together, suggest that requiring installation 
of SCR at Jim Bridger Units 1 and 2 earlier than 2021-2022 is not 
reasonable. First, PacifiCorp points to the large number of retrofit 
actions it is taking at 20 coal-fired electric generating units in 
Wyoming, Utah, and Arizona in order to reduce their emissions.\37\ 
These retrofits are intended to comply with the requirements in the 
regional haze SIPs that these states have submitted to EPA and with 
other regulatory requirements, including required controls for mercury 
and acid gases under the recent Mercury and Air Toxics Standards rule. 
The company claims that there are high capital costs for the measures 
required for these air quality-improving retrofits. Moreover, 
PacifiCorp states that accelerating the required installation of SCR at 
Jim Bridger Units 1 and 2 to late 2017, rather than the 2021 and 2022 
dates established by the State, would significantly increase the costs 
to the utility and to its customers.\38\
---------------------------------------------------------------------------

    \37\ For a listing of PacifiCorp's retrofit actions, see Table 1 
of Exhibit A--PacifiCorp's Emissions Reductions Plan in Chapter 6 of 
the State's TSD.
    \38\ See Exhibit A--PacifiCorp's Emissions Reductions Plan in 
Chapter 6 of the State's TSD.
---------------------------------------------------------------------------

    In addition, the company asserts that it has designed the 
installation schedule in order to minimize the number of units that are 
out of service system wide for installation of emissions controls at 
any one time. Its goal, it asserts, is to be able to maintain service 
to its customers with an adequate capacity margin. The company asserts 
that accelerating the timeline for installation of SCR would upset the 
orderly shut-down schedule they have devised and would threaten both 
service interruptions and an increased risk of spot-purchases of more 
expensive electrical energy, if it is available, to serve customers, 
but that either eventuality would significantly increase costs to its 
customers.\39\
---------------------------------------------------------------------------

    \39\ See Exhibit A--PacifiCorp's Emissions Reductions Plan in 
Chapter 6 of the State's TSD.
---------------------------------------------------------------------------

    Taken together, PacifiCorp claims that the schedule for 
installation of emissions control devices envisioned in our first 
proposed approach would be excessively costly and would pose service 
interruption risks for electrical energy customers over a large part of 
the region. EPA notes that PacifiCorp has offered these claims taking 
into account only the requirements in the SIPs that have been submitted 
to EPA by Wyoming, Utah, Colorado, and Arizona. Today's proposal 
includes requirements that would likely require the additional 
installation of SNCRs at two units owned by PacifiCorp in Wyoming. In 
addition, we have proposed to partially disapprove the SIP for Utah, 
and the eventual resolution of this disapproval may involve 
requirements for retrofits of more units owned by PacifiCorp in that 
state. We have not yet proposed action on the SIP for Arizona, and the 
possibility that the Cholla power plant that is partially owned by 
PacifiCorp may require retrofits not already in PacifiCorp's plans, 
cannot be ruled out at this time.
    Based on the claims made both by the State and PacifiCorp and 
noting the additional requirements in the proposed FIP for Wyoming and 
the possibility of additional requirements in future FIPs or SIPs in 
Utah and Arizona, EPA is seeking comment on these assertions of cost 
infeasibility and risk to electrical power reliability, as well as the 
desirability of the third proposed approach including the possible 
rationale for this third approach as described below.
    Our third proposed approach has two parts, one addressing BART and 
one addressing reasonable progress with respect to Jim Bridger. First, 
EPA would determine that the facts indicate that BART for the all the 
units at Jim Bridger is SCR when the units are considered individually 
based on the five factors without regard the status of those factors 
for other units in the PacifiCorp system. However, when the five 
factors are considered across all the units in that system, including 
the fact that EPA's actions on the SIPs for Wyoming, Utah, and Arizona 
may create additional retrofit obligations for other PacifiCorp-owned 
EGUs, BART for Jim Bridger as a whole is SCR on Units 3 and 4 and LNB 
plus OFA on Units 1 and 2. Costs, considered broadly, would be 
unreasonable to require any further retrofits at this source within 5 
years of our final action. We note that the CAA establishes 5 years at 
the longest period that can be allowed for compliance with BART 
emission limits.
    The second part of our third proposed approach is that EPA would 
approve the SIP with regard to the State's determination that the 
appropriate level of NOX control for Units 1 and 2 at Jim 
Bridger for purposes of reasonable progress is the SCR-based emission 
limit in the SIP, with compliance dates of December 31, 2021 for Unit 2 
and December 31, 2022 for Unit 1. We believe it may be reasonable and 
feasible for these retrofits to be completed somewhat earlier than 
these dates even if, as would be necessary to conclude this third 
approach to have merit, they cannot be completed within 5 years of our 
final action. However, in the context of reasonable progress in the 
second planning period of the regional haze program, we believe it may 
be appropriate to give considerable deference to the State's 
conclusions about what controls are reasonable and when they should be 
implemented. Thus, assuming that we were to finalize this third 
approach, we do not believe at this time that it would be appropriate 
to disapprove the State's preferred compliance deadlines for Units 1 
and 2.
    Under the third proposed approach, we would approve the SIP's 
provisions for Units 1 and 2 and not adopt a FIP, because while we 
would disagree with the State's reasoning, we would be agreeing with 
the outcome in terms of the sequence of emission limits that apply to 
these units and their compliance deadlines. We would be agreeing with 
the outcome within the context of the phased regional haze statutory 
and regulatory framework.
    As stated above, we are asking for comments and information 
pertaining to our second and third proposed approaches. We need more 
information to be able to support either alternative approach. If we 
receive such information, we will provide notice to the public on the 
availability of such information. We request that any information be 
submitted as soon as possible, but preferably no later than 30 days 
after the publication date of this notice. We are requesting that 
information be submitted within this timeframe to give the public an 
opportunity to review and comment on the information before the end of 
the comment period.

[[Page 33055]]

5. Disapproval of the State's PacifiCorp Wyodak Unit 1 NOX 
BART Determination and FIP To Address NOX BART
Wyoming's NOX BART Determination
    Wyodak Unit 1 is currently controlled for NOX emissions 
with early generation LNBs with a permit limit of 0.70 lb/MMBtu (3-hour 
block). The State determined new LNBs with OFA, existing LNBs with 
ROFA, new LNBs with OFA plus SNCR, and LNBs with OFA plus SCR were 
technically feasible for controlling NOX emissions. The 
State did not identify any technically infeasible control options.
    The State did not identify any energy or non-air quality 
environmental impacts that would preclude the selection of any of the 
controls evaluated, and there are no remaining-useful-life issues for 
this source. A summary of the State's NOX BART analyses for 
Unit 1 is provided in Table 33 below. Baseline NOX emissions 
are 5,744 tpy based on the unit heat input rate of 4,700 MMBtu/hr and 
7,884 hours of operation per year.

                                                  Table 33--Summary of Wyodak Unit 1 NOX BART Analysis
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                                                                                                            Visibility
                                                                                                                                            Improvement
                                                                                                                                           (Delta dv for
                                                              Control      Emission Rate     Emission                      Average Cost     the Maximum
                   Control Technology                       Efficiency    (lb/MMBtu) (30-    Reduction      Annualized     Effectiveness       98th
                                                                (%)         day Rolling        (tpy)           Costs          ($/ton)       Percentile
                                                                             Average)                                                     Impact at Wind
                                                                                                                                           Cave National
                                                                                                                                               Park)
--------------------------------------------------------------------------------------------------------------------------------------------------------
LNBs with OFA...........................................            25.8            0.23           1,483      $1,306,203            $881            0.25
LNBs with OFA and SNCR..................................            41.9            0.18           2,409       2,306,728             958            0.40
LNBs with OFA and SCR...................................            77.4            0.07           4,447      18,910,781           4,252            0.72
--------------------------------------------------------------------------------------------------------------------------------------------------------

    Incremental cost effectiveness for the controls evaluated is as 
follows: LNBs with OFA and SNCR: $1,080/ton, and LNBs with OFA and SCR: 
$8,147/ton.
    Based on its consideration of the five factors, the State 
determined LNBs with OFA was reasonable for NOX BART for 
Unit 1. The State determined other control technologies were not 
reasonable based on the high cost effectiveness and low visibility 
improvement. The State determined the NOX BART emission 
limits for Wyodak Unit 1 are 0.23 lb/MMBtu (30-day rolling average), 
1,081 lb/MMBtu (30-day rolling average), and 4,735 tpy.
EPA's Conclusions on Wyodak Unit 1 NOX BART Determination 
and FIP for NOX BART
    EPA does not agree with the State's conclusion that a limit of 0.23 
lb/MMBtu is reasonable for NOX BART for Wyodak Unit 1, which 
can be achieved with the installation and operation of LNBs with OFA. 
In particular, the cost effectiveness value for LNB with OFA plus SNCR 
at this unit is only $77/ton higher than LNBs with OFA, with an 
incremental cost of $1,080. The increase in cost effectiveness for LNBs 
with OFA plus SNCR affords a visibility improvement of 0.15 deciviews 
over LNBs plus OFA. LNBs with OFA plus SNCR would result in an 
additional reduction of around 900 tons of NOX. We find that 
it was unreasonable for the State not to determine that LNBs with OFA 
plus SNCR was NOX BART for Wyodak Unit 1. Thus, we are 
proposing to disapprove the State's NOX BART determination 
for Wyodak Unit 1 and proposing a FIP for NOX BART as 
explained below.
    Based on our examination of the State's costs estimates, emission 
reductions, and the predicted visibility improvement, we propose to 
find that LNBs with OFA plus SNCR at an emission limit of 0.18 lb/MMBtu 
(30-day rolling average) is reasonable for NOX BART for 
Wyodak Unit 1. We are proposing that the FIP NOX BART 
emission limit for PacifiCorp Wyodak Unit 1 is 0.18 lb/MMBtu (30-day 
rolling average).
    We have eliminated the single highest performing option from 
consideration--LNBs with OFA plus SCR--because the cost effectiveness 
value is significantly higher than LNBs with OFA and there is a 
comparatively small incremental visibility improvement over LNBs with 
OFA.
    We propose that PacifiCorp meet our proposed emission limit at 
Wyodak Unit 1 no later than five years after EPA finalizes action on 
our proposed FIP. This is consistent with the requirements of 40 CFR 
51.308(e)(iv).

B. Disapproval of the State's NOX Reasonable Progress Determinations 
and Federal Implementation Plan for NOX Reasonable Progress 
Determinations and Limits

    We are proposing to disapprove the State's reasonable progress 
determination for PacifiCorp Dave Johnston Unit 1 and Unit 2, and we 
are proposing a reasonable progress NOX FIP for these units, 
as explained below. As noted above, the State provided four-factor 
analyses that adequately evaluated the required factors. Thus, in 
disapproving the State's reasonable progress determination, we are 
basing our analysis on information provided by the State in its 
reasonable progress analysis, with the exception of visibility 
improvement modeling.
    We concluded that it is also appropriate for this facility to 
consider a fifth factor for evaluating potential reasonable progress 
control options--the degree of visibility improvement that may 
reasonably be anticipated from the use of the reasonable progress 
controls. Our reasonable progress guidance contemplates that states (or 
EPA in lieu of a state) may be able to consider other relevant factors 
for reasonable progress sources (see EPA's Guidance for Setting 
Reasonable Progress Goals under the Regional Haze Program, 
(``Reasonable Progress Guidance''), pp. 2-3, July 1, 2007). We find it 
appropriate, in certain circumstances, to consider visibility 
improvement when evaluating potential reasonable progress controls. 
Thus, EPA conducted visibility improvement modeling for Dave Johnston 
Units 1 and 2.\40\
---------------------------------------------------------------------------

    \40\ A summary of EPA's modeling methodology and results can be 
found in the docket under EPA BART and RP Modeling for Wyoming 
Sources.
---------------------------------------------------------------------------

1. PacifiCorp Dave Johnston--Units 1 and 2
Background
    PacifiCorp's Dave Johnston Power Plant is comprised of four units 
burning pulverized subbituminous Powder River Basin coal. Both are 
nominal 106 MW pulverized coal-fired units. Unit 1 began operation in 
1958 and Unit 2 in 1960.

[[Page 33056]]

Wyoming's NOX Reasonable Progress Determination
    Unit 1 and Unit 2 are currently uncontrolled for NOX 
emissions. The State determined that LNBs, LNBs with OFA, SNCR, and SCR 
were technically feasible for controlling NOX emissions. The 
State did not identify any technically infeasible control options.
    The State did not identify any energy or non-air quality 
environmental impacts that would preclude the selection of any of the 
controls evaluated, and there are no remaining-useful-life issues for 
this source. A summary of the State's NOX reasonable 
progress analyses for Unit 1 and Unit 2, along with our visibility 
modeling results, is provided in Tables 34 and 35 below. Baseline 
NOX emissions are 2,256 tpy for Unit 1 and 2,174 tpy for 
Unit 2 based on 2002 actual emissions. Wyoming did not provide 
controlled emission rates in their reasonable progress analysis. EPA 
calculated the controlled emission rates shown here.

                                       Table 34--Summary of Dave Johnston Unit 1 NOX Reasonable Progress Analysis
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                                                                                                            Visibility
                                                                                                                                            Improvement
                                                                                                                                           (Delta dv for
                                                              Control      Emission Rate     Emission                      Average cost     the Maximum
                   Control Technology                       Efficiency    (lb/MMBtu) (30-    Reduction      Annualized     Effectiveness       98th
                                                                (%)         day Rolling        (tpy)           Costs          ($/ton)       Percentile
                                                                             Average)                                                     Impact at Wind
                                                                                                                                           Cave National
                                                                                                                                               Park)
--------------------------------------------------------------------------------------------------------------------------------------------------------
LNBs....................................................              51            0.28           1,150        $631,000            $528            0.37
LNBs with OFA...........................................              65            0.20           1,466         962,000             632            0.49
SNCR....................................................              40            0.35             902       2,490,000           2,659            0.26
SCR.....................................................              80            0.12           1,804       3,390,000           1,810            0.58
--------------------------------------------------------------------------------------------------------------------------------------------------------


                                       Table 35--Summary of Dave Johnston Unit 2 NOX Reasonable Progress Analysis
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                                                                                                            Visibility
                                                                                                                                            Improvement
                                                                                                                                           (Delta dv for
                                                              Control      Emission Rate     Emission                      Average Cost     the Maximum
                   Control Technology                       Efficiency    (lb/MMBtu) (30-    Reduction      Annualized     Effectiveness       98th
                                                                (%)         day Rolling        (tpy)           Costs          ($/ton)       Percentile
                                                                             Average)                                                     Impact at Wind
                                                                                                                                           Cave National
                                                                                                                                               Park)
--------------------------------------------------------------------------------------------------------------------------------------------------------
LNBs....................................................              51            0.28           1,108        $631,000            $538            0.38
LNBs with OFA...........................................              65            0.20           1,413         962,000             644            0.49
SNCR....................................................              40            0.35             869       2,490,000           2,709            0.28
SCR.....................................................              80            0.12           1,739       3,390,000           1,844            0.58
--------------------------------------------------------------------------------------------------------------------------------------------------------

    The State estimated that it would take nearly five and a half years 
for NOX reduction strategies to become effective. The State 
determined that roughly two years would be necessary for the State to 
develop the necessary regulations to implement the selected control 
measures. The State estimated that it would take up to a year for the 
source to secure the capital necessary to purchase emission control 
devices and approximately 18 months would be required for the company 
to design, fabricate, and install SCR or SNCR technology. Since there 
are two boilers being evaluated at Dave Johnston, the State determined 
an additional year may be required for staging the installation 
process.
    The State determined that no controls were reasonable for this 
planning period. The State cited that the four-factor analysis was 
limited, in that no guidance was provided by EPA for identifying 
significant sources and EPA did not establish contribution to 
visibility impairment thresholds (a potential fifth factor for 
reasonable progress determinations).\41\ The State further claims that 
the State cannot, per Wyoming Statute 35-11-202, establish emission 
control requirements except through State rule or regulation. 
Furthermore, the Wyoming statute requires the State to consider the 
character and degree of injury of the emissions involved. In this case, 
the State claims it would need to have visibility modeling that 
assessed the degree of injury caused by the emissions, which the State 
does not have. The State believes it has taken a strong and reasonable 
first step in identifying potential contributors to visibility 
impairment, and that the next step of creating an appropriate rule or 
regulation will be accomplished in the next SIP revision.
---------------------------------------------------------------------------

    \41\ States must consider the four factors as listed above but 
can also take into account other relevant factors for the reasonable 
progress sources identified (see EPA's Guidance for Setting 
Reasonable Progress Goals under the Regional Haze Program, (``EPA's 
Reasonable Progress Guidance''), p. 2-3, July 1, 2007).
---------------------------------------------------------------------------

EPA's Conclusions on Dave Johnston Units 1 and 2 NOX 
Reasonable Progress Determination and FIP for NOX Reasonable 
Progress Controls
    We disagree with the State's reasoning for not adopting reasonable 
progress controls for Dave Johnston Unit 1 and Unit 2. If the State 
determined that it needed to adopt a rule or perform modeling to 
adequately assess and, if warranted, require reasonable progress 
controls, the State should have completed these steps before it 
submitted its regional haze SIP. The RHR does not allow for commitments 
to potentially implement strategies at some later date that are 
identified under reasonable progress or for the State to take credit 
for such commitments.
    In addition, the cost effectiveness values for LNBs with OFA at 
each unit are $632 and $644 per ton. These values are very reasonable 
and far less than some of the cost effectiveness values the State found 
reasonable in making its BART determinations. Given predicted 
NOX reductions of approximately 1,400 tpy per unit, 
visibility improvement of

[[Page 33057]]

approximately 0.5 deciviews per unit, and the fact that Wyoming's 
reasonable progress goals will not meet the URP, we find that it was 
unreasonable for the State to reject these very inexpensive controls. 
Thus, we are proposing to disapprove the State's NOX 
reasonable progress determination for Dave Johnston Unit 1 and Unit 2 
and proposing a FIP for NOX reasonable progress controls as 
explained below.
    Based on our examination of the State's costs estimates, emission 
reductions, and the predicted visibility improvement, we propose to 
find that LNBs with OFA at an emission limit of 0.20 lb/MMBtu (30-day 
rolling average) is reasonable for NOX reasonable progress 
controls for Dave Johnston Units 1 and 2. We are proposing that the FIP 
NOX reasonable progress emission limit for PacifiCorp Dave 
Johnston Unit 1 and Unit 2 is 0.20 lb/MMBtu (30-day rolling average).
    We have eliminated higher performing options from consideration--
LNBs with OFA plus SCR--because the cost effectiveness values are 
significantly higher than LNBs with OFA and there is a comparatively 
small incremental visibility improvement over LNBs with OFA.
    We propose that PacifiCorp meet our proposed emission limit at Dave 
Johnston Units 1 and 2 as expeditiously as possible, but no later than 
July 31, 2018. This is consistent with the requirement that the SIP 
cover an initial planning period that ends July 31, 2018.

C. Reasonable Progress Goals

    We are proposing to impose reasonable progress controls on Dave 
Johnston Units 1 and 2, as well as more stringent NOX BART 
controls on PacifiCorp Dave Johnston Unit 3, PacifiCorp Jim Bridger 
Units 1 and 2, PacifiCorp Wyodak Unit 1, and Basin Electric Laramie 
River Units 1, 2, and 3, than WRAP assumed in modeling Wyoming's RPGs.
    We could not re-run the WRAP modeling due to time and resource 
constraints, but anticipate that the additional controls would result 
in an increase in visibility improvement during the 20% worst days. As 
noted in our analyses, many of our proposed controls would result in 
significant incremental visibility benefits when modeled against 
natural background. We anticipate that this would translate into some 
measurable improvement if modeled on the 20% best days as well. While 
we expect our proposed controls will result in additional visibility 
improvement, we do not expect that these improvements will result in 
the State achieving the URP. For the reasons discussed in section 
VI.D.3, we find it reasonable for the State to not achieve the URP 
during this planning period. We expect the State to quantify the 
visibility improvement in its next regional haze SIP revision.
    For purposes of this action, we are proposing RPGs that are 
consistent with the additional controls we are proposing. While we 
would prefer to quantify the RPGs, we note that the RPGs themselves are 
not enforceable values. The more critical elements for our FIP are the 
emissions limits we are proposing to impose, which will be enforceable.

D. Federal Monitoring, Recordkeeping, and Reporting Requirements

    The CAA requires that SIPs, including the regional haze SIP, 
contain elements sufficient to ensure emission limits are practically 
enforceable.\42\ Other applicable regulatory provisions are contained 
in Appendix V to Part 51--Criteria for Determining the Completeness of 
Plan Submissions.\43\ We are proposing to find that the State's 
regional haze SIP does not contain adequate monitoring, recordkeeping 
and reporting requirements. Chapter 6.4, Section V of the SIP contains 
monitoring and reporting requirements that we find inadequate for 
numerous reasons, summarized as follows: (1) The State's language 
includes references to WAQSR Chapters that EPA has not approved as part 
of the SIP and are thus not federally enforceable. These references 
should be to the appropriate sections in the CFR; (2) Definitions have 
not been included; (3) The State's language allows for data 
substitution pursuant to 40 CFR part 75. The data substitution 
procedures of 40 CFR part 75 were never intended to apply to BART 
sources; (4) There are numerous language clarifications and rewordings 
needed; and (5) The State did not include appropriate recordkeeping 
language.\44\
---------------------------------------------------------------------------

    \42\ CAA Section 110(a)(2) states that SIPs ``shall (A) include 
enforceable emission limitations and other control measures, means, 
or techniques (including economic incentives such as fees, 
marketable permits, and auctions of emissions rights), as well as 
schedules and timetables for compliance, as may be necessary or 
appropriate to meet the applicable requirements of this chapter; (C) 
include a program to provide for the enforcement of the measures 
described in subparagraph (A), and regulation of the modification 
and construction of any stationary source within the areas covered 
by the plan as necessary to assure that national ambient air quality 
standards are achieved, including a permit program as required in 
parts C and D of this subchapter; (F) require, as may be prescribed 
by the Administrator--(i) the installation, maintenance, and 
replacement of equipment, and the implementation of other necessary 
steps, by owners or operators of stationary sources to monitor 
emissions from such sources, (ii) periodic reports on the nature and 
amounts of emissions and emissions-related data from such sources, 
and (iii) correlation of such reports by the State agency with any 
emission limitations or standards established pursuant to this 
chapter, which reports shall be available at reasonable times for 
public inspection''
    \43\ Appendix V part 51 states in section 2.2 that complete SIPs 
contain: ``(g) Evidence that the plan contains emission limitations, 
work practice standards and recordkeeping/reporting requirements, 
where necessary, to ensure emission levels''; and ``(h) Compliance/
enforcement strategies, including how compliance will be determined 
in practice.''
    \44\ On July 6, 2011, EPA sent an email to the State with 
detailed comments (that are summarized above) on the State's 
monitoring, recordkeeping, and reporting requirements in Chapter 
6.4, Section V of the SIP. The July 6, 2011 email from Laurel 
Dygowski, EPA Region 8, to Tina Anderson, State of Wyoming, is 
included in the Supporting and Related Materials section of the 
docket.
---------------------------------------------------------------------------

    EPA is proposing to disapprove the State's monitoring, 
recordkeeping, and reporting requirements in Chapter 6.4 of the SIP. 
EPA is proposing regulatory language as part of our FIP that specifies 
monitoring, recordkeeping, and reporting requirements for all BART and 
reasonable progress sources. For purposes of consistency, EPA is 
proposing to adopt language that is the same we have adopted for other 
states in Region 8.

E. Federal Implementation Plan for the Long-Term Strategy

    We are proposing regulatory language as part of our FIP that 
specifies NOX emission limits and compliance schedules for 
the following sources: PacifiCorp Dave Johnston Units 1-3, PacifiCorp 
Jim Bridger Units 1 and 2, PacifiCorp Wyodak Unit 1, and Basin Electric 
Laramie River Units 1, 2, and 3. We are also proposing monitoring, 
recordkeeping, and reporting requirements for all BART SIP and FIP 
sources and for Dave Johnston Units 1 and 2. We are proposing this 
regulatory language to fill the gap in the LTS that would be left by 
our proposed partial disapproval of the LTS.

F. Federal Implementation Plan for Coordination of RAVI and Regional 
Haze Long-Term Strategy

    In response to EPA's RAVI rules, Wyoming adopted WAQSR Chapter 9, 
Section 2. EPA approved WAQSR Chapter 9, Section 2 as part of the SIP 
on July 28, 2004 (69 FR 44965). As discussed above, the State is 
required to coordinate the review of its RAVI and regional haze LTS and 
conduct the reviews together. WAQSR Chapter 9, Section 2(f) requires 
the State to review its RAVI LTS every three years, which does not 
coordinate with the five-year review for the State's regional haze LTS.

[[Page 33058]]

Thus, we are proposing to disapprove the State's SIP because it does 
not meet the requirements of 40 CFR 51.306(c). We are proposing a FIP 
in which EPA commits to coordinating the State's RAVI LTS review with 
the regional haze LTS review. Thus, EPA is committing to provide a 
review of the State's RAVI LTS every five years in coordination with 
the State's regional haze LTS review. EPA is proposing that our review 
of the State's RAVI LTS will follow those items as indicated by 40 CFR 
51.306(c).

VIII. EPA's Proposed Action

    EPA is proposing to partially approve and partially disapprove a 
regional haze SIP revision submitted by the State of Wyoming on January 
12, 2011. Specifically, we are proposing to disapprove the following:
     The State's NOX BART determinations for 
PacifiCorp Dave Johnston Unit 3, PacifiCorp Jim Bridger Units 1 and 2, 
PacifiCorp Wyodak Unit 1, and Basin Electric Laramie River Units 1, 2, 
and, 3.
     The State's NOX reasonable progress 
determination for PacifiCorp Dave Johnston Units 1 and 2.
     Wyoming's Reasonable Progress Goals (RPGs)
     The State's monitoring and recordkeeping requirements in 
Chapter 6.4 of the SIP.
     Portions of the State's long-term strategy (LTS) that rely 
on or reflect other aspects of the regional haze SIP we are proposing 
to disapprove.
     The State's SIP because it does not contain the necessary 
provisions to meet the requirements for the coordination of the review 
of the reasonably attributable visibility impairment (RAVI) and the 
regional haze long-term strategy (LTS).
    We are proposing to approve the remaining aspects of the State's 
January 12, 2011, SIP submittal. We are also seeking comment on two 
alternative proposals related to the State's NOX BART 
determination for PacifiCorp Jim Bridger Units 1 and 2.
    We are proposing the promulgation of a FIP to address the 
deficiencies in the Wyoming regional haze SIP that we have identified 
in this proposal. The proposed FIP includes the following elements:
     NOX BART determinations and limits for 
PacifiCorp Dave Johnston Unit 3, PacifiCorp Jim Bridger Units 1 and 2, 
PacifiCorp Wyodak Unit 1, and Basin Electric Laramie River Units 1, 2, 
and 3.
     NOX reasonable progress determination and 
limits for PacifiCorp Dave Johnston Units 1 and 2.
     RPGs consistent with the SIP limits proposed for approval 
and the proposed FIP limits.
     Monitoring, record-keeping, and reporting requirements 
applicable to all BART and reasonable progress sources for which there 
is a SIP or FIP emissions limit.
     LTS elements pertaining to emission limits and compliance 
schedules for the proposed BART and reasonable progress FIP limits.
     Provisions to ensure the coordination of the RAVI and 
regional haze LTS.

IX. Statutory and Executive Order Reviews

A. Executive Order 12866: Regulatory Planning and Review and Executive 
Order 13563: Improving Regulation and Regulatory Review

    This action is not a ``significant regulatory action'' under the 
terms of Executive Order 12866 (58 FR 51735, October 4, 1993) and is 
therefore not subject to review under Executive Orders 12866 and 13563 
(76 FR 3821, January 21, 2011). As discussed in section C below, the 
proposed FIP applies to only four facilities. It is therefore not a 
rule of general applicability.

B. Paperwork Reduction Act

    This action does not impose an information collection burden under 
the provisions of the Paperwork Reduction Act, 44 U.S.C. 3501 et seq. 
Burden is defined at 5 CFR 1320.3(b). Because the proposed FIP applies 
to just four facilities, the Paperwork Reduction Act does not apply. 
See 5 CFR 1320(c).

C. Regulatory Flexibility Act

    The Regulatory Flexibility Act (RFA) generally requires an agency 
to prepare a regulatory flexibility analysis of any rule subject to 
notice and comment rulemaking requirements under the Administrative 
Procedure Act or any other statute unless the agency certifies that the 
rule will not have a significant economic impact on a substantial 
number of small entities. Small entities include small businesses, 
small organizations, and small governmental jurisdictions.
    For purposes of assessing the impacts of today's proposed rule on 
small entities, small entity is defined as: (1) A small business as 
defined by the Small Business Administration's (SBA) regulations at 13 
CFR 121.201; (2) a small governmental jurisdiction that is a government 
of a city, county, town, school district or special district with a 
population of less than 50,000; and (3) a small organization that is 
any not-for-profit enterprise which is independently owned and operated 
and is not dominant in its field.
    After considering the economic impacts of today's proposed rule on 
small entities, I certify that this action will not have a significant 
economic impact on a substantial number of small entities. The Regional 
Haze FIP that EPA is proposing for purposes of the regional haze 
program consists of imposing federal controls to meet the BART 
requirement for NOX emissions on specific units at four 
sources in Wyoming, and imposing controls to meet the reasonable 
progress requirement for NOX emissions at one additional 
source in Wyoming. The net result of this FIP action is that EPA is 
proposing direct emission controls on selected units at only four 
sources. The sources in question are each large electric generating 
plants that are not owned by small entities, and therefore are not 
small entities. The proposed partial approval of the SIP, if finalized, 
merely approves state law as meeting Federal requirements and imposes 
no additional requirements beyond those imposed by state law. See Mid-
Tex Electric Cooperative, Inc. v. FERC, 773 F.2d 327 (D.C. Cir. 1985).
    We continue to be interested in the potential impacts of the 
proposed rule on small entities and welcome comments on issues related 
to such impacts.

D. Unfunded Mandates Reform Act (UMRA)

    Title II of the Unfunded Mandates Reform Act of 1995 (UMRA), Public 
Law 104-4, establishes requirements for federal agencies to assess the 
effects of their regulatory actions on State, local, and Tribal 
governments and the private sector. Under section 202 of UMRA, EPA 
generally must prepare a written statement, including a cost-benefit 
analysis, for proposed and final rules with ``Federal mandates'' that 
may result in expenditures to State, local, and Tribal governments, in 
the aggregate, or to the private sector, of $100 million or more 
(adjusted for inflation) in any one year. Before promulgating an EPA 
rule for which a written statement is needed, section 205 of UMRA 
generally requires EPA to identify and consider a reasonable number of 
regulatory alternatives and adopt the least costly, most cost-
effective, or least burdensome alternative that achieves the objectives 
of the rule. The provisions of section 205 of UMRA do not apply when 
they are inconsistent with applicable law. Moreover, section 205 of 
UMRA allows

[[Page 33059]]

EPA to adopt an alternative other than the least costly, most cost-
effective, or least burdensome alternative if the Administrator 
publishes with the final rule an explanation why that alternative was 
not adopted. Before EPA establishes any regulatory requirements that 
may significantly or uniquely affect small governments, including 
Tribal governments, it must have developed under section 203 of UMRA a 
small government agency plan. The plan must provide for notifying 
potentially affected small governments, enabling officials of affected 
small governments to have meaningful and timely input in the 
development of EPA regulatory proposals with significant federal 
intergovernmental mandates, and informing, educating, and advising 
small governments on compliance with the regulatory requirements.
    Under Title II of UMRA, EPA has determined that this proposed rule 
does not contain a federal mandate that may result in expenditures that 
exceed the inflation-adjusted UMRA threshold of $100 million by State, 
local, or Tribal governments or the private sector in any one year. In 
addition, this proposed rule does not contain a significant federal 
intergovernmental mandate as described by section 203 of UMRA nor does 
it contain any regulatory requirements that might significantly or 
uniquely affect small governments.

E. Executive Order 13132: Federalism

    Federalism (64 FR 43255, August 10, 1999) revokes and replaces 
Executive Orders 12612 (Federalism) and 12875 (Enhancing the 
Intergovernmental Partnership). Executive Order 13132 requires EPA to 
develop an accountable process to ensure ``meaningful and timely input 
by State and local officials in the development of regulatory policies 
that have federalism implications.'' ``Policies that have federalism 
implications'' is defined in the Executive Order to include regulations 
that have ``substantial direct effects on the States, on the 
relationship between the national government and the States, or on the 
distribution of power and responsibilities among the various levels of 
government.'' Under Executive Order 13132, EPA may not issue a 
regulation that has federalism implications, that imposes substantial 
direct compliance costs, and that is not required by statute, unless 
the federal government provides the funds necessary to pay the direct 
compliance costs incurred by state and local governments, or EPA 
consults with state and local officials early in the process of 
developing the proposed regulation. EPA also may not issue a regulation 
that has federalism implications and that preempts state law unless the 
Agency consults with state and local officials early in the process of 
developing the proposed regulation.
    This rule will not have substantial direct effects on the states, 
on the relationship between the national government and the states, or 
on the distribution of power and responsibilities among the various 
levels of government, as specified in Executive Order 13132, because it 
merely addresses the State not fully meeting its obligation to prohibit 
emissions from interfering with other states measures to protect 
visibility established in the CAA. Thus, Executive Order 13132 does not 
apply to this action. In the spirit of Executive Order 13132, and 
consistent with EPA policy to promote communications between EPA and 
state and local governments, EPA specifically solicits comment on this 
proposed rule from state and local officials.

F. Executive Order 13175: Consultation and Coordination With Indian 
Tribal Governments

    Executive Order 13175, entitled Consultation and Coordination With 
Indian Tribal Governments (65 FR 67249, November 9, 2000), requires EPA 
to develop an accountable process to ensure ``meaningful and timely 
input by tribal officials in the development of regulatory policies 
that have tribal implications.'' This proposed rule does not have 
tribal implications, as specified in Executive Order 13175. It will not 
have substantial direct effects on tribal governments. Thus, Executive 
Order 13175 does not apply to this rule.

G. Executive Order 13045: Protection of Children From Environmental 
Health Risks and Safety Risks

    EPA interprets EO 13045 (62 FR 19885, April 23, 1997) as applying 
only to those regulatory actions that concern health or safety risks, 
such that the analysis required under section 5-501 of the EO has the 
potential to influence the regulation. This action is not subject to EO 
13045 because it implements specific standards established by Congress 
in statutes. However, to the extent this proposed rule will limit 
emissions of NOx, SO2, and PM, the rule will have 
a beneficial effect on children's health by reducing air pollution.

H. Executive Order 13211: Actions Concerning Regulations That 
Significantly Affect Energy Supply, Distribution, or Use

    This action is not subject to Executive Order 13211 (66 FR 28355 
(May 22, 2001)), because it is not a significant regulatory action 
under Executive Order 12866.

I. National Technology Transfer and Advancement Act

    Section 12(d) of the National Technology Transfer and Advancement 
Act of 1995 (``NTTAA''), Public Law No. 104-113, 12(d) (15 U.S.C. 272 
note) directs EPA to use voluntary consensus standards in its 
regulatory activities unless to do so would be inconsistent with 
applicable law or otherwise impractical. Voluntary consensus standards 
are technical standards (e.g., materials specifications, test methods, 
sampling procedures, and business practices) that are developed or 
adopted by voluntary consensus standards bodies. NTTAA directs EPA to 
provide Congress, through OMB, explanations when the Agency decides not 
to use available and applicable voluntary consensus standards.
    This proposed rulemaking does not involve technical standards. 
Therefore, EPA is not considering the use of any voluntary consensus 
standards.

J. Executive Order 12898: Federal Actions To Address Environmental 
Justice in Minority Populations and Low-Income Populations

    Executive Order 12898 (59 FR 7629, February 16, 1994), establishes 
federal executive policy on environmental justice. Its main provision 
directs federal agencies, to the greatest extent practicable and 
permitted by law, to make environmental justice part of their mission 
by identifying and addressing, as appropriate, disproportionately high 
and adverse human health or environmental effects of their programs, 
policies, and activities on minority populations and low-income 
populations in the United States.
    We have determined that this proposed action, if finalized, will 
not have disproportionately high and adverse human health or 
environmental effects on minority or low-income populations because it 
increases the level of environmental protection for all affected 
populations without having any disproportionately high and adverse 
human health or environmental effects on any population, including any 
minority or low-income population. This proposed rule limits emissions 
of NOX from four facilities in Wyoming.

[[Page 33060]]

The partial approval of the SIP, if finalized, merely approves state 
law as meeting Federal requirements and imposes no additional 
requirements beyond those imposed by state law.

K. Congressional Review Act

    The Congressional Review Act, 5 U.S.C. 801 et seq., as added by the 
Small Business Regulatory Enforcement Fairness Act of 1996, does not 
apply because this action is not a ``major rule'' as defined by 5 
U.S.C. 804(2).

List of Subjects in 40 CFR Part 52

    Environmental protection, Air pollution control, Intergovernmental 
relations, Nitrogen dioxide, Particulate matter, Reporting and 
recordkeeping requirements, Sulfur oxides, Volatile organic compounds.

    Dated: May 15, 2012.
James B. Martin,
Regional Administrator, Region 8.

    40 CFR part 52 is proposed to be amended as follows:

PART 52--[AMENDED]

    1. The authority citation for part 52 continues to read as follows:

    Authority:  42 U.S.C. 7401 et seq.

Subpart ZZ--Wyoming

    2. Add section 52.2636 to read as follows:


Sec.  52.2636  Federal implementation plan for regional haze.

    (a) Applicability. This section applies to each owner and operator 
of the following emissions units in the State of Wyoming for which EPA 
proposes to approve the State's BART determination:
    FMC Westvaco Trona Plant Units NS-1A and NS-1B (PM and 
NOX);
    TATA Chemicals Partners (previously General Chemical) Boilers C and 
D (PM and NOX);
    Basin Electric Power Cooperative Laramie River Station Units 1, 2, 
and 3 (PM);
    Pacificorp Dave Johnston Power Plant Unit 3 (PM);
    Pacificorp Dave Johnston Power Plant Unit 4 (PM and 
NOX);
    Pacificorp Jim Bridger Power Plant Units 1 and 2 (PM);
    Pacificorp Jim Bridger Power Plant Units 3 and 4 (PM and 
NOX);
    Pacificorp Naughton Power Plant Units 1, 2, and 3 (PM and 
NOX); and
    Pacificorp Wyodak Power Plant Unit 1 (PM).
    This section also applies to each owner and operator of the 
following emissions units in the State of Wyoming for which EPA 
proposes to disapprove the State's BART determination and issue a 
NOX BART Federal Implementation Plan:
    Basin Electric Power Cooperative Laramie River Station Units 1, 2, 
and 3;
    Pacificorp Dave Johnston Power Plant Unit 3;
    Pacificorp Jim Bridger Power Plant Units 1 and 2; and
    Pacificorp Wyodak Power Plant Unit 1.
    This section also applies to each owner and operator of the 
following emissions units in the State of Wyoming for which EPA 
proposes to disapprove the State's reasonable progress determinations 
and issue a reasonable progress determination NOX Federal 
Implementation Plan: Pacificorp Dave Johnston Power Plant Units 1 and 
2.
    (b) Definitions. Terms not defined below shall have the meaning 
given them in the Clean Air Act or EPA's regulations implementing the 
Clean Air Act. For purposes of this section:
    (1) BART means Best Available Retrofit Technology.
    (2) BART unit means any unit subject to a Regional Haze emission 
limit in Table 1 and Table 2 of this section.
    (3) CAM means Compliance Assurance Monitoring as required by 40 CFR 
part 64.
    (4) Continuous emission monitoring system or CEMS means the 
equipment required by this section to sample, analyze, measure, and 
provide, by means of readings recorded at least once every 15 minutes 
(using an automated data acquisition and handling system (DAHS)), a 
permanent record of NOX emissions, diluent, or stack gas 
volumetric flow rate.
    (5) FIP means Federal Implementation Plan.
    (6) Lb/hr means pounds per hour.
    (7) Lb/MMBtu means pounds per million British thermal units of heat 
input to the fuel-burning unit.
    (8) NOX means nitrogen oxides.
    (9) Operating day means a 24-hour period between 12 midnight and 
the following midnight during which any fuel is combusted at any time 
in the BART or RP unit. It is not necessary for fuel to be combusted 
for the entire 24-hour period.
    (10) The owner/operator means any person who owns or who operates, 
controls, or supervises a unit identified in paragraph (a) of this 
section.
    (11) PM means filterable total particulate matter.
    (12) RP unit means any Reasonable Progress unit subject to a 
Regional Haze emission limit in Table 3 of this section.
    (13) Unit means any of the units identified in paragraph (a) of 
this section.
    (c) Emissions limitations.
    (1) The owners/operators of emissions units subject to this section 
shall not emit, or cause to be emitted, PM or NOX in excess 
of the following limitations:

    Table 1--Emission Limits for BART Units for Which EPA Proposes to Approve the State's BART Determination
----------------------------------------------------------------------------------------------------------------
                                          PM Emission Limits                      NOX Emission Limits
     Source Name/BART Unit     ---------------------------------------------------------------------------------
                                 lb/MMBtu     lb/hr    Tons per year     lb/MMBtu      lb/hr      Tons per year
----------------------------------------------------------------------------------------------------------------
FMC Westvaco Trona Plant/Unit        0.05       45              197           0.35          284           1244
 NS-1A........................
FMC Westvaco Trona Plant/Unit        0.05       45              197           0.35          284           1244
 NS-1B........................
TATA Chemicals Partners              0.09       50              219           0.28        149.5            654.9
 (General Chemical) Green
 River Trona Plant/Boiler C...
TATA Chemicals Partners              0.09       80              350.4         0.28        246.4          1,079.2
 (General Chemical) Green
 River Trona Plant/Boiler D...
Basin Electric Power                 0.03      193              844            N/A          N/A            N/A
 Cooperative Laramie River
 Station/Unit 1...............
Basin Electric Power                 0.03      193              844            N/A          N/A            N/A
 Cooperative Laramie River
 Station/Unit 2...............
Basin Electric Power                 0.03      198              867            N/A          N/A            N/A
 Cooperative Laramie River
 Station/Unit 3...............
Pacificorp Dave Johnston Power       0.015      42.1            184            N/A          N/A            N/A
 Plant/Unit 3.................
Pacificorp Dave Johnston Power       0.015      61.5            269           0.15          615          2,694
 Plant/Unit 4.................

[[Page 33061]]

 
Pacificorp Jim Bridger Power         0.03      180              788            N/A          N/A            N/A
 Plant/Unit 1.................
Pacificorp Jim Bridger Power         0.03      180              788            N/A          N/A            N/A
 Plant/Unit 2.................
Pacificorp Jim Bridger Power         0.03      180              788           0.07          N/A            N/A
 Plant/Unit 3.................
Pacificorp Jim Bridger Power         0.03      180              788           0.07          N/A            N/A
 Plant/Unit 4.................
Pacificorp Naughton Power            0.04       74              324           0.26          481          2,107
 Plant/Unit 1.................
Pacificorp Naughton Power            0.04       96              421           0.26          624          2,733
 Plant/Unit 2.................
Pacificorp Naughton Power            0.015      56              243           0.07          259          1,134
 Plant/Unit 3.................
Pacificorp Wyodak Power Plant/       0.015      71              308.8          N/A          N/A            N/A
 Unit 1.......................
----------------------------------------------------------------------------------------------------------------


    Table 2--Emission Limits for BART Units for Which EPA Proposes To
      Disapprove the State's BART Determination and Implement a FIP
------------------------------------------------------------------------
                                                           NOX Emission
                  Source Name/BART Unit                     Limit  (lb/
                                                              MMBtu)
------------------------------------------------------------------------
Basin Electric Power Cooperative Laramie River Station/             0.12
 Unit 1.................................................
Basin Electric Power Cooperative Laramie River Station/             0.12
 Unit 2.................................................
Basin Electric Power Cooperative Laramie River Station/             0.12
 Unit 3.................................................
Pacificorp Dave Johnston Power Plant/Unit 3.............            0.19
Pacificorp Jim Bridger Power Plant/Unit 1...............            0.07
Pacificorp Jim Bridger Power Plant/Unit 2...............            0.07
Pacificorp Wyodak Power Plant/Unit 1....................            0.18
------------------------------------------------------------------------


     Table 3--Emission Limits for RP Units for Which EPA Proposes To
       Disapprove the State's RP Determination and Implement a FIP
------------------------------------------------------------------------
                                                           NOX Emission
                   Source Name/RP Unit                      Limit  (lb/
                                                              MMBtu)
------------------------------------------------------------------------
Pacificorp Dave Johnston Power Plant/Unit 1.............            0.20
Pacificorp Dave Johnston Power Plant/Unit 2.............            0.20
------------------------------------------------------------------------

     (2) These emission limitations shall apply at all times, including 
startups, shutdowns, emergencies, and malfunctions.
    (d) Compliance date. The owners and operators of the BART and RP 
sources subject to this section shall comply with the emissions 
limitations and other requirements of this section within five years of 
the effective date of this rule
    (e) Compliance determinations for NOX.
    (1) For all BART and RP units other than Trona Plant units:
    (i) CEMS. At all times after the compliance date specified in 
paragraph (d) of this section, the owner/operator of each unit shall 
maintain, calibrate, and operate a CEMS, in full compliance with the 
requirements found at 40 CFR part 75, to accurately measure 
NOX, diluent, and stack gas volumetric flow rate from each 
unit. The CEMS shall be used to determine compliance with the emission 
limitations in paragraph (c) of this section for each unit.
    (ii) Method.
    (a) For any hour in which fuel is combusted in a unit, the owner/
operator of each unit shall calculate the hourly average NOX 
concentration in lb/MMBtu and lb/hr at the CEMS in accordance with the 
requirements of 40 CFR part 75. At the end of each operating day, the 
owner/operator shall calculate and record a new 30-day rolling average 
emission rate in lb/MMBtu and lb/hr from the arithmetic average of all 
valid hourly emission rates from the CEMS for the current operating day 
and the previous 29 successive operating days.
    (b) An hourly average NOX emission rate in lb/MMBtu or 
lb/hr is valid only if the minimum number of data points, as specified 
in 40 CFR part 75, is acquired by both the pollutant concentration 
monitor (NOX) and the diluent monitor (O2 or 
CO2).
    (c) Compliance with tons-per-year emission limits shall be 
calculated on a rolling 12-month basis. At the end of each calendar 
month, the owner/operator shall calculate and record a new 12-month 
rolling average emission rate from the arithmetic average of all valid 
hourly emission rates from the CEMS for the current month and the 
previous 11 months and the report the result in tons.
    (d) Data reported to meet the requirements of this section shall 
not include data substituted using the missing data substitution 
procedures of subpart D of 40 CFR part 75, nor shall the data have been 
bias adjusted according to the procedures of 40 CFR part 75.
    (2) For all Trona Plant BART units:
    (i) CEMS. At all times after the compliance date specified in 
paragraph (d) of this section, the owner/operator of each unit shall 
maintain, calibrate, and operate a CEMS, in full compliance with the 
requirements found at 40 CFR part 60, to accurately measure 
NOX, diluent, and stack gas volumetric flow rate from each 
unit, including the CEMS quality assurance requirements in appendix F 
of 40 CFR part 60. The CEMS shall be used to determine compliance with 
the emission limitations in paragraph (c) of this section for each 
unit.
    (ii) Method.
    (a) For any hour in which fuel is combusted in a unit, the owner/
operator of each unit shall calculate the hourly average NOX 
concentration in lb/MMBtu and lb/hr at the CEMS in accordance with the 
requirements of 40 CFR part 60. At the end of each operating day, the 
owner/operator shall calculate and record a new 30-day rolling average 
emission rate in lb/MMBtu and lb/hr from the arithmetic average of all 
valid hourly emission rates from the CEMS for the current operating day 
and the previous 29 successive operating days.
    (b) An hourly average NOX emission rate in lb/MMBtu or 
lb/hr is valid only if the minimum number of data points, as specified 
in 40 CFR part 60, is acquired by both the pollutant concentration 
monitor (NOX) and the diluent monitor (O2 or 
CO2).
    (c) Compliance with tons-per-year emission limits shall be 
calculated on a rolling 12-month basis. At the end of each calendar 
month, the owner/operator shall calculate and record a new 12-month 
rolling average emission rate from the arithmetic average of all valid 
hourly emission rates from the CEMS for the current month and the 
previous 11 months and report results in tons.
    (f) Compliance determinations for particulate matter.

[[Page 33062]]

    Compliance with the particulate matter emission limit for each BART 
and RP unit shall be determined from annual performance stack tests. 
Within 60 days of the compliance deadline specified in section (d), and 
on at least an annual basis thereafter, the owner/operator of each unit 
shall conduct a stack test on each unit to measure particulate 
emissions using EPA Method 5, 5B, 5D, or 17, as appropriate, in 40 CFR 
part 60, Appendix A. A test shall consist of three runs, with each run 
at least 120 minutes in duration and each run collecting a minimum 
sample of 60 dry standard cubic feet. Results shall be reported in lb/
MMBtu and lb/hr. In addition to annual stack tests, the owner/operator 
shall monitor particulate emissions for compliance with the BART 
emission limits in accordance with the applicable Compliance Assurance 
Monitoring (CAM) plan developed and approved by the State in accordance 
with 40 CFR part 64.
    (g) Recordkeeping. The owner/operator shall maintain the following 
records for at least five years:
    (1) All CEMS data, including the date, place, and time of sampling 
or measurement; parameters sampled or measured; and results.
    (2) Records of quality assurance and quality control activities for 
emissions measuring systems including, but not limited to, any records 
required by 40 CFR part 75. Or, for Trona Plant units, records of 
quality assurance and quality control activities for emissions 
measuring systems including, but not limited to appendix F of 40 CFR 
part 60.
    (3) Records of all major maintenance activities conducted on 
emission units, air pollution control equipment, and CEMS.
    (4) Any other CEMS records required by 40 CFR part 75. Or, for 
Trona Plant units, any other CEMs records required by 40 CFR part 60.
    (5) Records of all particulate stack test results.
    (6) All data collected pursuant to the CAM plan.
    (h) Reporting. All reports under this section shall be submitted to 
the Director, Office of Enforcement, Compliance and Environmental 
Justice, U.S. Environmental Protection Agency, Region 8, Mail Code 
8ENF-AT, 1595 Wynkoop Street, Denver, Colorado 80202-1129.
    (1) The owner/operator of each unit shall submit quarterly excess 
emissions reports for NOX BART and RP units no later than 
the 30th day following the end of each calendar quarter. Excess 
emissions means emissions that exceed the emissions limits specified in 
paragraph (c) of this section. The reports shall include the magnitude, 
date(s), and duration of each period of excess emissions, specific 
identification of each period of excess emissions that occurs during 
startups, shutdowns, and malfunctions of the unit, the nature and cause 
of any malfunction (if known), and the corrective action taken or 
preventative measures adopted. The owner/operator shall also submit 
reports of any exceedances of tons-per-year emission limits.
    (2) The owner/operator of each unit shall submit quarterly CEMS 
performance reports, to include dates and duration of each period 
during which the CEMS was inoperative (except for zero and span 
adjustments and calibration checks), reason(s) why the CEMS was 
inoperative and steps taken to prevent recurrence, and any CEMS repairs 
or adjustments. The owner/operator of each unit shall also submit 
results of any CEMS performance tests required by 40 CFR part 75. Or, 
for Trona Plant units, the owner/operator of each unit shall also 
submit results of any CEMs performance test required appendix F of 40 
CFR part 60 (Relative Accuracy Test Audits, Relative Accuracy Audits, 
and Cylinder Gas Audits).
    (3) When no excess emissions have occurred or the CEMS has not been 
inoperative, repaired, or adjusted during the reporting period, such 
information shall be stated in the quarterly reports required by 
sections (h)(1) and (2) above.
    (4) The owner/operator of each unit shall submit results of any 
particulate matter stack tests conducted for demonstrating compliance 
with the particulate matter BART limits in section (c) above, within 60 
calendar days after completion of the test.
    (5) The owner/operator of each unit shall submit semi-annual 
reports of any excursions under the approved CAM plan in accordance 
with the schedule specified in the source's title V permit.
    (i) Notifications.
    (1) The owner/operator shall submit notification of commencement of 
construction of any equipment which is being constructed to comply with 
the NOX emission limits in paragraph (c) of this section.
    (2) The owner/operator shall submit semi-annual progress reports on 
construction of any such equipment.
    (3) The owner/operator shall submit notification of initial startup 
of any such equipment.
    (j) Equipment operation. At all times, the owner/operator shall 
maintain each unit, including associated air pollution control 
equipment, in a manner consistent with good air pollution control 
practices for minimizing emissions.
    (k) Credible Evidence. Nothing in this section shall preclude the 
use, including the exclusive use, of any credible evidence or 
information, relevant to whether a source would have been in compliance 
with requirements of this section if the appropriate performance or 
compliance test procedures or method had been performed.
    3. Add section 52.2637 to read as follows:


Sec.  52.2637  Federal implementation plan for reasonable attributable 
visibility impairment long-term strategy.

    As required by 40 CFR 41.306(c), EPA will ensure that the review of 
the State's reasonably attributable visibility impairment long-term 
strategy is coordinated with the regional haze long-term strategy under 
40 CFR 51.308(g). EPA's review will be in accordance with the 
requirements of 40 CFR 51.306(c).

[FR Doc. 2012-12923 Filed 6-1-12; 8:45 am]